Small Hydro CDM Project S-J-3 for SaleA Kyoto Protocol “Clean Deveolpement Mechanism” Sample Project “Jabusnica
3” in Gacko, BiH - Presentation
![Page 2: Small Hydro Cdm Project S J 3](https://reader033.vdocuments.us/reader033/viewer/2022061210/54902a82b4795913508b472c/html5/thumbnails/2.jpg)
What is CDM
• CDM stands for UNFCCC Kyoto Protocol “Clean Development Mechanism”
• http://unfccc.int/resource/docs/publications/08_cdm_in_brief.pdf
• When verified and confirmed for additionality CER’s or Certified Emission Reductions are issued. CER’s are recognized in EU ETS and have a price. The most relevant source for checking spot emission allowances price is
• http://bluenext.eu/
![Page 3: Small Hydro Cdm Project S J 3](https://reader033.vdocuments.us/reader033/viewer/2022061210/54902a82b4795913508b472c/html5/thumbnails/3.jpg)
CPM Energetika
• CPM Energetika is a part of CPM group of companies registered in Slovenia, EU
• http://cpm-en.com/• CPM d.d. built 50 MW Hydro in Slovenia• http://www.cpm.si/ • CPMBH is a specialist in building tunnels• http://www.cpmbh.ba/
![Page 4: Small Hydro Cdm Project S J 3](https://reader033.vdocuments.us/reader033/viewer/2022061210/54902a82b4795913508b472c/html5/thumbnails/4.jpg)
We Own Concessions in BiH
• In the territory of Republika Srpska in BiH we have access to many (50+) small hydro power plant concessions (20 year / 5% / up to 10MW, renewable). All locations and capacities are verified. We own three.
• We only offer a location for sale when it receives building permit and we get confirmation from grid operator that there is enough grid capacity to accept entire plant’s production .
![Page 5: Small Hydro Cdm Project S J 3](https://reader033.vdocuments.us/reader033/viewer/2022061210/54902a82b4795913508b472c/html5/thumbnails/5.jpg)
From Concession to Building Permit
1. Study for the Issue of Concession
2. Concession Contract3. Feasibility Study4. General Design5. Zoning Requirements6. Plots&Pipeline Study7. Hydrological Study8. Preliminary Ecological
Analysis
9. Grid Connectivity Consent
10. Zoning Approval11. Ecological Permit12. Main Design13. Land Use Rights14. Revision of Main
Design15. Fire Prevention Permit
16.Building Permit
![Page 6: Small Hydro Cdm Project S J 3](https://reader033.vdocuments.us/reader033/viewer/2022061210/54902a82b4795913508b472c/html5/thumbnails/6.jpg)
The Importance of Thorough Planning
• It is of utmost importance to know local legislation concernig: – Zoning and Building code– Energy– Ecology– National Parks– Labour– Security and Fire Prevention– Administrative Procedures
• It is also vise (necessary) to speak local language
![Page 7: Small Hydro Cdm Project S J 3](https://reader033.vdocuments.us/reader033/viewer/2022061210/54902a82b4795913508b472c/html5/thumbnails/7.jpg)
Characteristics of Jabušnica 3 (S-J-3)
• Water Flow Q = 1.0 m3 /s• Fall H = 270.6m• Power installed P = 2,124 MW• Anticipated Production E = 10.350 MWh/Year
• Preliminary calculations show that in BiH small hydro power plant saves 1,091 T CO2 /MWh
![Page 8: Small Hydro Cdm Project S J 3](https://reader033.vdocuments.us/reader033/viewer/2022061210/54902a82b4795913508b472c/html5/thumbnails/8.jpg)
Approximate Price Without CER’s
• ~ 2.000€/kW installed pays for:– The plant on “turnkey” basis
![Page 9: Small Hydro Cdm Project S J 3](https://reader033.vdocuments.us/reader033/viewer/2022061210/54902a82b4795913508b472c/html5/thumbnails/9.jpg)
Calculations for S-J-3 without CER
• Price for 2.124 MW installed = ~€ 4.248.000• Revenue from electricity production→
10.350MWh/Y * 50€/MWh =~ 517.500• Net Revenue -(5% maintenance, 5%
concession fee) =~ 465.750• IRR (30Y) = 10,33%• Return in 9.1 years
![Page 10: Small Hydro Cdm Project S J 3](https://reader033.vdocuments.us/reader033/viewer/2022061210/54902a82b4795913508b472c/html5/thumbnails/10.jpg)
Approximate Price
• ~ 2.300€/kW installed pays for:– The plant on “turnkey” basis– 100% of issued Certified Emission Reductions– Certificate of Origin
![Page 11: Small Hydro Cdm Project S J 3](https://reader033.vdocuments.us/reader033/viewer/2022061210/54902a82b4795913508b472c/html5/thumbnails/11.jpg)
Calculations for S-J-3 with CER
• Price for 2.124 MW installed = ~€ 4.885.200• Revenue from electricity production→ 10.350MWh/Y *
50€/MWh =~ €517.500• Net Revenue -(5% maintenance, 5% concession fee)
=~ €465.750• Revenue from CER’s 15€/T =~ €169.378• Total yearly revenue =~ €635.128• IRR (30Y) = ~12,58%• Return in 7.7 years• Certificate of Origin no price as yet but expected
![Page 12: Small Hydro Cdm Project S J 3](https://reader033.vdocuments.us/reader033/viewer/2022061210/54902a82b4795913508b472c/html5/thumbnails/12.jpg)
+ 386 2 33 21 281CPM Energetika, Tržaška 39, Si-2000 Maribor, SloveniaE-mail: [email protected] Web : http://cpm-en.com
CDM – a global tool for global warming problems