AGENDA
2
AGENDA
![Page 3: Structuri Metalica MTC Pre Zen Tare Companie](https://reader030.vdocuments.us/reader030/viewer/2022020110/54f513184a795902418b495c/html5/thumbnails/3.jpg)
MARTIFER GROUP- BUSINESS AREAS
MARTIFER CONSTRUCTIONS WORLWIDE
3
MARTIFER LOGISTIC BUILDINGS
PROJECT EXPERIENCE IN ROMANIA
INTERNATIONAL EXPERIENCE
![Page 4: Structuri Metalica MTC Pre Zen Tare Companie](https://reader030.vdocuments.us/reader030/viewer/2022020110/54f513184a795902418b495c/html5/thumbnails/4.jpg)
MARTIFER GROUP
4
BUSINESS AREAS
![Page 5: Structuri Metalica MTC Pre Zen Tare Companie](https://reader030.vdocuments.us/reader030/viewer/2022020110/54f513184a795902418b495c/html5/thumbnails/5.jpg)
METALLIC CONSTRUCTION SOLAR
OTHERS
5
STEEL STRUCTURESALUMINUM STAINLESS STRUCTURESENGENIERINGWIND INDUSTRY
EPC SOLUTIONSFOTOVOLTAIC SOLUTIONSDISTRIBUITION
![Page 6: Structuri Metalica MTC Pre Zen Tare Companie](https://reader030.vdocuments.us/reader030/viewer/2022020110/54f513184a795902418b495c/html5/thumbnails/6.jpg)
MARTIFER GROUP- BUSINESS AREAS
6
![Page 7: Structuri Metalica MTC Pre Zen Tare Companie](https://reader030.vdocuments.us/reader030/viewer/2022020110/54f513184a795902418b495c/html5/thumbnails/7.jpg)
MARTIFER GROUP- BUSINESS AREAS
504635 641 700
8841028
1418
1800
2853
3795
0
500
1000
1500
2000
2500
3000
3500
4000
2000 2001 2002 2003 2004 2005 2006 2007 2008 2009
No. of Workers (annual average)
6,5 7,8 7,7 9,3 11,115,6
28,6
37,0
61,7
66,8
0
10
20
30
40
50
60
70
80
2000 2001 2002 2003 2004 2005 2006 2007 2008 2009
EBITDA (M€)
7
2000 2001 2002 2003 2004 2005 2006 2007 2008 2009
52 67,7 78,4100,6
125,6148,9
278,7
518,5
635,1606,1
0
100
200
300
400
500
600
700
2000 2001 2002 2003 2004 2005 2006 2007 2008 2009
Operational Revenues (M€)
2000 2001 2002 2003 2004 2005 2006 2007 2008 2009
![Page 8: Structuri Metalica MTC Pre Zen Tare Companie](https://reader030.vdocuments.us/reader030/viewer/2022020110/54f513184a795902418b495c/html5/thumbnails/8.jpg)
MARTIFER CONSTRUCTIONS
8
WORLWIDE
![Page 9: Structuri Metalica MTC Pre Zen Tare Companie](https://reader030.vdocuments.us/reader030/viewer/2022020110/54f513184a795902418b495c/html5/thumbnails/9.jpg)
9Portugal |Spain |Poland |Angola |Romania |Ireland
![Page 10: Structuri Metalica MTC Pre Zen Tare Companie](https://reader030.vdocuments.us/reader030/viewer/2022020110/54f513184a795902418b495c/html5/thumbnails/10.jpg)
Martifer was established on 21st February 1990, and still maintains
its head office in the industrial zone of Oliveira de Frades, Portugal,
where is located the main factory of Steel Structures with 30.000
m2.
The factory is supplying the Portuguese, Spanish, Western Europe
and North African Market.
MARTIFER CONSTRUÇÕES
Oliveira de Frades | Portugal
10
During the first quarter of 2002, it began the construction of a new
plant in Benavente, Portugal.
The main goal of this was to engage in the construction of the new
EURO 2004 football stadiums and to supply the Spanish market at
the time.
The area occupied by this factory has a total value of 24.000 m2.
