TAIWAN'S SIX-YEAR DEVELOPMENT PLAN PROJECTS
(PARTIAL LIST)
May 30,1991
American Institute in Taiwan
Commercial Unit
MAY 30, 1991
TAIWAN'S SIX-YEAR DEVELOPMENT PLAN PROJECTS
The Taiwan Six-Year Development Plan (FY1992-1997) includes a total of 775projects budgeted at US$305 billion.
The following partial list of projects contained in the Six-Year Plancomprises 354 projects with a proposed budget of US$183,7 billion. AIT willprovide a complete list of Six-Year Plan projects as soon as the informationis available.
Projects scheduled to start in FY1992 or after are new projects in theSix-Year Plan. All other projects are on-going projects.
Taiwan authorities note that the projects in the Six-Year Plan are onlyproposed projects. For financial or other reasons? some of the projects inthe plan may not be implemented according to schedule.
I. MINISTRY_OF_COMMUNICATIONS (MOC).. Page 3
RAILWAYS . „ , . Page 3
HIGHWAYS . . .. . Page 4
CITY TRANSPORTATION . . Page 7
AERONAUTICS ,..„ Page 8
WATER TRANSPORTATION & HARBORS..... .Page 8
POSTAL ADMINISTRATION , .Page 9
TELECOMMUNICATIONS Page 10
METEOROLOGY Page 10
TOURISM Page 11
II. MINISTRY_OF_ECONOMIC_AFFAIRS_(MOEA)...... .--- .........Page 13
TAIWAN POWER COMPANY (TAIPOWER).. . . Page 13
HYDRO POWER PROJECTS .. ...... Page 13THERMAL POWER PROJECTS... Page 14NUCLEAR POWER PROJECT.. Page 14TRANSMISSION, DISTRIBUTION & ENVIRONMENTAL PROTECTION PROJECTS.... Page 15
CHINESE PETROLEUM CORPORATION (CPC) Page 15
CHINA STEEL CORPORATION (CSC).. ...Page 17
TAIWAN TOBACCO AND WINE MONOPOLY BUREAU (TTWMB) Page 19
TAIWAN SUGAR CORPORATION (TSC) Page 19
INDUSTRIAL DEVELOPMENT BUREAU (IDB) PROJECTS Page 30
HYDRAULIC FLOOD PREVENTION DEVELOPMENT PROJECTS Page 30
SCIENTIFIC DEVELOPMENT PROJECTS ....Page 21
SERVICE INDUSTRY PROJECTS Page 21
ENVIRONMENTAL PROTECTION PROJECTS .Page 21
OTHER PROJECTS .....Page 22
III - ENVIRONMENTAL- PROTECTION - ADMINISTRATION. - Page 23
The Ministry of Communications (MOO projects comprise 130 of the total 775projects in the Six-Year Plan and account for US$105 billion? 34 percent ofthe total US$305 billion Six-Year Plan budget.
MOC projects along with their implementation dates and budgets forFY1992-FY1997 are given below.
U.S. firms wishing to obtain further information on projects contained in theSix-Year Plan may contact:
Ministry of Communications2 Changsha St., Sec. 1Taipei, TaiwanTEL: 886-2-371-3984FAX: 886-8-331-2260
or
American Institute in TaiwanCommercial UnitRm. 3207, 32F, 333 Keelung Rd., Sec. 1Taipei, TaiwanTEL: 886-2-720-1550FAX: 886-2-757-7162ATTN: Robert H. Strongman
In US$ million(US$1 equals NT$27)
ProjectsResponsibleAgencies
Implemen-tationPeriod Budget
High-speed Railway Project EngineeringOffice ofHigh-SpeedRail Project?MOC
90-98 11,360
Extension of iaipei Underground Railwayto Sungshan
Construction of Four Underground RailLines between Wanhua & Panchiao
Taipei Railway 89-94UndergroundProject Office,MOC
ditto 91-9?
