PDO FATALITIES IN 2000
Date Fatalities Inc. PDO Department Contractor Type
23- Aug 1 Road Marmul Asset Marmul Contracting
03-Aug 2 Road Gas Al-Kharousy Est.
(Dodsal)
22-Jul 1 Road Well Engineering Damac (Sea&Land)
21-Jun 1 Indus. Electrical Infrastructure Al Hassan (BHEL)
10-Jun 1 Road Exploration Veritas Geophysical
08-Jun 1 Indus. Bahja/Rima Asset Al Hassan
05-Jun 1 Road Well Services PDO
27-May 1 Road Tech. Services Tuboscope Vetco
![Page 2: Slide Number 1 PDO FATALITIES IN 2000 DateFatalitiesInc.PDO Department Contractor Type 23- Aug1RoadMarmul AssetMarmul Contracting 03-Aug2Road Gas Al-Kharousy](https://reader035.vdocuments.us/reader035/viewer/2022070411/56649c915503460f9494be66/html5/thumbnails/2.jpg)
Slide Number 2
1 YR LTIF/TRCF ROLLING AVERAGE, 1993-2000
0.20
0.40
0.60
0.80
1.00
1.20
1.40
1.60
1.80
Jan-93
Ap
r-93
Jul-93
Oct-93
Jan-94
Ap
r-94
Jul-94
Oct-94
Jan-95
Ap
r-95
Jul-95
Oct-95
Jan-96
Ap
r-96
Jul-96
Oct-96
Jan-97
Ap
r-97
Jul-97
Oct-97
Jan-98
Ap
r-98
Jul-98
Oct-98
Jan-99
Ap
r-99
Jul-99
Oct-99
Jan-00
Ap
r-00
LT
IF
1.00
1.50
2.00
2.50
3.00
3.50
4.00
TR
CF
PDO LTIF
PDO TRCF
![Page 3: Slide Number 1 PDO FATALITIES IN 2000 DateFatalitiesInc.PDO Department Contractor Type 23- Aug1RoadMarmul AssetMarmul Contracting 03-Aug2Road Gas Al-Kharousy](https://reader035.vdocuments.us/reader035/viewer/2022070411/56649c915503460f9494be66/html5/thumbnails/3.jpg)
Slide Number 3
PDO & Contractors LTI Free Milestones, 2000
0
1
2
3
4
5
1-Ja
n
08-J
an
14-J
an
21-J
an
28-J
an
04-F
eb
10-F
eb
14-F
eb
19-F
eb
26-F
eb
03-M
ar
10-M
ar
16-M
ar
22-M
ar
24-M
ar
28-M
ar
04-A
pr
06-A
pr
13-A
pr
15-A
pr
22-A
pr
27-A
pr
01-M
ay
08-M
ay
14-M
ay
21-M
ay
23-M
ay
27-M
ay
05-J
un
08-J
un
10-J
un
13-J
un
20-J
un
21-J
un
02-J
ul
08-J
ul
14-J
ul
20-J
ul
22-J
ul
29-J
ul
03-A
ug
![Page 4: Slide Number 1 PDO FATALITIES IN 2000 DateFatalitiesInc.PDO Department Contractor Type 23- Aug1RoadMarmul AssetMarmul Contracting 03-Aug2Road Gas Al-Kharousy](https://reader035.vdocuments.us/reader035/viewer/2022070411/56649c915503460f9494be66/html5/thumbnails/4.jpg)
Slide Number 4
Incident DetailsIncident Details
• Date : Saturday 27 May, 2000
• Time : Approximately 15.15hrs
• Location: 106km north of Bahja (midway between Bahja and Qarn Alam)
• Incident Type : Road transport
• Severity : Third party fatality (C4P)
• Contractor : Tuboscope Vetco (Deutschland) GmbH (TVD)
• Contract : C682038 - MFL Inspection of Flowlines
• Deceased : Tariq Mahmoud Mohammed Saddiq -39 years old (Pakistani)
Road Traffic FatalityPedestrian hit by vehicle
![Page 5: Slide Number 1 PDO FATALITIES IN 2000 DateFatalitiesInc.PDO Department Contractor Type 23- Aug1RoadMarmul AssetMarmul Contracting 03-Aug2Road Gas Al-Kharousy](https://reader035.vdocuments.us/reader035/viewer/2022070411/56649c915503460f9494be66/html5/thumbnails/5.jpg)
Slide Number 5
Road Traffic Fatality 27th May
Pedestrian hit by vehicle
![Page 6: Slide Number 1 PDO FATALITIES IN 2000 DateFatalitiesInc.PDO Department Contractor Type 23- Aug1RoadMarmul AssetMarmul Contracting 03-Aug2Road Gas Al-Kharousy](https://reader035.vdocuments.us/reader035/viewer/2022070411/56649c915503460f9494be66/html5/thumbnails/6.jpg)
Slide Number 6
Findings Findings
• Primary cause of the incident was the pedestrian’s apparent lack of attention to traffic on the road
