STP Study M/s Hydrotech Paryavaran India
Pvt Ltd
CAA II UC Chennai Auto Ancillary Industrial Infrastructure
Up gradation CompanyAmbattur Industrial Estate Near HCL Unit - V
Chennai
![Page 2: Stp study chhenai](https://reader037.vdocuments.us/reader037/viewer/2022103018/558de1dd1a28ab551a8b45d1/html5/thumbnails/2.jpg)
STP (Gross Size 30 mt x70 mt)
![Page 3: Stp study chhenai](https://reader037.vdocuments.us/reader037/viewer/2022103018/558de1dd1a28ab551a8b45d1/html5/thumbnails/3.jpg)
View of STP from Top
![Page 4: Stp study chhenai](https://reader037.vdocuments.us/reader037/viewer/2022103018/558de1dd1a28ab551a8b45d1/html5/thumbnails/4.jpg)
Coarse Bar Screen (Constructed earlier but renovated by the firm )
Coarse Bar Screen Circular Tank Diameter 3 m depth 5 mt
![Page 5: Stp study chhenai](https://reader037.vdocuments.us/reader037/viewer/2022103018/558de1dd1a28ab551a8b45d1/html5/thumbnails/5.jpg)
Grit Chamber - constructed earlier
Grit Chamber I Diameter 4.5 mt depth 6.5 mt RCC const
Grit Chamber Ii Dia 5.0 mt depth 6.5 RCC Construction
![Page 6: Stp study chhenai](https://reader037.vdocuments.us/reader037/viewer/2022103018/558de1dd1a28ab551a8b45d1/html5/thumbnails/6.jpg)
Pumping Station Submersible Pump set 2 no ( 1 +1 standbye) each of 7.5 HP Collection tank dia 4.0 mt depth 6.5 mt RCC
![Page 7: Stp study chhenai](https://reader037.vdocuments.us/reader037/viewer/2022103018/558de1dd1a28ab551a8b45d1/html5/thumbnails/7.jpg)
Bye Pass structure Not in use @the Time of visit
![Page 8: Stp study chhenai](https://reader037.vdocuments.us/reader037/viewer/2022103018/558de1dd1a28ab551a8b45d1/html5/thumbnails/8.jpg)
STP Control Unit (Inside Brick Masonry Room)
![Page 9: Stp study chhenai](https://reader037.vdocuments.us/reader037/viewer/2022103018/558de1dd1a28ab551a8b45d1/html5/thumbnails/9.jpg)
CI Inlet Pipe( i/d 300 mm 2 no) to Equalization Tank
![Page 10: Stp study chhenai](https://reader037.vdocuments.us/reader037/viewer/2022103018/558de1dd1a28ab551a8b45d1/html5/thumbnails/10.jpg)
Collection Tank Cum Equalization Tank
Diameter 11 mt Depth RCC Const 3.8 mt
Excess effluent
again fed to tank
Inlet (One Inlet pipe no effluent)
![Page 11: Stp study chhenai](https://reader037.vdocuments.us/reader037/viewer/2022103018/558de1dd1a28ab551a8b45d1/html5/thumbnails/11.jpg)
Over flow Out Let at Equalization Tank
![Page 12: Stp study chhenai](https://reader037.vdocuments.us/reader037/viewer/2022103018/558de1dd1a28ab551a8b45d1/html5/thumbnails/12.jpg)
Electric Control of Two no Submersible Pumps at Equalization Tank
![Page 13: Stp study chhenai](https://reader037.vdocuments.us/reader037/viewer/2022103018/558de1dd1a28ab551a8b45d1/html5/thumbnails/13.jpg)
Stilling Chamber Rectangular- RCC
![Page 14: Stp study chhenai](https://reader037.vdocuments.us/reader037/viewer/2022103018/558de1dd1a28ab551a8b45d1/html5/thumbnails/14.jpg)
Fine Bar Screen Two numbers
![Page 15: Stp study chhenai](https://reader037.vdocuments.us/reader037/viewer/2022103018/558de1dd1a28ab551a8b45d1/html5/thumbnails/15.jpg)
Grit Chamber
![Page 16: Stp study chhenai](https://reader037.vdocuments.us/reader037/viewer/2022103018/558de1dd1a28ab551a8b45d1/html5/thumbnails/16.jpg)
FAB II (dia 7.3 mt )
Media in FAB II Out let of FAB II to Clarifier
![Page 17: Stp study chhenai](https://reader037.vdocuments.us/reader037/viewer/2022103018/558de1dd1a28ab551a8b45d1/html5/thumbnails/17.jpg)
MBBR Bio Reactor FAB I
Oil and Grease in F AB I MBBR Media in FAB I
![Page 18: Stp study chhenai](https://reader037.vdocuments.us/reader037/viewer/2022103018/558de1dd1a28ab551a8b45d1/html5/thumbnails/18.jpg)
Return sludge in FAB I
Return sludge Pump 2 HP
Return Sludge fed in to FAB I Pipe dia 63
mm
![Page 19: Stp study chhenai](https://reader037.vdocuments.us/reader037/viewer/2022103018/558de1dd1a28ab551a8b45d1/html5/thumbnails/19.jpg)
Air Compressor Unit( 3 no Compressors)