MARTIFER BENAVENTE
Benavente | Portugal
![Page 11: Structuri Metalica MTC Pre Zen Tare Companie](https://reader030.vdocuments.us/reader030/viewer/2022020110/54f513184a795902418b495c/html5/thumbnails/11.jpg)
Located in Gliwice, Poland, the production unit of Martifer started
operating in August 2004.
This unit has a nominal annual capacity of 10.000 tons of steel
structure and is possible to per-form shot blasting, painting and
coating. It is equipped with state of the art CNC cut and dril-ling
equipment for plates and profiles, as well as cutting and bending
of thin plate in the fini-shing sector.
MARTIFER POLSKA
Gliwice | Polska
11
Martifer started activity in Romania in 2005, importing the Steel
Structures from Poland and Portugal.
In 2008, the investment in the new Steel Structures Plant, allows
Martifer to have a local capacity of production of 10.000 tons to
supply Romania, Bulgaria, Serbia, Croatia, Turkey and part of the
Middle East Market.
MARTIFER CONSTRUCTII
Calarasi | Romania
![Page 12: Structuri Metalica MTC Pre Zen Tare Companie](https://reader030.vdocuments.us/reader030/viewer/2022020110/54f513184a795902418b495c/html5/thumbnails/12.jpg)
Located in Luanda, Angola, the production unit of Martifer
started operating in September 2009.
Projected to supply the Central and South African market the
factory will start production in September 2009 equipped with a
line for cutting and drilling profiles, oxicut machine with plasma,
MARTIFER CONSTRUÇÕES
Luanda | Angola
12
line for cutting and drilling profiles, oxicut machine with plasma,
guillotine, plate bending machine, plate drilling machine and
automatic shoot blasting chamber. Local capacity of production
of 150 tons \week.
![Page 13: Structuri Metalica MTC Pre Zen Tare Companie](https://reader030.vdocuments.us/reader030/viewer/2022020110/54f513184a795902418b495c/html5/thumbnails/13.jpg)
PROJECT EXPERIENCE IN ROMANIA
13
IN ROMANIA
![Page 14: Structuri Metalica MTC Pre Zen Tare Companie](https://reader030.vdocuments.us/reader030/viewer/2022020110/54f513184a795902418b495c/html5/thumbnails/14.jpg)
Saint Gobain Glass Factory| Romania
The first project of Martifer in Romania was a “turn-key” glass factory for Saint
Gobain Glass, executed from 2005 to 2007 in Calarasi.
14
![Page 15: Structuri Metalica MTC Pre Zen Tare Companie](https://reader030.vdocuments.us/reader030/viewer/2022020110/54f513184a795902418b495c/html5/thumbnails/15.jpg)
Henkel Factory | Romania
The scope of works was the supply of steel structures in Cluj with the
quantity of steel reaching 1.400 Tons.
15
![Page 16: Structuri Metalica MTC Pre Zen Tare Companie](https://reader030.vdocuments.us/reader030/viewer/2022020110/54f513184a795902418b495c/html5/thumbnails/16.jpg)
Biodiesel Factory| Romania
A turn-key project for Prio, which included the
works of special foundations, land movements,
civil construction, steel structures, cladding and
roofing, finishing, external networks, roads,
railway, etc.
16
![Page 17: Structuri Metalica MTC Pre Zen Tare Companie](https://reader030.vdocuments.us/reader030/viewer/2022020110/54f513184a795902418b495c/html5/thumbnails/17.jpg)
Grand Arena Berceni| Romania
The scope of works was the supply and assembly of the steel
structure for 9 of the 10 corps of the mall. The connections
between the main elements were welded on site. The quantity
of steel supplied and assembled reaches 4.500 Tons.
17
![Page 18: Structuri Metalica MTC Pre Zen Tare Companie](https://reader030.vdocuments.us/reader030/viewer/2022020110/54f513184a795902418b495c/html5/thumbnails/18.jpg)
Glass House| Romania
2 buildings for offices joined by two intermediarycorps.The quantity of steel reaches 1.550 Tons with aexecution period of 12 months including fabricationand erection on site.