• Deceased arrived in Oman from Pakistan 3 weeks before the incident and was probably disoriented with the direction of traffic flow in Oman
• Deceased and companion appear to have been solely focussed on hitching a ride back to Haima
• Driver was in good physical and mental condition before commencing the journey
• Some flaws revealed in the administration of contractor Journey Management Plan but these had no direct influence on the incident
Road Traffic Fatality 27th May
Pedestrian hit by vehicle
![Page 7: Slide Number 1 PDO FATALITIES IN 2000 DateFatalitiesInc.PDO Department Contractor Type 23- Aug1RoadMarmul AssetMarmul Contracting 03-Aug2Road Gas Al-Kharousy](https://reader035.vdocuments.us/reader035/viewer/2022070411/56649c915503460f9494be66/html5/thumbnails/7.jpg)
Slide Number 7
Corrective ActionCorrective Action
• Speed limiter option(on/off) removed from all contractor vehicles
• Contractor to tighten up on Journey Management procedures
• Compulsory toolbox briefings by Journey Manager for all drivers prior to commencement of any journey
• Warning letter issued to driver and Journey Manager
Road Traffic Fatality 27th May
Pedestrian hit by vehicle
![Page 8: Slide Number 1 PDO FATALITIES IN 2000 DateFatalitiesInc.PDO Department Contractor Type 23- Aug1RoadMarmul AssetMarmul Contracting 03-Aug2Road Gas Al-Kharousy](https://reader035.vdocuments.us/reader035/viewer/2022070411/56649c915503460f9494be66/html5/thumbnails/8.jpg)
Slide Number 8
Incident Details
Date : Monday 5 June, 2000
Time : Approximately 15.45 hrs
Location : Between Qarn Alam and Saih Rawl
(About 26 km from Qarn Alam Camp)
Incident Type : Road traffic accident
Severity : 4P Single Fatality
Potential : C5P Multiple Fatality
Dept involved: Well Services
Contractor : Offsat - Contract No. C688007 (Al Mutahidha Transport subcontractor to Offsat)
Deceased : Khalfan Mubarak Al Omairy (46 years, PDO Omani staff)
Road Traffic FatalityCollision pick-up & trailer-truck
![Page 9: Slide Number 1 PDO FATALITIES IN 2000 DateFatalitiesInc.PDO Department Contractor Type 23- Aug1RoadMarmul AssetMarmul Contracting 03-Aug2Road Gas Al-Kharousy](https://reader035.vdocuments.us/reader035/viewer/2022070411/56649c915503460f9494be66/html5/thumbnails/9.jpg)
Slide Number 9
Road Traffic Fatality 5th June Collision pick-up & trailer-truck
![Page 10: Slide Number 1 PDO FATALITIES IN 2000 DateFatalitiesInc.PDO Department Contractor Type 23- Aug1RoadMarmul AssetMarmul Contracting 03-Aug2Road Gas Al-Kharousy](https://reader035.vdocuments.us/reader035/viewer/2022070411/56649c915503460f9494be66/html5/thumbnails/10.jpg)
Slide Number 10
Findings
• Pick-up driver and passenger were listening to a radio phone-in debate. Their vehicle wandered into oncoming traffic lane
• Progress of the journey indicates pick-up average speed 80km/hour
• All three occupants in pick-up were wearing seat belts
• Passengers failed to alert driver (“buddy” system). One asleep the other distracted driver with discussion on the radio debate
• Trailer-truck driver had Journey Management plan. Well Services crew called Fahud on leaving Barik-6 well site
• Truck driver used flashing headlights to alert pick-up, not effective in broad daylight. Horn would have been more appropriate.
