PROJECT PROPOSAL SITE ANALYSIS
TARGET USERS
MIXED USE - RESIDENTIAL & COMMERCIAL
RESIDENTIAL MICRO CONDO UNITS - 20,000 SF
PUBLIC BAR & GRILLE - 7,000 SF
PUBLIC COFFEE SHOP - 3,000 SF
OUTDOOR GYM - 10,000 SF
SITE ANALYSIS: Rincon Park, San Francisco
NOISE- Southeast noise from bridge- West noise from Embarcadero tra�c- Aerial noise from helicopters- Northeast noise from ships
SUN- Nearby skyscrapers cast pretty heavy shadows on the Embar-cadero road (from West, refer to sun path diagram)- Sun shadows don’t quite hit the actual park- Sunshine is volatile
WIND- Wind patterns change throughout the day, but for the most part the area receives wind from the Western Paci�c Ocean.- There are spurts of wind that occur in the middle of the night from the north and south regions- Wind is not unbearable as a pedestrian, on a sunny day
TRANSPORTATION- Public Muni & Bart station- Lots of cars, bikes, scooters, etc.- Lots of foot tra�c along Embarcadero (ages 20-60)
CURRENT USE- Public buildings used as o�ce space, some empty squares- Exercise along the Embarcadero (running, biking, weight train-ing)- Nearby restaurants, bars and �tness centers used by locals after work
VEGETATION- Not a lot of natural vegetation- Rincon Park has man-planted bushes, shrubs and non-native palm trees- Seagulls, small chickadee birds and rodents gather towards the ocean
CULTURAL - Sunbathers & exercise on warm afternoons- Nearby weekend Farmer’s Market, summer concert series, ice-skate rink, local events
VIEWS- The best views are of the ocean (east) and the bridge (south-east).
AVERAGE MONTHLY PERCIPRETATION
http://www.weather.com/weather/wxclimatology/monthly/graph/94109 http://www.weather.com/weather/wxclimatology/monthly/graph/94109
AVERAGE TEMPERATURES
Rebecca Jensen. 03707124. IAD 613 - Sustainable Design
FINANCIAL DISTRICT WORKERS
- Nearby business people who work long hours- Looking for a place to sleep- Active lifestyle, ages 21-35- Second condo for those who don’t want a long commute
LOCAL WORKFORCE
- SF locals looking for happy hour after work- Place to go before games- Foodies, techies, yuppies
CON
DOS
RETA
IL
LOCATION: RINCON PARK, SAN FRANCISCO EMBARCADERO
PROJECT FEASIBILITY GREEN CASE STUDY
- Current rental rates are very high, indicating demand- FiDi locals love outdoor bars
- W Hotel, SF: LEED Certified- Efficient lighting, HVAC & sustainable food services
- Fitness advocates- FiDi foot traffic- Near AT&T & ferry- Man-made greens- Bridge, traffic & ocean noise
RINCON PARK BUILDING © Rebecca Jensen. 2013. All Rights Reserved. No part of this presentation or any of its contents may be reproduced, copied, modified or adapted, without the prior written consent of the author, unless otherwise indicated for stand-alone materials
PROGRAM REQUIREMENTSPR
OGR
AM D
IAGR
AM
REBECCA JENSEN. 03707124. IAD 613 SUSTAINABLE DESIGN
LEGENDH HighM MediumL LowY YesN No Minor Adjacency Major Adjacency
RINCON PARK BUILDING © Rebecca Jensen. 2013. All Rights Reserved. No part of this presentation or any of its contents may be reproduced, copied, modified or adapted, without the prior written consent of the author, unless otherwise indicated for stand-alone materials
CONCEPT DEVELOPMENT
CROSS: A mark, object or figure formed by two intersecting lines or pieces
People crossing paths on the Embarcadero
Various hubs that serve as connecting points
