Project VTS
42xx-040P/18-Feb-03
Site S urvey Check List
VOC5060
Project VTS
Author: Approved by:
___________________ ____________________Name Name
Site Survey C heck List
-
8/15/2019 Site Survey Check List
2/20
Project VTS
42xx-040P/18-Feb-03
2016 N ORCONTROL IT ASAll rights r eserv ed
No p art of this work covered by the copy righthereon may be r eproduced or otherwise copied
without prior p ermission fromNORCONTROL IT AS
Site Survey C heck List
-
8/15/2019 Site Survey Check List
3/20
Project VTS
42xx-040P/18-Feb-03
DOCUMENT STATUS
Issue No. Date/Year Inc. by Issue No. Date/Year Inc. by
CHANGES IN DOCUMENT
Issue ECO Paragraph Paragraph Heading/No. No. No. Description of Change
Site Survey Check List i
-
8/15/2019 Site Survey Check List
4/20
Project VTS
42xx-040P/18-Feb-03
Site Survey Check List ii
-
8/15/2019 Site Survey Check List
5/20
Project VTS
42xx-040P/18-Feb-03
TABLE OF CONTENTS
Section Page
1. P ROJECT I NTRODUCTION ............................................ 11.1 C USTOMER C ONTACT ...................................... 1
2. H ARDWARE C HECK L IST ............................................ 22.1 B UILDINGS ............................. 2
2.2 P HYSICAL D IMENSIONS AND E NTRANCES ..................................................... 2
2.3 C ABLING ............................ 3
2.4 P OWER ........................... 3
2.5 C ONTROL R OOM .................................. 4
2.6 E QUIPMENT R OOM .................................... 4
2.7 L IGHT C ONDITIONS .................................... 5
2.8 M ASTS .......................... 5
2.9 R ADAR .......................... 6
2.10 L INK E QUIPMENT .................................. 6
2.11 D OCUMENTATION .................................. 7
2.12 I NSTALLATION E QUIPMENT ......................................... 7
2.13 C OMMENTS /N OTES .................................... 8
3. S OFTWARE C HECK L IST ........................................... 93.1 M AP ........................ 9
3.2 C ONFIGURATION .................................. 9
3.3 C OMMENTS /N OTES .................................... 10
Site Survey Check List iii
-
8/15/2019 Site Survey Check List
6/20
Project VTS
42xx-040P/18-Feb-03
- This p age i s i ntentionally left blank -
Site Survey Check List iv
-
8/15/2019 Site Survey Check List
7/20
Project VTS
42xx-040P/18-Feb-03
1. PROJECT INTRODUCTION
Customer :
Project :
Project Number :
Performed By : Date :
The p urpose o f this Si te Survey Check List is t o get all the rel evant data a bout the si te a searly as p ossible i n a sp ecic p roject.
This list is p repared for a maximum system where the person responsible for t he SiteSurvey will ll in the r elevant information.
1.1 Customer Contact
Customer Name Responsibility Tlx/Fax/Tlf
CC Radar 1 Radar 2
a. Necessary with admission to enter area? _____ _____ _____
b. Working hours? _____ _____ _____
c. Recommended lodging? _____ _____ _____
Site Survey Check List 1
-
8/15/2019 Site Survey Check List
8/20
Project VTS
42xx-040P/18-Feb-03
2. HARDWARE CHECK LIST
2.1 Buildings Notes
a. All construction works nished (buildings/power/datalinks)? _____
b. If not, when will it be nished? _____
c. Storage place ready? _____
d. OK to perform unpacking at storage place? _____
e. Mentioned at para. 3? _____
f. Workshop for NCSS during installation available? _____
2.2 Physical Dimensions and Entrances
a. Check place for consoles for sufficient spacing. _____
b. Check place for antennas for sufficient spacing. _____
c. Check place for wallmounted equipment for sufficient spacing. _____
d. How is it possible to take equipment to proposed location? _____
e. Check door/window openings for enough width. _____
f. Is there any angled corridors/stairways causing problems? _____
g. Can the lift/oor/roof/walls take the weight of the equipment? _____
Site Survey Check List 2
-
8/15/2019 Site Survey Check List
9/20
Project VTS
42xx-040P/18-Feb-03
2.3 Cabling Notes
a. Customer responsibility? _____
b. Cable layout. Where can the cables be running? _____
c. Dimensions on cable ducts. _____
d. Cable lengths. _____
e. Any connection boxes to be used/mounted? Give dimensions! _____
f. Re.e):Any special types (ex/indoor/outdoor)? _____
g. Re.e):Which connectors are used? _____
h. Re.e):NCSS to deliver boxes? _____
i. Any regulations/requirements of cable trunks or cable trays in computeroor? _____
2.4 Power Note: NCSS personnel is no t certied to do installation works on AC Line
Voltage (110/220 VAC).