![Page 20: Stp study chhenai](https://reader037.vdocuments.us/reader037/viewer/2022103018/558de1dd1a28ab551a8b45d1/html5/thumbnails/20.jpg)
Air compressor distribution Header
![Page 21: Stp study chhenai](https://reader037.vdocuments.us/reader037/viewer/2022103018/558de1dd1a28ab551a8b45d1/html5/thumbnails/21.jpg)
Sludge and Grit Out lets to sludge bed
Grit out let from Grit Chamber
Sludge out at FAB I
![Page 22: Stp study chhenai](https://reader037.vdocuments.us/reader037/viewer/2022103018/558de1dd1a28ab551a8b45d1/html5/thumbnails/22.jpg)
RCC Clarifier (Dia 8.7 mt)
![Page 23: Stp study chhenai](https://reader037.vdocuments.us/reader037/viewer/2022103018/558de1dd1a28ab551a8b45d1/html5/thumbnails/23.jpg)
Clarifier Out fall to disinfection
Settled Effluent at the out let of clarifier
![Page 24: Stp study chhenai](https://reader037.vdocuments.us/reader037/viewer/2022103018/558de1dd1a28ab551a8b45d1/html5/thumbnails/24.jpg)
Disinfection unit
![Page 25: Stp study chhenai](https://reader037.vdocuments.us/reader037/viewer/2022103018/558de1dd1a28ab551a8b45d1/html5/thumbnails/25.jpg)
Steel structures ( like stair and Platform)
![Page 26: Stp study chhenai](https://reader037.vdocuments.us/reader037/viewer/2022103018/558de1dd1a28ab551a8b45d1/html5/thumbnails/26.jpg)
Sludge Bed
![Page 27: Stp study chhenai](https://reader037.vdocuments.us/reader037/viewer/2022103018/558de1dd1a28ab551a8b45d1/html5/thumbnails/27.jpg)
Sludge infilitrate collection sump
![Page 28: Stp study chhenai](https://reader037.vdocuments.us/reader037/viewer/2022103018/558de1dd1a28ab551a8b45d1/html5/thumbnails/28.jpg)
Sludge Distribution
![Page 29: Stp study chhenai](https://reader037.vdocuments.us/reader037/viewer/2022103018/558de1dd1a28ab551a8b45d1/html5/thumbnails/29.jpg)
Out Let Houdi and Out let into pond
![Page 30: Stp study chhenai](https://reader037.vdocuments.us/reader037/viewer/2022103018/558de1dd1a28ab551a8b45d1/html5/thumbnails/30.jpg)
Katcha Pond used to collect Treated effluent
![Page 31: Stp study chhenai](https://reader037.vdocuments.us/reader037/viewer/2022103018/558de1dd1a28ab551a8b45d1/html5/thumbnails/31.jpg)
Raw sewage and Treated Sewage
![Page 32: Stp study chhenai](https://reader037.vdocuments.us/reader037/viewer/2022103018/558de1dd1a28ab551a8b45d1/html5/thumbnails/32.jpg)
Lab at Site
![Page 33: Stp study chhenai](https://reader037.vdocuments.us/reader037/viewer/2022103018/558de1dd1a28ab551a8b45d1/html5/thumbnails/33.jpg)
Inspecting Team
![Page 34: Stp study chhenai](https://reader037.vdocuments.us/reader037/viewer/2022103018/558de1dd1a28ab551a8b45d1/html5/thumbnails/34.jpg)
Observations• Oil and grease has been observed in the FAB I so this needs to be removed at preliminary stage by
constructing oil and grease trap . This may constructed by department also• Return sludge is being fed in to FAB I . Normally in MBBR return sludge is not fed • STP was not running at Full capacity at the time of visit and no discharge meter was installed to check the
flow• Disinfection needs to be done regularly• Handling and Disposal of sludge agreement needs to be finalized with the operator • Plant was in good working condition .• Lab should have more testing equipment• Flow meter should be installed at STP• Following officers were present during visit• 1. Mr S Srinivasan Director and Mr N Palaniraja Chennai auto Ancillary Industrial Infrastructure Up
gradation Company • 2.Mr Rakesh Verma Sr Manger Projects M/s Hydro Tech Paryavaran India Pvt Ltd • 3Mr S Selvam Site Engineer M/s Hydro Tech Paryavaran India Pvt Ltd • Mr S Srinivasan is satisfied with the performance of the Plant executed by M/s Hydro Tech Paryavaran
India Pvt Ltd • Project was allotted on June 19 2006 vide CAAIIUC/STP and WTP /920 dt 19/6/2006 and completion time
was 15 months and it was completed June 17 2009 .The delay needs to be explained .and cost overruns if any needs to be checked .