Spring 2019Delaney Seeburger
California Polytechnic State University
![Page 2: Spring 2019 Delaney Seeburger California Polytechnic State](https://reader031.vdocuments.us/reader031/viewer/2022022807/621b3939631889206a77e3e8/html5/thumbnails/2.jpg)
Prescriptive◦ Structural◦ Flammability◦ Suppression◦ Alarm and Detection◦ Smoke Control◦ Egress
Performance Based◦ Design Fires◦ Tenability◦ FDS◦ Human Behavior◦ Pathfinder
Slide 2
![Page 3: Spring 2019 Delaney Seeburger California Polytechnic State](https://reader031.vdocuments.us/reader031/viewer/2022022807/621b3939631889206a77e3e8/html5/thumbnails/3.jpg)
Slide 3
![Page 4: Spring 2019 Delaney Seeburger California Polytechnic State](https://reader031.vdocuments.us/reader031/viewer/2022022807/621b3939631889206a77e3e8/html5/thumbnails/4.jpg)
Slide 4
![Page 5: Spring 2019 Delaney Seeburger California Polytechnic State](https://reader031.vdocuments.us/reader031/viewer/2022022807/621b3939631889206a77e3e8/html5/thumbnails/5.jpg)
Fire Resistance
Slide 5
TYPE I TYPE IIBuilding Element A A
Structural FrameIncluding columns, girders, trusses 3 1
Bearing wallsExteriorInterior
33
11
Nonbearing walls and partitionsExteriorInterior
See Table 602
Floor construction Including supporting beams and joists 2 1
Roof constructionIncluding supporting beams and joists 1.5 1
Building Element Resistance RatingCorridors 1 hourStairways 2 hour
Doors 20 minute
Occupancy Interior Exits Corridors RoomsA-3 B B CB, M B C CR-2 C C C
CBC Table 601CBC 510.2
CBC 1020.1
CBC 1023.2
CBC 716.5.3
CBC Table 803.11
![Page 6: Spring 2019 Delaney Seeburger California Polytechnic State](https://reader031.vdocuments.us/reader031/viewer/2022022807/621b3939631889206a77e3e8/html5/thumbnails/6.jpg)
Occupancy A-3 B M R-2 S-2A-3 N 1 1 1 NB ---- N N 1 1M ---- ---- N 1 1
R-2 ---- ---- ---- N 1S-2 ---- ---- ---- ---- N
Slide 6
CBC Table 508.4
![Page 7: Spring 2019 Delaney Seeburger California Polytechnic State](https://reader031.vdocuments.us/reader031/viewer/2022022807/621b3939631889206a77e3e8/html5/thumbnails/7.jpg)
Slide 7
Floor Area (ft2) Type I-A (ft2) Type II-A (ft2)First 33,100 UL --
Second 17,760 -- 72,000Third 17,800 -- 72,000
Height (ft) Type I-A (ft) Type II-A (ft)65 UL 85
Floor OccupancyFirst Assembly (A-3); Business (B); Mercantile (M); Storage (S-2)
Second – Fifth Residential (R-2)
CBC Table 504.3
CBC Table 506.2
![Page 8: Spring 2019 Delaney Seeburger California Polytechnic State](https://reader031.vdocuments.us/reader031/viewer/2022022807/621b3939631889206a77e3e8/html5/thumbnails/8.jpg)
Wet Pipe Automatic Sprinkler and Standpipe Risers◦ Sprinkler – 6”◦ Standpipe – 4”
Hazard Classification◦ Light (LH)◦ Ordinary I and II (OH-1/OH-2)
Preaction System
Slide 8
![Page 9: Spring 2019 Delaney Seeburger California Polytechnic State](https://reader031.vdocuments.us/reader031/viewer/2022022807/621b3939631889206a77e3e8/html5/thumbnails/9.jpg)
Slide 9
![Page 10: Spring 2019 Delaney Seeburger California Polytechnic State](https://reader031.vdocuments.us/reader031/viewer/2022022807/621b3939631889206a77e3e8/html5/thumbnails/10.jpg)
Occupancy Density (gpm/ft2) Area (ft2) HSA (gpm) Duration (min)
LH 0.085 2150 100 30
OH-1 0.15 1075 250 60-90
OH-2 0.195 1606 250 60-90
Slide 10
CBC 11.2.3.3.1-11.2.3.3.4
“The water supply requirements for sprinklers only shall be based upon the room that creates the greatest demand.”
