CALIFORNIA HIGH-SPEED RAIL AUTHORITY
BOARD MEETING
TRANSCRIPT OF PROCEEDINGS
DEPARTMENT OF HEALTHCARE SERVICES AUDITORIUM
1500 CAPITOL AVENUE
SACRAMENTO, CA 95814
TUESDAY, SEPTEMBER 19, 2017
10:00 A.M.
Reported by:
Peter Petty
California Reporting, LLC
(510) 224-4476
2
APPEARANCES
BOARD MEMBERS
Dan Richard, Chairman
Tom Richards, Vice Chair
Lynn Schenk
Lorraine Paskett
Mike Rossi
Daniel Curtin (Absent)
Nancy Miller
Bonnie Lowenthal
Ernest Camacho
EX OFFICIO BOARD MEMBERS
Assemblymember, Dr. Joaquin Arambula
Senator, Jim Beall (Absent)
STAFF
Tom Fellenz, Chief Counsel & Interim Chief Executive
Officer
Krista Jensen, Board Secretary
Jon Tapping, Acting Chief Operating Officer, Director of
Risk Management and Project Controls
Mark McLoughlin, Director of Environmental Services
Paula Rivera, Chief Auditor
Russell G. Fong, Chief Financial Officer
California Reporting, LLC
(510) 224-4476
3
APPEARANCES (Cont.)
STAFF
Scott Jarvis, Chief Engineer
PRESENTERS:
Jon Tapping, Acting Chief Operating Officer, Director of
Risk Management and Project Controls
Mark McLoughlin, Director of Environmental Services
Paula Rivera, Chief Auditor
Russell G. Fong, Chief Financial Officer
Scott Jarvis, Chief Engineer
Thomas Fellenz, Chief Counsel & Interim Chief Executive
Officer
PUBLIC COMMENT
Jeremy Bailey, Self
Ric Ortega, Grassland Water District
Ellen Wehr, Grassland Water District
Paul Guerrero, La Raza Roundtable
Diana LaCome, Association of Professionals and Contractors
of California, APAC
California Reporting, LLC
(510) 224-4476
4
INDEX
PAGE
Roll Call 5
Public Comment 6
1. Consider Approving the Board Meeting Minutes 14
From the August 16, 2017 Meeting
2. Consider Augmenting the Contingency Fund for the 15
Construction Package 1 Design-Build Contract
3. Consider Amending the Environmental and 33
Engineering Contract for the San Francisco to
San Jose and San Jose to Merced Project Sections
with HNTB
4. Consider Amending the Environmental and 55
Engineering Contract for the Central Valley Wye
with Parsons Transportation Group
5. Consider Approving the Fiscal Year 2017-18 61
Audit Plan and Acknowledging the Internal Quality
Assurance Self-Assessment for Fiscal Year 2016-17
6. Presentation of Finance & Audit Committee Reports 67
7. 2018 Business Plan Discussion 107
8. Closed Session Pertaining to Employment of an 119
Executive Director (CEO)
9. Closed Session Pertaining to Litigation 119
Adjourned 119
California Reporting, LLC
(510) 224-4476
5
P R O C E E D I N G S 1
10:05 a.m. 2
PROCEEDINGS BEGIN AT 10:05 A.M. 3
SACRAMENTO, CALIFORNIA, TUESDAY, SEPTEMBER 19, 2017 4
CHAIRMAN RICHARD: Good morning. This meeting of 5
the California High-Speed Rail Authority Board will come to 6
order. Will the Secretary please call the roll? 7
MS. JENSEN: Director Schenk? 8
BOARD MEMBER SCHENK: Here. 9
MS. JENSEN: Vice Chair Richards? 10
VICE CHAIR RICHARDS: Here. 11
MS. JENSEN: Director Rossi? 12
BOARD MEMBER ROSSI: Here. 13
MS. JENSEN: Director Curtin? 14
BOARD MEMBER CURTIN: (Absent). 15
MS. JENSEN: Director Paskett? 16
BOARD MEMBER PASKETT: Here. 17
MS. JENSEN: Director Lowenthal? 18
BOARD MEMBER LOWENTHAL: Here. 19
MS. JENSEN: Director Camacho? 20
BOARD MEMBER CAMACHO: Here. 21
MS. JENSEN: Director Miller? 22
BOARD MEMBER MILLER: Here. 23
MS. JENSEN: Senator Bell? 24
EX OFFICIO BOARD MEMBER BEALL: (Absent). 25
California Reporting, LLC
(510) 224-4476
6
MS. JENSEN: Assemblymember Arambula? 1
EX OFFICIO BOARD MEMBER ARAMBULA: Here. 2
MS. JENSEN: Chair Richard? 3
CHAIRMAN RICHARD: Here. 4
Would Vice Chair Tom Richards please lead us in 5
the Pledge of Allegiance? 6
(The Pledge of Allegiance is made). 7
CHAIRMAN RICHARD: Thank you. 8
Before we start, Governor Brown has appointed a 9
new member to our Board. And that is Nancy Miller, a 10
prominent attorney here in Sacramento. And we're very 11
pleased with her appointment and we thank the Governor. 12
This now brings the Board up to a full complement of nine 13
members. 14
And Ms. Miller, welcome to the High-speed Rail 15
Program. And I'd like to give you the opportunity to just 16
introduce yourself and say anything you'd like to day. 17
BOARD MEMBER MILLER: Good morning, all. I'm 18
looking forward to serving with you and since we have a 19
huge agenda, I'm just going to leave it at that. Thank 20
you. 21
CHAIRMAN RICHARD: Well, she clearly doesn't fit 22
on this Board with that level of cogent commentary. 23
(Laughter). But we'll go forward. Thank you very much. 24
Okay. So as we do, we'll start with Public 25
California Reporting, LLC
(510) 224-4476
7
Comment. I have public comment cards here. I'll take them 1
in the order in which they were received, so first is 2
Jeremy Bailey, from Sacramento, and followed by Ric, it 3
looks like, Ortega. 4
MR. BAILEY: (Off mic - indiscernible). 5
CHAIRMAN RICHARD: Excuse me, sir? If you could 6
come up to use the microphone and introduce yourself, so we 7
have your remarks recorded. Thank you. 8
MR. BAILEY: Thank you. I appreciate it. I'll 9
be real quick. I'm an East Sacramento resident, but my 10
wife and her family are from France and I just want to 11
congratulate everybody that's working so hard. The vast 12
majority of French people are really excited about this 13
project and hope that you can see it to completion. I will 14
be on another bullet train over the Christmas holidays 15
going to the French Alps to ski and it's an amazing 16
experience. 17
And for the people, I say the naysayers and 18
doomsdayers that are getting in the way of the project, I 19
really would imagine that most of them have never had the 20
experience to be on high-speed rail. And I really think 21
it's going to revolutionize not only transportation but 22
especially long-distance travel in this state and 23
eventually in the entire country. And we're going to be 24
shining example in the progressiveness of California 25
California Reporting, LLC
(510) 224-4476
8
throughout the history of this country. 1
So I just appreciate -- I really wanted to say 2
that I really appreciate all the hard work and all the 3
extra hours that I know everybody's probably -- or some of 4
you are putting in to see this to completion. 5
CHAIRMAN RICHARD: Thank you very much, sir. 6
Thank you. 7
Is it Mr. Ortega? Did I get your name correct? 8
MR. ORTEGA: Yes. 9
CHAIRMAN RICHARD: Thank you. 10
MR. ORTEGA: Thank you. My name is Ric Ortega. 11
I'm the General Manager of the Grassland Water District and 12
Resource Conservation District. I appreciate the 13
opportunity. 14
The Grasslands Wetland Complex in Merced County, 15
notably the size of Manhattan, represents the largest 16
remaining block of wetlands in the Western United States. 17
With only 5 percent of our interior wetlands remaining in 18
California, protecting the last remaining is - is really 19
imperative. 20
Annually, the single largest concentration of 21
over-wintering water fowl are found, on earth are found in 22
the Central Valley on these wetlands, the heart of which is 23
the Grassland Ecological Area. Because millions of birds 24
depend on the ecological area each year, it is designated 25
California Reporting, LLC
(510) 224-4476
9
as a wetland of global importance under the International 1
Ramsar Convention, the Western Hemisphere Shorebird Reserve 2
Network, the U.S. Fish and Wildlife Service and the Audubon 3
Society. The current proposed San Jose to Merced Alignment 4
bisects the Grassland Ecological Area and specifically mud 5
slew, a major and critical wildlife corridor linking the 6
north and south grasslands. 7
My Board of Directors has formally requested a 8
below-grade design through this critical wildlife corridor. 9
I strongly urge you to accommodate this request. 10
CHAIRMAN RICHARD: Thank you, Mr. Ortega. 11
Our next speaker is Ellen Wehr, also of the 12
Grasslands Water District. Then she'll be followed by 13
Paul Guerrero. 14
Good morning, Ms. Wehr. 15
MS. WEHR: Good morning, Board members. My name 16
is Ellen Wehr. I'm the General Counsel for the Grassland 17
Water District. The District has been involved with this 18
project from the start. We obtained strong commitments to 19
mitigate the effects of bisecting our Wetland Complex and 20
we're taking every meeting we can with your staff. We're 21
committing our resources and we're doing whatever it takes 22
to see that the commitments will be met. 23
To be honest, it's been a very slow and 24
cumbersome process. If we're going to properly address and 25
California Reporting, LLC
(510) 224-4476
10
mitigate the impacts of bisecting the largest remaining 1
wetland on the West Coast we need to do it together, and we 2
need to do it now. We have concerns about the decision to 3
use a biological model, rather than working with our 4
district to conduct on-the-ground biological surveys. 5
We're very worried about noise impacts. We're also worried 6
about bird strikes and lighting. We've seen very little 7
movement on the development of a plan to obtain 10,000 8
acres of conservation easements as promised in the 9
programmatic EIR for the project. 10
So we came today to introduce ourselves to you. 11
We'll be reaching out further in the weeks to come and we 12
look forward to sitting down with you to have further 13
discussions. Thank you. 14
CHAIRMAN RICHARD: Thank you, Ms. Wehr. 15
Paul Guerrero followed by Diana LaCome. 16
MR. GUERRERO: You should be getting two copies 17
of this right here. One is the San Francisco to San Jose 18
leg and the other is the San Jose to Merced leg. I hope 19
that you have them up there? 20
CHAIRMAN RICHARD: The Secretary is distributing 21
those. 22
MR. GUERRERO: Thank you, good morning. Your 23
handouts tell us that on November 23rd, 2015 the Authority 24
executed a contract with HNTB to act as the engineering and 25
California Reporting, LLC
(510) 224-4476
11
environmental consultant for the San Francisco to San Jose 1
and San Jose to Merced Project legs. 2
On or about August 16th last year, I asked the 3
Board about two environmental justice studies, which you 4
have in front of you for the San Francisco to San Jose and 5
Merced portions of the project. Those two studies, but for 6
a few minor differences, are identical. If you look at the 7
contents, you'll note that their contents are basically 8
identical. And the studies were prepared by Kearns & West, 9
not HNTB. And you should have the first three pages of 10
each study there. 11
Staff took the floor after I spoke and told the 12
Board I was mistaken. You hadn't commissioned any 13
environmental studies and those two studies were marked 14
"confidential" for internal use only. Today, staff is 15
asking for additional funding for a study staff last year 16
claimed was never done. 17
The question I asked you in August, about those 18
studies, was if the Authority considers itself the banker? 19
And I have heard this many times, that the Authority is the 20
banker for the San Francisco to San Jose leg. If you're 21
the banker then why does the Authority, as opposed to 22
Caltrain, contract for engineering and environmental 23
studies? Caltrain, the owner of the San Francisco to San 24
Jose leg, is responsible for the engineering and 25
California Reporting, LLC
(510) 224-4476
12
environmental studies, not the banker, Authority. Why open 1
yourself to additional lawsuits and liability when that 2
burden belongs to Caltrans? All the lawsuits that come 3
over the environmental studies, Caltrans should be taking 4
care of, not the High-Speed Rail. 5
Finally in closing, San Jose citizens have asked 6
and have been told that the EJ studies will come after the 7
route has been picked. La Raza Roundtable has never been 8
contacted, concerning an EJ study and I've heard that the 9
La Raza Lawyers Association were discussing a lawsuit 10
against the Authority. 11
This is the time to start working with the 12
minority community in the San Jose area. It comprises 13
almost 70 percent of the population down there; 50 percent 14
are Hispanic I believe, and somewhere around 20 percent are 15
Asian. La Raza is the largest organization down there and 16
we've never been contacted by anybody regarding an 17
environmental justice study or any other studies. We have 18
a member, Danny Garza, who sits on your Steering Committee, 19
but that was a labor to get somebody on there that was 20
Hispanic. 21
So I'm asking you to reach out to the community 22
down here and have your staff start reaching out to the 23
community and working with the community. Not just the 24
upper middle class and white section of the community, the 25
California Reporting, LLC
(510) 224-4476
13
rich people, but come down to the people and work with the 1
people whose homes you're going through with the train. 2
Start discussing it with them and get them involved. Thank 3
you. 4
CHAIRMAN RICHARD: Thank you, Mr. Guerrero. 5
Ms. LaCome? 6
MS. LACOME: Good morning, Chairman Richard, 7
Members of the Board, and Mr. Fellenz. I'm Diana LaCome, 8
President of APAC. 9
Last month I took a trip to the East Coast and I 10
managed to take a train ride on Amtrak from Boston to 11
Maine. So on the Amtrak train, I was touting how the 12
California High-Speed Rail is the largest, the only high-13
speed rail in the country, and someone in the train pops up 14
and says, "That's not true." And I said, "Oh. Is there 15
another one?" And they said, "Yes. It's the Northeast 16
Corridor High-Speed Rail." That was the first one from 17
D.C. to Boston. But I know that in a lot of the literature 18
that's posted, it says that we're the first. We may be the 19
largest, but apparently not the first. Okay. 20
The second area that I wanted to mention is I saw 21
that there's a contract amendments to AT&T and PG&E for 22
utility relocation. They're also going to be receiving 23
additional funding. I was here before the Board; I believe 24
it was in February of this year, asking for your assistance 25
California Reporting, LLC
(510) 224-4476
14
in making it a little bit easier for our small businesses 1
to get contracts with the utilities, specifically on the 2
High-Speed Rail Project. And so that request again I'm 3
repeating today and I know there has been some action on 4
it, but from what I gather not to a great extent. So any 5
help would be appreciated. Thank you. 6
CHAIRMAN RICHARD: Thank you, Ms. LaCome. 7
That concludes the (off mic colloquy) I’ll come 8
back to that – I will. That concludes the public comment 9
section. Thank you all for taking your time to come and 10
appear before us today, so we'll move on now to the regular 11
agenda. 12
But first, Ms. Schenk wanted me to point out that 13
in fact the Northeast Corridor is faster than traditional 14
Amtrak, but it's nowhere close to the speeds that high-15
speed, true high-speed rail around the world has. So they 16
may be -- it, no. 17
BOARD MEMBER SCHENK: 125. 18
CHAIRMAN RICHARD: Yeah. They can maybe hit 150 19
for about 5 seconds, right. 20