18
![Page 19: Structuri Metalica MTC Pre Zen Tare Companie](https://reader030.vdocuments.us/reader030/viewer/2022020110/54f513184a795902418b495c/html5/thumbnails/19.jpg)
Eurotower (Cascade) | Romania
A class A office building with 19 floors above ground floor.
Martifer scope is the Design of foundations and superstructure,
fabrication, assembly and supply of the steel structure and
execution of concrete slabs over ground floor. The estimation of
the quantity of steel structure is about 3.500 tons.
Assembly – 5 months
19
![Page 20: Structuri Metalica MTC Pre Zen Tare Companie](https://reader030.vdocuments.us/reader030/viewer/2022020110/54f513184a795902418b495c/html5/thumbnails/20.jpg)
Extraction Plant| Romania
A turn-key factory of oil extraction from seeds of sunflower
for Prio comprehending the Design and Build of: crushed
stone pilings, roads, railways, warehouses, silos, tanks, pipe-
racks & catwalks.
Steel Structure: 2.000 tons
Concrete: 15.000 m3
Steel Reinforcement: 1.600 tons
20
Steel Reinforcement: 1.600 tons
![Page 21: Structuri Metalica MTC Pre Zen Tare Companie](https://reader030.vdocuments.us/reader030/viewer/2022020110/54f513184a795902418b495c/html5/thumbnails/21.jpg)
Dambovita Center| Romania
For the restructuring of Casa Radio complex Martifer
manufactured 3.200 tons of Steel structure pilings for the
Underground Parking Area. The structure was delivered in
special transports of 25 length and 80 tons.
21
![Page 22: Structuri Metalica MTC Pre Zen Tare Companie](https://reader030.vdocuments.us/reader030/viewer/2022020110/54f513184a795902418b495c/html5/thumbnails/22.jpg)
Basarab Bridge| Romania
In the heart of Bucharest this cabled stayed bridge willhave 4.500 tons of metallic deck. The execution periodwill be 9 months for Detail Engineering, Manufacturingand Erection over the railroad access to the city mainstation.
22
![Page 23: Structuri Metalica MTC Pre Zen Tare Companie](https://reader030.vdocuments.us/reader030/viewer/2022020110/54f513184a795902418b495c/html5/thumbnails/23.jpg)
Otopeni Bridge| Romania
In the exit of Bucharest to Ploiesti this cabled stayedbridge will have 1.350 tons of metallic deck and 3800m2of steel deck floor. The execution period will be 2 monthsfor Detail Engineering, 3,5 months for Manufacturing and4 month for Erection over the railroad line.
23
![Page 24: Structuri Metalica MTC Pre Zen Tare Companie](https://reader030.vdocuments.us/reader030/viewer/2022020110/54f513184a795902418b495c/html5/thumbnails/24.jpg)
Petrom City| Romania
In Bucharest the steel structure for skylights andtechnical floor will have 510 tons and 4000m2 ofglass covering. The execution period will be 3,5months for Detail Engineering, Manufacturing andErection.
24
![Page 25: Structuri Metalica MTC Pre Zen Tare Companie](https://reader030.vdocuments.us/reader030/viewer/2022020110/54f513184a795902418b495c/html5/thumbnails/25.jpg)
Polus Center| Romania
In Constanta the steel structure for two buildings ofthe shopping center will have 2000 tons and it iserected on concrete piles. The execution period willbe 2 months for Detail Engineering, Manufacturingand Erection.