545
1,548
Mountain Railway Line between Cnu-nan& Fengyuan
Procurement/Replacement of Commuters
Completion of Around-the-Island RailwayProject
Improvement of Stations/Yards
Compartment Replacement
Underground & Elevated Railwaysin Cities
Improvement of Eastern Taiwan Railway
Southern Link Railway Project
HIGHWAYSCross Island Express Highway
West Coast Express Highway
Widening of Highway between Yang-meiKaohsiung? Chungshan Freeway-
Surface Repair of Chungshan Freeway
Tunghu to Wuku Section of ChungshanFreeway-
Southern Cross Island Freeway
TaiwanRailwayAdministra-tion (TRA),TaiwanProvincialAuthorities(TPA)
ditto
ditto
ditto
ditto
Department of
88-93
91-96
88-9£
93-95
92-97
91-2006
257
383
40
33
510
973Communications ,TPA
ditto 92-98
South Link 80-92Railway ProjectOffice, TPA
Institute of 92-97Transportation<IOT), HOC
Highway 92-96Bureau.* HOC
ditto 91-2000
Freeway 92-96Bureau, HOC
ditto 90-96
Taiwan Area 91-93NationalFreewayBureau ( T A N F B ) ,HOC
1,424
2,029
2,884
£5
955
4,926
- 4 -
Subsequent Construction of 2ndFreeway in N. Taiwan
Second Freeway of Northern Taiwan
Taipei-Ilan Freeway
2nd Generation Computerization forHighway Administration
Replacement of City Buses
Construction of Stations/Depots ofTaipei City
Depot at Lin-yun Villa
Computerized Traffic Control
System* Taipei City
Express Roads of Taipei City
Construction and Improvement of KeyRoads, Taipei City
Transportation Reconstruction Cost tobe Shared by Taipei MunicipalAuthorities
Depot at Shihlin
Highway Connecting Linhai & TafaIndustrial Zone
Nantze Overhead Bridge and ProvincialHighway No. 1
Widening of Mintsu Road Section ofProvincial Highway No. 1
ditto
ditto
ditto
89-98 12,996
85-92
90-99
Railways & 92-93Highways Dept?HOC
Taipei City Bus 92-97Administration?Taipei CityAuthorities
ditto 88-94
ditto 92-94
Department of 89-94Communications?Taipei CityAuthorities
Department ofPublic Works?Taipei CityAuthorities
ditto
ditto
87-2002
90-94
ditto 92-94
Department of 92-97Public Works?Kaohsiung CityAuthorities
ditto 91-97
ditto 92-97
891
2,096
333gr
'?S
"39
28
0.37
44
90-2001 1,155
379
529
0.74
4
14
IS
- 5 -
Elevated Junction of Kai-hsuen Road &Chungcheng Road
Kaohsiung Metropolitan Express HighwaySystem
Cross Harbor Bridge? Kaohsiung City
Eastern Section No1-1 Highway? Nantze
Road Improvement in Tourism Areas
Widening of Key Highways
Connecting Roads with End Freeway inN. Taiwan
Widening of Highway between Nankang &Keelung
Other Key Highway Improvements
Improvement of Highway Along Shih-ting,Pingshih and Jui-fang
Connecting Highways with Interchangesof Freeway
Improvement of Key Trunk of ProvincialHighway
Wan-ta Bridge Project
Widening Road between Nankeng & CKSAirport
Widening Road between Kaohsiung CountyKaohsiung City? Provincial HighwayNo. 1
Li-ling Bridge Expansion - No. 188Highway
Hsi-chuang Bridge and Connecting Roads
ditto
ditto
ditto
ditto
92-97
92-97
91-97
92-97
Taiwan Highway 91-95Bureau? DC?TPA
ditto 91-94
ditto 90-92
ditto 86-92
ditto
ditto
Taiwan Highway 91-95Bureau ? DC ?TPA
ditto 91-97
ditto 90-92
ditto 92-94
ditto 92
ditto 92-93
Taiwan Housing 91-93& Urban Develop-ment Bureau? TPA
13
111
111
4
280
1,021
123
15
91-2001 2,077
89-92 6
431
1,61
16
£7
10
Construction of Roads in Cities
Linking Roads between E & W Harbors?Keelung Port
Village Road System for MountainousAreas
ditto 92-97 1,591
Keelung Harbor 90-97 261Bureau, TPA
Department of 92-97 693Civil Affairs,TPA
Subsidy for Construc-tion of Model ParkingLots
Parking Lot Construction Project
Taipei City Parking Lot ConstructionPlan
Subsidy for Construction of City/CountyParking Lots
MRT Systems for Taoyuan, Hsinchu,Taichung & Tainan Cities
Kaohsiung Metropolitan MRT System
Subsequent Construction Projectof Taipei MRT System
Railways 8xHighways Dept. ,MOC
92-97
Department of 91-97Reconstruction?Kaohsiung CityAuthorities
Department of 91-94Communications?Taipei CityAuthorities
Taiwan Housing 92-97& DevelopmentBureau, TPA
ditto 90-2005
Department of 91-2000Kaohsiung MRT,PreparatoryOffice, KaohsiungCity Authorities?& MOC
Department of 90-2003Mass RapidTransit System(DORTS), TaipeiMunicipalAuthorities, 8, MOC
741
183
51
97
7,407
4,97?
