STRUCTURAL DESIGN FOR A LOW RISE OFFICE BUILDING
Senior Honors Project
Shane Halverson
Mentor: Derek Swanson
The overall goal of this project was to obtain a thorough understanding of structural system
design and construction. This was accomplished by studying the four phases a structural project
goes through; schematic design, design development, construction documents, and construction
administration. After gaining a thorough understanding of these four phases the knowledge was
applied to design an entire structural system for a four story office building located in Cheyenne,
WY. This system was designed in accordance to all applicable codes.
Table of Contents
Introduction…………………………………………………………………………..3
Body of Paper………………………………………………………………………...4
Background…………………………………………………...........................4
Research…………………………………………………………………........5
Engineer’s Timeline…………………………………………………..5
Phases of Typical Building Project…………………………………...6
Design Process………………………………………………………..6
Applying What We Learned………………………………………………….7
Schematic Design…………………………………………………….7
Design Development…………………………………………………8
Construction Documents……………………………………………..9
Construction Administration………………………………………...10
Calculations………………………………………………………….11
Conclusion…………………………………………………………………...11
Appendix A…………………………………………………………………………..13
Appendix B…………………………………………………………………………..18
Appendix C…………………………………………………………………………..25
Appendix D…………………………………………………………………………..32
Appendix E…………………………………………………………………………..35
Page 2
STRUCTURAL DESIGN FOR A LOW RISE OFFICE BUILDING
Introduction
As society advances, the built environment becomes an ever increasing component of
everyday life. As a result, buildings and their design are becoming a very scientific field. Buildings
can be as simple as four walls and a roof or as complicated as hundred story skyscrapers. Either
way there is an art to the design and construction of buildings.
Typically, people only see the outside of a building, or the “skin.” However, there is much
more to a building then stone and windows. Buildings can be looked at much like living, breathing
human beings. On the outside is a smooth skin, but under that skin are several different systems
working together in perfect harmony to make life possible. The mechanical system of a building
is like the respiratory system in a body. It is responsible for bringing in fresh air, along with
conditioning each space to the right temperature. The electrical system is much like the nervous
system in a body. It “keeps the lights on” and allows the building to function smoothly. The system
this project focuses on is the structural system. The structural system of a building is exactly like
the skeletal system in a body. The structural system is responsible for making the building stand
and stay standing, even in extreme conditions.
Page 3
STRUCTURAL DESIGN FOR A LOW RISE OFFICE BUILDING
Body of Paper
The overall goal of this project was to obtain a thorough understanding of structural system
design and construction. This was accomplished by studying the four phases a structural project
goes through; schematic design, design development, construction documents, and construction
administration. After gaining a thorough understanding of these four phases the knowledge was
applied to design an entire structural system for a four story office building located in Cheyenne,
WY. This system was designed in accordance to all applicable codes. The project is discussed in
depth within the background, research, applying what we learned and conclusion sections.
Background
This project was conducted in conjunction with the University of Wyoming Architectural
Engineering Capstone class ARE 4720. This class is designed to give students real world
experience in a classroom setting. Students are broken into teams of 2 to 3, and each team is
required to design the entire structural system for a given building. The building for this year’s
capstone class was a new student center for the Laramie County Community College campus
located in Cheyenne, Wyoming. The building will be used for various purposes and will contain
offices, classrooms, and some student services.
The capstone class is designed to be students’ final class prior to graduation. Therefore,
students within the class have a good understanding of various structural systems. Students at this
stage in their education also have a solid understanding of how buildings function, along with how
the various systems within a building interact. The intent of the capstone class is to connect all the
individual items students have learned. It is also designed to give students exposure to how an
Page 4
actual construction project takes place. Students are not required to design an entire building but
rather a component of that building as they would if they were working for an engineering firm.
The class begins the semester by researching the construction process, where students gain
a better understanding of how a project goes from conception to construction. After the initial
research component, the class is divided into four phases as a real construction project would be,
and each phase had a submittal associated with it. The remainder of this paper will follow the
layout of the class.
Research
This project began with research on the construction process. We looked at how one
person’s idea becomes a finished project, paying special attention to the structural engineer’s role
within the overall project scope. Our findings are summarized in the engineer’s timeline, phases
of typical building project, and design process sections.
Engineer’s Timeline. Although a building may take a few years to complete, the structural
engineer is not involved with the project the entire time. Depending on the complexity of the
structural system, and whether it is a focal point or if it is hidden in the background, the structural
engineer is only “actively” involved in about 25-50% of the entire project. Typically, they are
subcontracted to the architect and do not come into the project until both the owner and the
architect have a good understanding of the overall building design. This means the structural
engineer typically has little say in the overall appearance of the project.
Once the structural system erection is complete, the structural engineer is mostly done with
the project. Occasionally the engineer will receive questions resulting from a design change or a
potential issue, but the majority of the engineer’s responsibility is complete at this point.
Page 5
Phases of Typical Building Project. Our research revealed that there are four main phases
a typical building project goes through. These phases are as follows: Schematic Design, Design
Development, Construction Documents, and Construction Administration. The first three phases
are all preconstruction. Only the fourth phase directly deals with the actual construction of the
building and specifically the structural system. Each of the first three phases takes the design
progressively more towards the final design. The design is done in a progressive manner so that a
rough idea of the overall project costs can be estimated as early as possible. Other aspects of the
project are continually undergoing revision as well, so it would not make sense to design the entire
structural system at once only to have the building design change, which would require the system
to be completely redesigned.
Design Process. In addition to the four specific project phases described above, there is
also a design process that is incorporated. The first step is to choose a structural system. This is
perhaps the most important step in the entire process. Building size, use, and desired structural
aesthetics are key factors in deciding which type of structural system to utilize.
Once a structural system is chosen and the project location is known, the next step is to
find all applicable codes. Different regions, states, and municipalities work under different codes.
Following the correct codes is crucial for there are legal consequences if every code is not followed
exactly as written.
The third step is to calculate the loads. Buildings are exposed to two main types of loads,
which are gravity and lateral loads. Gravity loads act in the vertical direction and are the result of
the weight of the building and its contents. Lateral loads act in the horizontal direction and are the
result of wind or seismic factors. During this stage the loads are very roughly calculated as the
Page 6
actual building material and structural component weights are not yet known. These first three
steps are all incorporated into the schematic design.
Once a rough idea of the loading is known, member sizing can begin. This is typically
contained within the design development phase. The construction document deals with precisely
sizing each and every structural member along with all the connections between members.
Once all the members are properly sized, the actual construction documents can be created.
This is a set of blueprints with all the information required to build and erect the structural system.
At this point the design process is complete. However, there is one more phase in the project. For
the structural engineer, this phase is known as the construction administration phase. During this
portion of the project the engineer is responsible for handling any questions that arise. These
questions may be on constructability of the system or how to solve a problem that has arisen in the
field.
Applying What We Learned
The second half of the class project is to actually apply not only what we learned in the
initial research, but everything we have learned over our entire scholastic career. We applied the
knowledge we have gained to design the entire structural system for the four story building that
was previously mentioned. This process was broken into the four design phases previously
introduced; schematic design, design development, construction documents, and construction
administration, along with a section dedicated to calculations.
Schematic Design. For our schematic design submittal, we were required to provide an
executive summary of our intended structural system, state applicable building codes, give load &
design criteria, and give details on our intended structural system. The first step in accomplishing
these tasks was to select an appropriate structural system. There are countless systems that would
Page 7
work in this situation, including mass timber, concrete, and reinforced masonry. My partner and I
chose to use a structural system comprised of steel columns, girders, and beams, working in
conjunction with a mixture of concrete shear walls and braced steel frames. This is a very common
system for a building of this scale and usage. It is also a very popular system in this part of
Wyoming. These two factors contribute to reducing the overall construction costs for the project.
The first step was to determine the necessary codes. Since the building is located within
the city limits of Cheyenne, the City Council of Cheyenne is the governing body. Therefore, the
governing building code is the 2015 version of the International Building Code (IBC). ASCE 7-
10 also governs and is closely tied to the IBC.
The next step was to establish our load and design criteria. This includes factors such as
our Flat Roof Snow Load, which we calculated to be 21 psf, our Basic Wind Speed, which was
found to be 115 mph, and our seismic factors, which were found to be Ss = 0.155g and S1 = 0.036g.
The seismic factors were found using the United States Geological Services website.
The final step of the first phase was to discuss the details of the intended structural system.
This included details on the foundation design based on the given geotechnical report, along with
typical framing information. The lateral system and the interaction between its two different parts
were also discussed. All the details of the schematic design submittal are located in Appendix A,
which contains the entire submittal.