Road Traffic Fatality 5th June Collision pick-up & trailer-truck
![Page 11: Slide Number 1 PDO FATALITIES IN 2000 DateFatalitiesInc.PDO Department Contractor Type 23- Aug1RoadMarmul AssetMarmul Contracting 03-Aug2Road Gas Al-Kharousy](https://reader035.vdocuments.us/reader035/viewer/2022070411/56649c915503460f9494be66/html5/thumbnails/11.jpg)
Slide Number 11
Corrective Action
• Introduce competency assessment tests where date of birth is amended
• Emphasize effectiveness of using vehicle’s horn
• Increase efforts to minimise kilometres driven
• Follow Journey Management procedure in Well Services
• Improve toolbox communication methods to combat language differences
Road Traffic Fatality 5th June Collision pick-up & trailer-truck
![Page 12: Slide Number 1 PDO FATALITIES IN 2000 DateFatalitiesInc.PDO Department Contractor Type 23- Aug1RoadMarmul AssetMarmul Contracting 03-Aug2Road Gas Al-Kharousy](https://reader035.vdocuments.us/reader035/viewer/2022070411/56649c915503460f9494be66/html5/thumbnails/12.jpg)
Slide Number 12
Incident Details
Date : 8 June, 2000
Time : Approximately 09.30 hrs
Location : Rima Environmental Complex
Incident Type : Industrial
Severity : 4P Single Fatality
Potential : C5P Multiple Fatality
Dept involved : Bahja/Rima Asset OBM
Contractor : Al Hassan
Deceased : Leth Bahadur (age 36, Nepali)
Operation : Vacuum truck operator
Fatal Industrial Incident 8th June
Vacuum truck
![Page 13: Slide Number 1 PDO FATALITIES IN 2000 DateFatalitiesInc.PDO Department Contractor Type 23- Aug1RoadMarmul AssetMarmul Contracting 03-Aug2Road Gas Al-Kharousy](https://reader035.vdocuments.us/reader035/viewer/2022070411/56649c915503460f9494be66/html5/thumbnails/13.jpg)
Slide Number 13
1st failed bolt
blockage
2nd failed bolt
3rd failed boltPressure release valve
Failed weld - should have
been one machined piece
Poor design, manufacture and
welding of bolt and pin
`
Operator was standing here just before blast
![Page 14: Slide Number 1 PDO FATALITIES IN 2000 DateFatalitiesInc.PDO Department Contractor Type 23- Aug1RoadMarmul AssetMarmul Contracting 03-Aug2Road Gas Al-Kharousy](https://reader035.vdocuments.us/reader035/viewer/2022070411/56649c915503460f9494be66/html5/thumbnails/14.jpg)
Slide Number 14
Findings
- Design of door retaining assembly of ELCO vacuum tanker substandard
- Poor functioning of safety relieve valves
- No indications of explosion
- Inexperience of driver and helper
Fatal Industrial Incident 8th June
Vacuum truck
![Page 15: Slide Number 1 PDO FATALITIES IN 2000 DateFatalitiesInc.PDO Department Contractor Type 23- Aug1RoadMarmul AssetMarmul Contracting 03-Aug2Road Gas Al-Kharousy](https://reader035.vdocuments.us/reader035/viewer/2022070411/56649c915503460f9494be66/html5/thumbnails/15.jpg)
Slide Number 15
Corrective Action
• ELCO tankers taken out of service
• Inspection of all inventorised tankers
• Implement detailed safety valve testing procedure
•Inspect routinely suction tanker door bolts/housing
•Inspect suction tankers for potential blockages
•Revise procedures for use of vacuum tankers
Fatal Industrial Incident 8th June
Vacuum truck
