Technical Cooperation
Programme Cycle Management Framework
![Page 2: TC Programme Cycle Management Framework (PCMF) Overview](https://reader034.vdocuments.us/reader034/viewer/2022042600/586775a81a28ab68408bb60e/html5/thumbnails/2.jpg)
What is the NLO Role?
• NLO is the National Liaison Officer
• The NLO can view all information on the TC website http://www.iaea.org/technicalcooperation/
• On the PCMF (Programme Cycle Management Framework) website - http://pcmf.iaea.org/ - the NLO performs all upload and clearance work on behalf of the Member State they represent
• The NLO can view pre-2011 implementation data related to the Member State they represent on the old TC-PRIDE website - http://tcpride.iaea.org/
• On the In-Touch website - http://intouch.iaea.org/ - the NLO performs all clearance functions on behalf of the Member State they represent
![Page 3: TC Programme Cycle Management Framework (PCMF) Overview](https://reader034.vdocuments.us/reader034/viewer/2022042600/586775a81a28ab68408bb60e/html5/thumbnails/3.jpg)
What is the NLA Role?
• NLA is the National Liaison Assistant
• The NLA can view all information on the TC website http://www.iaea.org/technicalcooperation/
• On the PCMF (Programme Cycle Management Framework) website - http://pcmf.iaea.org/ - the NLA can perform all tasks an National Liaison Officer (NLO) can perform under the direction of the NLO
• The NLA can view all the information the National Liaison Officer (NLO) can see on the old TC-PRIDE website - http://tcpride.iaea.org/
• On the In-Touch website http://intouch.iaea.org/ the NLA can perform the same functions as the NLO
![Page 4: TC Programme Cycle Management Framework (PCMF) Overview](https://reader034.vdocuments.us/reader034/viewer/2022042600/586775a81a28ab68408bb60e/html5/thumbnails/4.jpg)
5/6/2009
The TC Website (public site)
The link http://www.iaea.org/technicalcooperation/
![Page 5: TC Programme Cycle Management Framework (PCMF) Overview](https://reader034.vdocuments.us/reader034/viewer/2022042600/586775a81a28ab68408bb60e/html5/thumbnails/5.jpg)
5/6/2009
The TC Website (tools page)
The page below shows the links to each of the tools
![Page 6: TC Programme Cycle Management Framework (PCMF) Overview](https://reader034.vdocuments.us/reader034/viewer/2022042600/586775a81a28ab68408bb60e/html5/thumbnails/6.jpg)
5/6/2009
The TC Website (How to Register)
The tool based websites are username and password protected. The page below gives information on how to register for a username and password.
![Page 7: TC Programme Cycle Management Framework (PCMF) Overview](https://reader034.vdocuments.us/reader034/viewer/2022042600/586775a81a28ab68408bb60e/html5/thumbnails/7.jpg)
TC Programme Cycle Management
PROGRAMME PLANNING& APPROVAL
(PCMF Phases I & II)Formulating Strategies
1. Planning/Concept identification
2. Concept pre-qualification 3. Prioritization4. Project design &
formulation5. Resource & Budgeting6. Approval
PROGRAMME IMPLEMENTATION
(PCMF Phase III)Monitoring, Assessing
& Reporting Performance1. Operational execution2. Monitor progress 3. Assess performance 4. Make adjustments5. Report performance
PROGRAMME REVIEW(PCMF Phase IV)
Reviewing Results1. Plan & conduct review2. Assess
Project/Programme 3. Follow-up adjustments
and implementation of recommendations
![Page 8: TC Programme Cycle Management Framework (PCMF) Overview](https://reader034.vdocuments.us/reader034/viewer/2022042600/586775a81a28ab68408bb60e/html5/thumbnails/8.jpg)
Member State Roles
• NLO – National Liaison Officer. Reviews, comments on and approves all projects for the Member State they represent. Adds/Removes Counterparts (CPs)
• NLA – National Liaison Assistant. Can perform the same tasks as the NLO under the direction of the NLO
• NCR – National Coordinator for Regional Agreements. Designs and comments on regional projects in collaboration with PMO and TO. Adds/Removes CPs.
