Overview
• Historical view
• Future challenges– Acquisition professionals opportunities
– CAPE’s role and responsibilities
• Challenges for us all
2
UNCLASSIFIED
UNCLASSIFIED
O S D C A P E
DoD Historical Data
3
1962
1965
1968
1971
1974
1977
1980
1983
1986
1989
1992
1995
1998
2001
2004
2007
2010
2013
2016
0
100
200
300
400
500
600
700
800
0
1,000
2,000
3,000
4,000
5,000
6,000
7,000
FY11
$B
Endstrength (K)
-37%
-31%
-18%
-59%
-35%
-33%
-14%
-64%
• Recent drawdowns each saw topline reductions ~30%• Acquisition cut disproportionately in both
Topline O&M Procurement Endstrength
post-Vietnam1967-1975
post-Cold War1985-1998
UNCLASSIFIED
UNCLASSIFIED
O S D C A P E
Post-Vietnam• “Hollow force”
– Readiness measures bottomed out in late 1970s
– Reduced public support, adjustment to all volunteer force, and resulting lower recruit quality were contributing factors
• Some attempt to modernize rather than fully fund training, maintenance, and spares to pace the Soviet threat
Post-Cold War
• Problems with readiness occurred in mid-90s
• Major capital equipment procured below steady state replacement rates– Took advantage of Reagan
build-up
• Significant consolidation in the industrial base
4
Consequences of Previous Drawdowns
UNCLASSIFIED
UNCLASSIFIED
O S D C A P E
Where we are today
• Systems need replacing
• Spectrum of threats– Large, conventional nation/state actors– Smaller but very dangerous terrorist cells.
• Historic deficits
• We’re still at war……….
5
UNCLASSIFIED
UNCLASSIFIED
O S D C A P E
The Secretary is determined
• NOT to recreate the readiness problems that characterized previous downsizing
• To make sure the Department is healthy enough to protect against and deter the continuum of very real threats that we currently face
• To find efficiency savings to reduce Department overhead costs– Protect force structure and procurement
6
UNCLASSIFIED
UNCLASSIFIED
O S D C A P E
Our challenges
• What’s good enough?
• What should we give up? When?
• How do we invest in S&T?
• How do we get better prices?
• How do we incentivize our workforce to participate in a Culture of Savings?
7
UNCLASSIFIED
UNCLASSIFIED
O S D C A P E
What’s good enough?
• Risk– Requirements risk– Technology risk– Cost risk
• New initiatives to inform the risk debates– Front End Assessments
• Example: Long Range Strike Family of Systems– Considered the entire portfolio of conventional deep-strike capabilities
– Focused on proven technologies to ensure that we deliver on time and on budget
– WSARA• ICE/AOA at Milestone A
8
UNCLASSIFIED
UNCLASSIFIED
O S D C A P E
What should we give up?
• Recent SECDEF decisions:– Truncate F-22 – Truncate C-17– Terminate Future Combat System– Terminate the Expeditionary Fighting Vehicle– JSF “extra engine” a veto issue– JSF STOVL on “probation”
• How do we incentivize the community to identify these opportunities? How do we learn to ignore sunk costs?
• CAPE’s role: – Provide an assessment of the complete range of options – Distinguish critically important capability from exquisite capability
9
UNCLASSIFIED
UNCLASSIFIED
O S D C A P E
How do we invest in S&T?• Science and Technology investment is a SECDEF and
Administration priority
• Big payoffs—the “game changers”—come from these investments.
• We need “game changers” in– Technological advancement
• Cyber– Savings
• Energy
• How do we know where to invest? How do we protect our design workforce?– One of this year’s Front End Assessments
10
PMs play a lead role in identifying S&T “game changers”
UNCLASSIFIED
UNCLASSIFIED
O S D C A P E
How do we get better prices?
• Teamwork key to successful programs:– Program managers; Acquisition executives; Industry; CAPE– Enables understanding of challenges, incentives, constraints– Critical to successfully working through difficult periods– Understanding leads to win-win solutions and better value for the Govt
• Example: Successful Development Program– Realistic cost estimate baselined at MS B– Realistic development schedule baselined at MS B– Experienced management team, continuity in key positions– Limited SDD phase capabilities to proven technologies
• CAPE analysis can enable strong programs and procurement savings
11
UNCLASSIFIED
UNCLASSIFIED
O S D C A P E
Growth in PAUC Over 7-Year SDD Phase
12
$225.6
2.7 4.8
150
175
200
225
250
275
300
Original PAUC (MS B 2004) CAPE estimate (MS C 2010)
Unit
Cost
(FY
04 $
M)
MILCON (underestimatedhangar requirements)
SDD Cost Growth(late test A/C build)
Quantity change (7 additional A/C)
Critical Breach
Significant Breach
$233.1$230.4
Critical Breach
Significant Breach
$233.1$230.4
(4.8)
UNCLASSIFIED
UNCLASSIFIED
O S D C A P E
Growth in PAUC for Critical N-M Breach
13
50
60
70
80
90
100
110
120
Uni
t Cos
t (BY
$M
)
PAUC
Spares
Support, Non-recurring and MILCONAcquisition Strategy/Fee ArrangementWeight Growth
Contractor Labor Rates and OverheadQuantity Reduction and Profile ExtensionSDD Cost Growth
Original PAUC (MS B)
Critical Breach
Significant Breach
UNCLASSIFIED
UNCLASSIFIED
O S D C A P E
Multi-year Procurement Certifications
• CAPE is required in statute to assess savings from use of multi-year contracting strategy.
– Two programs evaluated to date: F/A-18 E/F and H-60– CAPE compares multi-year vs. annual strategies to assess savings– Certifications sent to Congress
• Multi-year contracting strategies can reduce costs by enabling more efficient use of contractor resources including:
– improved economic order quantities;– potential buyouts of parts and materials;– concurrent Foreign Military Sales;– acceleration of production; and– enhanced manufacturing flow.
• Assessments of savings are difficult: program historical costs typically reflect a single contracting strategy
CAPE Identified Opportunities for Savings in Both Cases 14
UNCLASSIFIED
UNCLASSIFIED
O S D C A P E
Changing the Culture
• Program manager incentives– How do we best incentivize program ownership?
• What are the current disincentives?– What are the disincentives to raising concerns about a program?
• What would it take to incentivize this behavior?
• What tools do you need for effective program management?– Better cost visibility?– Better understanding of how different people assess risk and rewards?– More ability to question assumptions? – Ability to protect against requirements growth?– Other??
15
You have the critical role in achieving acquisition success.
UNCLASSIFIED
UNCLASSIFIED
O S D C A P E
Summary
• We are entering a period of tough budget pressures
• At the same time– We are still at war– We face a complex spectrum of threats– We need to recapitalize our force
16
You are on the front lines of the procurement challenges and opportunities.