6,178
Preliminary MRT Project, Taipei ditto 88-98 11,189
AERONAUTICS
Airfield Expansion at Lan-yu Islet
Phase II Expansion of Kaohsiung Airport
CKS International Airport ExpansionProject
Augmentation/replacement of TaiwanFlag-carrier Fleet
Construction of Civil Air Station atKinmen Airport
Heng-chun Airfield Reconstruction
No. 2 Apron at CKS InternationalAirport
Aeronautics Meteorology DevelopmentProject
Navigation Radar Construction Project
CivilAeronauticsAdministration?MQC
90-94
ditto
ditto
ditto
ditto
ditto
ditto
89-94
89-94
91-97
90-93
90-93
92
291
653
4,114
7
20
23
ditto
ditto
92-97
90-96 22
WATER TRANSPORTATION & HARBORS
Four Container Ships, 9th Shipment
1500 Sets of Car Racks
Containers 13,290 TEU
Four Container Ships? 8th Shipment
Containers 19,140 TEU
200 Sets of Car Racks
Replacement of Containers £,400 TEU
Kaohsiung Harbor Building Project
Vang mingMarine Trans-port Corp., Ltd.
ditto
ditto
ditto
ditto
ditto
ditto
Kaohsiung
92-97 «
92-97
92-97
92-97
92-97
92-97
92
91-97
14
10
66
31
30
1
6
120Harbor Bureau?TPA
The 5th Container Terminal, KaohsiungPort
Makung Port Expansion Project
Development of Anping Port
Development of Industry port atTaichung Port
Stage 1 of Phase II Project ofTaichung Port
Sand Dredging at North Section ofTaichung Port
Improvement Project of Wharf No. 19,Keelung Port
Phase I Construction of TamshuiDomestic Commercial Port
Steamship Traffic Management,Keelung Port
On-line Computerization for Savings &Remittance Operations
ftuto Hail Handling Program
Automated Window Postal ServiceEquipment
ditto
ditto
ditto
TaichungHarbor Bureau?TPA
ditto
ditto
KeelungHarbor Bureau,TPA
89-98
1989-2008
1990-S009
88-93
91-96
92-93
90-92
389
43
353
38
400
29
13
ditto
ditto
Directoratei3eneral ofPosts, HOC
ditto
ditto
92-96
92-95
89-96
90-99
92-97
216
13
121<t
563
0
Automated Postal Information Operations ditto 92-97
City Telephone Project for CentralTaiwan
Long Distance Communication Project
DirectorateGeneral ofTelecom-munications
ditto
92-97
92-97
Pleaseseeasteriskbelow.
ditto
International Communication Project ditto 92-97 ditto
Telecommunication Technology R&D
City Telephone Project for SouthernTaiwan
City Telephone Project for NorthernTaiwan
ditto
ditto
ditto
Cultivation of Telecommunication Experts ditto
Digital Telecommunication Project ditto
92-97 ditto
92-97 ditto
92-97 ditto
92-97 ditto
92-9; ditto
* The total budget for telecommunications projects is approximately US$7,388million.