• CP – Project Counterpart. Designs both national and regional projects in collaboration with PMO and TO
![Page 9: TC Programme Cycle Management Framework (PCMF) Overview](https://reader034.vdocuments.us/reader034/viewer/2022042600/586775a81a28ab68408bb60e/html5/thumbnails/9.jpg)
Major Roles within the Agency
• DIR-TC – Director Technical Cooperation. Approves all projects for their division in collaboration with the DIR-TD
• SH-TC – Section Head Technical Cooperation. Comments and approves each project assigned to their section in collaboration with SH-TD. Adds/removes PMO
• PMO – Programme Management Officer. Designs project in collaboration with TO and CP. Adds/removes project team members
• PSS – Project Support Staff. Assists the project design team in the administration of the project design
![Page 10: TC Programme Cycle Management Framework (PCMF) Overview](https://reader034.vdocuments.us/reader034/viewer/2022042600/586775a81a28ab68408bb60e/html5/thumbnails/10.jpg)
Major Roles within the Agency
• DIR-TD – Director Technical Division. Approves all projects for their division in collaboration with the DIR-TC
• SH-TD – Section Head Technical Division. Comments and approves each project assigned to their section in collaboration with SH-TC. Adds/removes TO
• FOA FP – Field of Activity Focal Point. Liaises between TC and TD in relation to allocation of projects to Fields of Activity. Adds/removes SH-TD and TO
• TO – Technical Officer. Designs projects in collaboration with PMO and CP
![Page 11: TC Programme Cycle Management Framework (PCMF) Overview](https://reader034.vdocuments.us/reader034/viewer/2022042600/586775a81a28ab68408bb60e/html5/thumbnails/11.jpg)
My Programme Note Key Features
• Submit Programme Note and Concepts
• Upload documents related to the project
• Email the Programme Note/Concept team
• Post discussion comments
• Download Feedback Note
• Transfer Concepts to Designs
• Transparent process
![Page 12: TC Programme Cycle Management Framework (PCMF) Overview](https://reader034.vdocuments.us/reader034/viewer/2022042600/586775a81a28ab68408bb60e/html5/thumbnails/12.jpg)
PCMF Programme Note Phase –Major Steps
1. Programme Note Submission
2. Secretariat Review
3. Return of Feedback Note
4. Move of Concept to Design Phase
Phase I
![Page 13: TC Programme Cycle Management Framework (PCMF) Overview](https://reader034.vdocuments.us/reader034/viewer/2022042600/586775a81a28ab68408bb60e/html5/thumbnails/13.jpg)
Programme Note: Submission
• Upstream work - concept identification
• NLO collects concepts
• NLO prepares Programme Note
• NLO selects concepts for submission
• Programme Note and Concepts submitted via PCMF website
![Page 14: TC Programme Cycle Management Framework (PCMF) Overview](https://reader034.vdocuments.us/reader034/viewer/2022042600/586775a81a28ab68408bb60e/html5/thumbnails/14.jpg)
Programme Note: Secretariat Review
• PMO makes initial review of each concept
• Each concept is passed to Tech Division for review
• Each concept review received PMO Final Review
• Safety review of all Member States concepts
• Consolidated Feedback Note prepared by PMO
• SH-TC and DIR-TC review Feedback Note
• DIR-TC sends Feedback Note to NLO
![Page 15: TC Programme Cycle Management Framework (PCMF) Overview](https://reader034.vdocuments.us/reader034/viewer/2022042600/586775a81a28ab68408bb60e/html5/thumbnails/15.jpg)
Programme Note: Feedback Note
• NLO receives Feedback Note
• Feedback Note provides
• guidance
• comments on overview
• comments on concepts
• input to decision making
![Page 16: TC Programme Cycle Management Framework (PCMF) Overview](https://reader034.vdocuments.us/reader034/viewer/2022042600/586775a81a28ab68408bb60e/html5/thumbnails/16.jpg)
Programme Note - Move to Design Phase