25
![Page 26: Structuri Metalica MTC Pre Zen Tare Companie](https://reader030.vdocuments.us/reader030/viewer/2022020110/54f513184a795902418b495c/html5/thumbnails/26.jpg)
MARTIFER LOGISTIC
26
BUILDINGS
![Page 27: Structuri Metalica MTC Pre Zen Tare Companie](https://reader030.vdocuments.us/reader030/viewer/2022020110/54f513184a795902418b495c/html5/thumbnails/27.jpg)
SWEDWOOD | Paços de Ferreira - Portugal
Covered Area: 120.000 m2 , Turn Key Project
Steel Structure: 3.000 Ton
27
![Page 28: Structuri Metalica MTC Pre Zen Tare Companie](https://reader030.vdocuments.us/reader030/viewer/2022020110/54f513184a795902418b495c/html5/thumbnails/28.jpg)
SUNVIAUTO MAROC | Maroc
Area: 4125 m2, Turn Key Project
Steel Structure: 220 Ton
28
![Page 29: Structuri Metalica MTC Pre Zen Tare Companie](https://reader030.vdocuments.us/reader030/viewer/2022020110/54f513184a795902418b495c/html5/thumbnails/29.jpg)
PLANT FOR SIMOLDES POLSKA | Poland
The plant for Simoldes is a turnkey project for an industrial hall
with 8500 sqm, including the office and social buildings with an
area of 1240 sqm. 450 tons of steel structures were used during
the 19 months of execution period.
29
![Page 30: Structuri Metalica MTC Pre Zen Tare Companie](https://reader030.vdocuments.us/reader030/viewer/2022020110/54f513184a795902418b495c/html5/thumbnails/30.jpg)
OBI - OGROD | Poland
Obi is focused on the trade of bricolage, decoration and gardening. It is located in Lubin in Poland. 160 tons of steel structures and 6700 sqm of cladding for the roof were used. The execution period started in October 2004 and ended in January 2005. Turn Key Project
30
![Page 31: Structuri Metalica MTC Pre Zen Tare Companie](https://reader030.vdocuments.us/reader030/viewer/2022020110/54f513184a795902418b495c/html5/thumbnails/31.jpg)
CONTINENTE VALONGO | Portugal
Building site area: 60.000 m2 , Turn Key Project
Construction Steel: 3.300 Ton
Concrete Quantity: 35:000
Steel Structure: 1000 Ton
31
![Page 32: Structuri Metalica MTC Pre Zen Tare Companie](https://reader030.vdocuments.us/reader030/viewer/2022020110/54f513184a795902418b495c/html5/thumbnails/32.jpg)
BIERDRONKA, JERÓNIMO MARTINS | Poland
Area: 22.000 m2, Turn Key Project
Steel Structure: 800 Ton
32
![Page 33: Structuri Metalica MTC Pre Zen Tare Companie](https://reader030.vdocuments.us/reader030/viewer/2022020110/54f513184a795902418b495c/html5/thumbnails/33.jpg)
ARCEN| Poland
Area: 2000 m2, Turn Key Project
Steel Structure: 160 Ton
33
![Page 34: Structuri Metalica MTC Pre Zen Tare Companie](https://reader030.vdocuments.us/reader030/viewer/2022020110/54f513184a795902418b495c/html5/thumbnails/34.jpg)
SAINT GOBAIN | Poland
Area: 12000 m2, Turn Key Project
Steel Structure: 700 Ton
34
![Page 35: Structuri Metalica MTC Pre Zen Tare Companie](https://reader030.vdocuments.us/reader030/viewer/2022020110/54f513184a795902418b495c/html5/thumbnails/35.jpg)
O2A| Poland
Area: 5000 m2, Turn Key Project
Steel Structure: 160 Ton
35
![Page 36: Structuri Metalica MTC Pre Zen Tare Companie](https://reader030.vdocuments.us/reader030/viewer/2022020110/54f513184a795902418b495c/html5/thumbnails/36.jpg)
UGINE ALZ, ARCELOR MITAL| Poland
Area: 5300 m2, Turn Key Project
Steel Structure: 580 Ton
36
![Page 37: Structuri Metalica MTC Pre Zen Tare Companie](https://reader030.vdocuments.us/reader030/viewer/2022020110/54f513184a795902418b495c/html5/thumbnails/37.jpg)
VOLVO| Poland
Area: 3000 m2, Turn Key Project
Steel Structure: 150 Ton
37
![Page 38: Structuri Metalica MTC Pre Zen Tare Companie](https://reader030.vdocuments.us/reader030/viewer/2022020110/54f513184a795902418b495c/html5/thumbnails/38.jpg)