BOARD MEMBER SCHENK: And no dedicated track. 21
CHAIRMAN RICHARD: Right, yeah. Okay. 22
First item is the minutes. 23
BOARD MEMBER SCHENK: Move approval. 24
BOARD MEMBER LOWENTHAL: Second. 25
California Reporting, LLC
(510) 224-4476
15
CHAIRMAN RICHARD: Okay. It's been moved by 1
Director Schenk, seconded by Director Lowenthal. Will the 2
Secretary please call the roll? 3
MS. JENSEN: Director Schenk? 4
BOARD MEMBER SCHENK: Yes. 5
MS. JENSEN: Vice Chair Richards? 6
VICE CHAIR RICHARDS: Yes. 7
MS. JENSEN: Director Rossi? 8
BOARD MEMBER ROSSI: Yes. 9
MS. JENSEN: Director Paskett? 10
BOARD MEMBER PASKETT: Abstain. 11
MS. JENSEN: Director Lowenthal? 12
BOARD MEMBER LOWENTHAL: Yes. 13
MS. JENSEN: Director Camacho? 14
BOARD MEMBER CAMACHO: Yes. 15
MS. JENSEN: Director Miller? 16
BOARD MEMBER MILLER: Abstain. 17
MS. JENSEN: Chair Richard? 18
CHAIRMAN RICHARD: Yes. 19
Okay. Thank you. The minutes are adopted. 20
Item two is consideration of an augmentation for 21
the contingency fund for a CP1 design-build contract. 22
Mr. Tapping, good morning. 23
MR. TAPPING: Good morning, Chairman Richard and 24
Board Members, it's my pleasure to be before you today. 25
California Reporting, LLC
(510) 224-4476
16
I'm here to request an augmentation of $35 million to the 1
CP1 construction contract contingency. 2
This is really technically an internal budget 3
transfer between provisional sums that were provided at the 4
initial stage of the project, which we estimate will not be 5
used to the capacity that was originally estimated. 6
As a way of background, the CP1 contingency was 7
initially $165 million. Through recent Finance and Audit 8
meetings and Board meetings we've explained some of the 9
risks that are associated with that project, primarily the 10
right-of-way acquisition risks, third-party agreement risks 11
and the railroad agreement risks. And some of these risks 12
have been realized. We've taken aggressive steps to 13
mitigate these risks. However, they have depleted the 14
contingency. So this is a short-term request while we 15
undergo a more robust risk informed contingency assessment 16
that is currently underway. 17
We're looking at not only CP1, but we're looking 18
at CP2-3, CP4 and in fact, the whole program in terms of 19
informing the 2018 Business Plan. So that process is 20
underway and well underway. 21
We're also looking at opportunities in cost 22
savings and we're having workshops in those regards. So 23
this is a short-term request to keep the critical 24
construction of this project moving in terms of the 25
California Reporting, LLC
(510) 224-4476
17
critical areas of construction that underway now, the 14 1
areas of construction. And some of the change orders that 2
are appropriate and need to be executed as we move forward. 3
So as way of background on the provision of sums, 4
there are two provisional sums -- there are more 5
provisional sums, but the two that were looked at 6
exhaustively in terms of estimating and use, were one 7
called the construction contract work. And that was 8
originally set up for right-of-way and dealing with 9
adjacent property owners. And looking at the projections 10
and the burn rates, very little money has been spent out of 11
that contingency. And staff has done an analysis looking 12
forward and does not anticipate spending the full amount. 13
In fact, they're looking at less than 5 million for that 14
one. 15
The utility, also a contingency, is not the big 16
risk that we're seeing with PG&E, AT&T. It is those 17
utilities that is (sic: are) under the control of the 18
contractor. He is to relocate the facilities. Given the 19
progress of that work to date and looking at the forward 20
projections, there also appears to be conclusively an 21
estimate not to exceed 5 million. 22
So the request is to basically augment the 35 23
million due to this technical transfer from the provisional 24
sums and in the long term, as we complete our risk informed 25
California Reporting, LLC
(510) 224-4476
18
and opportunity risk analysis that is ongoing to follow up 1
this request at that time. 2
CHAIRMAN RICHARD: Okay. 3
Are there questions for Mr. Tapping? 4
BOARD MEMBER ROSSI: Yeah. I have a couple. 5
CHAIRMAN RICHARD: I think Director Schenk was 6
first. 7
BOARD MEMBER ROSSI: Oh, I'm sorry. Go ahead. 8
BOARD MEMBER SCHENK: That's all right. No, go 9
ahead, Mike. 10
BOARD MEMBER ROSSI: Okay. 11
BOARD MEMBER SCHENK: You're always enlightening. 12
BOARD MEMBER ROSSI: Okay. I'm going to try. So 13
these monies are being transferred to the contingency fund? 14
MR. TAPPING: Correct. 15
BOARD MEMBER ROSSI: And then you're going to 16
spend them? 17
MR. TAPPING: Yes. 18
BOARD MEMBER ROSSI: So why are they going to the 19
contingency fund? I mean, we shouldn't be spending money 20
out of the contingency fund. 21
MR. TAPPING: Well we anticipate, Mike, some 22
change orders ongoing that will need to be executed. And 23
the change, the contingency funds will be the source for 24
the change order. 25
California Reporting, LLC
(510) 224-4476
19
BOARD MEMBER ROSSI: So that means that the 1
contract wasn't appropriate and we have now found out that 2
the contract wasn't appropriate. And we're putting these 3
extra monies in to cover that short fall of whatever the 4
contract was. And instead of setting it up to the contract 5
we're putting it into the contingency fund because 6
otherwise we'd have to draw from the contingency fund 7
anyhow? 8
MR. TAPPING: Correct. 9
BOARD MEMBER ROSSI: Okay. Well, then let's go 10
to the next. Let's go to the page four, Jon, where it 11
talks about budget and fiscal impact. The last line says, 12
so there's going to be more of this on this contract? 13
MR. TAPPING: That's correct, Mike. We're doing 14
a continuing risk informed analysis on this and other 15
projects, consistent with moving towards the 2018 Business 16
Plan and our updated estimates. 17
BOARD MEMBER ROSSI: So how was this original 18
budget item presented to this Board? Was it presented as 19
this was a contract for costs to complete? 20
MR. TAPPING: No. This was presented -- the 21
original contingency was presented to the Board -- 22
BOARD MEMBER ROSSI: It's not a contingency. I'm 23
talking about the contract. The contract that we are now 24
going to transfer funds to in order to meet the overages in 25
California Reporting, LLC
(510) 224-4476
20
it. 1
MR. TAPPING: Yes. 2
BOARD MEMBER ROSSI: They may be going to the 3
contingency, but that's not how the contingency was 4
approved. How was the contract approved? 5
MR. TAPPING: It was approved by -- it was 6
basically best value design-build procurement method, which 7
was a combination of price and qualifications. 8
BOARD MEMBER ROSSI: So we missed it 9
considerably? That's what this tells me; is that correct? 10
MR. TAPPING: This tells us that we have some 11
risks and we have some change orders, which we've discussed 12
at length. Yes, correct. 13
BOARD MEMBER ROSSI: Okay. I don't know if that 14
was enlightening, Lynn, but I'm done. 15
CHAIRMAN RICHARD: All right, Director Schenk 16
then Director Paskett. 17
BOARD MEMBER SCHENK: Thank you, Mr. Chairman, if 18
you'll indulge me. My comments are -- then that's 19
questions or comments really about this agenda item, and it 20
goes on to the next two agenda items. 21
Look, outcomes have many causes and I know we've 22
come to this moment with a lot of different decisions that 23
have occurred, some even before this Administration, so 24
it's not a matter of looking at fault, but as I said on the 25
California Reporting, LLC
(510) 224-4476
21
phone when you all did the briefing, and by the way it was 1
an excellent briefing, I thank the staff for taking this 2
time to do that. That my concern and my discomfort level 3
is that while this is short-term cash flow kinds of 4
decisions that need to be made, in the big picture for the 5
public, for our stakeholders where we don't frankly have a 6
great deal of good will or confidence in us, this sort of 7
shell game of moving money around where we know we're going 8
to eventually -- especially items three and four -- we're 9
eventually going to have to come up with the money that 10
we're moving around. I understand here in item two that we 11
might not have to go back and refund utilities or the 12
construction contract work provisional fund, but in the 13
next two items we will. 14
It just seems to me that we have a bigger public 15
relations communications issue that we must be more 16
transparent, that we must really have a simpler way of 17
doing this, so that the public can understand it. So it 18
doesn't look like oh we were caught up short because I know 19
we were not caught up short. You know, we made some of 20
these decisions when we didn't have all of the information 21
that we have today. We had good guestimates. 22
But still, you know we have a credibility issue 23
and rather than just dealing with sort of the cash flow, we 24
have to tell the full story and find a better way of doing 25
California Reporting, LLC
(510) 224-4476
22
it and I know from the conversations that we had at the 1
staff level that you are looking at a better way of doing 2
it, but this just -- I mean, I'll vote for it -- but it 3
leaves me tremendously uncomfortable in the way it appears. 4
And I think that you understand that from the conversations 5
that we've have. So it's not really a question. It's just 6
sort of an overall comment, Mr. Chairman. 7
CHAIRMAN RICHARD: Thank you, Ms. Schenk. 8
Ms. Paskett? 9
BOARD MEMBER PASKETT: So, my, is my mic on? 10
BOARD MEMBER ROSSI: Yes. 11
BOARD MEMBER PASKETT: (Indiscernible) button, 12
that's counter intuitive (laughter). 13
I have similar sentiments as Director Schenk and 14
then in listening to Director Rossi's questions I also have 15
similar questions. And so I'm a little uncomfortable with 16
the information in the packet and I apologize for missing 17
the briefing prepared by staff, but it feels like there 18
should be more information presented to us with this 19
request to augment the contract. 20
And the other piece that grabbed my attention is 21
the risk analysis and maybe if there was an effort right 22
now to do a risk analysis and put together a plan to 23
mitigate those risks on this contract, it would be more 24
appropriate to re-present this to us after we've also heard 25
California Reporting, LLC
(510) 224-4476
23
in more detail, the plan to mitigate those risks. 1
So I'm wondering -- and you can tell me if 2
there's a sense of urgency, because of a cash flow issue -- 3
but I'm wondering if it makes sense to get more information 4
and bring it back to us. And then let us vote on this at 5
the next meeting. 6
MR. TAPPING: There is an urgency with regard to 7
cash flow on this, on this project. We can certainly come 8
back to you with a presentation on the robust risk 9
mitigations that we're doing. For example, on the right-10
of-way we are working with a contractor to focus on 11
critical parcels to keep the project proceeding in looking 12
at a critical path method and moving forward. So there is 13
a robust list of mitigations, but with the nature of the 14
cash needs on this project at this time, I would recommend 15
that we move forward. 16
CHAIRMAN RICHARD: You done? 17
Director Camacho? 18
BOARD MEMBER CAMACHO: Thank you, Mr. Chairman. 19
I would echo the issues that Director Schenk has raised, 20
but it seems to me that we are perhaps dealing with a 21
symptom rather than the problem. 22
We establish a budget. We exceed that budget for 23
some reason. I think that in the discussion portion of the 24
recommendation that's being made to us, you talk about 25
California Reporting, LLC
(510) 224-4476
24
right-of-way acquisition and I would hope that we will deal 1
with the problem. We talk about environmental permits, 2
third-party agreements, those types of things. And I would 3
hope that in the next legislative session that we approach 4
the Legislature for relief in this area to accommodate us 5
so that we don't have these problems. 6
But we continue to kick the can down the road and 7
we continue to kick it every single time and in some cases 8
we kick it three times. So it doesn't make any sense that 9
-- or it makes a lot of sense that people lack the 10
confidence in our ability to be transparent in the things 11
that we're doing and certainly manage a budget and project. 12
Thank you. 13
CHAIRMAN RICHARD: Thank you, Director. And I 14
certainly want to associate myself with those remarks. 15
Other Directors have questions, Director Miller? 16
BOARD MEMBER MILLER: (off mic colloquy) How’s 17
that? Okay, since I'm new I'm just going to ask you a 18
couple of questions. It looks to me like this request is 19
due to some design changes and litigation that occurred 20
since 2013, when your original design-build was - contract 21
was issued. Is that correct? 22
MR. TAPPING: Yes, partially. 23
BOARD MEMBER MILLER: And those deal with City of 24
Fresno and Union Pacific issues where they benefitted by 25
California Reporting, LLC
(510) 224-4476
25
some of these changes? 1
MR. TAPPING: Correct. 2
BOARD MEMBER MILLER: And then you have 3
litigation, which resulted in some changes you also had to 4
make. Is that right? 5
MR. TAPPING: Correct. 6
BOARD MEMBER MILLER: When you do your risk 7
management -- I mean in design-build and I understand it 8
you're designing as you go, because you're not really sure 9
completely, you don't have specs for people to bid on. You 10
were basically designing, and as I understand this you 11
didn't have right-of-way, you didn't have environmental. 12
And so but you had construction funds, so you committed to 13
construction with the design-build to kind of go forward 14
and start the process. Is that right? 15
MR. TAPPING: We did advance the project. 16
BOARD MEMBER MILLER: So I think given that, I 17
mean this is CP1, and so I just understand the fact that 18
when you start like that you are definitely going to have 19
changes because you don't know going in really what your 20
right-of-way, what your litigation may be, and what your 21
partners -- meaning your city, your local, the railroad -- 22
are going to want or need in order for you to proceed 23
through their jurisdiction. 24
MR. TAPPING: Those are all risks to the project 25
California Reporting, LLC
(510) 224-4476
26
that we assess when we put out the project. 1
BOARD MEMBER MILLER: Right. 2
MR. TAPPING: But there's certainly uncertainty 3
to those risks. 4
BOARD MEMBER MILLER: So I think that Director 5
Rossi -- do we call ourselves Directors? 6
BOARD MEMBER ROSSI: I don't, but you can if you 7
want. You can just call me Mike. 8
BOARD MEMBER MILLER: Okay, what Mike said was 9
it's not really contingency because you're going to spend 10
it right away. But I did ask this question, which is what 11
is the percentage of contingency so far on the project? 12