• Move to design performed by PMO in PCMF
• Withdrawal from further development performed by PMO in PCMF
• Lead counterpart identified at this stage
• Any additional team members added at this stage
![Page 17: TC Programme Cycle Management Framework (PCMF) Overview](https://reader034.vdocuments.us/reader034/viewer/2022042600/586775a81a28ab68408bb60e/html5/thumbnails/17.jpg)
Brief Overview of PCMF Programme Notes
PHASE I
![Page 18: TC Programme Cycle Management Framework (PCMF) Overview](https://reader034.vdocuments.us/reader034/viewer/2022042600/586775a81a28ab68408bb60e/html5/thumbnails/18.jpg)
5/6/2009
PCMF – Login
![Page 19: TC Programme Cycle Management Framework (PCMF) Overview](https://reader034.vdocuments.us/reader034/viewer/2022042600/586775a81a28ab68408bb60e/html5/thumbnails/19.jpg)
5/6/2009
PCMF – Cycles
![Page 20: TC Programme Cycle Management Framework (PCMF) Overview](https://reader034.vdocuments.us/reader034/viewer/2022042600/586775a81a28ab68408bb60e/html5/thumbnails/20.jpg)
5/6/2009
PCMF – Member State List
![Page 21: TC Programme Cycle Management Framework (PCMF) Overview](https://reader034.vdocuments.us/reader034/viewer/2022042600/586775a81a28ab68408bb60e/html5/thumbnails/21.jpg)
5/6/2009
PCMF – Programme Overview
![Page 22: TC Programme Cycle Management Framework (PCMF) Overview](https://reader034.vdocuments.us/reader034/viewer/2022042600/586775a81a28ab68408bb60e/html5/thumbnails/22.jpg)
5/6/2009
PCMF – Concept Action Required
![Page 23: TC Programme Cycle Management Framework (PCMF) Overview](https://reader034.vdocuments.us/reader034/viewer/2022042600/586775a81a28ab68408bb60e/html5/thumbnails/23.jpg)
5/6/2009
PCMF – Add Concept
![Page 24: TC Programme Cycle Management Framework (PCMF) Overview](https://reader034.vdocuments.us/reader034/viewer/2022042600/586775a81a28ab68408bb60e/html5/thumbnails/24.jpg)
5/6/2009
PCMF – Concept Budget
![Page 25: TC Programme Cycle Management Framework (PCMF) Overview](https://reader034.vdocuments.us/reader034/viewer/2022042600/586775a81a28ab68408bb60e/html5/thumbnails/25.jpg)
5/6/2009
PCMF – Edit Concept Budget Pop-up
![Page 26: TC Programme Cycle Management Framework (PCMF) Overview](https://reader034.vdocuments.us/reader034/viewer/2022042600/586775a81a28ab68408bb60e/html5/thumbnails/26.jpg)
5/6/2009
PCMF – Edit Overview (1/2)
![Page 27: TC Programme Cycle Management Framework (PCMF) Overview](https://reader034.vdocuments.us/reader034/viewer/2022042600/586775a81a28ab68408bb60e/html5/thumbnails/27.jpg)
5/6/2009
PCMF – Edit Overview (2/2)
![Page 28: TC Programme Cycle Management Framework (PCMF) Overview](https://reader034.vdocuments.us/reader034/viewer/2022042600/586775a81a28ab68408bb60e/html5/thumbnails/28.jpg)
5/6/2009
PCMF – How to Send to the IAEA
![Page 29: TC Programme Cycle Management Framework (PCMF) Overview](https://reader034.vdocuments.us/reader034/viewer/2022042600/586775a81a28ab68408bb60e/html5/thumbnails/29.jpg)
5/6/2009
PCMF – Workflow
![Page 30: TC Programme Cycle Management Framework (PCMF) Overview](https://reader034.vdocuments.us/reader034/viewer/2022042600/586775a81a28ab68408bb60e/html5/thumbnails/30.jpg)
TC Programme Cycle Management
PROGRAMME PLANNING& APPROVAL
(PCMF Phases I & II)Formulating Strategies
1. Planning/Concept identification
2. Concept pre-qualification 3. Prioritization4. Project design &
formulation5. Resource & Budgeting6. Approval
PROGRAMME IMPLEMENTATION
(PCMF Phase III)Monitoring, Assessing
& Reporting Performance1. Operational execution2. Monitor progress 3. Assess performance 4. Make adjustments5. Report performance
PROGRAMME REVIEW(PCMF Phase IV)
Reviewing Results1. Plan & conduct review2. Assess
Project/Programme 3. Follow-up adjustments
and implementation of recommendations