Design Development. The second required submittal for this project was the design
development or DD submittal. As discussed earlier, this submittal builds on where the SD
submittal left off. The deliverables were an entire set of plans for the building, including a
foundation plan. Also required were detail drawings showing specific areas of the buildings where
the interaction between components may not have been entirely clear. The first step in
Page 8
accomplishing the task for this submittal was to lay out the framing. This was challenging because
the building was not square and each level changes slightly. The framing layout was further
complicated by the way the architect laid out each floor. The building contains several slanting
hallways and other challenging aspects that make column layout difficult.
To complete the layout, the structural framing building was drawn in the 3D modeling
program Revit. Gridlines were then added to create rectangular spaces that were easily broken into
framing bays. Columns were then placed at most of the gridline intersection points. Unfortunately,
due to the inconsistency of hallways and rooms from one floor to the next, there are a couple
columns that are not continuous from the foundation to the roof. This resulted in the need for a
transfer beam, a very deep steel member, to transfer the load from the upper column to the lower
columns.
Once a justifiable framing plan was created, rough member sizing could be done. In order
to accomplish this, the tributary area for each member is calculated and the load acting on that area
is found. This gives the total load acting on the member, which can then be used to determine how
big the member needs to be in order to successful carry the load. For additional information on the
contents of the DD submittal, please see appendix B, which contains the entire DD submittal.
Construction Documents. The third phase of this project was creating the construction
documents. This package contains everything necessary to fabricate and construct the structural
system for this building. The first step in this process was reviewing the feedback from the DD
submittal. The feedback implied that some of our detail drawings were not clear enough to be
constructed, so that was remedied. Once we had made the necessary changes to existing plans, we
moved into completing the new tasks.
Page 9
The biggest challenge with the CD submittal was presenting all of the necessary
information in a clear manner due to the limited amount of space on the plans, and each member
needed to be labeled and dimensioned. In order to clearly present all necessary information, plan
notes were used as much as possible. Each member was labeled as clearly as possible and specific
attention was paid to minimizing the use of leader lines. The CD plans have a much higher level
of detail and are very clearly explained, whereas the DD plans gave a good indication of member
location but were not completely buildable. For your convenience, the complete CD submittal has
been included in Appendix C.
Construction Administration. The fourth phase of the project was the Construction
Administration phase. On a real project this phase is during the actual construction of the building.
During the CA portion of the project the engineer has already completely design all necessary
elements for the structural system to be erected. The engineers job during the time the structural
system is erected is to solve any problems that arise. Perhaps a coordination issue causes a pipe
and a beam to be at the same height. The structural engineer would be responsible for finding a
solution.
For our CA submittal we were required to solve a theoretical problem. The problem was
that one of the shear tabs, the component that connects the girder to the column was installed 1”
too low. As a result, the bolt holes did not line up on the girder. Students were required to respond
to the Request For Information sent out about the problem with a reasonable solution. The solution
my team came up with was welding the shear tab to the girder. A 12” long, 3/16” weld was strong
enough to withstand the loading. For corresponding calculations and a detailed drawing solution
please the RFI and our solution in Appendix D.
Page 10
Calculations. The final submittal of our project was the calculations submittal. On a real project
the calculations would have needed to be done prior to the construction document phase. Although
these calculations are typically never “submitted” because contractors only need the results, within
the scope of the classroom setting submitting calculations was critical. Our calculations package
included all of the math required to size the structural components for the building. Both hand
calculations along with computer calculations were utilized. All computer calculations were
performed in Microsoft Excel. Excel enabled us to make adjustments without having to redo all of
our equations, however each formula in excel had to be created and programed by us.
Not every member and connection in the entire building was included within our
calculations submittal. The submittal includes one of each typical component. This includes one
column, beam, girder, connection, interior footing, and column base plate. Also required in the
calculations submittal was all the applicable loading condition calculations for factors such as
snow, wind and snow. Altogether the calculations package is roughly 27 pages. There are a few
discrepancies between the construction documents submittal member sizes and the calculations
submittal member sizes. This is due to the calculations not being entirely done when the CD
submittal was due. In a real world setting the calculations would have to be completed and then
the results are ‘published’ in the CD submittal. The calculations submittal has included in
Appendix E for your convenience.
Conclusion
Structural design is not an easy process. It is very complicated due to the numerous
factors that contribute to the various loads. However, it is a process that can be broken down into
a few, very systematic steps. Overall structural design is truly an art; an art which requires both
analytical and creative inputs. There are several considerations that go into designing structural
Page 11
systems. The ultimate goal of the structure is to keep the building standing and preserve life
safety. Keeping this goal in mind, the structural system is designed to meet all aesthetic and
architectural requirements.
An engineer’s true job is problem solving. They are responsible for coming up with a
solution to the problem the architect and the owner have created. A successful solution will meet
all design requirements as well as all code requirements. This project has given students a
preview of just how challenging it is to create a viable solution.
Page 12
APPENDIX A
Schematic Design Submittal
Page 13
STRUCTURAL
SCHEMATIC DESIGN
LARAMIE COMMUNITY COLLEGE WELCOME CENTER CAPSTONE ARE 4720 GROUP 7 Josh Knutson Shane Halverson
Page 14
Structural System Narrative 1. Executive Summary
A. The primary gravity structure for the LCCC Welcome Center Project will be a combination of structural steel columns, beams, and joists. Lateral loads will be supported using braced steel frames. The roof structure will consist of metal deck roof diaphragm supported by open web steel joists. The floor structure will consist of composite floor deck supported by steel beams. Roof joists and floor beams will bear on steel beams supported by steel columns. It is anticipated the building will be founded on a conventional spread footing and stem wall foundation system.
2. Building Code A. The governing building code for the project will be 2015 IBC. The fundamental design criteria are
anticipated to be as follows: 1) 2015 International Building Code 2) ASCE 7-10
3. Loading & Design Criteria A. Roof Snow Loads:
1) Design Roof Snow Load = 21 psf 2) Flat Roof Snow Load = 21 psf 3) Snow Exposure Factor (Ce) = 1.0 4) Importance Factor (I) = 1.0 5) Thermal Factor (Ct) = 1.0 6) Ground Snow Load (Pg) = 30 psf 7) Rain on Snow Surcharge = 0 psf 8) Sloped Roof Factor (Cs) = 1.00
B. Wind Design Data 1) Basic Wind Speed = 115 mph 2) Mean Roof Height = ± 60 ft 3) Risk Category = II 4) Exposure Category = C 5) Enclosure Classification = Enclosed building 6) Internal Pressure Coeff. = 0.18 7) Directionality (Kd) = 0.85 8) Topographical Factor (Kzt) = 1
C. Earthquake Design Data 1) Risk Category = II 2) Importance Factor (I) = 1.0 3) Mapped Spectral Response Accelerations:
a) Ss = 0.155g b) S1 = 0.054g
4) Site Class = B 5) Spectral Response Coef.:
a) Sds = 0.103g b) Sd1 = 0.036g
6) Seismic Design Category = A 7) Basic Structural System = Building Frame Systems
Page 15
8) Seismic Resisting System = Steel braced frames not specifically detailed for seismic resistance
9) Design Base Shear V = Cs*W 10) Seismic Response Coef. (Cs) = 0.034 11) Response Mod. Factor (R) = 3 12) Analysis Procedure = Equivalent Lateral Force Analysis
D. Design Loads: 1) Dead Load = weight of structure + 10psf lighting, ceiling, mech. & plumb. 2) Live Load at Elevated Floors = 80 psf 3) Mechanical Loads = weight of equipment, but not less than 125 psf
4. New Structure A. The proposed structural systems described below are a representation of group 7’s initial
analysis and design. B. Structural Systems for Proposed Welcome Center. C. Foundation:
1) Based on the Geotechnical Report, the following is anticipated for this project. a) The foundation will be constructed of conventional continuous strip footings
(supporting walls) and individual shallow spread footings (supporting columns or other isolated loads) placed on over-excavated and re-compacted subgrade, or engineered aggregate piers per the Geotechnical Report. 1) Assumed allowable bearing pressure of 3,000 psf. 2) Strip footings will be a minimum of 18”w x 12”t with 36”d exterior stem walls (total
of 48” deep). 3) Spread footings will be a minimum of 24” square. Size and reinforcing will vary by
location in an effort to balance footing pressures and minimize differential settlement.
4) Bottom of exterior foundation walls + footings shall have a minimum depth of 42” below finish exterior grade for requirements for frost protection. Interior footings within heated areas of the building may be placed at a minimum of 12” below finished grade.
D. Lateral System: 1) Steel braced frames will provide the lateral resistance. The lateral resisting members will be
positioned to minimize the architectural impact and/or enhance the architectural features. 2) Load bearing reinforced masonry walls will provide lateral resistance where possible.
Specific locations and design parameters will be developed to provide as many ‘dual use’ structural systems as possible.
3) In all locations, the metal roof and floor decks will be used as horizontal diaphragms to distribute the lateral loads to the bracing and interior or exterior shear walls.