![Page 16: Slide Number 1 PDO FATALITIES IN 2000 DateFatalitiesInc.PDO Department Contractor Type 23- Aug1RoadMarmul AssetMarmul Contracting 03-Aug2Road Gas Al-Kharousy](https://reader035.vdocuments.us/reader035/viewer/2022070411/56649c915503460f9494be66/html5/thumbnails/16.jpg)
Slide Number 16
Incident Details
• Date : Saturday 10 June, 2000
• Time : 13:37 hrs. (from In-Vehicle Monitoring System)
• Location : Blacktop road between Salalah and Thumrait, 15km N of Salalah
• Severity : 4P Single Fatality
• Potential : D4P Single Fatality
• Contractor : Veritas Geophysical (Contract Number C889004)• Deceased : Kasab Amur Sulaiyam Al Junaibi, Omani Driver (39 years old)
Road Traffic Fatality 10th JuneRoll-over Fuel Tanker of Seismic Contractor
![Page 17: Slide Number 1 PDO FATALITIES IN 2000 DateFatalitiesInc.PDO Department Contractor Type 23- Aug1RoadMarmul AssetMarmul Contracting 03-Aug2Road Gas Al-Kharousy](https://reader035.vdocuments.us/reader035/viewer/2022070411/56649c915503460f9494be66/html5/thumbnails/17.jpg)
Slide Number 17Looking downhill in direction of vehicle travel
Road Traffic Fatality 10th JuneRoll-over Fuel Tanker of Seismic Contractor
![Page 18: Slide Number 1 PDO FATALITIES IN 2000 DateFatalitiesInc.PDO Department Contractor Type 23- Aug1RoadMarmul AssetMarmul Contracting 03-Aug2Road Gas Al-Kharousy](https://reader035.vdocuments.us/reader035/viewer/2022070411/56649c915503460f9494be66/html5/thumbnails/18.jpg)
Slide Number 18
Findings
• Driving too fast for the road conditions
• Attitude: failure to follow rules and procedures
• Insufficient hazard identification
• Heavy Good Vehicle (HGV) course lacks practical assessment
• Low gear road sign missing
• Safety belt mounting design fault
• Performance of in-vehicle monitoring system erroneous
Road Traffic Fatality 10th JuneRoll-over Fuel Tanker of Seismic Contractor
![Page 19: Slide Number 1 PDO FATALITIES IN 2000 DateFatalitiesInc.PDO Department Contractor Type 23- Aug1RoadMarmul AssetMarmul Contracting 03-Aug2Road Gas Al-Kharousy](https://reader035.vdocuments.us/reader035/viewer/2022070411/56649c915503460f9494be66/html5/thumbnails/19.jpg)
Slide Number 19
Corrective Action
• Include risk assessment of supply routes in scouting trips
• Define standards for in-vehicle monitoring systems
• Revise HVG course
• Introduce driving disciplinary standards within PDO operations
• Recommend placement “engage low gear” sign to ROP
• Review seat belt mounting with manufacturer
(mounting should be on strong point on cabin floor)
• Investigate HGV roll bars with Hino
• Agree consistent standards for tankers across Shell group (centre of gravity)
Road Traffic Fatality 10th JuneRoll-over Fuel Tanker of Seismic Contractor
![Page 20: Slide Number 1 PDO FATALITIES IN 2000 DateFatalitiesInc.PDO Department Contractor Type 23- Aug1RoadMarmul AssetMarmul Contracting 03-Aug2Road Gas Al-Kharousy](https://reader035.vdocuments.us/reader035/viewer/2022070411/56649c915503460f9494be66/html5/thumbnails/20.jpg)
Slide Number 20
Incident Details
Date : 21st June, 2000Time : 18:00 hrsLocation : Outside perimeter fence of Hubara