Construction of Northern TaiwanMeteorologic Radar Station
Establishment of MeteorologicInstrument Calibration Center
Marine Weather Forecast Center
Modernization of Weather SatelliteInformation Receiving Systern
Auto Precipitation Measuring System forTaiwan Area
Computerization of Weather ForecastSystem No. 2 & No. 3
Building for Integrated MeteorologicOperations
Improvement of Meteorologic Technology
Central 89-95'weather Bureau?MOC
ditto
ditto
ditto
ditto
ditto
ditto
ditto
92-99
91-2000
90-2001
85-96
92-95
92-97
16
61
31
- 10 -
TOURISM
Development of Penghu Scenic Area
Development of the Coastal Scenic Areaof Eastern Taiwan
Development of Tourist Areas otherthan the Planned Scenic Areas
Development of the Coastal Scenic Areaof North-eastern Taiwan
TourismBureau? HOC
ditto
ditto
ditto
91-96
91-96
91-97
91-96
128
171
189
76
Development of a Grand Tourist andRecreational Area
ditto 92-97 74
Subsequent Development of Chi-ChinCoastal Park
Construction of Kaohsiung Fisherman'sRecreation Center
Development of No. 3 ProvincialHighway Tourist Areas
Development of the Native Farmer'sand Fisherman's Villages
Department of 92-97Reconstruction?Kaohsiung CityAuthorities
19
ditto
TouristBureau? TPA
ditto
92-97
90-93
91-99
£0
44
33
Reconstruction of Lotus Pool Scenic dittoArea in Tzu-ying
Tung-shan Creek Scenic Area Development dittoPlan
87-97
90-9E
Development of Shi-pin HighwaysTourist Areas
Development of New Provincial ScenicArea
ditto
ditto
90-93 S£
10
Development of Provincial Hot SpringScenic Area
ditto 91-95 19
Development of Forest EntertainmentArea
ditto 92-97
Establishment of Travel ServiceCenter
ditto 91-97
- 11 -
Tourism Farm Park Project ditto
Construction of Rest and Recreational dittoFacilities
Development of Ta-peng Bay Touring dittoArea
Recreational Farm Industry ditto
Initial Planning for Liu-chiou Special dittoScenic Area
Development of Su-ao to Hua-lien dittoHighways Scenic Spots
Development of Nan-hung Highways dittoScenic Spots
91-97 13
93-S007 890
92-2000
91-97
91-95
93-97
93-97
159
19
0.37
18
30
- 12 -
11. MINISTRY OF ECONOMIC AFFAIRS (MOEA)
Projects under the jurisdiction of the Ministry of Economic Affairs (MOEA)ycontained in Taiwan's Six-Year Development Plan (FY1992-1997). These projectscomprise 156 of the total 775 projects in the Six-Year Plan and account forUS$68 billion of the total US$305 billion Six-Year Plan budget.
MOEA projects along wi th their implementation dates and budgets forFY1992-FY1997 are provided below.