E. Roof Framing 1) The typical roof, covering the majority of the building, shall be constructed of open-web
steel joist framing as follows: a) 24” to 30” deep standard open web steel joists bearing on a steel beam and column
structure. b) Wide flange steel beams are estimated to be 16” to 24” deep. c) 1 ½” Type B metal roof deck (assume 20 gage).
Page 16
d) The deck will be used as a diaphragm for lateral load transfer to the bracing and/or shear walls.
e) Acoustical deck F. Floor Framing
1) The typical floor shall be constructed of composite slab-steel deck floor system. a) 1.5 VLI to 3 VLI composite steel deck. b) 4” to 7” normal weight concrete slab.
G. Wall Framing 1) The typical exterior wall construction will be either masonry or cold formed metal studs with
sheathing. The exposed finishes are expected to be a masonry veneer or metal panel.
Metal Stud Wall Information Unsupported Stud Height
Wall Finish Stud Size, Gage, and Spacing
18’ Metal panel , gypsum, or stucco 600S162-97 @ 16” 18’ Masonry veneer (CMU, stone, brick, etc.) 800S162-97 @12” 16’ Metal panel , gypsum, or stucco 600S162-68 @ 16” 16’ Masonry veneer (CMU, stone, brick, etc.) 800S162-68 @ 12” 14’ Metal panel , gypsum, or stucco 600S162-43 @ 16” 14’ Masonry veneer (CMU, stone, brick, etc.) 800S162-54 @ 16”
2) The interior walls will be primarily metal studs and drywall, that may be reinforced with
sheathing or strapping to resist lateral loads as needed. H. Slab-on-grade:
1) 4” normal weight 3500 psi reinforced concrete.
Page 17
APPENDIX B
Design Development Submittal
Page 18
G
H
E
D
3 4 6 8 10 12951 2 15
B
A
5' - 6"1' - 7"1' - 7"
2' - 7"
24' - 4" 23' - 10" 25' - 6" 24' - 6"
1' - 8"
3' - 2" 1' - 9"
7' - 8" 21' - 11" 3' - 9" 24' - 8" 17' - 6" 21' - 4"
33' -
11"
10' -
7"
30' -
6"
6' -
3"14
' - 8
"
1' - 5"
1' - 6"
1' - 7"
2' -
0"6'
- 2"
1' - 4"
2' - 9"
1' -
7"20
' - 5
"
16' -
3"
4' -
10"
3' -
10"
10' -
4"
11
1' -
8"
18' - 6"
1' - 0" TYP.
3' - 0" TYP. UNO
10' -
9"
3' -
0"
1' - 7"
C
3' -
5"
4
S.6
13
18' - 4"
7 14
13' - 9"
27' -
4"
9' - 1"
1' - 0" 0' - 8"
13' -
10"
35' - 0"0' - 8"
0' - 8"
1' - 0"
1' - 0"1' - 0"
1' - 0"
1' - 0"
1' - 0" TYP.
3' - 0" TYP.
Typ. Spread Footing5' x 5' x 1' Thick
Typ. Spread Footing5' x 5' x 1' Thick
2' -
0"
Typ. Perimeter SpreadFooting
Extends fromFoundation wall 2'
5' - 0"
11' -
6"
1' - 10"
1' - 4"
1' - 4"
1' - 4"
1' - 7"
1' - 7"1' - 7"
1' - 7"
14' - 4"
2' -
8"
Arc
hite
ctur
e E
ngin
eerin
g P
lann
ing
Inte
riors
©
, DLR
Gro
up in
c., a
Wyo
min
g co
rpor
atio
n, A
LL R
IGH
TS R
ESER
VED
LEGEND NOTESLEGEND NOTES ARE COMMON TO ALLSOME NOTES MAY NOT APPLY TO THIS SHEET
BE
NJA
MIN
TA
LPO
S
Revis
ions
PAPP
A S &
PAP
PAS
ARCH
I TEC
TS, P
C
3/31
/201
6 5:
12:5
9 PM
\\stu
dent
files
.uw
yo.e
du\s
tora
ge$\
Des
ktop
\AR
E 47
20\R
evit
Proj
ect\S
truct
ural
Cen
tral G
roup
7_j
knut
so4.
rvt
Proj
ect N
umbe
rIs
sue
Dat
eLA
RAM
IE C
OU
NTY
CO
MM
UN
ITY
CO
LLEG
EW
ELC
OM
E C
ENTE
R
Proje
ct St
atus
FOU
ND
ATIO
N P
LAN
S.1
1/8" = 1'-0"1 FOUNDATION PLAN
NOTES:1. SLAB-ON-GRADE:
1A. TOP OF SLAB-ON-GRADE ELEVATION=100'-0" UNLESS NOTED OTHERWISE1B. TYPICAL SLAB-ON-GRADE IS 4" THICK WITH #4 REINF. AT 18" O.C., E.W.1C. FOR EXTENTS OF SLAB-ON-GRADE DEPRESSIONS, SLOPES, STEPS, OPENINGS, SEE ARCH DRAWINGS
2. STEM WALLS:2A. TOP OF STEM WALL = 100'-0" UNLESS NOTED OTHERWISE2B. BOTTOM OF STEM WALL = TOP OF FOOTING
3. FOOTINGS:3A. TOP OF INTERIOR FOOTINGS = 99'-0" UNLESS NOTED OTHERWISE3B. TOP OF EXTERIOR FOOTINGS = 96'-6"3C. CENTER SPREAD FOOTINGS ON COLUMNS UNLESS DIMENSIONED OTHERWISE3D. CENTER STRIP FOOTINGS UNDER STEM WALLS UNLESS DIMENSIONED OTHERWISE3E. TOP OF INTERIOR PILASTERS = 100'-0" UNLESS NOTED OTHERWISE3F. TOP OF EXTERIOR PILASTERS = 100'-0" UNLESS NOTED OTHERWISE
4. COLUMNS4A. ALL COLUMNS ARE TO BE CENTERED ON GRIDLINES UNLESS DIMENSIONED OTHERWISE
Page 19
G
H
E
D
3 4 6 8 10 12951 2 15
B
A
11
C
137 14
6' - 0"
24' - 8" 36' - 0" 21' - 4"
33' -
11"
W14
X30
W14
X30
W14
X30
W14
X30
W14
X30
W16
X77
W16X77
W16X77
W16
X77
W12X58 W12X58
W12X58 W12X58
24' - 4" 23' - 10" 25' - 6" 24' - 6" 7' - 8" 21' - 11" 3' - 9" 21' - 2" 17' - 6" 18' - 6" 21' - 4" 2' - 2" 16' - 2"
33' -
11"
10' -
7"
30' -
6"
3' -
5"6'
- 3"
14' -
8"
1' - 7"
4' -
4" 3' - 4"
3' - 6"
Arc
hite
ctur
e E
ngin
eerin
g P
lann
ing
Inte
riors
©
, DLR
Gro
up in
c., a
Wyo
min
g co
rpor
atio
n, A
LL R
IGH
TS R
ESER
VED
LEGEND NOTESLEGEND NOTES ARE COMMON TO ALLSOME NOTES MAY NOT APPLY TO THIS SHEET
BE
NJA
MIN
TA
LPO
S
Revis
ions
PAPP
A S &
PAP
PAS
ARCH
I TEC
TS, P
C
3/31
/201
6 5:
12:5
9 PM
\\stu
dent
files
.uw
yo.e
du\s
tora
ge$\
Des
ktop
\AR
E 47
20\R
evit
Proj
ect\S
truct
ural
Cen
tral G
roup
7_j
knut
so4.
rvt
Proj
ect N
umbe
rIs
sue
Dat
eLA
RAM
IE C
OU
NTY
CO
MM
UN
ITY
CO
LLEG
EW
ELC
OM
E C
ENTE
R
Proje
ct St
atus
2ND
LEV
EL F
LOO
R F
RAM
ING
PLA
NS.