![Page 31: TC Programme Cycle Management Framework (PCMF) Overview](https://reader034.vdocuments.us/reader034/viewer/2022042600/586775a81a28ab68408bb60e/html5/thumbnails/31.jpg)
Project Design Key Features
• Collaborative development of project design
• Transparent process
• Develop and extract LFM
• Develop and extract workplan
• Upload documents related to the project
• Email the project design team
• Post discussion comments
![Page 32: TC Programme Cycle Management Framework (PCMF) Overview](https://reader034.vdocuments.us/reader034/viewer/2022042600/586775a81a28ab68408bb60e/html5/thumbnails/32.jpg)
Major Steps in PCMF Project Design Phase
1. Project / Programme Design
2. Secretariat Agreement
3. TACC/Board Approval
Phase II
![Page 33: TC Programme Cycle Management Framework (PCMF) Overview](https://reader034.vdocuments.us/reader034/viewer/2022042600/586775a81a28ab68408bb60e/html5/thumbnails/33.jpg)
Project / Programme Design
• The initial project design is developed off-line using a word template provided
• Concept moved to the design phase by PMO & returned to MS by SH-TC
• Copy background details & the logical framework matrix (LFM) to PCMF
• Submit the design to the IAEA
• The project team reviews the design
• TC/TD review of the project design
• NLO reviews the package for the Member State
• The design goes to the Board of Governors for approval
![Page 34: TC Programme Cycle Management Framework (PCMF) Overview](https://reader034.vdocuments.us/reader034/viewer/2022042600/586775a81a28ab68408bb60e/html5/thumbnails/34.jpg)
Secretariat Agreement
• The project is approved by the team (CPs, NLO, TOs, PMO with support from NSRW and FPS)
• The project is approved by SH-TD, FOA FP, NS & SH-TC based on technical appraisal
• The project is then included in the thematic package for approval by DIR-TD
• The project becomes part of the national package to be approved by NLO
• DIR-TC clears Divisional programme
![Page 35: TC Programme Cycle Management Framework (PCMF) Overview](https://reader034.vdocuments.us/reader034/viewer/2022042600/586775a81a28ab68408bb60e/html5/thumbnails/35.jpg)
TACC/Board Approval
• The draft Programme of all Member State projects (new & ongoing) is available for the General Conference in September
• Adjustments can be made
• DDG-TC final clearance
• The final Programme is presented to the TACC and Board of Governors in November
• The approved Programme is initiated at the start of the following year
![Page 36: TC Programme Cycle Management Framework (PCMF) Overview](https://reader034.vdocuments.us/reader034/viewer/2022042600/586775a81a28ab68408bb60e/html5/thumbnails/36.jpg)
Brief Overview of PCMF Project Design
PHASE II
![Page 37: TC Programme Cycle Management Framework (PCMF) Overview](https://reader034.vdocuments.us/reader034/viewer/2022042600/586775a81a28ab68408bb60e/html5/thumbnails/37.jpg)
5/6/2009
Project Design Cycle Listing
![Page 38: TC Programme Cycle Management Framework (PCMF) Overview](https://reader034.vdocuments.us/reader034/viewer/2022042600/586775a81a28ab68408bb60e/html5/thumbnails/38.jpg)
5/6/2009
Member State Listing
![Page 39: TC Programme Cycle Management Framework (PCMF) Overview](https://reader034.vdocuments.us/reader034/viewer/2022042600/586775a81a28ab68408bb60e/html5/thumbnails/39.jpg)
5/6/2009
Programme Note Overview Listing
![Page 40: TC Programme Cycle Management Framework (PCMF) Overview](https://reader034.vdocuments.us/reader034/viewer/2022042600/586775a81a28ab68408bb60e/html5/thumbnails/40.jpg)
Project Design Actions Required
![Page 41: TC Programme Cycle Management Framework (PCMF) Overview](https://reader034.vdocuments.us/reader034/viewer/2022042600/586775a81a28ab68408bb60e/html5/thumbnails/41.jpg)
5/6/2009
Project Design Details
