Testing, Testing, Testing
Installing Upper Completions
& Subsea Trees
Dan Smith
Subsea Engineer
Tree Systems Team
Perth
9/2014
This presentation contains forward looking statements that are subject to risk factors associated
with oil and gas businesses. It is believed that the expectations reflected in these statements are
reasonable but they may be affected by a variety of variables and changes in underlying
assumptions which could cause actual results or trends to differ materially, including but not
limited to: price fluctuations, actual demand, currency fluctuations, drilling and production
results, reserve estimates, loss of market, industry competition, environmental risks, physical
risks, legislative, fiscal and regulatory developments, economic and financial market conditions
in various countries and regions, political risks, project delay or advancement, approvals and
cost estimates.
All references to dollars, cents or $ in this presentation are to US currency, unless otherwise
stated.
References to “Woodside” may be references to Woodside Petroleum Ltd. or its applicable
subsidiaries.
30 September 2014 Testing, Testing, Testing Installing Upper Completions & Subsea Trees 2
Disclaimer and important notice
30 September 2014 3
Safety Moment
Testing, Testing, Testing Installing Upper Completions & Subsea Trees
Testing, Testing, Testing Installing Upper Completions & Subsea Trees 30 September 2014 4
• EDP Emergency Disconnect Package The wireline version of the Drillers Lower Marine Riser Package (LMRP)
• LRP Lower Riser Package The wireline version of the Drillers Blow Out Preventer (BOP)
• The Christmas Tree
• The Tubing Head
X m?
The Basics
13.3 m
The 7 P’s….
1. Proper
2. Prior
3. Preparation
4. Prevents
5. P…..
6. Poor
7. Performance
30 September 2014 5
Install
A Subsea Engineer
running tools, well control equipment and the ROV gear…
testing
A Take Away Message
Testing, Testing, Testing Installing Upper Completions & Subsea Trees
Testing, Testing, Testing Installing Upper Completions & Subsea Trees
• Objective for a Tree Installation Engineer
• Install a tree on time and on budget…
30 September 2014 6
Start out with the End in Mind
30 September 2014 7
Factory Acceptance Testing
Testing, Testing, Testing Installing Upper Completions & Subsea Trees
30 September 2014 8
Extended Factory Acceptance Testing
Testing, Testing, Testing Installing Upper Completions & Subsea Trees
30 September 2014 9
System Integration Testing
Testing, Testing, Testing Installing Upper Completions & Subsea Trees
30 September 2014 10
Pre-Mobilisation Testing
Testing, Testing, Testing Installing Upper Completions & Subsea Trees
30 September 2014 11
Installation
Testing, Testing, Testing Installing Upper Completions & Subsea Trees
TH
AAV
SSSV
ICV 1
ICV 2
Completion
THD
PMV
PIV
AWV XOV
PWV
EVDT XT
Flow Module
CIV 2
PSV
AMV
ASV
CIV 1
AVV
PIV
UXOV SSR
GSR
BPV
AIV
UAV RV
MIV
CATS DHPT
DHPT 1
DHPT 2
PT
PT
PT
LRP
EDP
Union Nut Riser
SPMV
SPSV
SPWV SPKV
CIV
Methanol Injection
Umbilical Termination
Plate. 16 Lines
EVDT Work
Over Reeler
Stand Pipe
SFT
SSV
Cement Unit
Circulation Reeler
2 x 1” Lines
Annulus Bleed
Off Tank
Variable Choke
Well Test
Fixed Choke
LP Inboard
Cap
Tree Installation Team Valve Status Sheet
GWF – 1
GDA
Date: _________________
Time:_________________
Operation:
______________________
Rev. 3
Circulation Manifold
1A
1B
1C 1E
1D
Mud Shakers
(if Well Test
not available)
Cement / test
Manifold
30 September 2014 13
The Real Test is on the Day
Christmas Tree
= Open
= Closed
= 120m
~ 0 Bar
Testing, Testing, Testing Installing Upper Completions & Subsea Trees
1. Testing.
30 September 2014 14
The Three Take Away Messages
2. Testing..
3.
Testing, Testing, Testing Installing Upper Completions & Subsea Trees
30 September 2014 15
Questions
30 September 2014 16
Testing, Testing, Testing Installing Upper Completions & Subsea Trees