![Page 11: Spring 2019 Delaney Seeburger California Polytechnic State](https://reader031.vdocuments.us/reader031/viewer/2022022807/621b3939631889206a77e3e8/html5/thumbnails/11.jpg)
Slide 11
![Page 12: Spring 2019 Delaney Seeburger California Polytechnic State](https://reader031.vdocuments.us/reader031/viewer/2022022807/621b3939631889206a77e3e8/html5/thumbnails/12.jpg)
Slide 12
LH - 8 sprinklers
Water SupplyLH - 5 sprinklers
OH2 – 16 Sprinklers
![Page 13: Spring 2019 Delaney Seeburger California Polytechnic State](https://reader031.vdocuments.us/reader031/viewer/2022022807/621b3939631889206a77e3e8/html5/thumbnails/13.jpg)
Two Fire Alarm Control Units (FACU) Addressable Signaling and Notification Line Circuits – Class B
Slide 13
![Page 14: Spring 2019 Delaney Seeburger California Polytechnic State](https://reader031.vdocuments.us/reader031/viewer/2022022807/621b3939631889206a77e3e8/html5/thumbnails/14.jpg)
Slide 14
![Page 15: Spring 2019 Delaney Seeburger California Polytechnic State](https://reader031.vdocuments.us/reader031/viewer/2022022807/621b3939631889206a77e3e8/html5/thumbnails/15.jpg)
Shutdown HVAC Close fire/smoke dampers Release door holders
Slide 15
Smoke Control
FloorPower (AH) 1 2 3 4 5
Required 60 3 3 3 3Provided 70 7 7 7 7
Secondary Power
![Page 16: Spring 2019 Delaney Seeburger California Polytechnic State](https://reader031.vdocuments.us/reader031/viewer/2022022807/621b3939631889206a77e3e8/html5/thumbnails/16.jpg)
Slide 16
First Floor
Second Floor
![Page 17: Spring 2019 Delaney Seeburger California Polytechnic State](https://reader031.vdocuments.us/reader031/viewer/2022022807/621b3939631889206a77e3e8/html5/thumbnails/17.jpg)
Type of Room Occupancy Classification Occupant Load Factor (ft2/occupant)
Study Areas A-3 15
Offices B 100
Market M 60
Dwelling Units R-2 200
Storage/Service S-2 300
Slide 17
𝑂𝑂𝑂𝑂𝑂𝑂𝑂𝑂𝑂𝑂𝑂𝑂𝑂𝑂𝑂𝑂 𝐿𝐿𝐿𝐿𝑂𝑂𝐿𝐿 =𝐴𝐴𝐴𝐴𝐴𝐴𝑂𝑂 𝐿𝐿𝑜𝑜 𝑅𝑅𝐿𝐿𝐿𝐿𝑅𝑅 (𝑜𝑜𝑂𝑂2)
𝑂𝑂𝑂𝑂𝑂𝑂𝑂𝑂𝑂𝑂𝑂𝑂𝑂𝑂𝑂𝑂 𝐿𝐿𝐿𝐿𝑂𝑂𝐿𝐿 𝐹𝐹𝑂𝑂𝑂𝑂𝑂𝑂𝐿𝐿𝐴𝐴 ( ⁄𝑜𝑜𝑂𝑂2 𝐿𝐿𝑂𝑂𝑂𝑂𝑂𝑂𝑂𝑂𝑂𝑂𝑂𝑂𝑂𝑂)
Floor Occupant Load (persons)
First 40
Second 60
Third 60
Fourth 60
Fifth 60
CBC Table 1004.1.2
![Page 18: Spring 2019 Delaney Seeburger California Polytechnic State](https://reader031.vdocuments.us/reader031/viewer/2022022807/621b3939631889206a77e3e8/html5/thumbnails/18.jpg)
Slide 18
Occupancy Travel Distance (ft)
A-3, M, R-2 250
B 300
S-2 400
Width (in) Egress Capacity (in./person) Egress Capacity (persons)
Residence Doors 35 0.2 175
Elevator Doors 42.5 0.2 213
Stairway Door 35 0.2 175
Stairs 45.5 0.3 152
Corridors 59 0.2 295Occupancy Dead End (ft)
B, M, R-2, S-2 50
CBC Table 1017.2
CBC Table 1020.4
CBC Table 1005.3.1/1005.3.2