And I heard it was approximately 20 percent. Is that 13
right? 14
MR. TAPPING: That's approximately correct. 15
BOARD MEMBER MILLER: Is that just for CP1 or is 16
that -- 17
MR. TAPPING: It is. And the other CPs are in 18
the similar magnitude. 19
BOARD MEMBER MILLER: All right, and -- 20
CHAIRMAN RICHARD: Excuse me, she asked a 21
question and your answer, I thought, was different than 22
what I understood. She asked is that just for CP1? I 23
thought the contingency on CP1 was not 20 percent. 24
MR. TAPPING: It was initially 16 percent. With 25
California Reporting, LLC
(510) 224-4476
27
this augmentation, it would go to 19 percent. 1
CHAIRMAN RICHARD: Okay, but just so clarity for 2
her question, initially the contingency -- prior to this 3
the contingency is not 20 percent though, right? 4
MR. TAPPING: It was not. No, it was not. 5
CHAIRMAN RICHARD: Okay. I'm sorry, Ms. Miller, 6
I just wanted -- 7
BOARD MEMBER ROSSI: CP1 was the only one. 8
CHAIRMAN RICHARD: Yeah. 9
MR. TAPPING: CP1 was 16 percent initially. 10
CHAIRMAN RICHARD: Yeah, that’s right. 11
BOARD MEMBER ROSSI: It was the only one that 12
wasn't 20. 13
CHAIRMAN RICHARD: It was the only one that 14
wasn't 20 percent. 15
MR. TAPPING: Yeah, CP2-3 was I believe 19 and 16
CP4 was in that neighborhood of 18. 17
CHAIRMAN RICHARD: Right. 18
MR. TAPPING: As I recall. 19
CHAIRMAN RICHARD: I apologize. 20
BOARD MEMBER MILLER: So to me, we're getting 21
closer to the contingencies that you had, that you have on 22
the other two or maybe exceeding it by 1 percent. So just 23
for me coming in new, I mean I understand we have some 24
financial and funding issues with this project obviously, 25
California Reporting, LLC
(510) 224-4476
28
but this does not trouble me in terms of once you start a 1
design-build and then having to deal with your partners and 2
making changes as a result of that, that you would be 3
somewhere in this percentage of contingency. 4
Now I don't know whether CP1, you're anticipating 5
a lot more contingency requests, that would be my next 6
question, but I don't have trouble with this. 7
MR. TAPPING: We are undertaking that analysis 8
now along with all the other CPs. 9
BOARD MEMBER MILLER: Okay. Thank you. 10
CHAIRMAN RICHARD: Other directors? 11
So I'll just -- first of all I think the 12
questions from the Board Members were good. And my only 13
impression on this is I think one of our most effective 14
management tools is managing against the contingency, so 15
that we establish contingency. 16
One of the things that I've always respected 17
about the way that you've approached this is that we 18
haven't just used a flat number. That basically, if I 19
understand it correctly, the contingencies that we 20
establish on each of these legs come from the risk 21
assessment analyses that you do so that it's not just some 22
average number, but it's supposed to be driven against the 23
risks that we see. 24
And then I've always been appreciative of the 25
California Reporting, LLC
(510) 224-4476
29
fact that at Finance and Audit and ultimately at the Board, 1
we're able to look at the draw against those contingencies 2
as one of our major management tools for staying on top of 3
the progress of the project. 4
So really my only discomfort with this was just 5
the telescoping collapse in time between the establishment 6
of the contingency against the draw down. Because what 7
that says is we're essentially moving the goal posts with 8
the draw, as opposed to staying ahead of this and saying, 9
"This is where we see the contingency and we can see these 10
things that are eroding the contingency." So I'm not going 11
to even ask you to comment on that, but I think it goes 12
back to what Ms. Schenk said at the beginning about 13
transparency. 14
It just seems that we should be way ahead of the 15
curve in always updating and understanding what the 16
contingency needs to be on these and that we draw against 17
that. And that we, I mean as a layperson, that I have a 18
sense that, "Okay, we're 80 percent of the way through a 19
project, for example, and we've only drawn 40 percent of 20
the contingency, that sounds good. If the obverse is true 21
that we're 40 percent of the way through, and have drawn 80 22
percent of the contingency, then that's obviously cause for 23
concern. 24
BOARD MEMBER ROSSI: Not necessarily, in 25
California Reporting, LLC
(510) 224-4476
30
fairness, not necessarily. It may depend on where the 1
complexities -- 2
CHAIRMAN RICHARD: Yeah, that's right if you've 3
just done the most complex part -- 4
BOARD MEMBER ROSSI: Right. 5
CHAIRMAN RICHARD: -- and then the rest of it is 6
just cruising that's right. 7
But in any case that we have a sense, is probably 8
a better way for me to say it, of where we are in terms of 9
the progress, versus how much of the contingency we have 10
remaining. So that's my only comment and I'm not being 11
critical. It's just to say that I agree with Ms. Schenk 12
that I think we want these contingency determinations to 13
really be moving far ahead of the draw against them. 14
MR. TAPPING: I would agree, and we're moving 15
towards being more proactive in that regard. 16
CHAIRMAN RICHARD: Okay. 17
VICE CHAIR RICHARDS: Mr. Chairman, may I? 18
CHAIRMAN RICHARD: Yes, Vice Chairman Richards. 19
VICE CHAIR RICHARDS: I don’t know if that is 20
working or not, no(colloquy to set up audio). No, I have 21
nothing to say (laughter). 22
CHAIRMAN RICHARD: Here (colloquy to set up 23
audio). 24
BOARD MEMBER ROSSI: You want to use mine? 25
California Reporting, LLC
(510) 224-4476
31
CHAIRMAN RICHARD: Use mine. 1
VICE CHAIR RICHARDS: Thank you. So Jon, I think 2
that to some extent it's the presentation doesn't help 3
here, I think that can be improved upon. I think that we 4
need to call things exactly what they are as opposed to 5
moving from one thing to another, when in fact it does 6
really lead right to what the real issue is. It is an 7
overrun. 8
I think what the issue when you provide part of 9
the information on these other major change orders, without 10
explanation -- I don't recall and maybe we should -- but 11
these are major items also in the drawdown of the 160 or so 12
and there's 110 of it right there. The dates that it 13
occurred, who authorized the change order, and if it's the 14
Board it could say that. 15
But that information would be helpful, not only 16
to the Board as we're looking at this with some degree of 17
disparity between the time that the change orders were 18
incurred and now that we're looking at them along with just 19
a clear explanation of what we're doing here, because as 20
Director Schenk and all of my colleagues have mentioned, I 21
think we've all had the same reaction to this. I think 22
some of it could be improved substantially through the 23
presentation. But also I'm concerned a bit about what's 24
missing. 25
California Reporting, LLC
(510) 224-4476
32
So that we've got a better understanding, as does 1
the public, with regards to this $110 million of additional 2
change orders that we don't really know what they mean. 3
And who authorized them and when they actually occurred. 4
MR. TAPPING: Okay. We can provide that 5
information. 6
BOARD MEMBER ROSSI: I'll move it. 7
CHAIRMAN RICHARD: Okay, moved by Director Rossi. 8
VICE CHAIR RICHARDS: Second. 9
CHAIRMAN RICHARD: Seconded by Vice Chair 10
Richards. 11
Will the Secretary please call the role? 12
MS. JENSEN: Director Schenk? 13
BOARD MEMBER SCHENK: Yes. 14
MS. JENSEN: Vice Chair Richards? 15
VICE CHAIR RICHARDS: Yes. 16
MS. JENSEN: Director Rossi? 17
BOARD MEMBER ROSSI: Yes. 18
MS. JENSEN: Director Paskett? 19
BOARD MEMBER PASKETT: Yes. 20
MS. JENSEN: Director Lowenthal? 21
BOARD MEMBER LOWENTHAL: Yes. 22
MS. JENSEN: Director Camacho? 23
BOARD MEMBER CAMACHO: Yes. 24
MS. JENSEN: Director Miller? 25
California Reporting, LLC
(510) 224-4476
33
BOARD MEMBER MILLER: Yes. 1
MS. JENSEN: Chair Richard? 2
CHAIRMAN RICHARD: Yes. 3
Thank you Jon. 4
MR. TAPPING: Thank you. 5
CHAIRMAN RICHARD: Okay. Our next item is 6
consideration of an amendment to the environmental and 7
engineering contract for the San Francisco, San Jose and 8
San Jose-Merced project sections, for HNTB. 9
I'm presuming most of this is for Maureen Hayes's 10
salary at HNTB; is that right? (Laughter). 11
MR. MCLOUGHLIN: Sure. I'll make one disclosure. 12
I have a boot on my foot, so that's what happens when you 13
run in with our auditor. (Laughter). I'll make sure I 14
don't do that again. 15
VICE CHAIR RICHARDS: Very good Mark. 16
CHAIRMAN RICHARD: Did you just steal her only 17
joke for the quarter? 18
MR. MCLOUGHLIN: I want to be ahead of that. 19
CHAIRMAN RICHARD: Yeah, okay. 20
MR. MCLOUGHLIN: So good morning, Chairman and 21
Members of the Board. Mark McLoughlin, the Director of 22
Environmental Services for the Authority. I want to 23
present on item number three for the HNTB contract. And I 24
want to go over a little bit of history here, here for 25
California Reporting, LLC
(510) 224-4476
34
context. 1
So the High-Speed Rail awarded HNTB our E&E 2
contract in November of 2015 with our 30 percent goal. And 3
we also authorized HNTB to initiate the technical work in 4
March for both NorCal sections: San Francisco to San Jose 5
and San Jose to Merced. 6
Currently without additional funding the HNTB 7
contract will be exhausted by November of this year. And 8
HNTB has estimated the cost to complete for both RODs and 9
all permitting PE for P, which is Project Engineerings for 10
Procurement for San Francisco to San Jose, and San Jose, 11
Merced. And also stakeholder outreach would require an 12
amendment of a total of 39.6 million. 13
HNTB, also in this context, will prepare the PEP 14
for the Central Valley Wye, at about 4.8 million at a 15
future date. 16
As again an amendment -- an advancement of 17
amendment of the 10 million will advance the work on both 18
RODs for these two sections and maintain momentum. It 19
would also raise the current value to not to exceed of 46 20
million and with the expenditure priorities to be 21
determined with the Executive Committee and/or consistent 22
with Board direction of the 2016 Business Plan. 23
Also, the $10 million we're reducing the existing 24
Kleinfelder Geotechnical Contract by 10 million to fund 25
California Reporting, LLC
(510) 224-4476
35
this $10 million amendment. And then future amendments to 1
complete permitting and PE for P for these two sections 2
will be forthcoming as the program goes through its 3
baseline exercise. 4
Some major changes that have been included for 5
both sections on the alignment have changed and I'll just 6
go through a few of them here. We currently have a San 7
Luis Reservoir Avoidance Alignment developed to avoid 8
significant water habitat and refuges and parks, including 9
the San Luis Reservoir owned by the Bureau of Reclamation, 10
the Morgan Hill Bypass, Caltrain Peninsula Corridor 11
Electrification Project in the San Francisco to San Jose 12
section for rail alignment. There's a short viaduct north 13
of Diridon Station to I-880 that was developed in response 14
to comments during scoping of the section, also the Newhall 15
neighborhood of San Jose. 16
Also, another aerial change this time at HSR 17
through the Diridon Station, introduce the aerial 18
alignment. It's part of that project. Modification of at-19
grade alignments through San Jose, Diridon analysis and 20
then a low viaduct downtown Gilroy Station. So the team 21
led by Ben Tripousis is working pretty diligently with 22
stakeholders in this area that wanted these changes. 23
We have some other pending issues on the sections 24
or these two sections, ongoing discussions with Caltrain, 25
California Reporting, LLC
(510) 224-4476
36
SPRR via corridor owners. And then we also have wildlife 1
crossing issues at Soap Lake, in the San Joaquin Valley and 2
the Coyote Valley areas. And we've also been working 3
closely with the environmental community, government-to-4
government concertation with Native Americans in this 5
section and then including water districts and the resource 6
agencies. 7
So the investment in this section, HNTB contract, 8
aligns with the 2016 Business Plan direction in getting to 9
Valley to Valley as the state's priority. 10
So of note, we've made also lots of progress. 11
I'd like to note that also, that the team is working on. 12
We're very close to concurrence of what we call Checkpoint 13
B with the Army Corps and the USEPA in our checkpoint 14
process and that is the approval of a range of alternatives 15
that will be put into the EIR/EISes. So we're getting 16
close to the concurrence to move forward with the document, 17
so that's very important. 18
Also this for those two sections, the 19
deliverables by June that are targeted are for San 20
Francisco to San Jose in this amendment would be a draft 21
PE/PD, which is our engineering record set that supports 22
the environmental document and a draft admin EIR/EIS to get 23
to that point by June. 24
San Jose, Merced again is PEPD, which is the 25
California Reporting, LLC
(510) 224-4476
37
draft of the record set, a full record set, and then the 1
draft administration for the admin for EIR/EIS for FRA 2
review. 3
So those are the deliverables that we're 4
targeting to get to June that we would see and then move 5
forward as the program would be in the baseline, based upon 6
what direction we would be providing. 7
So with that we would ask for approval to 8
maintain momentum in this, these two sections to attain the 9
RODs for the Valley to Valley section. 10
CHAIRMAN RICHARD: I'm going to exercise Chair's 11
prerogative and ask a question first ahead of my 12
colleagues, which I don't normally do, but I just want to 13
pick up on what Nancy Miller asked before. 14
Setting aside this particular item, Mark, can you 15
help me think about how we're doing all this? Because we 16
start off on things to do an environmental analysis. As we 17
go through that information becomes available, whether it's 18
community impacts and people want us to look at aerial as 19
opposed to at-grade, or things that come up. We heard from 20
the folks with the Grasslands District this morning. They 21
want us to look at below grade. 22
I mean, so as we start doing those things and 23
then we end up kind of churning it seems to me, maybe 24
that's the wrong word, but a lot of different permutations 25
California Reporting, LLC
(510) 224-4476
38
on this. Then we go back and we say, "Well, now these are 1
the things that have changed, so we're looking at these." 2
But at some point they'll come to the Board in the form of 3
a draft EOR Record for Decision, PIR. And we may say, 4
"Well wait a minute," like we said in Bakersfield. We 5
actually think there's a different alternative here, 6
because maybe we're looking at cost pressures or we're 7
looking at things like that. 8
