Transcript
Page 1: Strategic Plan for Commercialization of Solar Powered Mobile Telecom Towers

Authors:Sivakumar P S (25051)Surenderan E (25056)

Page 2: Strategic Plan for Commercialization of Solar Powered Mobile Telecom Towers

Methodology

Page 3: Strategic Plan for Commercialization of Solar Powered Mobile Telecom Towers

Chapter 2

Page 4: Strategic Plan for Commercialization of Solar Powered Mobile Telecom Towers

Growth in Mobile Subscriber Base in India

Page 5: Strategic Plan for Commercialization of Solar Powered Mobile Telecom Towers

Classes of Telecom Circle Class C Assam, Bihar & Jharkhand, Jammu & Kashmir, Orissa, Himachal Pradesh, North East India

(excludes Assam)

15 to 25%

Class B Uttar Pradesh (East), Uttar Pradesh (West) & Uttarakhand (excludes Ghaziabad & Noida), Madhya Pradesh & Chhattisgarh, Rajasthan, Haryana (excludes Faridabad, Gurgaon & Panchkula), Punjab (includes Chandigarh & Panchkula), West Bengal (includes Andaman & Nicobar, Sikkim, excludes Kolkata Telecom District), Kerala (includes Lakshadweep).

Class A Maharashtra (includes Goa, excludes Mumbai, Navi Mumbai & Kalyan), Gujarat (includes Daman & Diu, Dadra & Nagar Haveli), Tamil Nadu (includes Pondichery except Yanam, excludes Chennai, MEPZ, Mahabalipuram & Minjur), Andhra Pradesh (includes Yanam), Karnataka 35%

Metros Delhi (includes NCR, Faridabad, Ghaziabad, Gurgaon & Noida), Mumbai (includes Navi Mumbai & Kalyan), Chennai (includes MEPZ, Mahabalipuram & Minjur), Kolkata (Also known as KTD or Kolkata Telecom District; includes parts of Haora, Hooghly, North & South 24 Parganas and Nadia Districts) 90%

Page 6: Strategic Plan for Commercialization of Solar Powered Mobile Telecom Towers
Page 7: Strategic Plan for Commercialization of Solar Powered Mobile Telecom Towers

STRUCTURE OF TELECOM INFRASTRUCTURE INDUSTRY

Page 8: Strategic Plan for Commercialization of Solar Powered Mobile Telecom Towers

Market Share Distribution–Tower Infrastructure Industry

Page 9: Strategic Plan for Commercialization of Solar Powered Mobile Telecom Towers

1.Intensifying Competition

Page 10: Strategic Plan for Commercialization of Solar Powered Mobile Telecom Towers

2. Falling ARPUs

Page 11: Strategic Plan for Commercialization of Solar Powered Mobile Telecom Towers

Growth Trends

Page 12: Strategic Plan for Commercialization of Solar Powered Mobile Telecom Towers

Chapter 3

Page 13: Strategic Plan for Commercialization of Solar Powered Mobile Telecom Towers

Technical parameters to run a telecom tower

Page 14: Strategic Plan for Commercialization of Solar Powered Mobile Telecom Towers

Conventional DG Technology

Note: All Calculations and drawings refer CDMA technology.

Page 15: Strategic Plan for Commercialization of Solar Powered Mobile Telecom Towers

Economics of DG Technology

Page 16: Strategic Plan for Commercialization of Solar Powered Mobile Telecom Towers

Proposed Solar Technology

Standalone System

Hybrid System

Page 17: Strategic Plan for Commercialization of Solar Powered Mobile Telecom Towers

Economics of Solar Technology

Page 18: Strategic Plan for Commercialization of Solar Powered Mobile Telecom Towers

Economic Cost CalculationSolar System

DG System

Page 19: Strategic Plan for Commercialization of Solar Powered Mobile Telecom Towers

EIRR Calculation

Page 20: Strategic Plan for Commercialization of Solar Powered Mobile Telecom Towers

EIRR for different casesStandalone System

Hybrid System

Page 21: Strategic Plan for Commercialization of Solar Powered Mobile Telecom Towers

Chapter 4

Page 22: Strategic Plan for Commercialization of Solar Powered Mobile Telecom Towers

Present Government Policies

Page 23: Strategic Plan for Commercialization of Solar Powered Mobile Telecom Towers

Implications of Government Policies

Page 24: Strategic Plan for Commercialization of Solar Powered Mobile Telecom Towers

Issues and Stakeholder Consultations

Page 25: Strategic Plan for Commercialization of Solar Powered Mobile Telecom Towers

Issues and Stakeholder Consultations (ctd…)

Page 26: Strategic Plan for Commercialization of Solar Powered Mobile Telecom Towers

Strategies Proposed

Page 27: Strategic Plan for Commercialization of Solar Powered Mobile Telecom Towers

Chapter 5

Page 28: Strategic Plan for Commercialization of Solar Powered Mobile Telecom Towers

Way Forward

Page 29: Strategic Plan for Commercialization of Solar Powered Mobile Telecom Towers

Top Related