Springfield House - BioGarage
600
2139
26
2
17
7
3
18
25
1
P R O P O S E D G A R A G E E A S T E L E V A T I O N S C A L E 1 : 5 0
2187
4889
3123
1615
17
17
P R O P O S E D G A R A G E F L O O R P L A N S C A L E 1 : 5 0
Springfield House was designed by facilitator Wilf Meynell of Studio Bark in 2013 and has been on-site since March 2014. It is due to be featured on
Channel 4’s Grand Designs programme on October 8th 2014. Springfield House has been designed with a rigorous focus on low energy environ-
mental design and will be the first code level 6, paragraph 55 building in the UK. More information on the house can be found at www.studiobark.
co.uk. The Bio-Garage had to be omitted from the original tender due to cost and time-scale. The construction project in question allows for a flexible
design and build process, all within the jurisdiction of the local planning department and national building control. The three main unknown design
elements are the green roof, the external cladding design and the two external doors. The slab is cast and the boiler room has been formed to allow
for prior installation of the Herz log batch boiler and accumulator tank. This project requires creativity in design, specification and detailing, with
plenty of opportunity to learn about timber and joinery.
Address: Springfield House
Dereham Road
Honingham
Norwich
Norfolk NR9 5AP
Accommodation: Camping in woods (access to showers and toilets) note: programme requires students to stay over weekend.
Facilitators: Wilf Meynell (Studio Bark), Danny Sagan (Norwich University, USA)
Client: Natasha Cargill
Budget: Total Construction Budget: £1,500
Tasks: - review of the original design - re-thinking / re-designing / re-drawing / re-specifying
- external cladding design - liaisons with planning department and building control
- technical green roof design, species and specification research
- foundation & sole plate construction - resin fixing & waterproofing
- timber frame construction techniques, using C16 & C24 structural timber for the walls and i-joists for the roof
- designing, fabricating and installing timber doors
- building roof structure, laying firings, waterproofing, laying green roof substrate & installing rainwater goods
SMALL HOPES WALL 2011
HEATHERWICK PROTO 2013
B
uild
ing
for a
Futu
re Winter 2013 Volume 23, No. 3
ALSO:FURTHER INVESTIGATIONS INTO ABSENT INSULATION
SOLID WALL INSULATION AND CONSERVATION
SUSTAINABILITY IN LONDON BATTERY COUPLED SOLAR PV SYSTEMS FOR DWELLINGS
TOWARDS EnerPHit
AND MUCH MORE
News l Features l Research l Opinion l Projects l Debate l Products l People
THE WOODS / CAMPSITE + the farm dog
THE LOG (FUEL) PILE
Key
Job Ref Drawing Number RevL-104A
Springfield House, HoninghamDrawing TitleProposed Landscaping Scheme
WM NOV 13Scale
1:200@A3DateDrawn
A118
W I L F M E Y N E L L Ba Hons Arch. Dip Arch.ARCHITECTURAL [email protected] 355 53170786 333 1464Studio 32,13-15 Amhurst Terrace, London E8 2BTwww.wilfmeynell.co.ukPLEASE NOTE: DRAWINGS MAY INCLUDE TOLERANCES <10mm, NEVER MEASURE OFF DRAWINGS & ALWAYS CHECK ON SITE
P R O P O S E D L A N D S C A P I N G S C H E M E S C A L E 1 : 2 0 0
bank slopes to ground terrace level
grass
2400-2.15
+0.00
+0.40
-2.20
+0.95+0.60
-1.75
-1.25
site boundary
wild flower meadow
grass
24
24
27
25
26
23
22
21
21
19
20
22
22
22
228
8
8
8
19
30
29
16
15
15
16
16
16
18
18
16
17
16
17
13
14
12
11
11
10
10
9
2
7
7
6
5
5
4
4
4
4
3
3
1
1
min. 5000
28
wild flower meadow
22
22
1.5m
foot
way
exte
nsio
n to
Con
tract
or's
desig
n
3129
insula
ted
pipe
from
boil
er
4815
1946
5115
5662
2200min. clear width of boiler room
existing pavement cut straight at junction to new footpath. Concrete path kerb edgings used at threshold.
proposed footway and entrance splay formed with same type 1 crushed.