CARREFOUR| Poland
Area: 5000 m2, Turn Key Project
Steel Structure: 150 Ton
38
![Page 39: Structuri Metalica MTC Pre Zen Tare Companie](https://reader030.vdocuments.us/reader030/viewer/2022020110/54f513184a795902418b495c/html5/thumbnails/39.jpg)
DANA FLUID PRODUCTS| Slovakia
Area: 3100 m2, Turn Key Project
Steel Structure: 200 Ton
39
![Page 40: Structuri Metalica MTC Pre Zen Tare Companie](https://reader030.vdocuments.us/reader030/viewer/2022020110/54f513184a795902418b495c/html5/thumbnails/40.jpg)
FOCUS PARK BYDGOSZCZ| Poland
Area: 27648 m2, Turn Key Project
Steel Structure: 190 Ton
40
![Page 41: Structuri Metalica MTC Pre Zen Tare Companie](https://reader030.vdocuments.us/reader030/viewer/2022020110/54f513184a795902418b495c/html5/thumbnails/41.jpg)
MAKRO SZCZAWNO ZDRÓJ| Poland
Area: 12000 m2, Turn Key Project
Steel Structure: 520 Ton
41
![Page 42: Structuri Metalica MTC Pre Zen Tare Companie](https://reader030.vdocuments.us/reader030/viewer/2022020110/54f513184a795902418b495c/html5/thumbnails/42.jpg)
MAKRO, RZGÓW| Poland
Area: 10000 m2, Turn Key Project
Steel Structure: 520 Ton
42
![Page 43: Structuri Metalica MTC Pre Zen Tare Companie](https://reader030.vdocuments.us/reader030/viewer/2022020110/54f513184a795902418b495c/html5/thumbnails/43.jpg)
MAKRO, RZGÓW| Poland
Area: 10000 m2, Turn Key Project
Steel Structure: 520 Ton
43
![Page 44: Structuri Metalica MTC Pre Zen Tare Companie](https://reader030.vdocuments.us/reader030/viewer/2022020110/54f513184a795902418b495c/html5/thumbnails/44.jpg)
SHOPPING IKEA | Matosinhos - Portugal
2800 tons of steel in the roof
1000 tons of steel for support of production
42.000sqm application of polycarbonate
Assembly: 7 months
44
![Page 45: Structuri Metalica MTC Pre Zen Tare Companie](https://reader030.vdocuments.us/reader030/viewer/2022020110/54f513184a795902418b495c/html5/thumbnails/45.jpg)
SHOPPING IKEA | Lisboa - Portugal
From the bold architecture we highlight the strenght that the solutiongives us by using a diferent volume, both formal and aesthetically. MartiferAlumínios took part in the project not only in the façade solutions but alsoin the facing of this volume in Alucobond.
45
![Page 46: Structuri Metalica MTC Pre Zen Tare Companie](https://reader030.vdocuments.us/reader030/viewer/2022020110/54f513184a795902418b495c/html5/thumbnails/46.jpg)
INTERNATIONAL EXPERIENCE
INTERNATIONALEXPERIENCE
46
EXPERIENCE
![Page 47: Structuri Metalica MTC Pre Zen Tare Companie](https://reader030.vdocuments.us/reader030/viewer/2022020110/54f513184a795902418b495c/html5/thumbnails/47.jpg)
Dragão Stadium| Oporto
2800 tons of steel in the roof; 1000 tons of steel for support of
production. 42.000sqm application of polycarbonate.
Assembly: 7 months
47
![Page 48: Structuri Metalica MTC Pre Zen Tare Companie](https://reader030.vdocuments.us/reader030/viewer/2022020110/54f513184a795902418b495c/html5/thumbnails/48.jpg)
Benfica Stadium| Lisbon
The structure is composed by 4 tube arcs with 2000x40mm, main
trusses with girders and tubular sections, struts/ties that connect
the tubes and trusses, that sustain the roof purlins. Assembly: 8
months
48
![Page 49: Structuri Metalica MTC Pre Zen Tare Companie](https://reader030.vdocuments.us/reader030/viewer/2022020110/54f513184a795902418b495c/html5/thumbnails/49.jpg)
Alvalade Stadium| Lisbon
Roof constituted by a three-dimensional truss sustained on 16
ties connected to 4 masts. The main girders are perpendicular to
the interior ring and are sustained on it. Assembly: 8 months.
