IEEE/PES Substation Committee - GIS Subcommittee
T&D Chicago GIS
IEEE/PES Substation Committee - GIS Subcommittee
Substations CommitteeGIS Subcommittee K2
ModuleGas Insulated Substation (GIS)
Basics
IEEE
- 2 -
IEEE/PES Substation Committee - GIS Subcommittee
T&D Chicago GIS
IEEE/PES Substation Committee - GIS Subcommittee
ContentsGIS Basics
A Introduction to GISC Design Features of GIS
2
- 3 -
IEEE/PES Substation Committee - GIS Subcommittee
T&D Chicago GIS
IEEE/PES Substation Committee - GIS Subcommittee
ContentsGIS Basics
A Introduction to GIS
- 4 -
IEEE/PES Substation Committee - GIS Subcommittee
T&D Chicago GIS
IEEE/PES Substation Committee - GIS Subcommittee
Introduction to GISTypical Air Insulated Substation 345/230/115kV
3
- 5 -
IEEE/PES Substation Committee - GIS Subcommittee
T&D Chicago GIS
IEEE/PES Substation Committee - GIS Subcommittee
Introduction to GISTypical Gas Insulated Substation 345/115kV
- 6 -
IEEE/PES Substation Committee - GIS Subcommittee
T&D Chicago GIS
IEEE/PES Substation Committee - GIS Subcommittee
Introduction to GISCable Feeder Unit
4
- 7 -
IEEE/PES Substation Committee - GIS Subcommittee
T&D Chicago GIS
IEEE/PES Substation Committee - GIS Subcommittee
Introduction to GISDimension ComparisonGIS Technology
SF6 used as the insulating media
Reduced clearances- 345 kV AIS 4.6 m (15 feet)- 345 kV GIS 380 mm (15 inches)
- 8 -
IEEE/PES Substation Committee - GIS Subcommittee
T&D Chicago GIS
IEEE/PES Substation Committee - GIS Subcommittee
Introduction to GISView into Bus Bar: Conductor/Enclosure Dimension
5
- 9 -
IEEE/PES Substation Committee - GIS Subcommittee
T&D Chicago GIS
IEEE/PES Substation Committee - GIS Subcommittee
Busbar DisconnectorCurrent TransformerCircuit Breaker
CableConnection
DisconnectorCurrent TransformerCircuit Breaker
Introduction to GISClassic Single Phase Enclosure of GIS
- 10 -
IEEE/PES Substation Committee - GIS Subcommittee
T&D Chicago GIS
IEEE/PES Substation Committee - GIS Subcommittee
Introduction to GISMidway Sunset Sunoco Cogen 242 kV GIS
4
242 kV
2000 A
40 kA
No. of breakers
Rated voltage
Rated current
Rated short-circuit current
1988Supply year
6
- 11 -
IEEE/PES Substation Committee - GIS Subcommittee
T&D Chicago GIS
IEEE/PES Substation Committee - GIS Subcommittee
Introduction to GISClassic Three Phase Enclosure of 72.5 to 170 kV GIS
- 12 -
IEEE/PES Substation Committee - GIS Subcommittee
T&D Chicago GIS
IEEE/PES Substation Committee - GIS Subcommittee
Introduction to GISAdvanced Three Phase GIS 72.5 to 145 kV
7
- 13 -
IEEE/PES Substation Committee - GIS Subcommittee
T&D Chicago GIS
IEEE/PES Substation Committee - GIS Subcommittee
Introduction to GISAdvanced Three Phase GIS 72.5 to 145 kV
- 14 -
IEEE/PES Substation Committee - GIS Subcommittee
T&D Chicago GIS
IEEE/PES Substation Committee - GIS Subcommittee
ContentsGIS Basics
B Design Features of GIS
8
- 15 -
IEEE/PES Substation Committee - GIS Subcommittee
T&D Chicago GIS
IEEE/PES Substation Committee - GIS Subcommittee
Design Features
GIS technology: compact, low-life cycle cost andmodular for indoor and outdoor applications
Modular design, factory pre-assembled and tested units
Space requirement less than 20 % of comparable AIS
Safety (enclosed energized components)
Continous monitoring of SF6 densitity
Sealed for operating life > 50 years