Interesting criss-cross patterns on the park
Connected those patterns to a building
Continued interpretations of the word “cross” with 3D models - exploring depth, height, proportion, scale and extrusions
RINCON PARK BUILDING © Rebecca Jensen. 2013. All Rights Reserved. No part of this presentation or any of its contents may be reproduced, copied, modified or adapted, without the prior written consent of the author, unless otherwise indicated for stand-alone materials
CONTINUED EXPLORATION OF “CROSS” - Increased focus on extrusions, voids & intersections
REBECCA JENSEN. 03707124. IAD 613
PRELIMINARY IDEATION SKETCHES FOR “CROSS”
FLOORPLAN SKETCH
Spatial Exploration Floorplan ExplorationElevation & Aerial Exploration
RINCON PARK BUILDING © Rebecca Jensen. 2013. All Rights Reserved. No part of this presentation or any of its contents may be reproduced, copied, modified or adapted, without the prior written consent of the author, unless otherwise indicated for stand-alone materials
BUILDING A SUSTAINABLE FOUNDATION
SUN MOVEMENT & DAYLIGHTING PASSIVE AIR CIRCULATION DESIGN
UP
UP
DN
UP
UP
UPUPDN
UP
UP
UP
DN
DN
UP
UP
OUTDOOR GYM AREA
LEVEL 1
LEVEL 2
LEVEL 3
7AM SUN- Early morning sunlight hits eastern side of building - Tenants waking up to morning light
10AM SUN- Coffee shop receives morning sunlight
- Southern condo walls begin to warm up (while tenants leave for work)
12PM SUN- Coffee shop receives maximum sunlight & trellis awning used to minimize direct sunlight
- Southern condos warm up while tenants are at work
3PM SUN- Happy Hour sunshine (3-7pm) hits the bar & grille on the western side of building
RINCON PARK BUILDING © Rebecca Jensen. 2013. All Rights Reserved. No part of this presentation or any of its contents may be reproduced, copied, modified or adapted, without the prior written consent of the author, unless otherwise indicated for stand-alone materials
FINALIZED BUILDING FLOOR PLANS
COMMUNAL LIVING ROOM OUTDOOR COMMUNAL BBQ
OUTDOOR PICNIC AREA
(ROOMS ON LEVEL 2.5)
LEVEL 1
RINCON PARK BUILDING © Rebecca Jensen. 2013. All Rights Reserved. No part of this presentation or any of its contents may be reproduced, copied, modified or adapted, without the prior written consent of the author, unless otherwise indicated for stand-alone materials
FINALIZED BUILDING FLOOR PLANS
OUTDOOR COMMUNAL BBQ
COMMUNAL LIVING ROOM
OUTDOOR COMMUNAL BBQ
(ROOMS ON LEVEL 2.5)LEVEL 3
ROOF LEVEL
RINCON PARK BUILDING © Rebecca Jensen. 2013. All Rights Reserved. No part of this presentation or any of its contents may be reproduced, copied, modified or adapted, without the prior written consent of the author, unless otherwise indicated for stand-alone materials
MICRO CONDO UNITS
UP
UP
UP
DN
DN
UP
UP
OUTDOOR GYM AREA
OUTDOOR GYM AREAOUTDOOR BBQ PICNICAREA
PERSPECTIVE VIEW
LOWER LEVEL UPPER LEVEL
RINCON PARK BUILDING © Rebecca Jensen. 2013. All Rights Reserved. No part of this presentation or any of its contents may be reproduced, copied, modified or adapted, without the prior written consent of the author, unless otherwise indicated for stand-alone materials
MICRO CONDO UNITS
Additional window for daylight & ventilation
Ann Sacks Glass Tile: 30% pre-consumer recycled content and up to 65% post-consumer recycled bottle glassBamboo Flooring:
sustainable harvest process, recyclable and biodegradable material.