49
![Page 50: Structuri Metalica MTC Pre Zen Tare Companie](https://reader030.vdocuments.us/reader030/viewer/2022020110/54f513184a795902418b495c/html5/thumbnails/50.jpg)
Sacyr Tower | Spain
A 240m height tower with 59 floors and a construction site of
115.000m2. Manufacturing and assembly of the auditorium
covering, 170Ton; composite pier’s steel mass and tower’s edge
beams 5.000Ton; plates 60.000sqm.
50
![Page 51: Structuri Metalica MTC Pre Zen Tare Companie](https://reader030.vdocuments.us/reader030/viewer/2022020110/54f513184a795902418b495c/html5/thumbnails/51.jpg)
Colombo Tower| Portugal
Steel Structure: 1.400 Ton
12 floors
21.000m2 of Plate
51
![Page 52: Structuri Metalica MTC Pre Zen Tare Companie](https://reader030.vdocuments.us/reader030/viewer/2022020110/54f513184a795902418b495c/html5/thumbnails/52.jpg)
CAJA MAGICA | Spain
Steel coverage: 4.250 Ton divided by three stadiums
The stadium has a movable coverage.
52
![Page 53: Structuri Metalica MTC Pre Zen Tare Companie](https://reader030.vdocuments.us/reader030/viewer/2022020110/54f513184a795902418b495c/html5/thumbnails/53.jpg)
City of Communication| Madrid
12 buildings for offices and two for commercial areas, all joined
by a common roof. This structure is composed by 3 m high
beams and flanges with 65 mm thickness, which form a square
of 8,1 m by 8,1 m. The quantity of steel reaches 9.000 tons.
Assembly – 18 months.
53
![Page 54: Structuri Metalica MTC Pre Zen Tare Companie](https://reader030.vdocuments.us/reader030/viewer/2022020110/54f513184a795902418b495c/html5/thumbnails/54.jpg)
Bridge over Tâmega River | Basto
The project requires 2.900 tons on two steel decks with 390m,
with spans of 60m.
54
![Page 55: Structuri Metalica MTC Pre Zen Tare Companie](https://reader030.vdocuments.us/reader030/viewer/2022020110/54f513184a795902418b495c/html5/thumbnails/55.jpg)
Bascule Bridge | Leixões
The 4th largest bascule bridge in the World with 92 meters length
and 11 large, was executed during 10 months in 2007 with 1300
tons of Steel:
55
![Page 56: Structuri Metalica MTC Pre Zen Tare Companie](https://reader030.vdocuments.us/reader030/viewer/2022020110/54f513184a795902418b495c/html5/thumbnails/56.jpg)
Francisco Sá Carneiro Airport| Oporto
A reference work not only for the figures involved but also for the
complexity. 13.000 ton of steel structures manufactured and
assembled in 12 months. The main structure of this project is
constituted by arcs with 80m length, weighing 100 tons each.
56
![Page 57: Structuri Metalica MTC Pre Zen Tare Companie](https://reader030.vdocuments.us/reader030/viewer/2022020110/54f513184a795902418b495c/html5/thumbnails/57.jpg)
Dublin Airport| Ireland
Steel structure: 1.000 Ton
20.000m2 kalzip and alucobond coverage area
57
![Page 58: Structuri Metalica MTC Pre Zen Tare Companie](https://reader030.vdocuments.us/reader030/viewer/2022020110/54f513184a795902418b495c/html5/thumbnails/58.jpg)
Martifer Constructii S.R.L.
Office:
Str. Stelea Spataru , nr. 12Sector 3, 030213 Bucuresti, Romania Phone: + 4 0314 056 863Fax: + 4 0213 106 864
Factory:
58
Factory:
Str. Prelungirea Bucuresti nr. 166910513 Calarasi, RomaniaPhone: +4 037 271 53 09Fax: +4 037 371 06 71
www.martifer.com
Markets
Romania| Bulgaria | Turkey | Croatia | Serbia | Greece| Middle East