2
1/8" = 1'-0"1 2ND LEVEL FRAMING PLAN
NOTES:1. COLUMNS:
1A. ALL COLUMNS ARE TO BE CENTERED ON GRIDLINES UNLESS DIMENSIONED OTHERWISE2. BEAMS AND JOISTS:
2A. BEAMS AND JOISTS ARE TO BE EQUALLY SPACED BETWEEN GRID LINES OR ALONG GIRDERS UNLESS DIMENSIONED OTHERWISE2B. DIMENSIONS ARE TO CENTERLINE OF MEMBERS UNLESS NOTED OTHERWISE
3. SLAB-ON-DECK3A. 2ND LEVEL TOP OF SLAB-ON-DECK ELEVATION = 116'-0"
Diagonal Bracing
Dia
gona
l Bra
cing
Dia
gona
l Bra
cing
Diagonal Bracing
Page 20
South
G
H
E
D
3 4 6 10 12951 2 15
B
A
11
C
137 14
W14
X30
W14
X30
W14
X30
W14
X30
W14
X30
W16
X77
W16X77
W16X77
W16
X77
W12X58 W12X58
W12X58 W12X58
24' - 4" 23' - 10" 25' - 6" 24' - 6" 7' - 8" 21' - 11" 21' - 2" 17' - 6" 18' - 6" 21' - 4" 2' - 2" 16' - 2"7' - 3"
33' -
11"
10' -
7"
30' -
6"
3' -
5"6'
- 3"
14' -
8"
Arc
hite
ctur
e E
ngin
eerin
g P
lann
ing
Inte
riors
©
, DLR
Gro
up in
c., a
Wyo
min
g co
rpor
atio
n, A
LL R
IGH
TS R
ESER
VED
LEGEND NOTESLEGEND NOTES ARE COMMON TO ALLSOME NOTES MAY NOT APPLY TO THIS SHEET
BE
NJA
MIN
TA
LPO
S
Revis
ions
PAPP
A S &
PAP
PAS
ARCH
I TEC
TS, P
C
3/31
/201
6 5:
12:5
9 PM
\\stu
dent
files
.uw
yo.e
du\s
tora
ge$\
Des
ktop
\AR
E 47
20\R
evit
Proj
ect\S
truct
ural
Cen
tral G
roup
7_j
knut
so4.
rvt
Proj
ect N
umbe
rIs
sue
Dat
eLA
RAM
IE C
OU
NTY
CO
MM
UN
ITY
CO
LLEG
EW
ELC
OM
E C
ENTE
R
Proje
ct St
atus
3RD
LEV
EL F
LOO
R F
RAM
ING
PLA
NS.
3
1/8" = 1'-0"1 3RD LEVEL FRAMING PLAN
NOTES:1. COLUMNS:
1A. ALL COLUMNS ARE TO BE CENTERED ON GRIDLINES UNLESS DIMENSIONED OTHERWISE2. BEAMS AND JOISTS:
2A. BEAMS AND JOISTS ARE TO BE EQUALLY SPACED BETWEEN GRID LINES OR ALONG GIRDERS UNLESS DIMENSIONED OTHERWISE2B. DIMENSIONS ARE TO CENTERLINE OF MEMBERS UNLESS NOTED OTHERWISE
3. SLAB-ON-DECK3A. 3RD LEVEL TOP OF SLAB-ON-DECK ELEVATION = 130'-0"
Diagonal Bracing
Dia
gona
l Bra
cing
Dia
gona
l Bra
cing
Diagonal Bracing
Page 21
G
H
E
D
3 4 6 8 10 129530
' - 6
"10
' - 7
"33
' - 1
1"
1 2 15
B
A
11
C
137 14
W14
X30
W14
X30
W14
X30
W14
X30
W14
X30
W16
X77
W16X77
W16X77
W16
X77
W12X58 W12X58
W12X58 W12X58
24' - 4" 23' - 10" 25' - 6" 24' - 6" 7' - 8" 21' - 11" 3' - 9" 21' - 2" 17' - 6" 18' - 6" 21' - 4" 2' - 2" 16' - 2"3' - 6"29' - 7" 7' - 3"
3' -
5"6'
- 3"
14' -
8"
Arc
hite
ctur
e E
ngin
eerin
g P
lann
ing
Inte
riors
©
, DLR
Gro
up in
c., a
Wyo
min
g co
rpor
atio
n, A
LL R
IGH
TS R
ESER
VED
LEGEND NOTESLEGEND NOTES ARE COMMON TO ALLSOME NOTES MAY NOT APPLY TO THIS SHEET
BE
NJA
MIN
TA
LPO
S
Revis
ions
PAPP
A S &
PAP
PAS
ARCH
I TEC
TS, P
C
3/31
/201
6 5:
13:0
0 PM
\\stu
dent
files
.uw
yo.e
du\s
tora
ge$\
Des
ktop
\AR
E 47
20\R
evit
Proj
ect\S
truct
ural
Cen
tral G
roup
7_j
knut
so4.
rvt
Proj
ect N
umbe
rIs
sue
Dat
eLA
RAM
IE C
OU
NTY
CO
MM
UN
ITY
CO
LLEG
EW
ELC
OM
E C
ENTE
R
Proje
ct St
atus
4TH
LEV
EL F
LOO
R F
RAM
ING
PLA
NS.
4
1/8" = 1'-0"1 4TH LEVEL FRAMING PLAN
NOTES:1. COLUMNS:
1A. ALL COLUMNS ARE TO BE CENTERED ON GRIDLINES UNLESS DIMENSIONED OTHERWISE2. BEAMS AND JOISTS:
2A. BEAMS AND JOISTS ARE TO BE EQUALLY SPACED BETWEEN GRID LINES OR ALONG GIRDERS UNLESS DIMENSIONED OTHERWISE2B. DIMENSIONS ARE TO CENTERLINE OF MEMBERS UNLESS NOTED OTHERWISE
3. SLAB-ON-DECK3A. 4TH LEVEL TOP OF SLAB-ON-DECK ELEVATION = 144'-0"
Diagonal Bracing
Dia
gona
l Bra
cing
Dia
gona
l Bra
cing
Diagonal Bracing
Page 22
G
H
E
D
3 4 6 8 10 12951 2 15
B
A
11
C
13
24' - 4" 23' - 10" 25' - 6" 24' - 6" 36' - 10" 21' - 2" 17' - 6" 18' - 6" 21' - 4" 18' - 4"
7 14
33' -
11"
10' -
7"
30' -
6"
3' -
5"6'
- 3"
14' -
8"
Arc
hite
ctur
e E
ngin
eerin
g P
lann
ing
Inte
riors
©
, DLR
Gro
up in
c., a
Wyo
min
g co
rpor
atio
n, A
LL R
IGH
TS R
ESER
VED
LEGEND NOTESLEGEND NOTES ARE COMMON TO ALLSOME NOTES MAY NOT APPLY TO THIS SHEET
BE
NJA
MIN
TA
LPO
S
Revis
ions
PAPP
A S &
PAP
PAS
ARCH
I TEC
TS, P
C
3/31
/201
6 5:
13:0
0 PM
\\stu
dent
files
.uw
yo.e
du\s
tora
ge$\
Des
ktop
\AR
E 47
20\R
evit
Proj
ect\S
truct
ural
Cen
tral G
roup
7_j
knut
so4.
rvt
Proj
ect N
umbe
rIs
sue
Dat
eLA
RAM
IE C
OU
NTY
CO
MM
UN
ITY
CO
LLEG
EW
ELC
OM
E C
ENTE
R
Proje
ct St
atus
RO
OF
FRAM
ING
PLA
NS.
5
1/8" = 1'-0"1 ROOF FRAMING PLAN
NOTES:1. COLUMNS:
1A. ALL COLUMNS ARE TO BE CENTERED ON GRIDLINES UNLESS DIMENSIONED OTHERWISE2. BEAMS AND JOISTS:
2A. BEAMS AND JOISTS ARE TO BE EQUALLY SPACED BETWEEN GRID LINES OR ALONG GIRDERS UNLESS DIMENSIONED OTHERWISE2B. DIMENSIONS ARE TO CENTERLINE OF MEMBERS UNLESS NOTED OTHERWISE
3. SLAB-ON-DECK3A. ROOF TOP OF SLAB-ON-DECK ELEVATION = 158'-0"
Page 23
12"
24"
(2) #4 BARS CONTINUOUS
#4 BARS AT 18" O.C.EACH WAY
#4 BARS AT 18" O.C.BEND INTO FOOTING LEGSALTERNATE SIDES
4" CONCRETE ON6" GRAVEL BASE
6"36
"
3"CLR
0' -
4"
W14 x 30
0' -
2"
2" MetalDeck with4" Cover
Typ 8" x 2" 20g Metal Stud
Angle BracketBolted to Edge
Girder
6" Floor Slab
Arc
hite
ctur
e E
ngin
eerin
g P
lann
ing
Inte
riors
©
, DLR
Gro
up in
c., a
Wyo
min
g co
rpor
atio
n, A
LL R
IGH
TS R
ESER
VED
LEGEND NOTESLEGEND NOTES ARE COMMON TO ALLSOME NOTES MAY NOT APPLY TO THIS SHEET
BE
NJA
MIN
TA
LPO
S
Revis
ions
PAPP
A S &
PAP
PAS
ARCH
I TEC
TS, P
C
3/31
/201
6 5:
13:0
4 PM
\\stu
dent
files
.uw
yo.e
du\s
tora
ge$\
Des
ktop
\AR
E 47
20\R
evit
Proj
ect\S
truct
ural
Cen
tral G
roup
7_j
knut
so4.
rvt
Proj
ect N
umbe
rIs
sue
Dat
eLA
RAM
IE C
OU
NTY
CO
MM
UN
ITY
CO
LLEG
EW
ELC
OM
E C
ENTE
R
Proje
ct St
atus
LATE
RAL
SYS
TEM
AN
D S
TRU
CTU
RAL
DET
AILS
S.6
1 3D for Lateral Systems
LATERAL SYSTEM NOTES:1. OVERVIEW:
1A.THE LATERAL FORCE RESISTING SYSTEM IS COMPRISED OF TWO MAIN COMPONENTS: BRACED STEEL FRAMES AND CONCRETE SHEAR WALLS.