How do we avoid getting into a kind of a constant 9
do loop on this environmental analysis? I mean, it's kind 10
of shocking to me the level of numbers that we deal with in 11
terms of the environmental review costs that are just very, 12
very, very large. And which isn't to say that we shouldn't 13
be examining all the impacts on communities and biota and 14
all that. But I'm just sitting here wondering do we have 15
any ability to control this, or are we just going to be 16
consistently buffeted as we go through this process by 17
people saying, "Well wait. It can't go here. It has to go 18
there." And so now we have to go back and look at all this 19
stuff. 20
How do you think about that and how should we 21
think about that? 22
MR. MCLOUGHLIN: Well, the way that I think about 23
it is that we are trying to be proactive in where the 24
alignments are and with working with the teams that we 25
California Reporting, LLC
(510) 224-4476
39
have, but we're generally in the reactive, reaction mode 1
reacting to changes and requests to the project to 2
accommodate any changes whether those are political, those 3
are engineering resource agencies. 4
And I go back to also we have a program, 5
documented in our program alignment, so we have a pretty 6
strong framework of where we want to go and how we want to 7
get there. And we start getting down to the either smaller 8
levels of the analysis. So the program document is not 9
new. 10
And so we get down to these other areas and then 11
we have different changes in the political landscape, where 12
people want and that's what we react to. Whether it's an 13
engineering feasibility that wasn't foreseen or all kinds 14
of different things, 4(f) issues as it relates to a park or 15
recreation topic and so we're reacting to what the project 16
program needs or providing environmental constraints to 17
those and alternatives. 18
We do provide if there's analysis and change, is 19
there any environmental constraints to those topics and 20
those alternatives that would be costly, more or less 21
costly. Picking an alternative could be more costly 22
environmentally than it would be engineering. 23
CHAIRMAN RICHARD: So not for today, but I would 24
just like us to -- I'll direct this to Mr. Fellenz -- but 25
California Reporting, LLC
(510) 224-4476
40
I'd like us to take a breather at some point and step back 1
and look at what we've learned so far from this process. 2
I mean, I'm one who started off thinking that 3
design-build is the way to go. But if in fact what's 4
happening is that it just becomes kind of a floating crap 5
game where we never really know where we are – that, I 6
think we're at the point now far enough along in CP1 and 7
the Valley construction, or our first construction segment 8
in the Valley and what we've learned, I just think it would 9
be good to step back. And say, "Okay. Can we think 10
strategically about how this is going and whether there are 11
ways to make this more efficient?" 12
Because it strikes me that this becomes a huge 13
cost driver. Not just for individual contracts like this 14
that are doing the analysis, but cost driver because we end 15
up chasing our tail on the environmental. And we have to 16
go back on the engineering and we have to go back on the 17
right-of-way and everything because of all this. And so I 18
estimate this is a good time for us to take a strategic 19
reassessment of how we can do this in the context of the 20
laws and the things that we have to do, how we can do it 21
more efficiently. 22
MR. FELLENZ: Yeah, I'm happy to do that, 23
Mr. Chairman, is take a look at this and come with a report 24
back to the Board. 25
California Reporting, LLC
(510) 224-4476
41
BOARD MEMBER ROSSI: Mr. Chair? 1
CHAIRMAN RICHARD: Yeah, Mr. Rossi, and then 2
we'll go down the line for questions. 3
BOARD MEMBER ROSSI: Okay. Along the lines, 4
Mark, of what Lynn said and what Dan just said, one of the 5
problems I have with this presentation is we’ve made a 6
number it appears to changes in looking at alternatives. 7
And, you know, I'm getting old. Some people 8
would say I've long past gotten, I'm old. And I can't 9
remember who approves all these changes or who in effect 10
approves spending additional monies to do additional 11
studies before we actually have a decision at a level that 12
says, "Look. We only have so much money. We're only going 13
to do so many things. We can't do six different 14
alternative studies." 15
So Mr. Fellenz, as you look at that, would you 16
also look at that process, so I can understand that? 17
Because when I read a request for more money that 18
elucidates a series of alternatives, I'm not sure who's 19
controlling that exercise and it is a dollar exercise and 20
it is a time exercise -- time to complete, which means if 21
we're increasing costs, as we sit. 22
MR. FELLENZ: Yeah, I'm happy -- 23
BOARD MEMBER ROSSI: If you would add that too 24
then I'd appreciate it. 25
California Reporting, LLC
(510) 224-4476
42
MR. FELLENZ: Absolutely. Happy do to it. 1
MR. MCLOUGHLIN: As you point out that when 2
schedules change and move out there's a cost implication to 3
it. 4
BOARD MEMBER ROSSI: Right. Thank you, Mark. 5
CHAIRMAN RICHARD: Yeah, Ms. Miller? 6
BOARD MEMBER MILLER: Yes. Just the original 7
contract was 36 million; is that right? 8
MR. MCLOUGHLIN: Yes. 9
BOARD MEMBER MILLER: And you're asking for an 10
additional 10 today? 11
MR. MCLOUGHLIN: To get us through June, correct. 12
BOARD MEMBER MILLER: To get you through June, 13
but eventually you're going to need, you think an 14
additional 39.6? 15
MR. MCLOUGHLIN: Correct. 16
BOARD MEMBER MILLER: Is that on top of the 10? 17
MR. FELLENZ: No, 29.6. 18
MR. MCLOUGHLIN: 29.6. 19
BOARD MEMBER MILLER: So it's 29? 20
CHAIRMAN RICHARD: Correct. 21
BOARD MEMBER MILER: Right, okay. 22
CHAIRMAN RICHARD: Correct, but it's 39 including 23
the 10. 24
BOARD MEMBER MILLER: Including the 10 and that 25
California Reporting, LLC
(510) 224-4476
43
would get you to -- 1
MR. MCLOUGHLIN: ROD. 2
BOARD MEMBER MILLER: The ROD, right? 3
MR. MCLOUGHLIN: MM HMM (affirming). 4
BOARD MEMBER MILLER: Okay. So with these 5
alternatives that you, the additional alternatives, did you 6
drop any alternatives that you had before? 7
MR. MCLOUGHLIN: We modified the existing ones 8
that we had, not sure we dropped any major ones. The 9
interesting thing about San Jose-Merced is that it's more 10
than a one alignment with variations in between of one 11
alignment, especially as you go through Pacheco Pass. 12
There's only so many ways to go through there. We have 13
variations of one alignment, not separate and distinct 14
alignments. 15
BOARD MEMBER MILLER: So I'm sorry, because I'm 16
new, I just want to ask this question. Lots of times when 17
you go through that, you start your engineering, because 18
there was a lot of engineering work associated with these 19
different alternatives. Are you on top of the fact that if 20
something looks infeasible, you stop that engineering work 21
-- 22
MR. MCLOUGHLIN: Yes. 23
BOARD MEMBER MILLER: -- right away and then you 24
move on to the more feasible? 25
California Reporting, LLC
(510) 224-4476
44
MR. MCLOUGHLIN: Yes. 1
BOARD MEMBER MILLER: As a way of -- 2
MR. MCLOUGHLIN: Sometimes that's an increase in 3
cost, but -- or it could be a reduction in cost. 4
BOARD MEMBER MILLER: It should be a reduction if 5
you can manage it, right? I mean obviously design is -- 6
but these are project-level environmental documents, right? 7
They're not program level, right? 8
MR. MCLOUGHLIN: That's correct. 9
BOARD MEMBER MILLER: Okay. 10
MR. MCLOUGHLIN: And we're at 15 percent design 11
to support the document in light of the design-build 12
approach. 13
BOARD MEMBER MILLER: At 15? 14
MR. MCLOUGHLIN: Yes. 15
BOARD MEMBER MILLER: All right. Thanks. That's 16
all I have. Sorry, I have one other thing. 17
MR. MCLOUGHLIN: Sure. 18
BOARD MEMBER MILLER: The 10 million that's 19
coming from your geotechnical, do you expect to have to 20
supplement that at some point in the future or is that a 21
true saving? 22
MR. MCLOUGHLIN: For the geotech? 23
BOARD MEMBER MILLER: Yeah. 24
MR. MCLOUGHLIN: I would imagine -- I'm not 25
California Reporting, LLC
(510) 224-4476
45
managing that contract, but that had a certain scope to 1
complete. And they may ask for additional scope, based 2
upon supporting the procurement, the PE for P effort for 3
that section. 4
BOARD MEMBER MILLER: So we're just shifting that 5
at this point? 6
MR. MCLOUGHLIN: That's correct. 7
BOARD MEMBER MILLER: Thank you. 8
MR. MCLOUGHLIN: Depending on the priorities have 9
let the Board sets in baseline and the Business Plan. 10
BOARD MEMBER MILLER: But once again the goal is 11
to get these documents completed? 12
MR. MCLOUGHLIN: That's right. And I think I 13
wanted to make sure to note in the original estimates or 14
the original approach of HNTB and the procurement in 1516, 15
there were lots of assumptions that were made that we could 16
use a lot of the existing PTG information, the existing 17
engineering. San Jose to Merced went dark for a couple of 18
years. We didn't work on that very much on that section, 19
because the focus was in different areas. 20
And then to restart that up, it ended our 21
procurement. And then a lot of assumptions on streamlining 22
were looked at as to why the original cost was at a certain 23
amount. And that's why in those necessarily some things 24
have worked, some things have not, in those assumptions. 25
California Reporting, LLC
(510) 224-4476
46
CHAIRMAN RICHARD: Ms. Miller. Are you done? 1
BOARD MEMBER MILLER: I'm done, thanks. 2
CHAIRMAN RICHARD: Okay. I just didn't want to 3
cut you off. I didn't know. That's all right. 4
(Laughter). 5
Ms. Paskett, did I miss you? Did you have a 6
question? 7
BOARD MEMBER PASKETT: No. I'm fine. In fact, I 8
like coming behind Ms. Miller. She asked all my questions, 9
so I get a little break today. 10
CHAIRMAN RICHARD: You could ask them again. We 11
could have stereo. 12
BOARD MEMBER PASKETT: Thank you. 13
CHAIRMAN RICHARD: Okay. Coming down this way, 14
Ms. Schenk? 15
BOARD MEMBER SCHENK: No. I think I made my 16
points earlier. 17
CHAIRMAN RICHARD: Okay. 18
BOARD MEMBER PASKETT: And I may move the item, 19
Mr. Chair. 20
CHAIRMAN RICHARD: Hold on a second. Your 21
colleague, Mr. Camacho, looks like he has a question first. 22
BOARD MEMBER PASKETT: Oh, sorry. 23
BOARD MEMBER CAMACHO: Thank you. It seems 24
though that we continue to manage the cash flow, not the 25
California Reporting, LLC
(510) 224-4476
47
project and we are again robbing Peter to pay Paul. What 1
is the impact that it has on Kleinfelder? 2
MR. MCLOUGHLIN: What's the last question, the 3
impact on? 4
CHAIRMAN RICHARD: Kleinfelder. 5
MR. MCLOUGHLIN: Oh. They will reduce their -- 6
I'm assuming they would reduce their scope. If they had X 7
work plan, they would reduce that work plan based upon 8
lesser priorities of – what they have a work plan of 9
priority of locations, I am sure. So it would reduce that 10
work plan. 11
BOARD MEMBER CAMACHO: By reducing their contract 12
are you confident that they will have enough money to 13
accomplish any work that's not completed? Or are you going 14
to come back to us again and ask to amend that too? 15
MR. MCLOUGHLIN: That's I think the plan if 16
required that -- Tom, I don't know if you want to answer 17
that, but the goal is -- 18
BOARD MEMBER CAMACHO: I'm sorry? 19
MR. MCLOUGHLIN: -- to complete. If we could 20
come back as part of the, whatever the baselining is in the 21
Business Plan, if it's appropriate to finish that and come 22
back for that same amount. 23
BOARD MEMBER CAMACHO: So once again, we'll come 24
back to it again. We're kicking this can down the road? I 25
California Reporting, LLC
(510) 224-4476
48
support the idea that the HNTB needs to do the work. I 1
disagree on the solution. 2
CHAIRMAN RICHARD: Did I understand Ms. Miller's 3
question to you, to indicate -- I thought your answer to 4
her was that you expected that there would probably be a 5
scope change requested by Kleinfelder for the geotech work? 6
MR. MCLOUGHLIN: If we're reducing -- generally 7
if we're reducing the scope in their work plan they would 8
come back -- a possibility to come back and replace that 9
work plan depending who's managing that if the existing -- 10
if the reduced work plan would support the PE for P effort 11
or not. 12
CHAIRMAN RICHARD: So could I just ask a quick 13
question -- 14
BOARD MEMBER CAMACHO: Sure. 15
CHAIRMAN RICHARD: -- in furtherance of what the 16
Director meant? Then why aren't we doing the same thing 17
that we did in the prior contract? Why aren't we just 18
increasing the contingency in the program and taking the 19
money against it, as opposed to taking it from the 20
Kleinfelder contract that we suspect is going to come back 21
and re-up? Maybe you didn't make that decision, but -- 22
MR. MCLOUGHLIN: I did not, Tom? 23
CHAIRMAN RICHARD: So let me ask that question of 24
somebody. 25
California Reporting, LLC
(510) 224-4476
49
MR. FELLENZ: If I could try to explain? There 1
is no particular contingency. There is no contingency 2
assigned to these environmental clearance contracts. 3
CHAIRMAN RICHARD: Because they're not part of a 4
CP1 construction contract? 5
MR. FELLENZ: Right. 6
CHAIRMAN RICHARD: Okay. I've got it. 7
MR. FELLENZ: Correct, correct. They're an 8
environmental clearance and their budget is really the 9
amount of the contract value that was approved by the 10
Board. To the extent that there was additional scope added 11
or changes were made that increased the cost of doing the 12
work, then we would have to come back to the Board to have 13
an augmentation of that contract, because there is no 14
contingency that's approved by the Board to draw from. 15
CHAIRMAN RICHARD: Okay. But with all due 16
respect, until Director Miller asked the question, I guess 17
I just assumed that the Kleinfelder contract had been 18
budgeted for more than was needed and so we were able to 19
harvest some savings from that to offset the cost growth 20
here, but in fact, it sounds like the trajectory of that 21
contract is that that's only a temporary situation. And as 22
a consequence this goes back -- yeah. 23
And look, I'm not trying to grind on the staff 24
here. I don't think anybody is, but it goes back to the 25
California Reporting, LLC
(510) 224-4476
50
initial comments of Ms. Schenk, which is we've got to just 1
be transparent about it. If we know that their trajectory 2
is that overall, the area under the curve is going to 3
expand, we just need to say that. 4
MR. FELLENZ: Yes. I agree. And the reason for 5
doing this is it's a timing issue, so that the Kleinfelder 6
work and the cost of that work is out in time. 7
CHAIRMAN RICHARD: But that's a cash flow 8
question. 9
MR. FELLENZ: Correct. 10
CHAIRMAN RICHARD: That's not a budget question. 11