a. Available power. Indicate voltage/frequency/number of phases. _____
b. What is the power source domestic/generator/via regula _____
c. Satisfactory quality on power? NCSS will test with line analyzer. _____
d. Check type of connection (plug type). _____
e. Dene fuse values available/to be installed. Ref spec. _____
f. Grounding. Ref. spec. _____
Site Survey Check List 3
-
8/15/2019 Site Survey Check List
10/20
Project VTS
42xx-040P/18-Feb-03
g. Size of cable passages roof/wall/oor/cabinets. _____
Site Survey Check List 4
-
8/15/2019 Site Survey Check List
11/20
Project VTS
42xx-040P/18-Feb-03
2.5 Control Room Notes
a. Make a drawing/sketch of the room with measures. Also put in wantedposition of all equipment to b e i nstalled. ( Consoles, printers,videorecorders etc). _____
b. What is the room temperature/humidity? _____
c. Is the room air-conditioned? _____
d. Is there a Data-oor? _____
e. Floor material (wood, armoured concrete). _____
f. Wall materials. _____
g. Any existing equipment to be installed into consoles? _____
h. Give exact dimensions on parts mentioned under para.g). Ref spec. _____
i. How is it to physically install parts mentioned u nder para.g) ( problemswith cables, dismantling, obstructions etc). _____
j. Who is going to make the installation mentioned _____
2.6 Equipment Room
a. Make a drawing/sketch of the room with measures. _____
b. Also put in wanted position of equipment to be _____
c. What is the room temperature/humidity? Is the room air-conditioned? _____
d. Is there a Data-oor? _____
e. Floor material (wood, armoured concrete). _____
Site Survey Check List 5
-
8/15/2019 Site Survey Check List
12/20
Project VTS
42xx-040P/18-Feb-03
f. Wall materials. _____
Site Survey Check List 6
-
8/15/2019 Site Survey Check List
13/20
Project VTS
42xx-040P/18-Feb-03
2.7 Light Conditions Notes
a. How is the room/rooms lighted? _____
b. Windows causing reections on the screens? _____
c. Colour on walls/ceiling. _____
d. Anything to be changed? _____
e. NCIT to deliver some special screening/illumination? _____
2.8 Masts Note: NCIT has no competence on ci vil works concerning masts, and
appropriate exp ertise m ust be b rought in from subcontractors.
a. Is a mast to be installed? _____
b. State height. _____
c. Foundation. _____
d. Meteorological conditions (max. wind force etc). _____
e. Lightning conductor. _____
f. Mast lights to be mounted? _____
g. Local safety requirements (ladders, rails, signs etc) _____
h. Weight of equipment to be installed in mast. _____
Site Survey Check List 7
-
8/15/2019 Site Survey Check List
14/20
Project VTS
42xx-040P/18-Feb-03
2.9 Radar Notes
a. Position of antenna. Give exact geographical LAT/LON position. _____
b. Available power. Re. 2.4 Power. _____
c. How is the possibilities to transport the antennato the site? _____
d. Polemast to be mounted? _____
e. Polemast baseplate to be dened. _____
f. Radar coverage area. Make a sketch on a map. Ref. Project Spec. _____
g. Sight from site. Any obstructions causing blind sectors? Ref. Project Spec. _____
h. Customer to get frequency assignment for radar. _____
i. Customer to get RADIATION Warning Sign. _____
j. Distance from antenna to MTR. _____
k. Mounting method for waveguide to mast. _____
l. New Remote Control to existing radar? _____
m. Who is going to do the interface engineering and installation? _____
2.10 Link Equipmenta. Position of antenna. _____
b. Available power. Re. 2.4 Power. _____
c. How is the possibilities to transport the antenna to the site? _____
d. How will it be to perform service (place around, height etc)? _____
Site Survey Check List 8
-
8/15/2019 Site Survey Check List
15/20
Project VTS
42xx-040P/18-Feb-03
e. Sight from site. Any obstructions? _____
f. Line of sight over land or sea (diversity)? _____
g. Customer to get frequency assignment for link. _____
Site Survey Check List 9
-
8/15/2019 Site Survey Check List
16/20
Project VTS
42xx-040P/18-Feb-03
2.11 Documentation Notes
a. Get information for existing equipment to be integrated/used in newsystem (radar video level, radar antenna bearing etc). _____
b. Get "Map Information" (safety areas, cables overlays, etc. Ref. SW Site Survey List. _____
c. Photos from site. _____
2.12 Installation Equipmenta. What kind of tools are required? _____
b. What kind ot tools are available? _____
c. Where to get in and any who to contact. _____
Site Survey Check List 10
-
8/15/2019 Site Survey Check List
17/20
Project VTS
42xx-040P/18-Feb-03
2.13 Comments/Notes
Section Comment OK
Site Survey Check List 11
-
8/15/2019 Site Survey Check List
18/20
Project VTS
42xx-040P/18-Feb-03
3. SOFTWARE CHECK LIST
3.1 Map Notes
a. Indicate map limits. _____
b. Give accurate radar positions. _____
c. Radar positions to be marked on synthetic map? _____
d. What is going to be displayed? _____
e. Display overlay. What should be possible to remove? _____
f. Give wanted colours on items mentioned under d). _____
g. Position of Reference Points. _____
3.2 Congurationa. If more than 1 console, which is the Integrating Console? _____
b. If the console(s) shall have spec _____
c. Navigation Channels to be implemented? _____
d. If yes on para. c), make map on wanted positions. _____
e. Buoy Surveillance to be implemented? _____
f. If yes in para. e), make buoylist with position and name. _____
g. Make a list over wanted sites with name and positions. _____
h. Radar index connected to Site index or not? _____
i. If 2 x RTS, which radar to which RTS. _____
Site Survey Check List 12
-
8/15/2019 Site Survey Check List
19/20
Project VTS
42xx-040P/18-Feb-03
j. Wanted RDC connections. _____
Site Survey Check List 13
-
8/15/2019 Site Survey Check List
20/20
Project VTS
42xx-040P/18-Feb-03
3.3 Comments/Notes
Section Comment OK
Site Survey Check List 14