![Page 19: Spring 2019 Delaney Seeburger California Polytechnic State](https://reader031.vdocuments.us/reader031/viewer/2022022807/621b3939631889206a77e3e8/html5/thumbnails/19.jpg)
Slide 19
Occupancy Common Path (ft)
A, M 75
B 100
R-2 125
S-2 100
CBC Table 1006.2.1
![Page 20: Spring 2019 Delaney Seeburger California Polytechnic State](https://reader031.vdocuments.us/reader031/viewer/2022022807/621b3939631889206a77e3e8/html5/thumbnails/20.jpg)
Structural
Suppression
Alarm and Detection
Egress
Slide 20
![Page 21: Spring 2019 Delaney Seeburger California Polytechnic State](https://reader031.vdocuments.us/reader031/viewer/2022022807/621b3939631889206a77e3e8/html5/thumbnails/21.jpg)
RSET vs ASET
Slide 21
SFPE Handbook Figure 59.16
![Page 22: Spring 2019 Delaney Seeburger California Polytechnic State](https://reader031.vdocuments.us/reader031/viewer/2022022807/621b3939631889206a77e3e8/html5/thumbnails/22.jpg)
Post Office/Market Residential Unit Business Offices
Flammable Liquid Pool Fire Furniture Fire
Slide 22
![Page 23: Spring 2019 Delaney Seeburger California Polytechnic State](https://reader031.vdocuments.us/reader031/viewer/2022022807/621b3939631889206a77e3e8/html5/thumbnails/23.jpg)
CO – 1,200 ppm x min
Slide 23
![Page 24: Spring 2019 Delaney Seeburger California Polytechnic State](https://reader031.vdocuments.us/reader031/viewer/2022022807/621b3939631889206a77e3e8/html5/thumbnails/24.jpg)
Heat Flux – 2.5 kW/m2 (0.22 Btu/ft2)
Slide 24
![Page 25: Spring 2019 Delaney Seeburger California Polytechnic State](https://reader031.vdocuments.us/reader031/viewer/2022022807/621b3939631889206a77e3e8/html5/thumbnails/25.jpg)
Visibility – 4 m (13 ft.)
Slide 25
![Page 26: Spring 2019 Delaney Seeburger California Polytechnic State](https://reader031.vdocuments.us/reader031/viewer/2022022807/621b3939631889206a77e3e8/html5/thumbnails/26.jpg)
Central Stairway
Slide 26
Common Ignitable Liquids used as AccelerantsAcetone (lacquers, varnishes, nail polish remover)Ethyl Alcohol (alcoholic beverages, antifreezes)Isopropyl Alcohol (lacquers, rubbing alcohol, lotions)
![Page 27: Spring 2019 Delaney Seeburger California Polytechnic State](https://reader031.vdocuments.us/reader031/viewer/2022022807/621b3939631889206a77e3e8/html5/thumbnails/27.jpg)
Slide 27
SFPE Handbook Table A.39
0
500
1000
1500
2000
2500
0 10 20 30 40 50 60 70 80 90 100
Hea
t Rel
ease
Rat
e (k
W)
Time (s)
Acetone Pool Fire
Pool fireNo growth phase
Q”*A = Q → 1058 kW/m2 * (1.4 m)2 = 2073 kW
![Page 28: Spring 2019 Delaney Seeburger California Polytechnic State](https://reader031.vdocuments.us/reader031/viewer/2022022807/621b3939631889206a77e3e8/html5/thumbnails/28.jpg)
Slide 28