MR. FELLENZ: Correct, it's a cash flow. 12
CHAIRMAN RICHARD: So we should just be clear 13
about those two things. 14
MR FELLENZ: Yes. 15
BOARD MEMBER PASKETT: Mr. Chair, if I can jump 16
in a little bit, because it does feel like we're grinding 17
on staff a little bit. It does say that in the resolution 18
that it's likely to increase. 19
CHAIRMAN RICHARD: Okay. Yes. 20
BOARD MEMBER PASKETT: That the costs are likely 21
to increase and I had questions around that, because I was 22
looking at the contract amount in the addition, listened to 23
the presentation. But after Ms. Miller's questions, I 24
think that Mark answered to my satisfaction, the amounts, 25
California Reporting, LLC
(510) 224-4476
51
but it's also in the document and our resolution saying 1
that we should expect an increase. 2
And it's a little unsettling as a Board to see an 3
iterative process where we don't have complete visibility 4
into the expenses. But the nature of these projects are 5
such that I would rather have the staff come back to us 6
incrementally, when there are changes and present them, 7
maybe with a little more data (laughter) so we have 8
context. But check in with us along the way -- 9
CHAIRMAN RICHARD: Yeah. 10
BOARD MEMBER PASKETT: -- because there are so 11
many unexpected changes when you're going through CEQA and 12
EPA. 13
So I don't want the staff to feel like we are 14
overly critical and expect you to crystal ball everything 15
and I actually appreciate the continuous check-in, even 16
though it feels like the target's moving a little bit. 17
MR. MCLOUGHLIN: The questions are fair, of 18
course. 19
BOARD MEMBER ROSSI: Look, I would 20
(indiscernible) am I on now? 21
CHAIRMAN RICHARD: Yeah. 22
BOARD MEMBER ROSSI: I think we have to be 23
careful here in that I think the staff's doing exactly what 24
they should do. They're managing their cash. They're not 25
California Reporting, LLC
(510) 224-4476
52
pushing anything out, but they have time to deal with the 1
other issue and that's what they're doing. They're taking 2
time to figure out how do deal with it and it may not be a 3
problem in the future. And there may be other things they 4
can do with the existing contract, but if we just keep 5
pumping up numbers, then there is no incentive to get 6
better. So by maintaining a firm grasp of our cash flow, 7
they're working very hard to try and match the timing and 8
the needs and stay within budget. I think they're to be 9
applauded. 10
CHAIRMAN RICHARD: Okay. And -- 11
VICE CHAIR RICHARDS: I would agree with that. 12
CHAIRMAN RICHARD: And thank you, Lorraine, 13
because I -- 14
BOARD MEMBER CAMACHO: Mr. Chairman, isn't the -- 15
CHAIRMAN RICHARD: -- didn’t read the resolution 16
well enough. 17
Mr. Camacho, I cut you off before and I 18
apologize, so you have the floor. 19
BOARD MEMBER CAMACHO: Go ahead, sorry. I'm 20
sorry, isn't there an overall contingency in the program as 21
opposed to just i.e. a project? 22
CHAIRMAN RICHARD: Yes. 23
BOARD MEMBER CAMACHO: So your comment about 24
using that contingency to offset this, can't we do that? 25
California Reporting, LLC
(510) 224-4476
53
MR. FELLENZ: There are contingencies that the 1
Board has approved for the design-build contracts. There 2
are no contingencies for environmental clearance that came 3
to the Board for approval. Instead, there are just 4
contract amounts that come to the Board for approval. So 5
to the extent that there needs to be additional money the 6
staff doesn't have access to additional funds, which 7
typically would be contingency. 8
So you could add contingency to the environmental 9
program from which -- after port Board approval -- from 10
which the staff draws from, under certain conditions, so 11
that's -- we could arrange it differently, but presently 12
that's how it is set up. 13
CHAIRMAN RICHARD: Yeah, I think what you were 14
referring to is we generally think in terms of we have $11 15
billion or whatever of "contingency." But that's a 16
theoretical number as opposed to a specific number of 17
dollar contingency out of allocated funds that exist that 18
we apply to specific segments. I think I've got that 19
right. 20
BOARD MEMBER ROSSI: That's right, but we want to 21
be careful (indiscernible) it's probably not worth 22
listening to anyhow. But in fact it is that you want to be 23
careful how you use that unallocated contingency, so that 24
you don't end up somewhere down the road with no 25
California Reporting, LLC
(510) 224-4476
54
contingency. So you need to manage every day your cash 1
flow vis-a-vis your budget, in the timing in which you need 2
that cash flow, which means that the staff is actively 3
trying to manage their cash flow situation vis-a-vis the 4
budget. And personally, I would not want to see that 5
change. We've been there before. 6
CHAIRMAN RICHARD: Okay. Other questions or are 7
we ready to for -- 8
BOARD MEMBER PASKETT: I'll move the item. 9
CHAIRMAN RICHARD: I'm sorry? 10
BOARD MEMBER ROSSI: She moved the item. 11
CHAIRMAN RICHARD: All right, moved by Director 12
Paskett. Do I hear a second? 13
BOARD MEMBER LOWENTHAL: Second. 14
CHAIRMAN RICHARD: Seconded by 15
Director Lowenthal. 16
Secretary, please call the roll. 17
MS. JENSEN: Director Schenk? 18
BOARD MEMBER SCHENK: Yes. 19
MS. JENSEN: Vice Chair Richards? 20
VICE CHAIR RICHARDS: Yes. 21
MS. JENSEN: Director Rossi? 22
BOARD MEMBER ROSSI: Yes. 23
MS. JENSEN: Director Paskett? 24
BOARD MEMBER PASKETT: Yes. 25
California Reporting, LLC
(510) 224-4476
55
MS. JENSEN: Director Lowenthal? 1
BOARD MEMBER LOWENTHAL: Yes. 2
MS. JENSEN: Director Camacho? 3
BOARD MEMBER CAMACHO: No. 4
MS. JENSEN: Director Miller? 5
BOARD MEMBER MILLER: Yes. 6
MS. JENSEN: Chair Richard? 7
CHAIRMAN RICHARD: Yes. 8
Okay, next item, same topic for the Central 9
Valley Wye for contractor Parsons Transportation Group. 10
MR. MCLOUGHLIN: Yes. 11
CHAIRMAN RICHARD: Mr. McLoughlin? 12
MR. MCLOUGHLIN: Yes. This is the same approach 13
and I'll go through a little bit, and some assumptions, and 14
then also deliverables and that approach. 15
So for context and history PTG began this work on 16
the Central Valley Wye, under the San Jose-Merced Project 17
section for originally for 55 million on December of 2008. 18
And its contract was suspended in 2012, having spent 44.5 19
million. PTG received a task order for authorization for 20
remaining balance of the current contract, now valued at 21
77.24 million in July of this year. 22
Without additional funding PTG again will exhaust 23
its capacity in October of this year. So that's a little 24
bit of context on the contract portion that the original 25
California Reporting, LLC
(510) 224-4476
56
Wye portion was housed in the San Jose-Merced contract. 1
And when the Wye was broken out, it was separated. But the 2
contract value amount still remains the same, the total. 3
The original contract again, for 55 million for 4
preliminary engineering and then project specific 5
environmental work was again from San Jose to Merced. 6
In April of 2013 we studied additional 7
alternatives in the Wye for environmental clearance to be 8
included in the Checkpoint B of our integration 404/408 MOU 9
at the Corps and the EPA. 10
In June of 2014, there was additional public 11
outreach to address comments and concerns raised by the 12
community and agencies, resulting in additional engineering 13
and environmental work to address those comments. That was 14
in June of '14. 15
June of 2016, additional alternative SR 152, Road 16
11, was added to -- revised, so to add that as the PPA the 17
Board acted on that previously on the Preliminary Preferred 18
Alternative as 152 to Road 11. 19
So major changes since that period of time, we've 20
refined our wetland delineation and land cover refinements. 21
The Corps required updated information from the original 22
Merced Fresno EIR/EIS document. There's been changes to 23
CEQA thresholds not consistent with our environmental 24
methods, that we address that. Revisions to impact 25
California Reporting, LLC
(510) 224-4476
57
avoidance minimization measures that we learned from CP1, 1
so we took lessons learned of our EIR/EIS mitigation 2
measures and refined them forward on those lessons learned. 3
There's also been refinements to PG&E electrical 4
interconnection and networks upgrades, analysis that 5
required that. We've also had continued work in the 6
environmental justice topic with the area of Fairmead, and 7
looked at other mitigation measures for them. 8
We also increased the overall schedule based on 9
the delays and the reviews and the change in the overall 10
approach. 11
Some other considerations that we have is the 12
changes to the Wye resulted in a need to modify the RC 13
scope and contract since these changes are an expansion of 14
their current scope. And this expansion will be for a time 15
and money. 16
So this advanced amount, this plus minus $3 17
million will get us to the ultimate RODs for this section, 18
including the Surface Transportation Board ROD. So we'll 19
get finality with this proposed approach. 20
We also have, during the period of time in this 21
last year we've had negotiations with FRA on durations of 22
review times. And where we're trying to streamline or do 23
concurrent reviews. We've also come to an agreement with 24
then currently on review times that are consistent and we 25
California Reporting, LLC
(510) 224-4476
58
can apply to all the sections now versus a unending 1
timeframe, which depend on the availability of our staff 2
and the FRA to review these documents. 3
So with that I'd like to finish my presentation, 4
and if there's any questions with anybody that they may 5
have on the Wye? 6
CHAIRMAN RICHARD: Okay. Director Paskett? 7
BOARD MEMBER PASKETT: Mark, can you hear me? In 8
your comments you had mentioned a number of items including 9
environmental justice work. And on page four, I think you 10
have a paragraph, can you just tell me a little bit more 11
about that work? 12
MR. MCLOUGHLIN: Sure. Diana Gomez has led the 13
conversations with the town of Fairmead and in what their 14
requirements may be for our alignments and what their needs 15
are. And I think I've been involved in the Wye for five 16
years, including meeting with Fairmead and Diana has been 17
more focused on the ground with that group, including our 18
engineering team and environmental team. And so we're 19
trying to work out different ways the project can be 20
accommodated in their area, pretty detailed. 21
BOARD MEMBER PASKETT: What is -- give me an 22
example, what does that mean? 23
MR. MCLOUGHLIN: Well, I think they have certain 24
needs that they have, certain improvements to their 25
California Reporting, LLC
(510) 224-4476
59
community they'd like to see. Visual and aesthetics, of 1
course, is a big thing depending on the alternative. They 2
have civic needs that they would like to address, whether 3
it's their community center. They have infrastructure 4
needs, things like that, that are important to them that 5
they currently don't have. So Diana's been doing a good 6
job with them and meet with them frequently. I'm not sure 7
if any other Board Members have met with them at all. 8
CHAIRMAN RICHARD: I'm meeting with them 9
tomorrow. I'm going to Fairmead tomorrow. 10
MR. MCLOUGHLIN: Yeah. When I have met with 11
them, they're very professional people. They're very 12
focused on their community at heart and that's the very 13
important thing to recognize. 14
CHAIRMAN RICHARD: Okay, other questions coming 15
down this way. 16
Ms. Schenk? 17
BOARD MEMBER SCHENK: Oh, just the same issue, 18
you know, that I've mentioned before. And a little bit -- 19
can you just expand a little bit on the T.Y. Lin contract? 20
MR. MCLOUGHLIN: Sure. As you pointed out the 21
dollars are coming from the existing T.Y Lin contract, 22
which is Bakersfield to Palmdale, which is including the 23
Fresno Bakersfield LGA, Locally Generated Alternative. 24
BOARD MEMBER SCHENK: Are they reducing their 25
California Reporting, LLC
(510) 224-4476
60
scope, are we going get -- 1
MR. MCLOUGHLIN: That one, their scope is not 2
reduced as they're moving forward to get to the document. 3
They have somewhat over -- or contingency dollars in there 4
that we found that can be applied there and they will not 5
reduce their scope. 6
BOARD MEMBER SCHENK: So we can look forward to 7
having you or someone coming before us and asking for an 8
amendment in the future for the T.Y. Lin contract, is it? 9
MR. MCLOUGHLIN: No. Not currently at this time. 10
BOARD MEMBER SCHENK: Yeah. Okay. 11
MR. MCLOUGHLIN: We have enough budget in that 12
contract. 13
BOARD MEMBER SCHENK: Okay. 14
CHAIRMAN RICHARD: Other questions, the pleasure 15
of the Board? 16
BOARD MEMBER PASKETT: Moved. 17
CHAIRMAN RICHARD: Moved by Director Paskett. 18
BOARD MEMBER ROSSI: Seconded. 19
CHAIRMAN RICHARD: Seconded by Director Rossi. 20
Secretary, please call the roll. 21
MS. JENSEN: Director Schenk? 22
BOARD MEMBER SCHENK: Yes. 23
MS. JENSEN: Vice Chair Richards? 24
VICE CHAIR RICHARDS: Yes. 25
California Reporting, LLC
(510) 224-4476
61
MS. JENSEN: Director Rossi? 1
BOARD MEMBER ROSSI: Yes. 2
MS. JENSEN: Director Paskett? 3
BOARD MEMBER PASKETT: Yes. 4
MS. JENSEN: Director Lowenthal? 5
BOARD MEMBER LOWENTHAL: Yes. 6
MS. JENSEN: Director Camacho? 7
BOARD MEMBER CAMACHO: No. 8
MS. JENSEN: Director Miller? 9
BOARD MEMBER MILLER: Yes. 10
MS. JENSEN: Chair Richard? 11
CHAIRMAN RICHARD: Yes. 12
MR. MCLOUGHLIN: Thank you 13
CHAIRMAN RICHARD: Thank you, Mark. 14
Okay. Next we'll have a presentation on the 15
2017-2018 Business Plan by Paula Rivera. Oh, you don't 16
look like Paula Rivera. (Laughter.) 17
Well, if you need to introduce it, Russ, that's 18
fine. 19
MR. FONG: Oh, I'm sorry. I think I -- 20
MR. FELLENZ: There's another item first, Russ. 21
MR. FONG: Yeah. I just remembered that. 22
MR. FELLENZ: Yeah, I think Paula goes first. 23
MR. FONG: So I'll (indiscernible) up here. 24
Okay. 25
California Reporting, LLC
(510) 224-4476
62
BOARD MEMBER SCHENK: There's another item? 1
MR. FONG: Yeah, well Paula -- 2
CHAIRMAN RICHARD: Russ jumped the gun. 3
MS. RIVERA: Sorry. 4
CHAIRMAN RICHARD: Ms. River is going to 5
demonstrate leaning in. Okay. 6
MS. RIVERA: Good morning, sorry. I'm Paula 7
Rivera. I'm the auditor for the High-Speed Rail Authority. 8
And I'm here today to bring the internal self-assessment of 9
our Quality Assurance Plan and the Audit Plan for this 10
fiscal year to you. 11
By way of background, we have a Quality Assurance 12
Program that we've developed for our Audit Office. It's 13
documented in your audit manual. And each year, we do a 14
self-assessment of how we meet those standards we've set 15
for ourselves. And every three years, we have an external 16
review of that, so this year in April we had the external 17
review. So this internal self-assessment that we're 18
bringing you is just sort of that gap period. 19