Low VOC white paint to reflect daylight
Ladder acts as a bridge to connect levels
Cross construct inspiring railing
RINCON PARK BUILDING © Rebecca Jensen. 2013. All Rights Reserved. No part of this presentation or any of its contents may be reproduced, copied, modified or adapted, without the prior written consent of the author, unless otherwise indicated for stand-alone materials
COFFEE SHOP
UP
UP
PERSPECTIVE VIEW
RINCON PARK BUILDING © Rebecca Jensen. 2013. All Rights Reserved. No part of this presentation or any of its contents may be reproduced, copied, modified or adapted, without the prior written consent of the author, unless otherwise indicated for stand-alone materials
COFFEE SHOP
Retractable south-facing glass doors allow for natural air circulation & light
Indoor/outdoor connection
Recyclable concrete with no toxic runoff
Cradle to Cradle certified IceStone countertop made from recycled glass
Outdoor trellis provides natural shade
Local reclaimed wood from Restoration Timber in San Francisco
Cross construct inspiring ceiling, flooring & trellis
RINCON PARK BUILDING © Rebecca Jensen. 2013. All Rights Reserved. No part of this presentation or any of its contents may be reproduced, copied, modified or adapted, without the prior written consent of the author, unless otherwise indicated for stand-alone materials
BAR & GRILLE
UP
UP
UP
DN
DN
UP
UP
OUTDOOR GYM AREA
OUTDOOR GYM AREAOUTDOOR BBQ PICNICAREA
LOWER LEVELPERSPECTIVE VIEW ROOF LEVEL
RINCON PARK BUILDING © Rebecca Jensen. 2013. All Rights Reserved. No part of this presentation or any of its contents may be reproduced, copied, modified or adapted, without the prior written consent of the author, unless otherwise indicated for stand-alone materials
BAR & GRILLE
Ceiling boxes at different scales with extrusions & voids
Cross pattern shadows
Proyecta porcelain floor, Cradle to Cradle certified material
Clear tempered glass boxes provide daylight for lower level & transform into light boxes at night
Brentano Eco-Friendly Faux Leather made from polyurethane w/ low VOC
Green walls w/ herb garden
Vertical columns connect the horizontal levels
RINCON PARK BUILDING © Rebecca Jensen. 2013. All Rights Reserved. No part of this presentation or any of its contents may be reproduced, copied, modified or adapted, without the prior written consent of the author, unless otherwise indicated for stand-alone materials
OUTDOOR GYM
UP
UP
UP
DN
DN
UP
UP
OUTDOOR GYM AREA
OUTDOOR GYM AREAOUTDOOR BBQ PICNICAREA
PERSPECTIVE VIEW
RINCON PARK BUILDING © Rebecca Jensen. 2013. All Rights Reserved. No part of this presentation or any of its contents may be reproduced, copied, modified or adapted, without the prior written consent of the author, unless otherwise indicated for stand-alone materials
OUTDOOR GYM
DN
UP
UP
UPUPDN
PERSPECTIVE VIEW
RINCON PARK BUILDING © Rebecca Jensen. 2013. All Rights Reserved. No part of this presentation or any of its contents may be reproduced, copied, modified or adapted, without the prior written consent of the author, unless otherwise indicated for stand-alone materials
OUTDOOR GYM
Green rooftop gym connects with park & wild habitat
Indoor living wall allows for gardening and air purification
Skylight added for natural daylighting
Outdoor gym runs through condo corridor, connecting runners with other residents
Interactive outdoor gym acts as the “glue” that connects people throughout the vertical and horizontal building spaces
RINCON PARK BUILDING © Rebecca Jensen. 2013. All Rights Reserved. No part of this presentation or any of its contents may be reproduced, copied, modified or adapted, without the prior written consent of the author, unless otherwise indicated for stand-alone materials
SUSTAINABLE STRATEGIES
BAY WATER FILTER PUMP SYSTEM
ECO-EFFECTIVE “Q-FLOOR SYSTEM” HH ROBINSON BAY WATER FILTER PUMP SYSTEM
FILTER
- Cradle to Cradle taproute flooring system
- Organizes & simplifies wiring
- Full shear stud capacity for efficient composite beam design
- Reduces horizontal steel frame weight by up to 35%
- Filters water from the bay with advanced filter system
- Provides water for toilet flush
- Provides irrigation water for living walls & green spaces throughout the rooftop gym and nearby park area
- Additional underwater wildlife environment on top of pump