U.S. firms wishing to obtain fur ther information on projects contained in theSix-Year Plan may contact:
Ministry of Economic Affai rs15 Foochow St.Taipei, TaiwanTEL: 836-2-321-2200FAX: 886-E-391-9398
or
American Institute in TaiwanCommercial UnitRm. 3207, 32F, 333 Keelung Rd., Sec. 1Taipei? TaiwanTEL: 886-2-720-1550FAX: 886-2-757-7162ATTN: Robert H. Strotman
In US$ million(US$1 equals NT$27)
ProjectsResponsibleAgencies
Implemen-tationPeriod Budget
Mingtan Pumped-Storage Nos. 1-6
Shuili
Maan Project
Liyutan Reservoir Project
Tai power &MOEA
ditto
ditto
ditto
88-96 }
-t
92 }
90-96
92-96
1884
i
i
422
440
Chu Keng Renewal Project
New Tienlun
Juanchiao Reconstruction
Kaoping Renewal Project
Chumen
Construction of power units at Mingchien ditto
Tenhu
Chushan
Bihai
Chuping
Wushen Enlargement
Taichung Fossil-fired No. 1-4
Taichung Fossil-fired No. 5-8
Nanpu Combined Cycle No. 1-6
Hsinta Combined Cycle No. 1-6
Suao Fossil-fired No. 1-4
Chang ping No. 1-4
Tunghsiao Combined Cycle
Talin No. 6 LNG
Linkou Combined Cycle
Basic Indust, Complex No. 1
ditto
ditto
ditto
ditto
ditto
ditto
ditto
ditto
ditto
ditto
ditto
ditto
ditto
ditto
ditto
ditto
ditto
ditto
ditto
ditto
ditto
91
87-92
89-92
89-93
89-93
96-97
96-97
96-97
94-99
97-2000
97-2000
87-95
90-98
91-96
91-96
91-2001
91-2001
91-96
89-94
91-96
94-2001
15
319
16
11
8
37
37
32
904
199
41
3,341
3,342
1,233
2,079
4,667
4,793
344
467
237
1,333
Fourth Nuclear Nos. 1 & ditto 91-99 5,824
- 14 -
Fourth Transmission & Substation Project ditto
Second Distribution Project ditto
Environmental Protection & others ditto
90-96 2,646
92-95 1,967
88-93 858
Naphtha Cracking Plant Renovation
Talinpu Area Storage and TransportationFacility Expansion
Construction of the 16th Tanker
High-pressure Boilers for PowerGeneration
Crude Oil Storage and TransportationFacility Establishment
Kaohsiung Plant No. 11 Topping Unit
Kaohsiung Plant Residue DesulfurizationUnit
LNG Distribution Facility Expansion
Kaohsiung Plant No. 4 OffshoreMooring Buoys
Oil Terminal Storage and TransportationFacility Expansion in Erh-chiao? Kaohsiung
Increasing Gasoline Octane in KaohsiungPlant
No. 2 Topping Unit in Taoyuan Plant
Self-navigated Barge Renovation
Construction of the 18th and 19thtankers
Oil and Gas Development Well of theChu-kuang-keng Area
CPC & MQEA
ditto
ditto
ditto
ditto
ditto
ditto
ditto
ditto
86-92
88-91
89-91
89-9S
89-92
89-93
89-93
89-95
90-92
58
7
6
8
45
29
116
SO
20
ditto
ditto
ditto
ditto
ditto
ditto
90-92
90-93
91-92
91-92
91-92
83
108
25
7
15
Tugboat Renovation Project
Relocation of Oil Tanks at Linya LiaoHarbor Terminal
Tao-yuan Oil Refinery FactoryExpansion Project
Co-generation Facility in Talin Plant
Taoyuan Plant Oil Storage? Transportationand Blending Center
Expansion of Liquefied Natural GasReceiving Plant
Circular Gas Pipeline Construction
Construction of Around-the-IslandOil Product Delivery Tankers
Liquefied Natural Gas Adjustment andMonitoring System Integration
Hsin-hsin Oil Refinery Factory(First Phase)
Renovation of Oil Terminal Facilityand Pipelines
Investment in Overseas Oil RefineryFactories-
Storage Transportation Facilities atNorth Tanker Piers