2. BRACED FRAMES:2A. THE BRACED FRAMES WILL BE CREATED THROUGH THE UTILIZATION OF DIAGONAL HSS MEMBERS.2B. BRACE LOCATIONS ARE DISTRIBUTED THROUGHOUT THE BUILDING. EACH WALL HAS ONE CONTINOUS BRACED FRAME. LOCATIONS ARE NOTED ON EACH PLAN.
3. SHEAR WALLS3A. SHEAR WALLS ARE CONSTRUCTED AROUND THE TWO MAIN STAIRWELLS ALONG WITH THE ELEVATOR SHAFT.3B. SHEAR WALLS WILL BE CONSTRUCTED FROM 12" THICK CONCRETE ADEQUATELY REINFORCED WITH REBAR.
Diagonal HSSFrame Bracing
ConcreteShearWalls
1 1/2" = 1'-0"2 TYP. STEEL DECK DETAIL
1 1/2" = 1'-0"3 METAL STUD DETAIL
1 1/2" = 1'-0"4 FOUNDATION WALL SECTION
Page 24
APPENDIX C
Construction Documents Submittal
Page 25
G
H
E
D
3 4 6 8 10 12951 2 15
B
A
5' - 6"
1' - 7"1' - 7"
2' - 7"
24' - 4" 23' - 10" 25' - 6" 24' - 6"
1' - 8"
3' - 2" 1' - 9"
7' - 8" 21' - 11" 3' - 9" 24' - 8" 17' - 6" 21' - 4"
33' -
11"
10' -
7"
30' -
6"
6' -
3"14
' - 8
"
1' - 5"
1' - 6"
1' - 7"
2' -
0"
6' -
2"
1' - 4"
2' - 9"
1' -
7"20
' - 5
"
12' -
3"
4' -
10"
3' -
10"
10' -
4"
11
1' -
8"
18' - 6"
1' - 0" TYP.
2' - 0" TYP. UNO
10' -
9"
3' -
0"
1' - 7"
C
3' -
5"
4S.6
13
18' - 4"
7 14
27' -
4"
9' - 1"
1' - 0" 0' - 8"
13' -
10"
26' - 7"
0' - 8"
0' - 8"
1' - 0"
1' - 0"1' - 0"
1' - 0"
1' - 0"
1' - 0" TYP.
11' -
6"
1' - 10"
1' - 4"
1' - 4"
1' - 4"
1' - 7"
1' - 7"1' - 7"
1' - 7"
14' - 4"
2' -
8"
F6x6F10x10 F10x10 F10x10
F10x10
F10x10 F10x10 F10x10
F10x10
F10x10
F10x10 F10x10
F10x10 F10x10
F10x10
F10x10
F5x5 F5x5F4x4
F5x5 F5x5
F10x10 F10x10
F6x6
F10x10
F6x6
F10x10F10x10
F5x5
F10x10
F10x10
F10x10
F10x10 F10x10
F4x4
F10x10
F6x6
F10x10
F4x4
F5x5
F6x6
F2x2F2x2
F10x10
4' - 0"
5' -
0"5'
- 0"
4' - 0"11' - 9"
W12X58 W12X58 W12X58 W12X58
W12X58
W12X58 W12X58
W12X58
W12X58 W12X58 W12X58
W12X58
W12X58
W12X58 W12X58
W12X58 W12X58
W12X58
W12X58
W12X58
W12X58
W12X58
W12X58W12X58
W12X58
W12X58
W12X58
W12X58
W12X58W12X58W12X58
W12X58W12X58
W12X58
W12X58 W12X58 W12X58 W12X58 W12X58 W12X58
W12X58
W12X58
W12X58 W12X58
4' -
0"
4' - 0" 5' - 10" 4' - 0"
4' -
0"
4' -
0"
4' - 0" 4' - 0"
Arch
itect
ure
Eng
inee
ring
Pla
nnin
g In
terio
rs
©
, DLR
Gro
up in
c., a
Wyo
min
g co
rpor
atio
n, A
LL R
IGH
TS R
ESER
VED
LEGEND NOTESLEGEND NOTES ARE COMMON TO ALLSOME NOTES MAY NOT APPLY TO THIS SHEET
BE
NJA
MIN
TA
LPO
S
Revis
ions
P AP P
A S &
PA P
P AS
A RC H
ITEC
TS, P
C
5/5/
2016
2:3
9:17
PM
\\stu
dent
files
.uw
yo.e
du\s
tora
ge$\
Des
ktop
\AR
E 47
20\R
evit
Proj
ect\S
truct
ural
Cen
tral G
roup
7_j
knut
so4.
rvt
Proj
ect N
umbe
rIs
sue
Dat
eLA
RAM
IE C
OU
NTY
CO
MM
UN
ITY
CO
LLEG
EW
ELC
OM
E C
ENTE
R
GROU
P 7
FOU
ND
ATIO
N P
LAN
S.1
1/8" = 1'-0"1 FOUNDATION PLAN
NOTES:1. SLAB-ON-GRADE:
1A. TOP OF SLAB-ON-GRADE ELEVATION=100'-0" U.N.O.1B. TYPICAL SLAB-ON-GRADE IS 4" THICK WITH #4 REINF. AT 18" O.C., E.W.1C. FOR EXTENTS OF SLAB-ON-GRADE DEPRESSIONS, SLOPES, STEPS, OPENINGS, SEE ARCH DRAWINGS
2. FOUNDATION WALLS:2A. TOP OF FOUNDATION WALL (T.O.W.) = 100'-0" TYP U.N.O.2B. BOTTOM OF FOUNDATION WALL = TOP OF FOOTING2C. TOP OF PILASTERS (T.O.C.) = 99'-4" TYP U.N.O.
3. FOOTINGS:3A. TOP OF INTERIOR FOOTINGS = 99'-4" TYP U.N.O.3B. TOP OF EXTERIOR FOOTINGS = 97'-0" TYP U.N.O.3C. CENTER SPREAD FOOTINGS ON COLUMNS UNLESS DIMENSIONED OTHERWISE3D. CENTER STRIP FOOTINGS UNDER STEM WALLS UNLESS DIMENSIONED OTHERWISE
4. COLUMNS4A. ALL COLUMNS ARE TO BE CENTERED ON GRIDLINES UNLESS DIMENSIONED OTHERWISE
Page 26
G
H
E
D
3 4 6 8 10 12951 2 15
B
A
11
C
137 14
6' - 0"
24' - 8" 36' - 0" 21' - 4"
33' -
11"
24' - 4" 23' - 10" 25' - 6" 24' - 6" 7' - 8" 21' - 11" 3' - 9" 21' - 2" 17' - 6" 18' - 6" 21' - 4" 2' - 2" 16' - 2"
33' -
11"
10' -
7"
30' -
6"
3' -
5"6'
- 3"
14' -
8"
1' - 7"
4' -
4" 3' - 4"
3' - 6"
W12X58
W12X58
W12X58
W12X58
W16X77
W12
X26
W16X77
W16
X77
W16
X77
W16X77
W16X77
W16
X77
W16
X77
W16
X77
W16
X77
W16
X77
W18X106
W18X106
W16X77
W16
X77
W16
X77
W16X77
W16X77
W16X77
W16
X77
W12
X26
W18X106
W18X106
W16X77
W16X77
W16X77
W16X77
W16X77
W16
X77
W16X77
W16
X77
W16X77
W16
X77
W16
X77
W16
X77
W12
X26
W16X77
W16
X77
W16X77 W16X77
W16X77
W16
X77
W16
X77
W16
X77
W16
X77
W16
X77
W16
X77
W16
X77
W16
X77
W14
X30
W14
X30
W14
X30
W14
X30
W14
X30
W14
X30
W14
X30
W14
X30
W14
X30
W14
X30
W14
X30
W14
X30
W16
X77
W14
X30
W14
X30
W14
X30
W14
X30
W14
X30
W14
X30
W14
X30
W14
X30
W14
X30
W14
X30
W14
X30
W14
X30
W14
X30
W14
X30
W14
X30
W14
X30
W14
X30
W14
X30
W14
X30
W14
X30
W14
X30
W16
X77
W14
X30
W14
X30
W14
X30
W14
X30
W14
X30
W14
X30
W14
X30
W14
X30
W16
X77
W14
X30
W14
X30
W14
X30
W14
X30
W14
X30
W14
X30
W14
X30
W14
X30
W14
X30
W14
X30
W14
X30
W14
X30
W14
X30
W14
X30
W16
X77
W14
X30
W14
X30
W14
X30
W14
X30
W16X77
W16
X77
W14
X30
W14
X30
W14
X30
W14
X30
W14
X30
W14
X30
W14
X30
W14
X30
W14
X30
W14
X30
W16
X77
W14
X30
W14
X30
W14
X30
W14
X30
W14
X30
W14
X30
W14
X30
W14
X30
W14
X30
W14
X30
W14
X30
W14
X30
W14
X30
W14
X30
W14
X30
W14
X30
W12X26
12K3
12K3
12K3
12K3
12K3
12K3
12K3
W16X77
W16X77
HSS6X6X1/2
W16
X77
HSS
6X6X
1/2
HSS
6X6X
1/2
W16
X77
W16X77
W12X26 W12X26 W12X26
W16X77 W16X77 W16X77
W12
X26
W12
X26
W12
X26
W12
X26
W12
X26
W12
X26
W16
X77
W12
X26
W12
X26
W12
X26
W12
X26
W16
X77
Dia
gona
l Bra
cing
Diagonal Bracing
Dia
gona
l Bra
cing
Diagonal BracingHSS6X6X1/2
W16X77 W16X77W16X77 W16X77 W16X77 W16X77
3' - 6 1/8" 4' - 2 3/8"
W12X58
W12X58
W12X58
Arch
itect
ure
Eng
inee
ring
Pla
nnin
g In
terio
rs
©
, DLR
Gro
up in
c., a
Wyo
min
g co
rpor
atio
n, A
LL R
IGH
TS R
ESER
VED
LEGEND NOTESLEGEND NOTES ARE COMMON TO ALLSOME NOTES MAY NOT APPLY TO THIS SHEET
BE
NJA
MIN
TA
LPO
S
Revis
ions
P AP P
A S &
PA P
P AS
A RC H
ITEC
TS, P
C
5/5/
2016
2:3
9:18
PM
\\stu
dent
files
.uw
yo.e
du\s
tora
ge$\
Des
ktop
\AR
E 47
20\R
evit
Proj
ect\S
truct
ural
Cen
tral G
roup
7_j
knut
so4.
