Transcript

Large flow rates to meet peak demand.

Complete Turn Key Bypass Solutions.

Griffin has practical field experience in designing and implementing by-pass pumping projects from a few gallons per minute peak flow, to several thousand of gallons per minute and should problems arise Griffin will have the solutions. www.griffindewatering.com

8 Griffin Locations To Serve You Nationwide

Call Griffin Toll Free At: 1-800-431-1510join the griffin team: www.griffincareers.com

California • Connecticut • Florida • Indiana • Nebraska • New Jersey • Texas • Virginia

Turn Key Contract • Rentals • Sales • Service

The photo above depicts a project in which the presumed peak flow was actually half the actual flow. Once the project started Griffin found a way to double the system.

Top Related