Storage and Transportation Facility-Establishment
Kaohsiung No. 9 Hydro-DesulfurizationUnit
Degeneration at Tzoying Plant &Linyuan Plant
Oil Terminal Pipeline at Keelung Port
Waphtha Unit Modernization
ditto
ditto
ditto
ditto
ditto
ditto
ditto
ditto
ditto
ditto
ditto
ditto
ditto
ditto
91-92
91-94
91-94
91-94
91-95
91-95
91-95
91-92
92-94
92-97
92-97
92-95
92-95
92-97
7
133
335
167
249
611
246
22
35
2,259
1,111
556
836
337
ditto
ditto
ditto
ditto
92-95
92
92-95
35
210
19
- 16
Deeper Layer Development of Gas
Field at Chu-kuang-keng Area
Expansion of Oil TransportationPipeline in Talin Plant
Oil Terminal Operation MonitoringSystem
Development of No. 2 Oil and Gas Field
Talin Plant Storage and TransportationFacility Expansion
Real-time Oil Products StorageMali-line Monitoring System
Construction and Renovation of GasStations
Liquefied Natural Gas ReceivingTerminal in Northern Taiwan
Aromatics Production
Qlefin Conversion Plant
Taoyuan Plant Light NaphthaIsomerization Unit
Kaohsiung Plant No. 6 Reforming Unit
Pollution Contro1
Post Phase III Expansion Project
Cold Rolling and Galvanizing LineInstallation Project
No. 2« Power Plant Expansion
No. £„ BOF Plant. Roof VentilationSystem Installation Project
No. 4 Coke Oven Plant PreliminaryProject
ditto
ditto
ditto
ditto
ditto
ditto
ditto
ditto
92-95
92-95
92-97
95-97
91-93
92-95
93-97
93-99
50
35
83
Hfr:
462
*37
31
193
1,881
ditto
ditto
ditto
ditto
ditto
CSC 8. MQEfi
ditto
ditto
ditto
88-92
87-93
88-92
88-92
90-94
88-93
89-92
90-93
91-93
73
9
6
9
17277
72
138
49
10
dittc 91-94 49
- 17 -
Cold Rolled Finishing LineTension Leveler Installation
Scrap Cutting Plant
No. 3 Raw Water Reservoir ConstructionProject
Plate Mill Qn-Line Accelerated CoolingFacility Installation
No, Blast Furnace Revamping Project
Industrial-Waste Incineration PlantConstruction Project
Phase I & II By-product Light OilSystem Revamping Project
By-product Plant Gas DesulphurizationProject
By-project Plant Gas Storage Tanks
Waste Heat Recovery Facilities ofSinter Plant Project
No. 3 Slag Water Quenching SystemInstallation Project
Phase I Continuous Casting FacilityRevamping Project
Plate Shot Blasting and Prime CoatingEquipment Installation
Hot Metal Desiliconization andDephosphorization EquipmentInstallation Project
Continuous Galvanizing Line
CI Chemistry PlantProject
Aluminum Foil Finishing Plant
Aluminum Foil Line Revamping Project
Cake Dry Quenching Project
ditto
ditto
ditto
ditto
ditto
ditto
ditto
ditto
ditto
ditto
ditto
ditto
ditto
ditto
ditto
ditto
ditto
ditto
ditto
91-98
91-93
91-93
91-93
91-93
91-93
91-94
91-94
91-94
92-94
92-93
92-93
92-93
92-94
92-95
-
19
14
32
46
17
42
9
20
10
63
93-95
93-97
-45
186
170
7
ii
148
- 18 -
No. 1 Hot Strip hill Revamping Project
No. 4 Slag Water Quenching SystemInstallation Project
Vibration Damping Steel Line
No. 3 Vacuum Degassing Equipment
Enameled Steel Sheets Line Project
No. 1 Blast Furnace Second limeRevamping Project
Pollution Control for FY1993-1996
Continuous vacuum Deposition LineProject
ditto
ditto
ditto
ditto
ditto
ditto
ditto
ditto
93-95
93-95
93-95
93-95
93-95
93-96
93-96
94-96
19
11
7
33
•***.