![Page 29: Spring 2019 Delaney Seeburger California Polytechnic State](https://reader031.vdocuments.us/reader031/viewer/2022022807/621b3939631889206a77e3e8/html5/thumbnails/29.jpg)
Slide 29
![Page 30: Spring 2019 Delaney Seeburger California Polytechnic State](https://reader031.vdocuments.us/reader031/viewer/2022022807/621b3939631889206a77e3e8/html5/thumbnails/30.jpg)
Slide 30
![Page 31: Spring 2019 Delaney Seeburger California Polytechnic State](https://reader031.vdocuments.us/reader031/viewer/2022022807/621b3939631889206a77e3e8/html5/thumbnails/31.jpg)
Slide 31
Maintain Tenability? Time (s)CO Concentration Yes --Thermal Radiation Yes --
Visibility Yes --
![Page 32: Spring 2019 Delaney Seeburger California Polytechnic State](https://reader031.vdocuments.us/reader031/viewer/2022022807/621b3939631889206a77e3e8/html5/thumbnails/32.jpg)
Study Room
Slide 32
![Page 33: Spring 2019 Delaney Seeburger California Polytechnic State](https://reader031.vdocuments.us/reader031/viewer/2022022807/621b3939631889206a77e3e8/html5/thumbnails/33.jpg)
Slide 33
SFPE Handbook Table A.39
0
10
20
30
40
50
60
70
80
90
0 20 40 60 80 100 120
Hea
t Rel
ease
Rat
e (k
W)
Time (s)
GM27 Polyurethane
Q = αt2α = 0.047 kW/s2
0
20
40
60
80
100
120
140
160
0 100 200 300 400 500 600 700
Hea
t Rel
ease
Rat
e (k
W)
Time (s)
GM27 Polyurethane
![Page 34: Spring 2019 Delaney Seeburger California Polytechnic State](https://reader031.vdocuments.us/reader031/viewer/2022022807/621b3939631889206a77e3e8/html5/thumbnails/34.jpg)
Slide 34
![Page 35: Spring 2019 Delaney Seeburger California Polytechnic State](https://reader031.vdocuments.us/reader031/viewer/2022022807/621b3939631889206a77e3e8/html5/thumbnails/35.jpg)
Slide 35
![Page 36: Spring 2019 Delaney Seeburger California Polytechnic State](https://reader031.vdocuments.us/reader031/viewer/2022022807/621b3939631889206a77e3e8/html5/thumbnails/36.jpg)
Slide 36
![Page 37: Spring 2019 Delaney Seeburger California Polytechnic State](https://reader031.vdocuments.us/reader031/viewer/2022022807/621b3939631889206a77e3e8/html5/thumbnails/37.jpg)
Slide 37
Maintain Tenability? Time (s)
CO Concentration Yes --
Thermal Radiation Yes --
Visibility Yes --
![Page 38: Spring 2019 Delaney Seeburger California Polytechnic State](https://reader031.vdocuments.us/reader031/viewer/2022022807/621b3939631889206a77e3e8/html5/thumbnails/38.jpg)
Occupant characteristics Pre-evacuation◦ 3 minutes
Movement◦ 4 minutes
RSET◦ Safety Factor 1.5◦ Total 10.5 minutes
Slide 38
SFPE Handbook Table 64.4
SFPE Handbook Figure 58.1
![Page 39: Spring 2019 Delaney Seeburger California Polytechnic State](https://reader031.vdocuments.us/reader031/viewer/2022022807/621b3939631889206a77e3e8/html5/thumbnails/39.jpg)
