Taupo Case Study19th November 2013SH1 Desert Road - Waikato Stream
![Page 2: Taupo Case Study 19 th November 2013 SH1 Desert Road - Waikato Stream](https://reader038.vdocuments.us/reader038/viewer/2022110116/551a1a5955034654788b4647/html5/thumbnails/2.jpg)
Geographical Location
• Incident Location
![Page 3: Taupo Case Study 19 th November 2013 SH1 Desert Road - Waikato Stream](https://reader038.vdocuments.us/reader038/viewer/2022110116/551a1a5955034654788b4647/html5/thumbnails/3.jpg)
• SH 1 leaves Turangi and ascends onto the North Island Volcanic Plateau, passing through the fringes of the Tongariro National Park and into the Rangipo Desert, and is commonly known as the Desert Road
Geographical Location
![Page 4: Taupo Case Study 19 th November 2013 SH1 Desert Road - Waikato Stream](https://reader038.vdocuments.us/reader038/viewer/2022110116/551a1a5955034654788b4647/html5/thumbnails/4.jpg)
Detour Extent
![Page 5: Taupo Case Study 19 th November 2013 SH1 Desert Road - Waikato Stream](https://reader038.vdocuments.us/reader038/viewer/2022110116/551a1a5955034654788b4647/html5/thumbnails/5.jpg)
• 52km Affected – approx. 36 Minutes
• 107km Detour – approx. 84 minutes, adding 48 minutes to the journey
• MADT for the Desert Road for this month was 4300 vehicles – 179 vehicles per hour.
Detour Details
![Page 6: Taupo Case Study 19 th November 2013 SH1 Desert Road - Waikato Stream](https://reader038.vdocuments.us/reader038/viewer/2022110116/551a1a5955034654788b4647/html5/thumbnails/6.jpg)
SH1 Desert Road – 19th November 2013
![Page 7: Taupo Case Study 19 th November 2013 SH1 Desert Road - Waikato Stream](https://reader038.vdocuments.us/reader038/viewer/2022110116/551a1a5955034654788b4647/html5/thumbnails/7.jpg)
• Initial Incident – Trailer Roll Over • 2.10pm Event Logged and Contractors
Dispatched• 3.00pm Communications that bridge was
“smashed” – Consultant en-route• 3.45pm Confirmed incident details and advised
only 1 lane closure with lights overnight – No road closure until the next day.
Timeline of Events
![Page 8: Taupo Case Study 19 th November 2013 SH1 Desert Road - Waikato Stream](https://reader038.vdocuments.us/reader038/viewer/2022110116/551a1a5955034654788b4647/html5/thumbnails/8.jpg)
Initial Incident – Trailer Roll Over
![Page 9: Taupo Case Study 19 th November 2013 SH1 Desert Road - Waikato Stream](https://reader038.vdocuments.us/reader038/viewer/2022110116/551a1a5955034654788b4647/html5/thumbnails/9.jpg)
Initial Incident - Trailer Roll Over
![Page 10: Taupo Case Study 19 th November 2013 SH1 Desert Road - Waikato Stream](https://reader038.vdocuments.us/reader038/viewer/2022110116/551a1a5955034654788b4647/html5/thumbnails/10.jpg)
Initial Incident - Trailer Roll Over
![Page 11: Taupo Case Study 19 th November 2013 SH1 Desert Road - Waikato Stream](https://reader038.vdocuments.us/reader038/viewer/2022110116/551a1a5955034654788b4647/html5/thumbnails/11.jpg)
• Planned Road Closure at 7am – 12pm• Establishment of Site• Righting and Removal of Trailer• Righting and Removal of Crusher Unit• Pavement repairs and barrier erection• Road Opening
Day 2 – Recovery
![Page 12: Taupo Case Study 19 th November 2013 SH1 Desert Road - Waikato Stream](https://reader038.vdocuments.us/reader038/viewer/2022110116/551a1a5955034654788b4647/html5/thumbnails/12.jpg)
Recovery Operation – Trailer/Crusher
![Page 13: Taupo Case Study 19 th November 2013 SH1 Desert Road - Waikato Stream](https://reader038.vdocuments.us/reader038/viewer/2022110116/551a1a5955034654788b4647/html5/thumbnails/13.jpg)
Recovery Operation – Trailer/Crusher
![Page 14: Taupo Case Study 19 th November 2013 SH1 Desert Road - Waikato Stream](https://reader038.vdocuments.us/reader038/viewer/2022110116/551a1a5955034654788b4647/html5/thumbnails/14.jpg)
Recovery Operation – Trailer/Crusher
![Page 15: Taupo Case Study 19 th November 2013 SH1 Desert Road - Waikato Stream](https://reader038.vdocuments.us/reader038/viewer/2022110116/551a1a5955034654788b4647/html5/thumbnails/15.jpg)
Recovery Operation – Trailer/Crusher
![Page 16: Taupo Case Study 19 th November 2013 SH1 Desert Road - Waikato Stream](https://reader038.vdocuments.us/reader038/viewer/2022110116/551a1a5955034654788b4647/html5/thumbnails/16.jpg)
Recovery Operation – Trailer/Crusher
![Page 17: Taupo Case Study 19 th November 2013 SH1 Desert Road - Waikato Stream](https://reader038.vdocuments.us/reader038/viewer/2022110116/551a1a5955034654788b4647/html5/thumbnails/17.jpg)
• 1 Incident • 7 Hour Road Closure• Estimated 1300 Vehicles effected (Based
on MADT)• Additional 48 minutes of travelling per
vehicle for signed detour• Social/Economic Costs
Effects of Entire Event
![Page 18: Taupo Case Study 19 th November 2013 SH1 Desert Road - Waikato Stream](https://reader038.vdocuments.us/reader038/viewer/2022110116/551a1a5955034654788b4647/html5/thumbnails/18.jpg)
Opus International Consultants