rvt
Proj
ect N
umbe
rIs
sue
Dat
eLA
RAM
IE C
OU
NTY
CO
MM
UN
ITY
CO
LLEG
EW
ELC
OM
E C
ENTE
R
GROU
P 7
2ND
LEV
EL F
LOO
R F
RAM
ING
PLA
NS.
2
1/8" = 1'-0"1 2ND LEVEL FRAMING PLAN
NOTES:1. COLUMNS:
1A. ALL COLUMNS ARE TO BE CENTERED ON GRIDLINES UNLESS DIMENSIONED OTHERWISE2. BEAMS AND JOISTS:
2A. BEAMS AND JOISTS ARE TO BE EQUALLY SPACED BETWEEN GRID LINES OR ALONG GIRDERS UNLESS DIMENSIONED OTHERWISE2B. DIMENSIONS ARE TO CENTERLINE OF MEMBERS UNLESS NOTED OTHERWISE
3. SLAB-ON-DECK3A. 2ND LEVEL TOP OF SLAB-ON-DECK ELEVATION = 16'-0"3B. ALL FLOOR SLABS TO UTILIZE 2VLI20 COMPOSITE DECKS WITH 4" OF COVER UNLESS OTHERWISE NOTED
Page 27
G
H
E
D
3 4 6 10 12951 2 15
B
A
11
C
137 14
24' - 4" 23' - 10" 25' - 6" 24' - 6" 7' - 8" 21' - 11" 21' - 2" 17' - 6" 18' - 6" 21' - 4" 2' - 2" 16' - 2"7' - 3"
33' -
11"
10' -
7"
30' -
6"
3' -
5"6'
- 3"
14' -
8"
W16X77
W16
X77
W16
X77
W16
X77
W16
X77
W16
X77
W16X77
W12
X26
W16
X77
W16X77
W14
X30
W16
X77
W16
X77
W16
X77
12K3
W16
X77
W16X77 W16X77
W16X77
W16
X77
W16
X77
W16
X77
W14
X30
W14
X30
W14
X30
W14
X30
W14
X30
W14
X30
W14
X30
W14
X30
W14
X30
W14
X30
W14
X30
W14
X30
W16
X77
W14
X30
W14
X30
W14
X30
W14
X30
W14
X30
W14
X30
W14
X30
W14
X30
W16
X77
W14
X30
W14
X30
W14
X30
W14
X30
W14
X30
W16
X77
W14
X30
W14
X30
W14
X30
W14
X30
W14
X30
W14
X30
W14
X30
W14
X30
W16
X77
W14
X30
W14
X30
W14
X30
W14
X30
W14
X30
W14
X30
W14
X30
W14
X30
W14
X30
W14
X30
W14
X30
W14
X30
W14
X30
W14
X30
W14
X30
W16
X77
W16
X77
W14
X30
W14
X30
W14
X30
W16X77
W16X77W16X77W16X77
W16X77 W16X77
W16
X77
W16X77
W16X77W16X77W16X77W16X77
W16
X77
W16X77
W16
X77
W16
X77
W16
X77
W16
X77
W16
X77
W16
X77
W16
X77
W16X77 W16X77 W16X77
W16X77W16X77W16X77 W16X77 W16X77 W16X77
W16X77 W16X77
W16X77
W16X77
W16
X77
W14
X30
W14
X30
W14
X30
W14
X30
W14
X30
W14
X30
W14
X30
W14
X30
W14
X30
W14
X30
W14
X30
W14
X30
W14
X30
W14
X30
W14
X30
W14
X30
W14
X30
W14
X30
W14
X30
W14
X30
W14
X30
W14
X30
W14
X30
W14
X30
W14
X30
W14
X30
W16X77
W14
X30
W16X77
W16
X77
W16X77
W16
X77
W16X77W12X26W12X26 W12X26 W12X26 W12X26 W12X26 W12X26 W12X26 W12X26 W12X26 W12X26 W12X26
W16X77
W12
X26
W12
X26
W12
X26
W12
X26
W12
X26
W12
X26
W12
X26
W12
X26
W12
X26
W12
X26
W12
X26
W14
X30
W14
X30
W14
X30
12K3
12K3
W16X77
116' - 0"129' - 6"
HSS6X6X1/2
130' - 0"143' - 6"
W16X77
W16
X77
W16
X77
HSS
6X6X
1/2
W16
X77
W16
X77
HSS
6X6X
1/2
HSS6X6X1/2
W16X77
W16
X77
W12X26
Dia
gona
l Bra
cing
Diagonal Bracing
Dia
gona
l Bra
cing
Diagonal Bracing
W12X58 W12X58
W12X58 W12X58
W12X58
W12X58
W12X58 W12X58
W12X58
W12X58W12X58
W12X58
W12X58 W12X58
W12X58 W12X58 W12X58 W12X58 W12X58
W12X58W10X49 W12X58 W12X58
W12X58
W12X58W12X58 W12X58 W12X58
W12X58
W12X58
W12X58
W12X58
W12X58
W12X58W12X58W12X58
W12X58
W12X58
W12X58
W12X58
W12X58 W12X58
2' - 6 1/8"
Arch
itect
ure
Eng
inee
ring
Pla
nnin
g In
terio
rs
©
, DLR
Gro
up in
c., a
Wyo
min
g co
rpor
atio
n, A
LL R
IGH
TS R
ESER
VED
LEGEND NOTESLEGEND NOTES ARE COMMON TO ALLSOME NOTES MAY NOT APPLY TO THIS SHEET
BE
NJA
MIN
TA
LPO
S
Revis
ions
P AP P
A S &
PA P
P AS
A RC H
ITEC
TS, P
C
5/5/
2016
2:3
9:19
PM
\\stu
dent
files
.uw
yo.e
du\s
tora
ge$\
Des
ktop
\AR
E 47
20\R
evit
Proj
ect\S
truct
ural
Cen
tral G
roup
7_j
knut
so4.
rvt
Proj
ect N
umbe
rIs
sue
Dat
eLA
RAM
IE C
OU
NTY
CO
MM
UN
ITY
CO
LLEG
EW
ELC
OM
E C
ENTE
R
GROU
P 7
3RD
LEV
EL F
LOO
R F
RAM
ING
PLA
NS.