Major inspection: not before 25 years 1)
1) Is influenced by the operation duties
- 16 -
IEEE/PES Substation Committee - GIS Subcommittee
T&D Chicago GIS
IEEE/PES Substation Committee - GIS Subcommittee
Design Features
GIS technology: compact, low-life cycle cost andmodular for indoor and outdoor applications
Corrosion-resistant
Low fault-probability/high availability
Protected against aggressive environmental conditions
Seismic resistant
Low EMF and susceptibility to EMC
9
- 17 -
IEEE/PES Substation Committee - GIS Subcommittee
T&D Chicago GIS
IEEE/PES Substation Committee - GIS Subcommittee
Design FeaturesSpace Savings
Space Reductionappr. 70 %
Previous
Afterwards
Retrofit of an existing AIS Substation byCompact Substation
145 kV/31,5 kA 4000 A
- 18 -
IEEE/PES Substation Committee - GIS Subcommittee
T&D Chicago GIS
IEEE/PES Substation Committee - GIS Subcommittee
Design FeaturesModular Structure (schematic)
10
- 19 -
IEEE/PES Substation Committee - GIS Subcommittee
T&D Chicago GIS
IEEE/PES Substation Committee - GIS Subcommittee
Design FeaturesModular Structure (devices)
- 20 -
IEEE/PES Substation Committee - GIS Subcommittee
T&D Chicago GIS
IEEE/PES Substation Committee - GIS Subcommittee
Design FeaturesGIS Pressure Systems
Closed pressure systems:
The closed pressure system uses isolated apparatus compartments with o-ring sealed bolted flanges.
The tightness characteristic of a closed pressure system stated by the manufacturer shall be consistent with a minimum maintenance and inspection philosophy.
The leakage rate from any single compartment of GIS to atmosphere and between compartments shall not exceed 0.5 % per year for the service life of the equipment.*
Practical experiences to the today’s design of GIS show as low as 0.2 % per year.
* IEC 62271-203 Gas Insulated Switchgear for voltages above 52 kV
11
- 21 -
IEEE/PES Substation Committee - GIS Subcommittee
T&D Chicago GIS
IEEE/PES Substation Committee - GIS Subcommittee
Sealant
O-Ring
Insulating Spacer
Air Side
SF6 Gas Side
Flange
■ O-RING
■ LIQUID SILICONE SEALANT
GAS SEALING
PROTECTION AGAINSTGISEnclosure
� WATER INGRESS FROM AIR SIDE
� RUST OF FLANGE
Design FeaturesExample for Static Double Sealing System
- 22 -
IEEE/PES Substation Committee - GIS Subcommittee
T&D Chicago GIS
IEEE/PES Substation Committee - GIS Subcommittee
Design FeaturesExample for Corrosion Protection
– – – Tectyl 506 coating for external area A- - - - Trost Multifunction Oil coating for inner area B
Grease bolts with “Molykote Longterm 2”before inserting
gap protection by seal coating
12
- 23 -
IEEE/PES Substation Committee - GIS Subcommittee
T&D Chicago GIS
IEEE/PES Substation Committee - GIS Subcommittee
Design FeaturesExample for Dynamic Sealing System
Coupling of operating rodSF6 gas compartmentSF6 gas compartment
Coupling of operating rod
Shaft SF6 seal Operating lever
- 24 -
IEEE/PES Substation Committee - GIS Subcommittee
T&D Chicago GIS
IEEE/PES Substation Committee - GIS Subcommittee
Design FeaturesTypical Grounding / Earthing Arrangement of GIS
Earthing of the buildingConnection to GIS bayOutside the buildingEarthing in the floor/ceilingConnection earthing of floor/ceiling to building
13
- 25 -
IEEE/PES Substation Committee - GIS Subcommittee
T&D Chicago GIS
IEEE/PES Substation Committee - GIS Subcommittee
Thank you for your attention.