I am proud to say that we've made a lot of 20
improvements since the self-assessment we did last year. 21
And audit standards require that I bring this to the Board 22
for your acknowledgement of how we're meeting our Quality 23
Assurance Program. 24
I also bring to you the Audit Plan for the '17-25
California Reporting, LLC
(510) 224-4476
63
'18 year. If you have any questions about the Plan, I can 1
let you know how it was developed, some topics, that sort 2
of information. But I ask that you acknowledge the self-3
assessment and approve our Audit Plan. 4
CHAIRMAN RICHARD: Is there anything in the Audit 5
Plan that you particularly want to highlight or does it 6
stand on its own? 7
MS. RIVERA: It is as much fun as an auditor can 8
imagine -- (Laughter). -- (indiscernible) current standard. 9
CHAIRMAN RICHARD: Director Schenk? 10
BOARD MEMBER SCHENK: Yeah, thanks. 11
Paula, so just that I know you answered this on 12
the call, but the 1 through 17 is your priority list of how 13
these audits will be covered and they will all be covered? 14
MS. RIVERA: Yes. 15
BOARD MEMBER SCHENK: Yeah. And you have the 16
resources that you need for this? 17
MS. RIVERA: We're allocated the budged for those 18
resources. However we have two vacancies that we're 19
actively working to fill. This plan is based on being 20
fully staffed and we had interviews last Friday. A couple 21
of good candidates and hopefully we will be fully staffed 22
soon. 23
BOARD MEMBER SCHENK: Okay. And I know you 24
report this to Finance and Audit, but would you let us 25
California Reporting, LLC
(510) 224-4476
64
know, the full Board, when you have fully staffed up? 1
MS. RIVERA: Yes. 2
BOARD MEMBER SCHENK: That you're still on track 3
to cover all of these. 4
MS. RIVERA: Yes. 5
BOARD MEMBER SCHENK: Because I have particular 6
interest in ones that are sort of 6, 7, 8, so they're 7
further down the list. 8
MS. RIVERA: Okay. 9
BOARD MEMBER SCHENK: Thank you. 10
MS. RIVERA: Okay. I will do, thank you. 11
CHAIRMAN RICHARD: Other questions for 12
Ms. Rivera? 13
Mr. Rossi? 14
BOARD MEMBER ROSSI: Hi, Paula. So as you've 15
been here for this meeting and you saw the three agenda 16
items, clearly there's something about budgeting that we 17
need to focus on. Are you going to be auditing the system 18
by which these things get approved and keep -- in effect 19
addressing Ernie's question is, you know, something's 20
happening here that sort of could be because we didn't know 21
enough at the time, but there's sort of a systemic issue 22
there. Will you be examining those, auditing those issues 23
in the future? 24
MS. RIVERA: We –- 25
California Reporting, LLC
(510) 224-4476
65
BOARD MEMBER ROSSI: I.e. did they have the 1
appropriate approvals? Was the stuff done in a manner that 2
is reflective of the appropriate analysis, all of those 3
things? 4
MS. RIVERA: That, we have an audit of contract 5
management on the plan and we will cover those things. We 6
also have an audit of contract execution. And one of the 7
things we will look at is the initial estimate. 8
BOARD MEMBER ROSSI: Okay. Thank you. 9
CHAIRMAN RICHARD: Okay, other questions? 10
Okay. 11
BOARD MEMBER LOWENTHAL: Mr. Chairman? 12
CHAIRMAN RICHARD: I'm sorry, Director Lowenthal 13
had a question. 14
BOARD MEMBER LOWENTHAL: Yeah, just looking at 15
the plan, as it goes forward is it possible for us to get 16
reports as you finish each item, as opposed to the final 17
report? 18
MS. RIVERA: Yes. We issue report -- as we 19
finish each audit, we issue the report to the Finance and 20
Audit Committee and it gets presented in that month's 21
meeting. And I can share copies of the final reports with 22
the full Board. 23
BOARD MEMBER LOWENTHAL: Just saying, yeah I'm 24
glad to hear that, because it seems to me that some of 25
California Reporting, LLC
(510) 224-4476
66
these items are very relevant to the conversations that 1
we've had on the previous items. 2
CHAIRMAN RICHARD: Okay. Great. Okay. I 3
believe that item was moved by Director Schenk. Is there a 4
second? 5
BOARD MEMBER ROSSI: Second. 6
BOARD MEMBER LOWENTHAL: Second. 7
CHAIRMAN RICHARD: Second by Director Rossi for 8
the approval of the Audit Plan for the coming year. 9
Will the Secretary please call the roll? 10
MS. JENSEN: Director Schenk? 11
BOARD MEMBER SCHENK: Yes. 12
MS. JENSEN: Vice Chair Richards? 13
VICE CHAIR RICHARDS: Yes. 14
MS. JENSEN: Director Rossi? 15
BOARD MEMBER ROSSI: Yes. 16
MS. JENSEN: Director Paskett? 17
BOARD MEMBER PASKETT: Yes. 18
MS. JENSEN: Director Lowenthal? 19
BOARD MEMBER LOWENTHAL: Yes. 20
MS. JENSEN: Director Camacho? 21
BOARD MEMBER CAMACHO: Yes. 22
MS. JENSEN: Director Miller? 23
BOARD MEMBER MILLER: Yes. 24
MS. JENSEN: Chair Richard? 25
California Reporting, LLC
(510) 224-4476
67
CHAIRMAN RICHARD: Yes. 1
So Paula, you know when Stephen Curry puts up a 2
shot and he knows it's going to go and he walks away I saw 3
you just walked away from the podium before the vote was 4
even done. That's a lot of confidence there. (Laughter). 5
(Off mic colloquy.) 6
CHAIRMAN RICHARD: Okay. Very good. 7
Okay. The next item is a presentation of Finance 8
and Audit Committee reports. Mr. Fong? 9
MR. FONG: Good morning, Mr. Chair, Board 10
Members, Interim CEO Mr. Fellenz, Russ Fong, your Chief 11
Financial Officer and I apologize for the mix-up earlier 12
today. 13
We're going to go through the first set of slides 14
relatively quickly, because all the data does appear on our 15
Finance and Audit Committee Board reports that come out 16
monthly. So with that, let me go ahead and get started. 17
We'll talk about the Financial Office and our 18
Budgets, Accounting, Reporting and Commercial and 19
especially our Contract Management Office. 20
This slide basically answers the question, "How 21
are we doing paying our invoices?" I just wanted to point 22
out that over the fiscal year '10-'11 to current we've 23
decreased our late penalty payments by 99.9 percent, which 24
is a big accomplishment. 25
California Reporting, LLC
(510) 224-4476
68
This slide just talks about our cash, as we have 1
talked about earlier today. We do monitor our cash. Prop 2
1A cash as of today is $1.2 billion. 3
Moving over to our Cap and Trade our current cash 4
balance is $541 million. 5
Moving over to our admin budget, our admin budget 6
just for those that aren't familiar, this is our budget 7
that pays our salary, wages, IT, travel, training 8
facilities and etcetera. This displays a three-year period 9
of time in how our budget has changed, past two years, and 10
then obviously our new budget for fiscal year '17 and '18. 11
During the reorg we pulled IT out of Admin. We 12
eliminated the Strategic Office. And our Regional 13
Director's Office was merged into Program Delivery. 14
This slide is the same. This is where we're 15
spending our money by line item. We've had a 3 percent 16
increase from the prior year and we currently have 226 17
positions established. 18
This highlights our admin budget, our last slide, 19
and basically shows our position growth over '13-'14 to the 20
current year. We started at 174 positions and like I said, 21
we have 226 as of today. 22
Moving over to our Capital Outlay Budget, we have 23
a decrease of 26 percent from the previous year. This 24
budget is in line with the 2016 Business Plan and to 25
California Reporting, LLC
(510) 224-4476
69
prioritize our executed contracts to complete the Central 1
Valley segment, both development and construction, our 2
Valley-to-Valley, and also our local assistance known as 3
our bookends. 4
Expenditures were under budget for two main 5
reasons. Project development was 55 percent under budget, 6
due to the extension of the raw dates. And our 7
construction was 42 percent under budget due to delays in 8
right-of-way acquisition and our delays in the weather. 9
This slide highlights our actual expenditures for 10
fiscal year 2006. As you can see we spent -- this project 11
has spent $3.7 billion. If you add in our forecast, we 12
will be projected to spend $5.4 billion. 13
The slide highlights our expenditures and 14
forecast funding by funding source. Our Prop 1A is 15
highlighted in blue, our ARRA in purple, and our Cap and 16
Trade in green. Again, all this information is in our 17
Board reports. 18
I just want to highlight our grants team. They 19
are responsible, the financial tracking and report of our 20
ARRA grant. The ARRA grant is $2.553 billion and we also 21
have our upcoming FY '10 grant of $929 million. I just 22
wanted to point out as of this week we've spend 99.9 23
percent of our ARRA funds. We literally have $14,000 24
remaining. 25
California Reporting, LLC
(510) 224-4476
70
So how many contracts do we have? As of July 1
'14, we had 137 for about 2.3 billion. Today, we have over 2
400 at $5.6 billion. 3
Looking at our Projects Initiatives Report, we 4
are currently actively monitoring and reporting monthly to 5
the F and A Committee 45 critical projects and initiatives. 6
I am excited about our new Economics and -- or 7
excuse me -- Business and Economics branch. They're going 8
to be focusing on doing fiscal and economic impact reports 9
and also job and housing reports. 10
Moving over to our funding for the Central Valley 11
segment I just wanted to point out that our Central Valley 12
segment has an $8 billion appropriation. Currently, year-13
to-date we've spent 3.4 billion, as is displayed here. We 14
have 4.6 billion in appropriations remaining and today, we 15
have the $2.1 billion in cash. But during the bond sales, 16
as the program moves forward, we'll be selling more bonds 17
to actually match what we need. 18
Now, I'm really excited about this slide. I do 19
want to spend a little time on our Contract Management 20
Office. A big part of what we do, now our office has been 21
fully staffed for about a year now. And I would personally 22
believe in state service, our Contract Management Office is 23
state-of-the-art. We've centralized approximately 40 24
percent of all contract management activities. This gives 25
California Reporting, LLC
(510) 224-4476
71
the contract managers more time to better manage their 1
contracts. A big part of what we do is training and how to 2
effectively manage our contracts. In 2017, we had a total 3
of 26 training classes. And we have about 22 more 4
scheduled. 5
The bottom portion shows our policies and 6
procedures. I'm proud to present that 100 percent of our 7
contract managers have signed off on their policies and 8
procedures and also the rules and responsibilities, which 9
I'll be highlighting in the next two slides here. 10
Well, I know our CMO team also does -- they do 11
manage two of our critical contracts. One is the RDP 12
contract at $700 million. And the other one is our Finance 13
and Audit Committee -- or excuse me -- the Financial 14
Adviser not to exceed $40 million. 15
Here's a summary of our performance for the RDP 16
contract. Once the 2018 Business Plan is completed, we'll 17
be entering Work Plan 3. 18
This next slide shows the RDP's performance on 19
the budget versus invoice. And this one shows the RDP's 20
performance on the delivering of their plans. Currently, 21
they've delivered 173 completed deliverables, which is 22
slightly below the plan of 200. By the end of the month, 23
and in some of the discussions we've had today, we will 24
have a Monthly Cost Performance Trends and Variants Report 25
California Reporting, LLC
(510) 224-4476
72
for all the major contracts. And this will centralize the 1
monitoring of the burn rate, which will help some of the 2
situations we find ourselves in today. 3
Finally, the Business Oversight Committee, this 4
is a brand-new committee. We just finished our charter; 5
this Committee, which will introduce a commercial and 6
business discipline within the organization. 7
What you're looking at here is our guiding 8
principles. It's consistent, are these items consistent 9
with the 2016 Business Plan? Our funding sources aligned 10
with the funding positions and priorities of the 11
organization? Is there a sound business case and value for 12
money and are assured that proper review by all key areas? 13
Here are the steps to develop the business case, 14
to assess the business case alignment with the guiding 15
principles and then the CFO will make a recommendation to 16
the CEO and if appropriate, it will go to our Board for 17
approval. 18
And then finally, I wanted to highlight some of 19
the cost reduction initiatives we currently have going on 20
in the Finance Office. They are basically breaking up into 21
four categories. We have estimating strategies, cost 22
savings/value engineering, cost deferral/cost avoidance and 23
finally scope change. 24
With that, I'd like to conclude my presentation 25
California Reporting, LLC
(510) 224-4476
73
and turn it over to Paula. I'll be happy to answer any 1
questions. Thank you. 2
CHAIRMAN RICHARD: Questions for Mr. Fong? 3
That's good, thank you. 4
(Off mic colloquy.) 5
CHAIRMAN RICHARD: Well, I couldn't tell from you 6
smile whether you were happy or wanting to ask a question. 7
BOARD MEMBER PASKETT: Well, I (indiscernible). 8
BOARD MEMBER ROSSI: Your microphone is off. 9
CHAIRMAN RICHARD: Your microphone? 10
BOARD MEMBER PASKETT: Rossi doesn't have any, so 11
I'll go ahead anyway. 12
As I was reading the materials in the last couple 13
of days for the Board meeting, I did notice this new 14
Commercial Office and you touched on it. And so that's 15
interesting to me and somewhat encouraging and maybe you 16
can give a little bit more information. Are you taking a 17
new strategy with the projects, so that you layer on top of 18
it, a business case analysis before there's a green light 19
to proceed? 20
MR. FONG: Correct. It's couple of roles. One 21
is obviously the budget scope changes, all that will go 22
through a scrutiny's analysis on "should we do this?" A 23
part of the challenges that we have with the three agenda 24
items you just saw today was we have a set budget. The 25
California Reporting, LLC
(510) 224-4476
74
budget's already spent. So if something's more a priority 1
one, than something else, then we take the money and move 2
it over. What the Business Oversight Committee will 3
validate that one that's occurring, but also start asking 4
those questions that you asked today. What happens to that 5
other contract who just got their scope reduced? 6
BOARD MEMBER PASKETT: Right. 7
MR. FONG: We'll dive into that, but also to look 8
at it a more commercial business discipline. We have to 9
get our arms around it. This project has to make money. 10
And so how we build it, we just want to look at another set 11
of lens. And also everything that goes to the Board will 12
have to be run through this Committee first, hopefully to 13
answer some of those questions that came out today. 14
It's really to emphasize the financial and a 15