![Page 42: TC Programme Cycle Management Framework (PCMF) Overview](https://reader034.vdocuments.us/reader034/viewer/2022042600/586775a81a28ab68408bb60e/html5/thumbnails/42.jpg)
Project Design: Background
![Page 43: TC Programme Cycle Management Framework (PCMF) Overview](https://reader034.vdocuments.us/reader034/viewer/2022042600/586775a81a28ab68408bb60e/html5/thumbnails/43.jpg)
Project Design: Edit Background
![Page 44: TC Programme Cycle Management Framework (PCMF) Overview](https://reader034.vdocuments.us/reader034/viewer/2022042600/586775a81a28ab68408bb60e/html5/thumbnails/44.jpg)
OverallObjective
Outcome
Outputs
Activities
Inputsare provided
to carry out
to produce
contributing to
to achieve anPlan Down
Implement Up
Elements of Project Plan
![Page 45: TC Programme Cycle Management Framework (PCMF) Overview](https://reader034.vdocuments.us/reader034/viewer/2022042600/586775a81a28ab68408bb60e/html5/thumbnails/45.jpg)
Project Design LFM: Objective
![Page 46: TC Programme Cycle Management Framework (PCMF) Overview](https://reader034.vdocuments.us/reader034/viewer/2022042600/586775a81a28ab68408bb60e/html5/thumbnails/46.jpg)
Project Design LFM: Outcome
![Page 47: TC Programme Cycle Management Framework (PCMF) Overview](https://reader034.vdocuments.us/reader034/viewer/2022042600/586775a81a28ab68408bb60e/html5/thumbnails/47.jpg)
Project Design LFM: Output
![Page 48: TC Programme Cycle Management Framework (PCMF) Overview](https://reader034.vdocuments.us/reader034/viewer/2022042600/586775a81a28ab68408bb60e/html5/thumbnails/48.jpg)
Project Design LFM: Activity
![Page 49: TC Programme Cycle Management Framework (PCMF) Overview](https://reader034.vdocuments.us/reader034/viewer/2022042600/586775a81a28ab68408bb60e/html5/thumbnails/49.jpg)
Project Design LFM: Activity – add/edit
![Page 50: TC Programme Cycle Management Framework (PCMF) Overview](https://reader034.vdocuments.us/reader034/viewer/2022042600/586775a81a28ab68408bb60e/html5/thumbnails/50.jpg)
Project Design LFM: Input
![Page 51: TC Programme Cycle Management Framework (PCMF) Overview](https://reader034.vdocuments.us/reader034/viewer/2022042600/586775a81a28ab68408bb60e/html5/thumbnails/51.jpg)
Project Design LFM: Input Add/Edit
![Page 52: TC Programme Cycle Management Framework (PCMF) Overview](https://reader034.vdocuments.us/reader034/viewer/2022042600/586775a81a28ab68408bb60e/html5/thumbnails/52.jpg)
Project Design LFM: Assumptions
![Page 53: TC Programme Cycle Management Framework (PCMF) Overview](https://reader034.vdocuments.us/reader034/viewer/2022042600/586775a81a28ab68408bb60e/html5/thumbnails/53.jpg)
Project Design LFM: Indicators
![Page 54: TC Programme Cycle Management Framework (PCMF) Overview](https://reader034.vdocuments.us/reader034/viewer/2022042600/586775a81a28ab68408bb60e/html5/thumbnails/54.jpg)
Project Design: Related Documents & Discussion
![Page 55: TC Programme Cycle Management Framework (PCMF) Overview](https://reader034.vdocuments.us/reader034/viewer/2022042600/586775a81a28ab68408bb60e/html5/thumbnails/55.jpg)
Project Design: Navigation in Detail
![Page 56: TC Programme Cycle Management Framework (PCMF) Overview](https://reader034.vdocuments.us/reader034/viewer/2022042600/586775a81a28ab68408bb60e/html5/thumbnails/56.jpg)
Project Design: Team
![Page 57: TC Programme Cycle Management Framework (PCMF) Overview](https://reader034.vdocuments.us/reader034/viewer/2022042600/586775a81a28ab68408bb60e/html5/thumbnails/57.jpg)
Project Design: Generate LFM
![Page 58: TC Programme Cycle Management Framework (PCMF) Overview](https://reader034.vdocuments.us/reader034/viewer/2022042600/586775a81a28ab68408bb60e/html5/thumbnails/58.jpg)
Project Design: Generate Workplan (Text)