53
217
61
Cheng kung Brewery MolassesProcess/ Pack ing Facility Installation
Pure Rice Wine Distillery Project
Pingtung Winery Expansion
Nantou Winery
Chiayi Winery Second Phase Expansion
Pushing Brewery First PhaseConstruction
Taichung Winery Relocation
Puli Winery Relocation
Phase II Modernization of Sugar Mills
Food Processing t. Production Plant
Alcohol Tank Modernization atHsinying By-product Plant
TTWMB & MOEA 89-93 15
ditto
ditto
ditto
ditto
ditto
ditto
ditto
TSC & MOEA
ditto
ditto
89-95
90-92
90-94i
90-95
90-95
90-96
92-97
93-97
91-92
91-93
8
7
7
346
233
21l"
439
91
11
19
19 -
Expansion of Lysine Purification Plant
Animal Feeds Plant Modernization atBy-product Plant
Construction of FineSugar Mill
Paper Container Production Plant
Phase I Modernization of Sugar Mills
Modernization of Soy-bean Oil SolventExtraction- Facility
ditto
ditto
ditto
ditto
ditto
ditto
91-93
93-94
91-97
91-93
81-92
94-96
IS
16
130
6
6
7
Development of Off-shore Industrial IDB, MOEAArea
Development of Scientific and dittoIndustrial Area
Development of Ho-ping Cement Area, dittoHualien County
Development of Ping-hai Industrial Area? dittoChanghua County
Establishment of Plants for Small-sized dittoBusiness
91-2000 4,639
91-96
91-96
90-98
91-94
346
1,650
913
Underground Water Monitoring Network
Mei-lung Water Dam Construction
Third-phase Planning for Teh-chiWater Dam
MOEA
ditto
ditto
9S-98 ,48
92-2000 8S6
92-97 32
SCIENCE DEVELOPMENT PROJECTS
Environment & Resources
Infrastructure and Facilities
Engineering and Design
Material science? Production Line
Food and Medicine
Mechanics & Automation
Electronics and Information Science
Promotion of Business Automation
Data Processing of Optical Disk Image
Development of National Data onIndustrial and Business Management
Establishment of Fauna & Flora SpeciesExamination Laboratory
Development of Standard MeasuresPark
Establishment of Electrical ProductTest Center
MOEPi
ditto
ditto
ditto
ditto
ditto
ditto
MOEA
ditto
ditto
92-97
9S-97
92-97
92-97
92-97
92-97
92-97
91-2000
91-96
90-98
313
1,147
230
741,
504
758
1,501
62
13
82
ditto
ditto
ditto
91-96
91-2001
91-96
26
136
2?
Industrial Discharge Treatment Factory MOEA & EPARenovation
Environmental Monitoring Systems in dittoLi nyua n? Ta-s he h
Industrial Pollution Control ditto
Industrial Waste Treatment Center ditto
90-93
89-92
91-2000
91-95
140
54
82
- 21
QltO-EBQIECIS
Overseas Economic Cooperation MQEA 92-97 222Development Fund
Development Fund for Small and ditto 92-97 illMedium size Business
Purchase of New Office Building ditto 92-97 19
Construction of Sulfuric/Nitric Acid ditto 91-97 131Plant
2nd Set of Equipment for Acetic Acid ditto 88-91 33Production
3rd Set of Equipment for Caprolactum ditto 89-92 136Plant
Bottleneck El i¥ii nation Program for ditto 90-92 4Acetic Acid
III.
The Taiwan Environmental Protection Administration (EPS) projects comprise 68of the total 775 projects in the plan? and account for US$10.7 billion of thetotal US$305 billion Six-Year Plan budget.
EPA projects along with their implementation dates and budgets forFY1992-FY1997 are provided below.
U.S. firms wishing to obtain further information on projects contained in theSix-Year Plan may contact:
'•̂i&
Environmental Protection Administration1 Hsiangyang_ Rd.Taipei y TaiwanTEL: 886-2-311-7722FAX: 886-2-311-5436
or
American Institute in TaiwanCommercial UnitRm. 3207, 32F? 333 Keelung Rd., Sec. 1Taipei r TaiwanTEL: S86-2-720-1S50FAX: 886-2-757-7162ATTN: Robert H. Strotman
In US$ million(US$1 equals NT$S7)
Projects-ResponsibleAgencies
Implemen-tationPeriod Budget
Acceleration of Environmental ImpactAssessment on projects
Air- Quality Improvement in Taiwan
CPC-funded Garbage Recycling Plant
Industrial Waste Disposal Center
Industrial Waste Management Program
Environmental Quality Monitoring Tor-Taiwan