Proposed footpath - engineer's detail - N.T.S
25m
- to
tal le
ngth
oute
r skin
of s
crub
hed
ge
rem
oved
for v
ision
spl
ays
oute
r skin
of s
crub
hed
ge re
mov
ed fo
r visi
on s
play
and
foot
path
inne
r skin
of s
crub
hed
ge p
rese
rved
and
repl
ante
d
inne
r skin
of s
crub
hed
ge
pres
erve
d an
d re
plan
ted
development exclusion zones
7
bankkk slopesk to groundrogg terrace
-1.25
19
19
7
ce5
ace
P R O P O S E D L A N D S C A P I N G K E Y1 - Wild flower green roof. See ecologist's report for more details2 - Location of photovaltaic solar panels3 - Prestige 100l wall mounted water butts4 - Raised landscaping bund (spoil sourced from excavation) - planted with a wild flower meadow mix. See ecologist's report for more details5 - Existing waste water manhole6 - Vegetable / plant bed. 7 - Existing North boundary hedge layed, bolstered and trimmed.8 - South / West boundary hedges. See ecologist's report for more details9 - Location of evacuated tube solar panel10 - Permeable western red cedar timber deck11 - Gabion retaining wall12 - Bin / recycling store13 - Lean-to wood store14 - Climbing flower bed. See ecologist's report for more details.15 - Small leafed lime tree (Tilia Cordata) - bare root stock 3ft 16 - Apple Trees - Norfolk vareities (planting stock 6-9ft) including:
- Pineapple Russet- Horsford Prolific- Adams Pearmain- Caroline
17 - Cherry Trees - Norfolk vareities (planting stock 5-7ft) including:- Mermat- Colney
18 - Pear Trees - Norfolk vareities (planting stock 5-7ft) - including:- Robin- Hacon's Incomparable
19 - Existing tree canopy oversails site boundary20 - Trench drain - taking water away from buidling21 - Shingle Driveway22 - Timber fence23 - Timber gate and gate posts24 - Soakaways25 - External covered wood pile26 - Amelanchier Laevis - 10 year old - 10ft min. planting stock 27 - Hard paving 28 - Wetland bog, planted with water loving plants:
- Watercress- Iris- Bog Arum- Marsh Marigold- Water Plantain- Saux Stachys
29 - Greengauge Tree (planting stock 5-7ft)30 - Crab Apple Tree (planting stock 5-7ft)
Rev Date Description Drwn Chkd Rev Date Description Drwn ChkdM 15.11.13 Preliminary Stage E Issue to Nbea & Norfolk Pro Build WM -
CONSTRUCTION
N 11.12.13 Preliminary issue to CNC building control WM -P 17.01.14 Issued for Contractor meeting WM -Q 23.01.14 Tender Issue to Norfolk Pro Build (contractor) WM -
TR 05.05.14 Issue to Renewables consultant WM -
S 08.07.14 For Highways approval WM -T 09.07.14 For Planning condition sign-off WM -
13
F-06MUSIC ROOM
F-05WC
F-04HALL
F-01LIVING
F-07M TERRACE
F-08E TERRACE
F-02DINING
F-03KITCHEN
WF-03S +0387H +2665
WF-
04S
+116
5H
+26
65
WF-05
S +1165H
+2665
WF-08S +0865H +2365
WF-
06S
+116
5H
+26
65
WF-
07S
+116
5H
+26
65
WF-10S +1165H +2665
WF-
11S
+116
5H
+26
65
WF-09S +0016H +2685
WF-01S -0002H +2708 WF-02
S -0002H +2708
882 180
180
1926
163
IN
bins
&re
cycl
ing
velux M04 above
RETRACTABLE DRYING LINE ABOVE
300
F-C +2600mm
mec
hani
cal e
xtra
ctve
nts
thro
ugh
wal
lmechanical extractvents through wall
level threshold
level threshold
level threshold
radi
ator
radiator
radiator
radiator
ID-07 ID-08
ID-09
ID-10
WALL TYPE 3
WALL TYPE 3
1100mm high balustrade & handrail
1100mm high balustrade & handrail
glulam lintel overto eng's details
glulam lintel overto eng's details
glulam lintel overto eng's details
121110987654321 14 15
1100mm high balustrade
945 945
DOWN
FLOOR TYPE 2A
FLOOR TYPE 2A
FLOOR TYPE 2A
FLOOR TYPE 2A
FLOOR TYPE 2B
FLOOR TYPE 3A
FLOOR TYPE 3A
3
7
3
7
22
23
20
20
20
20
31
SVP - vented through roof
WWP
WWP in floor zone
AAV
First FFL +30928mm
External Ground Level +30778mm
External Ground Level +30778mm
2843
2006
2733
4062
1200
1600
800
800
DRAINAGE:- All below ground drainage to comply with current building regulations- All below ground drainage to Contractor's Design