commercial discipline within the organization. 16
BOARD MEMBER PASKETT: Which is very encouraging 17
that that's a concept that is going to be introduced, and 18
then I only have one other question. And you had a lot of 19
information that you presented in a short amount of time, 20
so I was very impressed. You did mention that you're going 21
to have a contract review process and related it back to a 22
lot of our questions today. Is that a new process or 23
you're going to -- 24
MR. FONG: It's a new process. 25
California Reporting, LLC
(510) 224-4476
75
BOARD MEMBER PASKETT: Okay. 1
MR. FONG: And the Project Management Office 2
that's been around for about a year-and-a-half, it's just 3
been fully staffed recently. One of the things that we 4
want to manage is how the contract managers manage their 5
burn rate, take a look at their variances and the trends on 6
what they're spending their money on, so we don't come to 7
the Board and say we need funds and we need it by the next 8
month. 9
It's to help prevent that and help support the 10
contract managers so that we're making sure that we're 11
spending the money in an appropriate fashion, but also 12
within the guidelines of the contracts. 13
BOARD MEMBER PASKETT: So those are two very 14
encouraging changes, Mr. Chair. And I don't know if that's 15
due to your leadership or a collective leadership, but it's 16
nice to see those two items. 17
CHAIRMAN RICHARD: No, I'm certainly not going to 18
take credit for it. I think that the staff -- well, I will 19
also say Finance and Audit has been driving a lot of this. 20
But you know, Mike Rossi said for a long time that our 21
motto should be that we're not building a railroad, we're 22
building an enterprise. Because the law requires that this 23
has to operate without an ongoing operating subsidy. 24
So I think anything that -- there are a lot of 25
California Reporting, LLC
(510) 224-4476
76
decisions that have been made. A lot of people are 1
empowered to make decisions around the program, but those 2
decisions can have impacts on the ultimate enterprise 3
value. So I like this -- like you, I like this approach 4
very much -- 5
BOARD MEMBER PASKETT: I do, yeah. 6
CHAIRMAN RICHARD: -- because I think what it 7
does is it interposes a management structure that says 8
these decisions are going to be looked at through the 9
filter of not just short-term impacts on costs and so 10
forth, but the longer-term impacts on a program's economic 11
viability. And I think that's very good that we have the 12
leadership team focused on that. 13
So I really give credit to Tom Fellenz, the 14
Interim CEO and the Executive leadership team, which 15
includes Russ Fong and Jon Tapping and Roy Hill, as the 16
Chief Program Delivery Officer. I think this Business 17
Oversight Committee is a very good (indiscernible). 18
BOARD MEMBER PASKETT: It's a great idea, Russ 19
and Tom. And it's nice to see this development in a short 20
amount of time. 21
CHAIRMAN RICHARD: Great. 22
Other questions for Mr. Fong? 23
MR. FONG: Thank you. 24
BOARD MEMBER MILLER: I have. 25
California Reporting, LLC
(510) 224-4476
77
CHAIRMAN RICHARD: Yes. I'm sorry, Ms. Miller, 1
excuse me. I didn't mean to miss you. 2
BOARD MEMBER MILLER: Thank you. No, that's all 3
right. 4
First of all, I wanted to thank you for briefing 5
me ahead of time and for the rest of the staff, Tom and 6
Mark and Jon and others. I just have one question on just 7
who -- and I'm sure you have this, but it's the procurement 8
satisfaction -- in other words, because this is a 9
construction project. As concrete's delivered and rebar 10
all those kinds of things, you have an oversight 11
construction manager who's checking specs on all of that? 12
MR. FONG: Yes, we do. This is probably a 13
question a little bit out of my element, but I know we do. 14
BOARD MEMBER MILLER: Oh, I'm sure it's not. 15
Fire away. 16
MR. FONG: As the Chief Finance Officer, I'm 17
going to turn around and probably look at -- 18
CHAIRMAN RICHARD: We have a -- 19
BOARD MEMBER MILLER: Or maybe I'll ask this 20
after, to whoever the appropriate person is. Just because 21
it helps for your business finance in the future if you've 22
got a project that's been built to spec. 23
MR. FONG: We do have a quality assurance team. 24
BOARD MEMBER MILLER: Right. 25
California Reporting, LLC
(510) 224-4476
78
MR. FONG: And actually Mr. Tapping is going to 1
present next, or (indecipherable). 2
BOARD MEMBER MILLER: Okay. Thank you. 3
MR. FONG: Thank you. 4
BOARD MEMBER PASKETT: Dan, I had -- I'm sorry, I 5
have one more. 6
CHAIRMAN RICHARD: Sure. 7
BOARD MEMBER PASKETT: And it's more Tiki Taki 8
and we could address this in the next Board meeting and 9
it's probably something for Tom. So in the deck, on page 10
31 there's a pay-go bullet for Cap and Trade up through 11
2030? 12
CHAIRMAN RICHARD: Right. 13
BOARD MEMBER PASKETT: And so I didn't follow it 14
that closely, but with the extension doesn't it require 15
two-thirds approval in future years, just for the 16
expenditure or did I get that wrong? 17
CHAIRMAN RICHARD: No. My understanding is that 18
as part of the agreement, the legislative agreement on Cap 19
and Trade -- well, actually I'm sitting here -- 20
BOARD MEMBER PASKETT: Staring at our expert. 21
CHAIRMAN RICHARD: Actually we have a subject 22
matter expert on the Board who could speak to this, but 23
Dr. Arambula, do you want me to give my description or do 24
you want to do it? 25
California Reporting, LLC
(510) 224-4476
79
EX OFFICIO BOARD MEMBER ARAMBULA: No, go ahead. 1
CHAIRMAN RICHARD: Okay. I apologize. That was 2
not appropriate. 3
So my understanding is that in the agreement that 4
was reached, it was agreed that a ballot measure would be 5
put before the public on the 2018 June ballot that would 6
provide that in 2024, and only in 2024 there would be, if 7
the ballot measure passed, that it would require that in 8
2024 the expenditure plan for that year would require a 9
two-thirds vote. My further understanding is that every 10
year before and after that, it would be a majority vote of 11
the Legislature passing the expenditure plan. 12
BOARD MEMBER PASKETT: Okay. That was my 13
question. 14
CHAIRMAN RICHARD: So it's sort of like a fire 15
break, if you will. I think it was the thinking on the 16
part of the members of the other party who wanted that. 17
So Assemblymember -- 18
BOARD MEMBER PASKETT: Okay. 19
CHAIRMAN RICHARD: -- how'd I do with that? 20
EX OFFICIO BOARD MEMBER ARAMBULA: That sounds 21
correct. 22
CHAIRMAN RICHARD: Okay. 23
BOARD MEMBER ROSSI: You'll notice he didn't say 24
it was correct. (Laughter). 25
California Reporting, LLC
(510) 224-4476
80
CHAIRMAN RICHARD: No. He also didn't say it 1
with the microphone on, (laughter) so let the record show 2
the Assemblymember said that what I just said was correct. 3
BOARD MEMBER PASKETT: So Russ I was -- to put it 4
in pay-go with the Chair's explanation I'm now more 5
comfortable. Thank you. 6
MR. FONG: Good. 7
CHAIRMAN RICHARD: All right. Yeah, I think the 8
market's going to look at that and they'll have to wait and 9
see if the ballot measure passes, but until it does they 10
probably look at that and assume that it is not conducive 11
to financing, right? 12
BOARD MEMBER PASKETT: Thank you. 13
CHAIRMAN RICHARD: Right. Okay, other questions? 14
Okay. Thank you. Thanks very much, Russ. I know a lot of 15
work went into all that, so that's good. 16
Ms. Rivera, you're back. 17
MS. RIVERA: I'm back. And I have two slides 18
that identify audit reports that we've issued since our 19
last update. And then I have two slides that talk about 20
audits that we're working on right now. So if you have any 21
questions, feel free to slow me down. 22
We issued a report on design-build oversight. 23
The scope was to see if the risk model of Authority design 24
acceptance and oversight is being maintained. And we just 25
California Reporting, LLC
(510) 224-4476
81
looked at CP1. We found that there had been a lot of 1
progress from where we started the audit to when we 2
finished the audit. And we recommend that lessons learned 3
be compiled and used in subsequent CP or construction 4
packages, sorry. 5
We completed an audit of third-party agreements 6
and how those contracts are managed. And we found that the 7
invoicing on some of those third-party agreements did not 8
allow the contract manager to identify the work that had 9
been performed and whether or not it was actually 10
necessary. We also found that the contract manager could 11
be doing other alternative analysis. And so we recommended 12
that they look at some other ways to assure the work's been 13
done. 14
We completed our first incurred cost audit, a 15
contract compliance audit. We looked at the costs that 16
were billed and reimbursed and determined that there were 17
some costs that did not comply with the terms of the 18
agreement. But it was 0.4 percent, so we found some money 19
that needed to be repaid, but we don't have any overall 20
concerns on how our largest contracts for A&E, within the 21
A&E services are being met. 22
We did a pre-award review, which is the review we 23
do of contracts that are awarded based on qualifications 24
only. We take a look at the cost proposed before the 25
California Reporting, LLC
(510) 224-4476
82
contract is executed to be sure that it's based on actual 1
labor rates, current overhead rates, and actual other 2
direct costs. 3
We completed an audit on third-party estimating, 4
the process that the regional consultants and the RDP are 5
using to estimate third-party costs. And we found that 6
they had some areas that would improve their process, but 7
we didn't find anything that we highlighted as a flaw in 8
their process. 9
We also finished an audit on the project 10
construction management materials oversight. 11
CHAIRMAN RICHARD: Excuse me one second, 12
Ms. Rivera? 13
MS. RIVERA: Yes? 14
CHAIRMAN RICHARD: Just on that one we have some 15
experience with third-party contracts. And of course those 16
contracts have come in higher than estimated before. So I 17
guess my question is you looked at their processes? 18
MS. RIVERA: Yes. 19
CHAIRMAN RICHARD: I think I know the answer to 20
this, but were you able to go back and look at -- was there 21
anything from your work that gives us any insight into why 22
we missed some of those costs early on? I mean -- 23
MS. RIVERA: It seems to have been due to the 24
granularity with which the estimate was developed. At the 25
California Reporting, LLC
(510) 224-4476
83
15 percent design, the estimates are created and that's not 1
based on very detailed information. And then as the 2
estimates progressed, there was not that additional 3
granularity added into the estimates. 4
CHAIRMAN RICHARD: So for your purposes, for 5
looking at their processes, you identified some areas where 6
those could be improved. But, maybe this is a little 7
outside your area, but I mean how much do you think that 8
will improve the forecasting of these costs? 9
MS. RIVERA: They feel like it will greatly 10
improve the forecasting of the costs. Right now, there's a 11
general -- is it rural, is it agricultural, is it housing? 12
So there are some generalities that are applied to those 13
third-party costs and to use specific parcels or whether or 14
not we're going to have alternative technical concepts, 15
viaducts, above ground. Using that additional information, 16
we'll get better estimates. 17
CHAIRMAN RICHARD: Okay. Thank you. Sorry for 18
the interruption. 19
MS. RIVERA: And then we also completed an audit 20
on the project construction management materials oversight, 21
which is what you were asking, Director Miller. We have a 22
project construction management contract, a firm for each 23
design-build contract that is working with the Authority as 24
the oversight of that. And we've just looked at their 25
California Reporting, LLC
(510) 224-4476
84
materials oversight and whether or not the materials the 1
design-builder is using meet the standards and 2
specifications. 3
So that was this specific audit. And so we found 4
there were some procedural things that the Authority can do 5
better to manage those contracts. 6
BOARD MEMBER MILLER: Thank you. 7
MS. RIVERA: Sure. 8
Audits in progress, we're looking at the right-9
of-way critical parcel acquisition process. All right-of-10
way parcels are not equal in their priorities. And so 11
we're looking to see the process that they use to 12
prioritize those parcels. We're looking at the design 13
change process whether or not the steps that they perform 14
and the order in which they perform those steps are the 15
most economical and efficient use of that process. We're 16
looking at project controls. We're looking at current 17
policies and practices for project controls, including 18
schedule management and cost management. 19
I am finalizing a small business follow-up review 20
on the source of the information for the small business 21
reports the Authority prepares. We're working on an audit 22
of the hiring process, if there are any economies of 23
efficiencies that we can find in that process and that's 24
specifically for state staff. 25
California Reporting, LLC
(510) 224-4476
85
We also have a contract compliance, an incurred 1
cost audit going on, to see if the contractor has complied 2
with the contract provision and specifically federal cost 3
principals. 4
So that's what we have going on right now. Are 5
there any questions? 6
VICE CHAIR RICHARDS: Thank you, Paula. 7
MS. RIVERA: Thank you. 8
VICE CHAIR RICHARDS: Any questions from anybody? 9
Okay. Thank you. 10
Scott? 11
MR. JARVIS: Good morning, Members of the Board. 12
My name is Scott Jarvis. I'm the Chief Engineer for the 13
Authority and I'm going to give a very quick program 14
delivery status update. And I'm going to focus on project 15
delivery. We've talked about some of the challenges that 16
we've had today. I'll also talk about the corrective 17
actions that we're taking. I'll touch on the audit 18
responses that Paula just went through. And then I'll also 19
give a project delivery update on some of the main 20
functional areas of our Project Delivery Program. 21
So I'll start with contingency management. We've 22
had quite a bit of discussion on that this morning. And so 23
you know obviously, contingency is needed to cover the 24
unknowns on the project. There's a lot of information on 25
California Reporting, LLC
(510) 224-4476
86
this slide. But really what it focuses on is what is our 1
process, how we inform the Finance and Audit Committee what 2
the CEO is authorized to do. 3
And I think what's really important is that 4
bottom bullet. Contingency management is directly related 5
to change control. And we've had some discussions on that 6
today as our ability to manage change on the projects, and 7