3
1/8" = 1'-0"1 3RD LEVEL FRAMING PLAN
NOTES:1. COLUMNS:
1A. ALL COLUMNS ARE TO BE CENTERED ON GRIDLINES UNLESS DIMENSIONED OTHERWISE2. BEAMS AND JOISTS:
2A. BEAMS AND JOISTS ARE TO BE EQUALLY SPACED BETWEEN GRID LINES OR ALONG GIRDERS UNLESS DIMENSIONED OTHERWISE2B. DIMENSIONS ARE TO CENTERLINE OF MEMBERS UNLESS NOTED OTHERWISE
3. SLAB-ON-DECK3A. 3RD LEVEL TOP OF SLAB-ON-DECK ELEVATION = 30'-0"3B. ALL FLOOR SLABS TO UTILIZE 2VLI20 COMPOSITE DECKS WITH 4" OF COVER UNLESS OTHERWISE NOTED
Page 28
G
H
E
D
3 4 6 8 10 1295
30' -
6"
10' -
7"
33' -
11"
1 2 15
B
A
11
C
137 14
24' - 4" 23' - 10" 25' - 6" 24' - 6" 7' - 8" 21' - 11" 3' - 9" 21' - 2" 17' - 6" 18' - 6" 21' - 4" 2' - 2" 16' - 2"3' - 6"29' - 7" 7' - 3"
3' -
5"6'
- 3"
14' -
8"
Dia
gona
l Bra
cing
Diagonal Bracing
Dia
gona
l Bra
cing
Diagonal Bracing
7' - 2 7/8" 7' - 2 7/8"
W16
X77
W12
X26
W12
X26
W16
X77
W14
X30
W16
X77
W16X77
W14
X30
W12
X26
W16
X77
W16
X77
W16
X77
W16
X77
W16X77
W16X77
W16
X77
W16
X77
W16
X77
W16
X77
W14
X30
W14
X30
W14
X30
W14
X30
W14
X30
W14
X30
W14
X30
W14
X30
W14
X30
W14
X30
W14
X30
W14
X30
W16
X77
W14
X30
W14
X30
W14
X30
W14
X30
W14
X30
W14
X30
W14
X30
W14
X30
W14
X30
W14
X30
W14
X30
W14
X30
W14
X30
W14
X30
W16
X77
W14
X30
W14
X30
W14
X30
W14
X30
W14
X30
W14
X30
W14
X30
W14
X30
W16
X77
W14
X30
W14
X30
W14
X30
W14
X30
W14
X30
W14
X30
W14
X30
W14
X30
W14
X30
W14
X30
W14
X30
W14
X30
W14
X30
W16
X77
W16
X77
W16X77
W16X77
W16
X77
W14
X30
W16
X77
W16
X77
W16X77
W16
X77
W16X77 W16X77
W16X77W16X77W16X77
W16
X77
W16
X77
W16X77 W16X77
W16
X77
W16X77W16X77W16X77W16X77W16X77 W16X77 W18X106
W16
X77
W16X77 W16X77 W16X77
W16
X77
W16X77 W16X77W16X77
W14
X30
W14
X30
W14
X30
W14
X30
W14
X30
W14
X30
W14
X30
W14
X30
W14
X30
W14
X30
W14
X30
W14
X30
W14
X30
W14
X30
W14
X30
W14
X30
W14
X30
W14
X30
W14
X30
W14
X30
W12
X26
W14
X30
W14
X30
W12
X26
W14
X30
W14
X30
W16X77 W16X77
W16X77
HSS6X6X1/2
W16
X77
HSS
6X6X
1/2
W16
X77
HSS
6X6X
1/2
W16X77
HSS6X6X1/2
W14
X30
W16X77
W14
X30
W14
X30
W14
X30
W12X26
W14X30 W14X30 W16X774'
- 2
1/8"
3' - 4"
W12X26 W12X26 W12X26
Arch
itect
ure
Eng
inee
ring
Pla
nnin
g In
terio
rs
©
, DLR
Gro
up in
c., a
Wyo
min
g co
rpor
atio
n, A
LL R
IGH
TS R
ESER
VED
LEGEND NOTESLEGEND NOTES ARE COMMON TO ALLSOME NOTES MAY NOT APPLY TO THIS SHEET
BE
NJA
MIN
TA
LPO
S
Revis
ions
P AP P
A S &
PA P
P AS
A RC H
ITEC
TS, P
C
5/5/
2016
2:3
9:19
PM
\\stu
dent
files
.uw
yo.e
du\s
tora
ge$\
Des
ktop
\AR
E 47
20\R
evit
Proj
ect\S
truct
ural
Cen
tral G
roup
7_j
knut
so4.
rvt
Proj
ect N
umbe
rIs
sue
Dat
eLA
RAM
IE C
OU
NTY
CO
MM
UN
ITY
CO
LLEG
EW
ELC
OM
E C
ENTE
R
GROU
P 7
4TH
LEV
EL F
LOO
R F
RAM
ING
PLA
NS.
4
1/8" = 1'-0"1 4TH LEVEL FRAMING PLAN
NOTES:1. COLUMNS:
1A. ALL COLUMNS ARE TO BE CENTERED ON GRIDLINES UNLESS DIMENSIONED OTHERWISE2. BEAMS AND JOISTS:
2A. BEAMS AND JOISTS ARE TO BE EQUALLY SPACED BETWEEN GRID LINES OR ALONG GIRDERS UNLESS DIMENSIONED OTHERWISE2B. DIMENSIONS ARE TO CENTERLINE OF MEMBERS UNLESS NOTED OTHERWISE
3. SLAB-ON-DECK3A. 4TH LEVEL TOP OF SLAB-ON-DECK ELEVATION = 44'-0"3B. ALL FLOOR SLABS TO UTILIZE 2VLI20 COMPOSITE DECKS WITH 4" OF COVER UNLESS OTHERWISE NOTED
Page 29
G
H
E
D
3 4 6 8 10 12951 2 15
B
A
11
C
13
24' - 4" 23' - 10" 25' - 6" 24' - 6" 29' - 7" 21' - 2" 17' - 6" 18' - 6" 21' - 4" 18' - 4"
7 14
33' -
11"
10' -
7"
30' -
6"
3' -
5"6'
- 3"
14' -
8"
W16X26W16X26 W16X26 W16X26 W16X26
W14X30 W14X30 W14X30 W14X30
W14
X30
W16X26
W14X30
W14
X30
12K3
12K3
12K3
W14
X30
W14
X30
W14
X30
W14
X30
W14X30 W14X30 W14X30 W14X30 W14X30 W14X30 W16X26 W16X77
W16
X26
W16X77
W16X26
W16X77
W16
X26
W16X26W16X26W16X26
W14X30
W14
X30
W12
X26
W12
X26
W14
X30
W12X26
W12X26
W14
X30
W14X30
W14
X30
W14X30 W14X30 W12X26
W12X26
W12
X26
W12
X26
W12
X26
W12X26
W12X26
W14X30
W12
X26
W12X26
W12X26
W14
X30
W12X26
W12X26
W12X26
W14
X30
W14
X30
W14
X30
W14
X30
W14
X30
W14
X30
W14
X30
W14
X30
W14
X30
W12
X26
W21
X44
W8X
10
W8X
10
W8X
10
W8X
10
W8X
10
W8X
10
W8X
10
W8X
10
W8X
10
W8X
10
W8X
10
W8X
10
W14X30
12K3
12K3 12
K3
12K3
12K3
12K3
12K3
12K3
12K3
12K3
12K3
12K3
12K3
12K3 12K3
12K3
12K3
12K3
12K3
12K3
12K3
12K3
12K3
W8X10 W8X10 W8X10
W14
X30
12K3
12K3
12K3
12K3
12K3
12K3
12K3
12K3
12K3
12K3
12K3
12K3
12K3
12K3
12K3
12K3
12K3
12K3
12K3
12K3
12K3
12K3
12K3
12K3
12K3
12K3
12K3
12K3
12K3
12K3
12K3
12K3
12K3
12K3
12K3
12K3
12K3
12K3
12K3
12K3
12K3
12K3
12K3
12K3
12K3
12K3
12K3
12K3
12K3
W21
X44
W18
X106
W12X26
W12X26
W12X26
W12X26
W12X26
W12X26
W12X26
W12X26
W12X26
W12X26
12K3
12K3
12K3
12K312K3
12K3
12K3
W12X26
W12X26
W12X26
W12X26
W8X
10
W8X
10
W8X
10
W8X
10
W8X
10
W8X
10
12K3
W21X44
W16X26
W8X
10
W16X26
W14
X30
W12X26W12X26
L6X6X5/16 L6X6
X5/16
L6X6X5/16L6X6X
5/16
7' - 3"
W14X30
W14
X30
W16X77
W12X26
W12X26
W12X26
W12X26
W12X26
3' - 9 7/8"
W12X26
12' -
0 1
/4"
5' -
2"
10.00°
100.00°
12' -
3 1
/4"
17' -
4 1
/4"
80.00°
95.00°
4' - 1"
H
1 2
12K1
12K1
12K1
12K1
12K1
33' - 0"
11' -
10"
D
8 109
B
A
C
7
W14
X30
W14
X30
W14
X30
W14
X30
W14X30
W14X30
HSS4X4X1/421' - 8 3/4"
Arch
itect
ure
Eng
inee
ring
Pla
nnin
g In
terio
rs
©
, DLR
Gro
up in
c., a
Wyo
min
g co
rpor
atio
n, A
LL R
IGH
TS R
ESER
VED
LEGEND NOTESLEGEND NOTES ARE COMMON TO ALLSOME NOTES MAY NOT APPLY TO THIS SHEET
BE
NJA
MIN
TA
LPO
S
Revis
ions
P AP P
A S &
PA P
P AS
A RC H
ITEC
TS, P
C
5/5/
2016
2:3
9:20
PM
\\stu
dent
files
.uw
yo.e
du\s
tora
ge$\
Des
ktop
\AR
E 47
20\R
evit
Proj
ect\S
truct
ural
Cen
tral G
roup
7_j
knut
so4.
