Technology ProjectsApril 1 – June 30, 2012
MEASURE ICITIZEN’S OVERSIGHT
COMMITTEEQUARTERLY MEETING
Technology-Phoenix Project
Progress – IFAS Human Resources/Payroll
Payroll Continuing to add employees and
full time faculty into the IFAS Payroll test runs
Workflows/Reports• Completed the development of
the Position Request workflow
2
Technology-Phoenix Project
Progress – Banner Student System
DegreeWorks Upgraded DegreeWorks
Trained IT Services staff on DegreeWorks
Installed DegreeWorks in production
3
Technology-Phoenix Project
Look ahead to next quarter
IFAS – Human Resources and Payroll
Continue testing IFAS Payroll
Develop training guides for Position Request workflow and plan launch
4
TECHNOLOGY AND INSTRUCTIONAL EQUIPMENT MODERNIZATION
5
Technology and Instructional Equipment
ModernizationTechnology Advisory Committee (TAC) Recommended: 14 projects for close to $430K
– 181 computers for ARC and CE classrooms ($173K)– 8 document cameras for classrooms ($5K)– iSTAN simulation manikin ($78K)– 2 classroom smart podiums ($37K)– Polaris integrated library system ($58.5K)– Wireless lock access control system($57K)
6
7
iSTAN Manikin
Technology and Instructional Equipment
ModernizationLook ahead to next quarter
42 computers for CAD lab Accessibility software & netbooks
for LAP Offset press infrared dryer for
campus graphics
8
VOICE OVER INTERNET PROTOCAL (VOIP) TELEPHONE SYSTEM
9
VOIP Telephone ProjectProgress –
Held 63 meetings to identify the call handling requirements for each area/department
Trained 450 users in 62 classes Cut over 17 buildings to new
phone system
10
VOIP Telephone ProjectLook ahead to next quarter
Cut over remaining buildings to new phone system 7/11: G, K-annex, H, L, N-Annex, R2, S, S2
7/31: A
8/13: B, J, P, Q, R, Z, and PCPA Box Office
Implement remaining services E911, Paging, Speech Recognition, Fax
Server, Call Accounting Reports, Conference Bridge
11
VOIP Telephone Project
• Copper Cable Upgrade• Install new copper wire in exiting
conduit• Install new conduit and copper to
building D• Install new conduit and copper
from L to NE corner of parking lot 8
July 17 – Select contractorDec 2012 – Complete project