EPA 92-94
ditto
ditto
ditto
ditto
ditto
91-97
89-94
91-95
91-97
91-97
62
214
81
40
70
Establishment of Environmental Policy dittoInformation 'Network
Establishment of Environmental dittoInspection Center
Environmental Monitoring System at dittoTasheh & Linyuan Industrial Zones
Industrial Pollution Control
Industrial Pollution Control
Environmental Protection Projectsfor Kinmen Island
Global Atmospheric Quality Protection
Noise Control Improvement Project
Establishment of Chemical DisasterPreventive Systems
Toxic Chemical Control Projects
Improvement of Environmental Sanitation
Industrial Uastewater Pollution Control
Control of Waste Recycling Project
Improvement of Pig Farm PollutionControL Projects
Pollution Control for state-run dittoEnterprises from 93-96
wastewater Pollution Control at the dittoState-run Sugar Refineries
Sugar Mill Pollution Control Projects ditto
Phase II Pollution Control at Taisugar dittoByproduct Plants
Protection of Underground Water dittoResources
Ocean Pollution Control ditto
91-97
91-97
S4-9S
92-96
93-2003
01 -QT
?£-200i
81
ditto
ditto
ditto
ditto
ditto
ditto
ditto
ditto
ditto
ditto
ditto
91-2000
90-94
91-97
91-97
92-97
91-97
92-97
91-97
91-97
92-97
91-93 '
54
1,277
40
.-\o
16
17
17
34
47
3
4
217
15
14
145
707
- 24
Soil Pollution Control in Taiwan ditto 91-97 34
Improvement of Waste-Water TreatmentPlants at Industrial Parks
Investment in EnvironmentalProtection at Sugar Refineries
Livestock Farm Pollution Control
Construction of Feitsui ReservoirUpstream Sewerage System
Pollution Control & Diversion forTamsui River
Planning for Sewerage Systems
Construction of Sewerage Systems
Phase II Wastewater Treatment Plant
Phase II Garbage Disposal Project forTaiwan Province
Landfill with Compressed Garbage atChanghua Coastal Area
Pollution Control at Industrial Parks-
Control of Agricultural Pollution
Improvement of Construction WasteDisposal Yards
Control of Industrial Wastes
Renewal of Pig Farm Pollution ControlFacilities
Pollution Control for Heavy MetalContamination in Fartn Land
EPA & 90-93IndustrialDevelopmentBureau, MOEA
Taiwan Sugar 89-92Corporation &EPA
EPA & 91-97Council ofAgriculture
Taiwan 92-97ProvincialAuthorities
ditto 90-93
156
22
ditto
ditto
ditto
ditto
ditto
ditto
ditto
ditto
ditto
ditto
91-2001
91-2001
90-92
91-96
92-96
91-97
91-97
91-97
91-97
93-2001
S9
1,922
1
856
74
5
S
42
7
7
ditto
- 25 -
Environmental Protection Education andPublicity
Intensified Air Pollution Control
Noise Control Improvement for Primary& Junior High Schools
Noise Control in Taiwan
Pig Farm Pollution Control Projects
Construction of Sewerage Systems
Shihlin Incinerator
Mucha Incinerator
Planning for Second Landfill (Phase I)yTaipei City
Planning for Second Landfill (Phase ID?Taipei City
Urban Garbage Disposal? Phase II
Taipei City Air Pollution MonitoringSystem
Construction of a Building for trainingof Public Servants
Heng-kuang Excavated Soil Landfill atMuch a
Nei-kou Excavated Soil Landfill atN.eihu
Kuantu Plain Landfill for Excavated Soil
Taipei Construction Surplus SoilLandfill
Pali Surplus Soil for Coastal LandReclamation Project
Pollution Control for (-touching River
ditto 91-97 10
ditto
ditto
ditto
ditto
Taipei CityAuthorities
ditto
ditto
ditto
ditto
ditto
ditto
91-97
92-97
91-97
91-97
91-2001
89-96
87-94
91-94
91-95
92-97
91-97
102
222
125
£6
1,009
£49
120
104
272
377
2
ditto
ditto
ditto
ditto
ditto
ditto
91-97
92-96
92-2002
91-97
92-97
14
Kaohsiung 92-97City Authorities
£71
186
33S
13
26 -
Pollution Control for Chiencheng River ditto
Six-Year Plan for Sewerage Systems ditto
Construction of Recycling Plant ditto
Kaohsiung Regional Sanitary Landfill ditto
Landfill at Talinpu Coastal Area ditto
Noise Control for Schools near dittoKaohsiung International Airport
9E-97
91-2001
91-97
91-96
8S-9S
9S-97
19
430
102
33
6
12
- S7 -