rvt
Proj
ect N
umbe
rIs
sue
Dat
eLA
RAM
IE C
OU
NTY
CO
MM
UN
ITY
CO
LLEG
EW
ELC
OM
E C
ENTE
R
GROU
P 7
RO
OF
FRAM
ING
PLA
NS.
5
1/8" = 1'-0"1 ROOF FRAMING PLAN
NOTES:1. COLUMNS:
1A. ALL COLUMNS ARE TO BE CENTERED ON GRIDLINES UNLESS DIMENSIONED OTHERWISE2. BEAMS AND JOISTS:
2A. BEAMS AND JOISTS ARE TO BE EQUALLY SPACED BETWEEN GRID LINES OR ALONG GIRDERS UNLESS DIMENSIONED OTHERWISE2B. DIMENSIONS ARE TO CENTERLINE OF MEMBERS UNLESS NOTED OTHERWISE
3. SLAB-ON-DECK3A. ROOF TOP OF SLAB-ON-DECK ELEVATION = 58'-0"3B. ALL FLOOR SLABS TO UTILIZE 2VLI20 COMPOSITE DECKS WITH 4" OF COVER UNLESS OTHERWISE NOTED
1/8" = 1'-0"2 HIGH ROOF FRAMING PLAN
1/8" = 1'-0"3 HIGH ROOF FRAMING PLAN B
Page 30
0' -
4"
W14 x 30
0' -
2"
2" MetalDeck with4" Cover
Typ 6" x 2" 20g Metal Stud
Angle BracketBolted to Edge
Girder
6" Floor Slab
4" CONCRETE ON6" GRAVEL BASE
(3) #4 BARSCONT, EQ SPA
#4 BARS AT 18" O.C.BEND INTO FOOTINGALTERNATE SIDES
1' -
0"
2' - 0"
(3) #4 BARSCONTINUOUS
3" CLR
0' -
8"
Arch
itect
ure
Eng
inee
ring
Pla
nnin
g In
terio
rs
©
, DLR
Gro
up in
c., a
Wyo
min
g co
rpor
atio
n, A
LL R
IGH
TS R
ESER
VED
LEGEND NOTESLEGEND NOTES ARE COMMON TO ALLSOME NOTES MAY NOT APPLY TO THIS SHEET
BE
NJA
MIN
TA
LPO
S
Revis
ions
P AP P
A S &
PA P
P AS
A RC H
ITEC
TS, P
C
5/5/
2016
2:3
9:27
PM
\\stu
dent
files
.uw
yo.e
du\s
tora
ge$\
Des
ktop
\AR
E 47
20\R
evit
Proj
ect\S
truct
ural
Cen
tral G
roup
7_j
knut
so4.
rvt
Proj
ect N
umbe
rIs
sue
Dat
eLA
RAM
IE C
OU
NTY
CO
MM
UN
ITY
CO
LLEG
EW
ELC
OM
E C
ENTE
R
GROU
P 7
LATE
RAL
SYS
TEM
AN
D S
TRU
CTU
RAL
DET
AILS
S.6
1 3D for Lateral Systems
LATERAL SYSTEM NOTES:1. OVERVIEW:
1A.THE LATERAL FORCE RESISTING SYSTEM IS COMPRISED OF TWO MAIN COMPONENTS: BRACED STEEL FRAMES AND CONCRETE SHEAR WALLS.
2. BRACED FRAMES:2A. THE BRACED FRAMES WILL BE CREATED THROUGH THE UTILIZATION OF DIAGONAL HSS MEMBERS.2B. BRACE LOCATIONS ARE DISTRIBUTED THROUGHOUT THE BUILDING. EACH WALL HAS ONE CONTINOUS BRACED FRAME. LOCATIONS ARE NOTED ON EACH PLAN.
3. SHEAR WALLS3A. SHEAR WALLS ARE CONSTRUCTED AROUND THE TWO MAIN STAIRWELLS ALONG WITH THE ELEVATOR SHAFT.3B. SHEAR WALLS WILL BE CONSTRUCTED FROM 12" THICK CONCRETE ADEQUATELY REINFORCED WITH REBAR.
Diagonal HSSFrame Bracing
ConcreteShearWalls
1 1/2" = 1'-0"2 TYP. STEEL DECK DETAIL
1 1/2" = 1'-0"3 METAL STUD DETAIL 1 1/2" = 1'-0"4 FOUNDATION WALL SECTION
Page 31
APPENDIX D
Construction Administration Submittal
Page 32
Request For Information (RFI) 001
Subject: Structural Steel
Project: LCCC Student Services
To: ARE 4720 Design Team
From: Bob the Builder
Date requested by: May 13, 2016 5:00 p.m.
Request: A single shear tab connection with (4) bolts on a W18x35 beam was installed 1” too
low. The required capacity is Ru= 45 kips. Please provide field fix for connection. You can
provide a verbal or drawing response. Verbal responses shall include enough information that
it is contructable.
Answer:
In response to RFI 001 we have come up with the following solution. Please raise the beam to the original specified installed height then field weld the beam to the shear tab. No bolts are required. A single 12” long, 3/16” fillet weld down the long side of the shear tab will provide a connection of adequate strength. Please see attached drawing and calculations for more detail along with capacity verification. If you have any questions or concerns regarding this solution please do not hesitate to contact me.
Page 33
Page 34
APPENDIX E
Structural Calculations Package
Page 35
Laramie County Community College
Welcome Center Structural Calculation Package
ARE 4720 STRUCTURAL SYSTEMS DESIGN GROUP 7
SHANE HALVESON & JOSH KNUTSON
University of Wyoming Laramie, WY
May 11, 2016
Page 36
TABLE OF CONTENTS
1 General Site Information…...………………………………..……3
1.1 Design Criteria……………………...……………………….…..3
2 Vertical (Gravity Loads)……………………………………….….4
2.1 Dead Loads………………………………………………….…..4
2.2 Live Loads………………………………………………………5
2.3 Snow Loads……………………………………………………..5
3 Lateral Loads………………………………………………………7
3.1 Wind Loads…………………………………………………......7
3.2 Seismic Loads…………………………………………………..8
4 Gravity System Design……………………………………………16
4.1 Composite Beam Design……………………………………….16
4.2 Composite Girder Design………………………………………18
4.3 Open Web Steel Joist Design…………………………………..20
4.4 Column Design…………………………………………………22
4.5 Column Base Plate Design……………………………………..23
4.6 Interior Column Footing Design……………………………….24
4.7 Beam to Girder Connection…………………………………….25
Page 372 of 27
1. GENERAL INFORMATION
1.1 Design Criteria
Page 383 of 27
2. VERTICAL (GRAVITY LOADS)
2.1 Dead Loads
Page 394 of 27
2.2 Live Loads
2.3 Snow Loads
Page 405 of 27
Page 416 of 27
3. LATERAL LOADS
3.1 Wind Loads
Page 427 of 27
3.2 Seismic Loads
Page 438 of 27
Page 449 of 27
Page 4510 of 27
Page 4611 of 27
Page 4712 of 27
Page 4813 of 27
Page 4914 of 27
Page 5015 of 27
4. GRAVITY SYSTEM DESIGN
4.1 Composite Beam Design
Page 5116 of 27
Page 5217 of 27
4.2 Composite Girder Design
Page 5318 of 27
Page 5419 of 27
4.3 Open Web Steel Joist Design
Page 5520 of 27
Page 5621 of 27
4.4 Column Design
Page 5722 of 27
4.5 Column Base Plate Design
Page 5823 of 27
4.6 Interior Column Footing Design
Page 5924 of 27
4.7 Beam to Girder Connection
Page 6025 of 27
Page 6126 of 27
Page 6227 of 27