![Page 59: TC Programme Cycle Management Framework (PCMF) Overview](https://reader034.vdocuments.us/reader034/viewer/2022042600/586775a81a28ab68408bb60e/html5/thumbnails/59.jpg)
Project Design: View Status Map
![Page 60: TC Programme Cycle Management Framework (PCMF) Overview](https://reader034.vdocuments.us/reader034/viewer/2022042600/586775a81a28ab68408bb60e/html5/thumbnails/60.jpg)
Project Design: Workflow
![Page 61: TC Programme Cycle Management Framework (PCMF) Overview](https://reader034.vdocuments.us/reader034/viewer/2022042600/586775a81a28ab68408bb60e/html5/thumbnails/61.jpg)
TC Programme Cycle Management
PROGRAMME PLANNING& APPROVAL
(PCMF Phases I & II)Formulating Strategies
1. Planning/Concept identification
2. Concept pre-qualification 3. Prioritization4. Project design &
formulation5. Resource & Budgeting6. Approval
PROGRAMME IMPLEMENTATION
(PCMF Phase III)Monitoring, Assessing
& Reporting Performance1. Operational execution2. Monitor progress 3. Assess performance 4. Make adjustments5. Report performance
PROGRAMME REVIEW(PCMF Phase IV)
Reviewing Results1. Plan & conduct review2. Assess
Project/Programme 3. Follow-up adjustments
and implementation of recommendations
![Page 62: TC Programme Cycle Management Framework (PCMF) Overview](https://reader034.vdocuments.us/reader034/viewer/2022042600/586775a81a28ab68408bb60e/html5/thumbnails/62.jpg)
“My TCPRIDE” in PCMF
• Details all projects under implementation for all Member States
• Allows full details of HR and Procurement to be viewed on a per project basis
• View financial details for projects in summary
• Export information to Word, PDF and/or Excel
• Information transparent to all Member States
![Page 63: TC Programme Cycle Management Framework (PCMF) Overview](https://reader034.vdocuments.us/reader034/viewer/2022042600/586775a81a28ab68408bb60e/html5/thumbnails/63.jpg)
“My TCPRIDE” Search
![Page 64: TC Programme Cycle Management Framework (PCMF) Overview](https://reader034.vdocuments.us/reader034/viewer/2022042600/586775a81a28ab68408bb60e/html5/thumbnails/64.jpg)
“My TCPRIDE” Results
![Page 65: TC Programme Cycle Management Framework (PCMF) Overview](https://reader034.vdocuments.us/reader034/viewer/2022042600/586775a81a28ab68408bb60e/html5/thumbnails/65.jpg)
The old “TC PRIDE” website
The website was migrated to the “My TC PRIDE” tab in PCMF
![Page 66: TC Programme Cycle Management Framework (PCMF) Overview](https://reader034.vdocuments.us/reader034/viewer/2022042600/586775a81a28ab68408bb60e/html5/thumbnails/66.jpg)
“My Project Management” Tab (1/4)
![Page 67: TC Programme Cycle Management Framework (PCMF) Overview](https://reader034.vdocuments.us/reader034/viewer/2022042600/586775a81a28ab68408bb60e/html5/thumbnails/67.jpg)
“My Project Management” Tab (2/4)
![Page 68: TC Programme Cycle Management Framework (PCMF) Overview](https://reader034.vdocuments.us/reader034/viewer/2022042600/586775a81a28ab68408bb60e/html5/thumbnails/68.jpg)
“My Project Management” Tab (3/4)
![Page 69: TC Programme Cycle Management Framework (PCMF) Overview](https://reader034.vdocuments.us/reader034/viewer/2022042600/586775a81a28ab68408bb60e/html5/thumbnails/69.jpg)
“My Project Management” Tab (4/4)
![Page 70: TC Programme Cycle Management Framework (PCMF) Overview](https://reader034.vdocuments.us/reader034/viewer/2022042600/586775a81a28ab68408bb60e/html5/thumbnails/70.jpg)
The Country Profile website
The website will be migrated to the “My TC PRIDE” tab in PCMF
![Page 71: TC Programme Cycle Management Framework (PCMF) Overview](https://reader034.vdocuments.us/reader034/viewer/2022042600/586775a81a28ab68408bb60e/html5/thumbnails/71.jpg)
Website(s):
http://www.iaea.org/technicalcooperation/
http://pcmf.iaea.org/
http://intouch.iaea.org/
http://tcpride.iaea.org/
For specific questions / comments