36 36
AA
BB
CC
D-113
1
4
2
3 E
metre box
1062 BIN / RECYCLING STORE TO CONTRACTOR'S DESIGN
D-115
Key
Job Ref Drawing Number RevL-104
Springfield House, HoninghamDrawing TitleProposed First Floor Plan
WM SEP 13Scale
1:50@A3DateDrawn
A118
Rev Date Description Drwn Chkd Rev Date Description Drwn ChkdW I L F M E Y N E L L Ba Hons Arch. Dip Arch.ARCHITECTURAL [email protected] 355 53170786 333 1464Studio 32,13-15 Amhurst Terrace, London E8 2BTwww.wilfmeynell.co.ukPLEASE NOTE: DRAWINGS MAY INCLUDE TOLERANCES <10mm, NEVER MEASURE OFF DRAWINGS & ALWAYS CHECK ON SITE
P R O P O S E D F I R S T F L O O R P L A N S C A L E 1 : 5 0
WINDOW NOTES
- All ground floor sill (s) & head (h) heights given from top of slab (in mm)- All first floor sill (s) and head (h) heights given from top of first floor joists (in mm)- All sill and head heights provided are for structural openings only
PRELIM. CON.W 23.04.14 Preliminary Construction Issue WM -
Z
X 11.06.14 Sanitaryware and layout updated/elevations labelled SC -Y 24.06.14 Issue to contractor for bin / recycling store setting out WM -Z 08.07.14 Revised location of WC sink WM -
Key
Job Ref Drawing Number RevL-109
Springfield House, HoninghamDrawing TitleProposed Section BB
WM SEP 13ScaleDateDrawn
A1181:50@A3
Rev Date Description Drwn Chkd Rev Date Description Drwn ChkdW I L F M E Y N E L L Ba Hons Arch. Dip Arch.ARCHITECTURAL [email protected] 355 53170786 333 1464Studio 32,13-15 Amhurst Terrace, London E8 2BTwww.wilfmeynell.co.ukPLEASE NOTE: DRAWINGS MAY INCLUDE TOLERANCES <10mm, NEVER MEASURE OFF DRAWINGS & ALWAYS CHECK ON SITE
G-01BEDROOM 1
G-03EN-SUITE
F-06MUSIC ROOM
F-01LIVING
WF-02
WF-06WF-07
WG-08
WG-01
ROOF TYPE 1
ROOF TYPE 2
FLOOR TYPE 3AFLOOR TYPE 2A
FLOOR TYPE 1CFLOOR TYPE 1B
WALL TYPE 2
WALL TYPE 3
WALL TYPE 1
FLOOR TYPE 2A
2 2
WALL TYPE 3
10 8
1
11
14
22
23
D-101
FFL +30928mmFFL +30928mm
FFL +28328mm
FFL +30928mm
FFL +28328mm+28158mm
5003024
33
34
35
TOP OF SLAB +28300mm
First FFL +30928mm
Celing FL +33528mm 585
2600
200
2400
603
370 2500 150 4600 370 1180
D-102
D-103
5963
3685
385
D-114Parapet (highest point) +34263mm
1229
12293495
385
319
D-105
min 600
electricity in through trench and up through sheltered store
metre
consumer unit
BIN / RECYCLING STORE TO CONTRACTOR'S DESIGN
all electrical cabling inside weatherproof sheltered store and attached to shelter walls - all to comply with current building regulations
358
2450
2955
60
1500
P R O P O S E D S E C T I O N B B S C A L E 1 : 5 0
M 15.11.13 Preliminary Stage E Issue to Nbea & Norfolk Pro Build WM -
O U T L I N E S P E C I F I C A T I O N
- Wild flower green roof - refer to ecologist's CSH report- Sarnafil metal drip detail (flashed under) - colour to be anthra grey- Alumasc flushjoint rectangular downpipe (100 x 75) & hopper - colour RAL 7016- Window / door - see window schedule for details and SAP calcs for performance - colour RAL 7016- NBT lime render system - textured and coloured to give concrete effect- - 100L Prestige wall mounted water butt - dark grey- 6kWp Solar PV array (made up of 20 no. 300kWp PV panels)- Viridian evacuated tube solar panel- selkirk twinwall flue and cap
- Gabion retaining wall - see eng's details- Marine grade plywood fascia BS-1088 - Dulux Weathershieldquick drying satin with primer and undercoat - - Localled sourced western red cedar drained terrace- DPM laid to fall away from buidling - to Contractor's design- Windhager log gasification boiler- 1000l thermal buffer cylinder (inc. valves pump and controls)- 250-300l unvented solar ready HWC, with min 100l dedicatedsolar volume ( 25l per m2 solar area)- 2m x 1m viridian solar panels and pump station- Remote wireless programmable room thermostat to control house and hot water temps.