Power Station (under construction)Severity : 4P
Pot. Severity : 4P(C) & 4A(C)Contractor : Al Hassan (subcontractor to BHEL)Deceased Name : Mohammed Saleem (40 years old, Pakistani
grader operator)
Operation : Grading
Fatal IncidentGrader operator killed by his grader driving over him
![Page 21: Slide Number 1 PDO FATALITIES IN 2000 DateFatalitiesInc.PDO Department Contractor Type 23- Aug1RoadMarmul AssetMarmul Contracting 03-Aug2Road Gas Al-Kharousy](https://reader035.vdocuments.us/reader035/viewer/2022070411/56649c915503460f9494be66/html5/thumbnails/21.jpg)
Slide Number 21
Head of body here Feet here
Fatal Incident 21st June 2000 Grader operator killed by his grader driving over him
![Page 22: Slide Number 1 PDO FATALITIES IN 2000 DateFatalitiesInc.PDO Department Contractor Type 23- Aug1RoadMarmul AssetMarmul Contracting 03-Aug2Road Gas Al-Kharousy](https://reader035.vdocuments.us/reader035/viewer/2022070411/56649c915503460f9494be66/html5/thumbnails/22.jpg)
Slide Number 22
Findings
• Position of body indicated deliberate fall, suggesting suicide. Supported by letter and other evidence
• Operator is able to exit the grader whilst the vehicle is in motion. (No ‘dead man’s handle’)
• Point of entry/exit from grader is very exposed.
• Long time in desert camp with long working hours and limited rest periods
• Evidence of family problems and disturbed mind
Fatal Incident 21st June 2000 Grader operator killed by his grader driving over him
![Page 23: Slide Number 1 PDO FATALITIES IN 2000 DateFatalitiesInc.PDO Department Contractor Type 23- Aug1RoadMarmul AssetMarmul Contracting 03-Aug2Road Gas Al-Kharousy](https://reader035.vdocuments.us/reader035/viewer/2022070411/56649c915503460f9494be66/html5/thumbnails/23.jpg)
Slide Number 23
Corrective Action
• Revise Company specification for earth moving and construction equipment
• Review requirement for contractor staff to have a counsellor available
Fatal Incident 21st June 2000 Grader operator killed by his grader driving over him
![Page 24: Slide Number 1 PDO FATALITIES IN 2000 DateFatalitiesInc.PDO Department Contractor Type 23- Aug1RoadMarmul AssetMarmul Contracting 03-Aug2Road Gas Al-Kharousy](https://reader035.vdocuments.us/reader035/viewer/2022070411/56649c915503460f9494be66/html5/thumbnails/24.jpg)
Slide Number 24
Incident Details
Date: 22st July, 2000
Time: 17:00 hrs
Location: 57 km South of Adam on the Muscat - Salalah Highway
Severity: 4P
Contractor: Sea and Land (Draieh Catering Services (DAMAC))
Deceased Name: Aslam Darvi (age 39, Indian)
Operation: Rig Boy
Road Traffic Fatality 22nd July 2000Roll-over
![Page 25: Slide Number 1 PDO FATALITIES IN 2000 DateFatalitiesInc.PDO Department Contractor Type 23- Aug1RoadMarmul AssetMarmul Contracting 03-Aug2Road Gas Al-Kharousy](https://reader035.vdocuments.us/reader035/viewer/2022070411/56649c915503460f9494be66/html5/thumbnails/25.jpg)
Slide Number 25
Roof caved-in due to absence of rollover cage protection in the
front
Roof in rear unaffected due to rollover protection in the back
Road Traffic Fatality 22nd July 2000Roll-over
