![Page 1: The 5G Infrastructure Public-Private Partnership](https://reader030.vdocuments.us/reader030/viewer/2022012503/617dbd48a3ec037c606b587e/html5/thumbnails/1.jpg)
The 5G Infrastructure Public-Private Partnership
1
Manuel Lorenzo (Ericsson, 5G EVE TM)
2021-06-18
Practical insights from 5G Test, Measurement and KPI Validation with
vertical applications
![Page 2: The 5G Infrastructure Public-Private Partnership](https://reader030.vdocuments.us/reader030/viewer/2022012503/617dbd48a3ec037c606b587e/html5/thumbnails/2.jpg)
High-level Agenda for the WebinarSession 1
9:00 – 11:00 5G PPP Test Measurement and KPI validation white paper
• Vangelis Kosmatos, Wings ICT• Almudena Diaz, University of Malaga• Ole Grøndalen, Telenor and Ilkka Kansala, Nokia• Marc Molla, EricssonModerates: Manuel Lorenzo, Ericsson
10:30 – 11:00 Methodologies for E2E Testing & Validation of Vertical Applications over 5G & Beyond networks, an ETSI TC INT
Perspective from EC-funded 5G PPP Projects
• Manuel Lorenzo, Ericsson11:00 – 11:15 Short break
Session 2
11:15 – 12:45 5G PPP Vertical KPIs to network KPIs mapping
• Ioannis Markopoulos, Forthnet• Ioanna Mesogiti, Cosmote• Luca Valcarenghi, Scuola Superiore Sant'Anna• Konstantinos Katsaros, ICCS• Anastasius Gavras, EurescomModerates: Anastasius Gavras, Eurescom
12:45 – 13:00 Summary / Conclusions
Michael Dieudonne, Keysight
![Page 3: The 5G Infrastructure Public-Private Partnership](https://reader030.vdocuments.us/reader030/viewer/2022012503/617dbd48a3ec037c606b587e/html5/thumbnails/3.jpg)
Expectations on 5G
![Page 4: The 5G Infrastructure Public-Private Partnership](https://reader030.vdocuments.us/reader030/viewer/2022012503/617dbd48a3ec037c606b587e/html5/thumbnails/4.jpg)
Daily Measurements at 5G-PPP projects
![Page 5: The 5G Infrastructure Public-Private Partnership](https://reader030.vdocuments.us/reader030/viewer/2022012503/617dbd48a3ec037c606b587e/html5/thumbnails/5.jpg)
So, we may wonder …
Is there a gap ?
or
Is there a Path ? Is there a Path ?
![Page 6: The 5G Infrastructure Public-Private Partnership](https://reader030.vdocuments.us/reader030/viewer/2022012503/617dbd48a3ec037c606b587e/html5/thumbnails/6.jpg)
There is a path, … actually many paths
With our deepest respect and appreciation to the genius of MC. Escher
![Page 7: The 5G Infrastructure Public-Private Partnership](https://reader030.vdocuments.us/reader030/viewer/2022012503/617dbd48a3ec037c606b587e/html5/thumbnails/7.jpg)
As many paths as 5G configurations …
![Page 8: The 5G Infrastructure Public-Private Partnership](https://reader030.vdocuments.us/reader030/viewer/2022012503/617dbd48a3ec037c606b587e/html5/thumbnails/8.jpg)
5G-PPP WG TMV comes to our aid
• Gathering measurements _and_ underlying 5G configurations at 5G PPP projects
• Finding out reasons, learnings and recipes behind the performance figures collected
• Analyzing the applicability and portability of results to commercial 5G deployments and vertical services now and in the near future
![Page 9: The 5G Infrastructure Public-Private Partnership](https://reader030.vdocuments.us/reader030/viewer/2022012503/617dbd48a3ec037c606b587e/html5/thumbnails/9.jpg)
Agenda for Session 1
Session 1 5G PPP Test Measurement and KPI validation white paper
Moderator: Manuel Lorenzo, Ericsson
9:00 – 10:30 Introduction
Performance impact factors of 5G experimentation results
Preliminary results of throughput and latency in a 5G NSA mmWave setup
Coverage aspects in 5G experimentation results
Tuning 5G for UL Throughput, RTT Latency and Network Resources
utilization, at the 5G EVE project
Q&A session
Manuel Lorenzo, Ericsson
Vangelis Kosmatos, Wings ICT
Almudena Diaz, University of Malaga
Ole Grøndalen, Telenor and
Ilkka Kansala, Nokia
Isaac Quintana, Ericsson
Marc Molla, Ericsson
10:30 – 11:00 Methodologies for E2E Testing & Validation of Vertical Applications over 5G
& Beyond networks, an ETSI TC INT Perspective from EC-funded 5G PPP
Projects
Manuel Lorenzo, Ericsson
11:00 – 11:15 Short break