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
Additional Notes- Please see SP-101 for wall types- Shadow gap detail for internal wall to Contractor's Design- Internal doors generally to be 2100mm head- ID-07 & ID-08 to be head 2600mm to Contractor's design- Moveable furniture shown for reference only
20
21
22
23
24
25
26
27
28
29
30
31
- Stelrad classic column vertical radiators - Stelrad Espirit towel radiators - Non combustible hearth- Wood stove - supplied by client (install hearth and trim roof to suit)- Composting bin - supplied by client- Log boiler flue - supplied by client- Timber clad up and over garage door- Alumasc flushjoint gutter - colour RAL 7016- Locally sourced western red cedar timber shingle roof - Velux MK04 rooflight - bespoke flashings by roofing contractor- Entrance pergola - spec TBC- Self supporting in-situ concrete stair and trombe wall
32
33
34
35
36
37
- Soil vent pipe - black- Backfill gravel to Eng's details- Perforated land drain to Contractor's design- Painted marine plywood BS-1088 edge detail to contractor's design- Timber fence (to match boundary fence) - supplied by client- Timber clad access panel to Contractor's design
N 11.12.13 Preliminary issue to CNC building control WM -Q 23.01.14 Tender Issue to Norfolk Pro Build (contractor) WM -R 25.02.14 Setting out issue to Norfolk Pro Build (contractor) WM -T 14.04.14 Construction Issue to Contractor WM -
U 15.04.14 Preliminary Issue to Consultants WM -
WINDOW NOTES
- All ground floor sill (s) & head (h) heights given from top of slab (in mm)- All first floor sill (s) and head (h) heights given from top of first floor joists (in mm)- All sill and head heights provided are for structural openings only
OMIT TIMBER PACKER FOR INSTALLATION BY WINDOW INSTALLER (WF-01 & WF-02)
SCALE 1:5
V 17.04.14 Preliminary Construction Issue to Contractor for Ground Floor Works WM -
CONSTRUCTION
Z
X 03.06.14 Issued for construction - revised parapet detail WM -Y 13.06.14 Revised to show incoming electricity & dims for external insulation WM -Z 24.06.14 Issue to contractor for bin / recycling store setting out WM -
Key
Job Ref Drawing Number RevL-110
Springfield House, HoninghamDrawing TitleProposed Section CC
WM SEP 13ScaleDateDrawn
A1181:50@A3
Rev Date Description Drwn Chkd Rev Date Description Drwn ChkdW I L F M E Y N E L L Ba Hons Arch. Dip Arch.ARCHITECTURAL [email protected] 355 53170786 333 1464Studio 32,13-15 Amhurst Terrace, London E8 2BTwww.wilfmeynell.co.ukPLEASE NOTE: DRAWINGS MAY INCLUDE TOLERANCES <10mm, NEVER MEASURE OFF DRAWINGS & ALWAYS CHECK ON SITE
P R O P O S E D S E C T I O N C C S C A L E 1 : 5 0
O U T L I N E S P E C I F I C A T I O N
- Wild flower green roof - refer to ecologist's CSH report- Sarnafil metal drip detail (flashed under) - colour to be anthra grey- Alumasc flushjoint rectangular downpipe (100 x 75) & hopper - colour RAL 7016- Window / door - see window schedule for details and SAP calcs for performance - colour RAL 7016- NBT lime render system - textured and coloured to give concrete effect- - 100L Prestige wall mounted water butt - dark grey- 6kWp Solar PV array (made up of 20 no. 300kWp PV panels)- Viridian evacuated tube solar panel- selkirk twinwall flue and cap
- Gabion retaining wall - see eng's details- Marine grade plywood fascia BS-1088 - Dulux Weathershieldquick drying satin with primer and undercoat - - Localled sourced western red cedar drained terrace- DPM laid to fall away from buidling - to Contractor's design- Windhager log gasification boiler- 1000l thermal buffer cylinder (inc. valves pump and controls)- 250-300l unvented solar ready HWC, with min 100l dedicatedsolar volume ( 25l per m2 solar area)- 2m x 1m viridian solar panels and pump station- Remote wireless programmable room thermostat to control house and hot water temps.