![Page 26: Slide Number 1 PDO FATALITIES IN 2000 DateFatalitiesInc.PDO Department Contractor Type 23- Aug1RoadMarmul AssetMarmul Contracting 03-Aug2Road Gas Al-Kharousy](https://reader035.vdocuments.us/reader035/viewer/2022070411/56649c915503460f9494be66/html5/thumbnails/26.jpg)
Slide Number 26
Findings
• Recruitment of an inexperienced driver
• Inadequate Journey Management
• Complacency with regard to managing road safety
• Inadequate Safety Management Systems (DAMAC)
• Inadequate sub-contractor management (S&LDC)
• Inadequate PDO monitoring of sub-contractor
Road Traffic Fatality 22nd July 2000Roll-over
![Page 27: Slide Number 1 PDO FATALITIES IN 2000 DateFatalitiesInc.PDO Department Contractor Type 23- Aug1RoadMarmul AssetMarmul Contracting 03-Aug2Road Gas Al-Kharousy](https://reader035.vdocuments.us/reader035/viewer/2022070411/56649c915503460f9494be66/html5/thumbnails/27.jpg)
Slide Number 27
Corrective ActionCorrective Action
• Subcontractor compliance with PDO road safety specifications
• Five year experience requirement for all drivers
• Additional driver assessments for those below the age of 25
• Improved information cascade to subcontractors via the PDO external
web site
Road Traffic Fatality 22nd July 2000Roll-over
![Page 28: Slide Number 1 PDO FATALITIES IN 2000 DateFatalitiesInc.PDO Department Contractor Type 23- Aug1RoadMarmul AssetMarmul Contracting 03-Aug2Road Gas Al-Kharousy](https://reader035.vdocuments.us/reader035/viewer/2022070411/56649c915503460f9494be66/html5/thumbnails/28.jpg)
Slide Number 28
MAIN SHORTCOMINGS
• Supervision
• Following rules
• Hazard awareness
• Attitude
![Page 29: Slide Number 1 PDO FATALITIES IN 2000 DateFatalitiesInc.PDO Department Contractor Type 23- Aug1RoadMarmul AssetMarmul Contracting 03-Aug2Road Gas Al-Kharousy](https://reader035.vdocuments.us/reader035/viewer/2022070411/56649c915503460f9494be66/html5/thumbnails/29.jpg)
Slide Number 29
EXISTING INITIATIVES
• Safety Champions (PDO + Contractor) for key issues
• Company introduction of STOP
• PDO/Contractors Safety Conference in 1998 and 1999
• Monthly HSE Area Contractor Forums held on site
• Weekly MD reviews of LTI’s and high potential incidents
• Structured Communication
• General Safety work stoppages
• Intensive HSE Road Shows
• Launched WHIMS (Work Hazard Identification Management System) to support preparation of Job Safety Plans
• HSE Audit and Inspection Effort (also Improvement KBA ongoing)
• Terminate Contractors/stop from tendering for poor HSE performance
![Page 30: Slide Number 1 PDO FATALITIES IN 2000 DateFatalitiesInc.PDO Department Contractor Type 23- Aug1RoadMarmul AssetMarmul Contracting 03-Aug2Road Gas Al-Kharousy](https://reader035.vdocuments.us/reader035/viewer/2022070411/56649c915503460f9494be66/html5/thumbnails/30.jpg)
Slide Number 30
ADDITIONAL ACTION
• Safety Blitz with focus on contractor HSE management
• Focus on Road Safety management:
- Disciplinary actions
- Review driver/vehicle specifications
- Improve driver training
- Review jouney management
- Engagement of sub-contractors
• Introduction of HazId packages and other tools to identify safety hazards