Slide 39
![Page 40: Spring 2019 Delaney Seeburger California Polytechnic State](https://reader031.vdocuments.us/reader031/viewer/2022022807/621b3939631889206a77e3e8/html5/thumbnails/40.jpg)
Slide 40
![Page 41: Spring 2019 Delaney Seeburger California Polytechnic State](https://reader031.vdocuments.us/reader031/viewer/2022022807/621b3939631889206a77e3e8/html5/thumbnails/41.jpg)
Slide 41
![Page 42: Spring 2019 Delaney Seeburger California Polytechnic State](https://reader031.vdocuments.us/reader031/viewer/2022022807/621b3939631889206a77e3e8/html5/thumbnails/42.jpg)
Slide 42
![Page 43: Spring 2019 Delaney Seeburger California Polytechnic State](https://reader031.vdocuments.us/reader031/viewer/2022022807/621b3939631889206a77e3e8/html5/thumbnails/43.jpg)
Slide 43
Stairway
Study RoomImmediate Exposure Last Person
Central 185 s 230 sWest 195 s 237 s
Immediate Exposure Last PersonSecond 239 s 248 sThird 196 s 237 s
Fourth 211 s 269 sFifth 185 s 239 s
![Page 44: Spring 2019 Delaney Seeburger California Polytechnic State](https://reader031.vdocuments.us/reader031/viewer/2022022807/621b3939631889206a77e3e8/html5/thumbnails/44.jpg)
Slide 44
Ignition at t = 0 s Detector activation at t = 15 s Alarm activation at t = 25 s Last person exits at t = 294 s
(𝑇𝑇𝑇𝑇𝑅𝑅𝐴𝐴𝑑𝑑𝑑𝑑𝑑𝑑𝑑𝑑𝑑𝑑𝑑𝑑+𝑇𝑇𝑇𝑇𝑅𝑅𝐴𝐴𝑎𝑎𝑎𝑎𝑎𝑎𝑎𝑎𝑎𝑎 + 𝑇𝑇𝑇𝑇𝑅𝑅𝐴𝐴𝑑𝑑𝑎𝑎𝑎𝑎𝑡𝑡𝑑𝑑𝑎𝑎) ∗ 𝑆𝑆𝑂𝑂𝑜𝑜𝐴𝐴𝑂𝑂𝑆𝑆 𝐹𝐹𝑂𝑂𝑂𝑂𝑂𝑂𝐿𝐿𝐴𝐴 = 𝑅𝑅𝑆𝑆𝑅𝑅𝑇𝑇15𝑠𝑠 + 10𝑠𝑠 + 269𝑠𝑠 ∗ 1.5 = 440𝑠𝑠
![Page 45: Spring 2019 Delaney Seeburger California Polytechnic State](https://reader031.vdocuments.us/reader031/viewer/2022022807/621b3939631889206a77e3e8/html5/thumbnails/45.jpg)
Slide 45
Ignition at t = 0 s Detector activation at t = 79 s Alarm activation at t = 89 s Last person exits at t = 326 s
(𝑇𝑇𝑇𝑇𝑅𝑅𝐴𝐴𝑑𝑑𝑑𝑑𝑑𝑑𝑑𝑑𝑑𝑑𝑑𝑑+𝑇𝑇𝑇𝑇𝑅𝑅𝐴𝐴𝑎𝑎𝑎𝑎𝑎𝑎𝑎𝑎𝑎𝑎 + 𝑇𝑇𝑇𝑇𝑅𝑅𝐴𝐴𝑑𝑑𝑎𝑎𝑎𝑎𝑡𝑡𝑑𝑑𝑎𝑎) ∗ 𝑆𝑆𝑂𝑂𝑜𝑜𝐴𝐴𝑂𝑂𝑆𝑆 𝐹𝐹𝑂𝑂𝑂𝑂𝑂𝑂𝐿𝐿𝐴𝐴 = 𝑅𝑅𝑆𝑆𝑅𝑅𝑇𝑇79𝑠𝑠 + 10𝑠𝑠 + 237𝑠𝑠 ∗ 1.5 = 490𝑠𝑠
![Page 46: Spring 2019 Delaney Seeburger California Polytechnic State](https://reader031.vdocuments.us/reader031/viewer/2022022807/621b3939631889206a77e3e8/html5/thumbnails/46.jpg)
Slide 46
Central Stairway
Study Room
440 s < unknown (> 600 s)
490 s < unknown (> 600 s)
![Page 47: Spring 2019 Delaney Seeburger California Polytechnic State](https://reader031.vdocuments.us/reader031/viewer/2022022807/621b3939631889206a77e3e8/html5/thumbnails/47.jpg)
More Modelling Means of Egress Investigate switching out HD for SD
Slide 47
![Page 48: Spring 2019 Delaney Seeburger California Polytechnic State](https://reader031.vdocuments.us/reader031/viewer/2022022807/621b3939631889206a77e3e8/html5/thumbnails/48.jpg)
Slide 48
Questions