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
Additional Notes- Please see SP-101 for wall types- Shadow gap detail for internal wall to Contractor's Design- Internal doors generally to be 2100mm head- ID-07 & ID-08 to be head 2600mm to Contractor's design- Moveable furniture shown for reference only
20
21
22
23
24
25
26
27
28
29
30
31
- Stelrad classic column vertical radiators - Stelrad Espirit towel radiators - Non combustible hearth- Wood stove - supplied by client (install hearth and trim roof to suit)- Composting bin - supplied by client- Log boiler flue - supplied by client- Timber clad up and over garage door- Alumasc flushjoint gutter - colour RAL 7016- Locally sourced western red cedar timber shingle roof - Velux MK04 rooflight - bespoke flashings by roofing contractor- Entrance pergola - spec TBC- Self supporting in-situ concrete stair and trombe wall
32
33
34
35
36
37
- Soil vent pipe - black- Backfill gravel to Eng's details- Perforated land drain to Contractor's design- Painted marine plywood BS-1088 edge detail to contractor's design- Timber fence (to match boundary fence) - supplied by client- Timber clad access panel to Contractor's design
G-04UTILITIES
F-04HALL
G-07CORRIDOR
WG-03
WF-03 WF-09
WG-04
WF-04
2
8
1
11
FLOOR TYPE 1A
FLOOR TYPE 2A
WALL TYPE 2
+28158mmFFL +28300mm
FFL +30928mm
FFL +28300mmFFL +28300mm
D-109
585
2191
3037
920
012
023
08
318 1050 200 800 150 1500 318
D-102
D-112
FFL +30928mm
1201
1319
399
433
TOP OF SLAB +28300mm
First FFL +30928mm
Celing FL +33528mm
Parapet (highest point) +34263mm
U 15.04.14 Preliminary Issue to Consultants WM -
WINDOW NOTES
- All ground floor sill (s) & head (h) heights given from top of slab (in mm)- All first floor sill (s) and head (h) heights given from top of first floor joists (in mm)- All sill and head heights provided are for structural openings only
V 17.04.14 Preliminary Construction Issue to Contractor for Ground Floor Works WM -
X
X 03.06.14 Issued for construction - revised parapet detail WM -
CONSTRUCTION
Key
Job Ref Drawing Number RevL-104B
Springfield House, HoninghamDrawing TitleProposed Garage Layouts
WM NOV 13Scale
1:50@A3DateDrawn
A118
W I L F M E Y N E L L Ba Hons Arch. Dip Arch.ARCHITECTURAL [email protected] 355 53170786 333 1464Studio 32,13-15 Amhurst Terrace, London E8 2BTwww.wilfmeynell.co.ukPLEASE NOTE: DRAWINGS MAY INCLUDE TOLERANCES <10mm, NEVER MEASURE OFF DRAWINGS & ALWAYS CHECK ON SITE
2187
4889
3123
1615
17
24
17
25
18
18
1
23
28
600
2139
26
2
17
7
3
18
25
1
Rev Date Description Drwn Chkd Rev Date Description Drwn ChkdM 15.11.13 Preliminary Stage E Issue to Nbea & Norfolk Pro Build WM -
P R O P O S E D G A R A G E R O O F P L A N S C A L E 1 : 5 0 P R O P O S E D G A R A G E F L O O R P L A N S C A L E 1 : 5 0
P R O P O S E D G A R A G E E A S T E L E V A T I O N S C A L E 1 : 5 0
N 11.12.13 Preliminary issue to CNC building control WM -Q 23.01.14 Tender Issue to Norfolk Pro Build (contractor) WM -
Q
FOR TENDER
THE TIMBER - WESTERN RED CEDAR
SPRINGFIELD HOUSE - THE BUILDING SITE