especially related to additional scope that's added through 8
various means and added to our contracts. That's been a 9
real challenge for us, as far as staying in the budget 10
within our projects. 11
So as far as, just real briefly and talking on 12
contingency of CP1, we had a discussion on that this 13
morning. But really to summarize it at a very high level 14
the challenge that we had was we delivered projects to 15
construction very, very early in the project development 16
process, even for the design-build model. We didn't have 17
right-of-way. We didn't have railroad agreements. We 18
didn't have most of the other third-party agreements. We 19
didn't have some of the key environmental permits. And we 20
had very little information on utilities, so obviously a 21
lot of challenges that the team has had to deal with and 22
work their way through. 23
The positive side of doing that is we have really 24
advanced this program. There is a lot of construction 25
California Reporting, LLC
(510) 224-4476
87
going on, on the 119 miles down in the Central Valley, 1
especially on the CP1, about 31 miles of construction at 2
various locations. But there has been a cost to that and 3
there have been challenges of risk that the Authority 4
retained and took into construction and has led to some 5
major change orders. 6
Now we did follow up with CP2-3 and CP4. They 7
followed shortly after CP1, but we were able to incorporate 8
some lessons learned into CP2 and CP4, related to the 9
contingency assessment as detailed there. One of the major 10
things that we did as you see on the far right there, is 11
that we used a 90 percent confidence level on CP2-3 and 12
CP4. And on CP1, we used a 50 percent confidence level. 13
But like I said CP2-3 and CP4 followed closely after CP1, 14
so a lot of those challenges that we've had on CP1 we also 15
have on CP2-3 and CP4, but we actively manage and mitigate 16
those challenges to the extent that we can. 17
So in a very big picture what were some of our 18
initial challenges? You know, it really gets down to the 19
big three: organizational challenges, policies and 20
procedures, tools and systems. When we went out to 21
construction, we essentially were a planning organization. 22
We had been working many years on planning and 23
environmental clearance processes and we went to 24
construction very quickly. And so during that period, now 25
California Reporting, LLC
(510) 224-4476
88
we are working on corrective actions. We've implemented 1
many corrective actions. We continue to implement them, as 2
we continue to improve. 3
One is organizational. We have talked about some 4
organizational changes this morning, but one of the main 5
ones is we've transitioned to more of a project management 6
organization to successfully manage construction projects 7
that management has to take place -- boots on the ground 8
where the work is taking place -- and so we've really 9
worked towards implementing that project management 10
organization, and even more so, a task management 11
organization where you drill down into the major tasks of 12
the project, have clear responsibility and accountability. 13
Policies and procedures, we've transitioned. 14
We've developed many policies and procedures now related to 15
project delivery as outlined there. 16
And tools and systems. We've been able to 17
advance many of our tools and systems that we didn't have 18
when we originally went out to construction. One of them 19
is the Project Management Information System. We are 20
making progress on that, sometimes not as fast as we would 21
like. But there are some of the major modules that have 22
made some really good progress on our PMIS. 23
And the second to the bottom bullet is really 24
important. The Resource Loaded Master Program Schedule 25
California Reporting, LLC
(510) 224-4476
89
that we are working on now to really define our plan, 1
moving forward and really that helps us to manage the 2
program with that Resource Loaded Master Schedule. But, 3
very important at a project level, is then use that 4
information to develop detailed project work plans. 5
Again, to be successful, you have to manage at 6
the project level. So you have to have that clear work 7
plans in place. Who does what by when and with what 8
resources. 9
And as you can see, there's a lot of other 10
continuous improvements that we have accomplished and 11
continue to focus on, in the program delivery area. But 12
what I do want to draw your attention to is the last 13
bullet, which is advancing project development for San Jose 14
to Merced section, or just all future contracts. And we 15
are advancing engineering and geotechnical investigations, 16
environmental permits, right-of-way to the extent that we 17
can. Surveying and mapping as we go through the process of 18
delivery and get a preferred preliminary alignment, we'll 19
be able to advance right-of-way even more, and our third-20
party agreements. 21
So we are moving forward on a lot of those 22
functional areas that we had not advanced before going to 23
construction in the Central Valley. 24
So I want to touch on the audits that Paula went 25
California Reporting, LLC
(510) 224-4476
90
through. And I want to say that we really welcome the work 1
that Paula does. Her and her team do a great job and they 2
help us focus. They help us understand some areas where we 3
need to improve, so it's an opportunity for us to 4
continually improve our processes. So Paula touched on 5
these areas. I will just say for each of them, we read 6
through the recommendations very carefully, we develop an 7
action plan and we manage those action plans for each of 8
the audits. 9
Now, I'm going to transition into project 10
development or the preliminary engineering and the 11
environmental phase. A very big picture is that as part of 12
this project management organization, we have adjusted 13
schedules and costs to reflect the current environmental 14
clearance plans. We continue to focus on the very 15
important environmental clearance section: Silicon Valley 16
to Central Valley line. But while doing all that, we're 17
keeping the state wide perspective in mind, while 18
efficiently using our resources. We have limited 19
resources, so we want to make sure that we're efficiently 20
focusing them on the most important environmental clearance 21
areas. 22
As far as our major accomplishments to date, we 23
have those two major section clearances in the Central 24
Valley, which has enabled us to go to construction. We've 25
California Reporting, LLC
(510) 224-4476
91
also environmentally cleared the electrical 1
interconnections and we continue to work closely with our 2
stakeholders, FRA and cooperating agencies, to expedite the 3
reviews and clearances. And Mark talked about some of 4
those in more detail in some specific sections. 5
I'm just going to go through these slides very, 6
very quickly. The Central Valley is where we're the most 7
far along on our environmental clearance and we continue to 8
work on three major environmental documents as described 9
there. Northern California, this is a very high priority 10
for us including the San Francisco to San Jose section. We 11
have Caltrain construction ongoing in this section, so it's 12
from a schedule standpoint it's very important for us to 13
advance our environmental clearance there and coordinate 14
with that Caltrain construction work that's going on. 15
And as mentioned, the San Jose to Merced, we've 16
talked about that earlier this morning and the importance 17
of that section. 18
The Southern California section, we're working on 19
four major environmental clearance documents. And we're at 20
the stage where we're performing the preliminary 21
engineering; we're working towards the project definition 22
as we work to preferred preliminary alignments within those 23
four sections. 24
Right-of-way, there's been a lot of talk on 25
California Reporting, LLC
(510) 224-4476
92
right-of-way. We're aware of a lot of right-of-way 1
challenges that we have had, continue to have, but I do 2
want to mention that there has been significant progress, 3
tremendous right-of-way acquisition. We have acquired and 4
transferred to our contractors over 1,100 parcels, so a 5
huge right-of-way program, a lot of progress. 6
However, primarily due to the slow start the 7
acquisition lags behind the original plan. That's part of 8
the risk that I talked about earlier that the Authority 9
retains. We gave our bidder some dates with right-of-way. 10
We haven't met all of those, so we continue to have some 11
construction delay cost exposure with right-of-way. But 12
with the advancement, right-of-way is no longer on the 13
critical path for construction on CP1. There's 13 14
locations under construction and more starting, so that's 15
very good news. 16
And we have focused on CP2-3 and CP4, on really 17
the critical parcels so the contractor can start and 18
continue construction. And from a right-of-way perspective 19
we do have areas where the contractor can go to work on 20
CP2-3 and CP4. So we do have some progress there. 21
Now, in the Central Valley, the majority of the 22
parcels, the original parcels that have not been acquired 23
yet are in the eminent domain process. So it's very 24
important that we try to quickly go through that process. 25
California Reporting, LLC
(510) 224-4476
93
And a way that we do that is obtaining orders of 1
possession, so the contractor can go to work even if we 2
don't have full ownership of the parcel. 3
So accomplishments where I go into some details 4
on each of the contracts, but the high-level summary as I 5
described it working on CP1 in many locations and have 6
locations on 2,3 and 4 where the work can start. 7
Now I'm not going to get into the details here, 8
but if you like graphs, there's all kinds of numbers here. 9
I will just summarize though. At the top, the dark blue is 10
the original plan and this is CP1. There had been changes. 11
There's been a scheduled cost increase, so that plan is 12
changed. And the yellow is our alternative plan that we 13
have established and we're very close as far as in the 14
numbers, to the alternative plan that we established back 15
in 2015. And our brown, is where we're at. And you can 16
see 644 to 677. We're pretty close to where we've 17
predicted we would be back in 2015. 18
This is for the northern extension part of CP1, 19
the north part of the project. And you can see with the 20
brown line being above the blue, we've consistently stayed 21
above the plan in that area of the project. 22
This is for CP2-3. The green is original 23
acquisition plan. Now, what occurs is there's a lot of 24
design changes. They're primarily contractor requested 25
California Reporting, LLC
(510) 224-4476
94
design changes for right-of-way. And so that gives 1
contractually, it gives the Authority additional time. We 2
have an additional 12 months. It's really what that pink 3
line represents, is that re-baselining, based upon changes 4
to the contract, primarily contractor requested changes. 5
And then the brown is where we're at compared to that plan. 6
So we're fairly close, but we are lagging behind. 7
But again the focus has been on critical areas to get the 8
contractor to construction. CP4, we are ahead of that 9
changed plan, related to right-of-way, but behind the 10
original acquisition plan. 11
Third-party agreements is the next major 12
functional area I want to talk about. Overall, we've made 13
some very good progress in the area of utilities. There 14
are certain utilities, AT&T, PG&E, Level 3 Communications, 15
where we've set aside provisional sums. It wasn't part of 16
the contractor's bid, so that is a risk that the Authority 17
retains. 18
Progress is continuing. There has been cost 19
pressure in this area, especially related to the PG&E 20
relocations primarily on CP1. So we've worked to establish 21
some improvements including a coordinated monthly meeting. 22
We analyze the past bid results, looking for ways to more 23
efficiently procure and complete this work, including 24
working with PG&E and AT&T, four more vendors to increase 25
California Reporting, LLC
(510) 224-4476
95
the competition. That's what drives prices down is 1
competition. 2
And as far as the policies and procedures, we're 3
developing a best practices manual to guide the future 4
third-party coordination. So here's a high level summary 5
of the status of the master agreements for third party. If 6
you look at the total there, the second from the right, we 7
have executed 127 of the master third-party agreements that 8
have been identified; 102 have not been executed. But then 9
if you look over at the far left you see, like for example, 10
in the Central Valley where 90 have been executed, 10 are 11
unexecuted, so significant progress where the work is going 12
on. 13
And then if you look to the far right, we've also 14
been focusing on the Valley-to-Valley and as you can see, 15
100 executed, 33 non-executed. So this really reflects the 16
areas that we focus on negotiating an execution of the 17
third-party agreements, based upon where the work is being 18
performed. 19
As far as a construction summary, there's 20
significant field activity on CP1. We have some limited 21
field activities on CP2-3; CP4 is primarily in the design 22
phase. We do anticipate a more extensive construction 23
plan, as far as starting on CP2-3 and CP4 later this year. 24
We do continue to see risk using our risk models of looking 25
California Reporting, LLC
(510) 224-4476
96
forward and identifying risks, primarily due to additional 1
costs through railroad agreements, third-party 2
infrastructure, right-of-way delays and utility relocation. 3
That's really the big four. 4
But, as we look forward and see those risks, 5
we're able to mitigate and manage to the extent that we 6
can. So we're really focused. We understand the context 7
of delivering that Central Valley, as it fits into the 8
overall V to V. 9
So I'll just kind of skip through here, because 10
these get through some details as far as accomplishments. 11
CP1, as you can see, there's a listing there of 13 active 12
constructive sites that are ongoing and we're also starting 13
construction in four other areas, so really some great 14
progress on CP1. CP2-3 really has been more on the design 15
and the design-related activities, clearing and grubbing, 16
demolition, geotechnical exploration for design. And 17
again, we expect construction to ramp up starting later 18
this year. 19
I do want to say, that on CP2-3, we have received 20
some significant cost and time-extension claims that have 21
been submitted by the contractor. And Executive leadership 22
is involved in that to develop strategies, moving forward. 23
CP4, overall, has been going well. It was our 24
last contract, but if things if schedule go as planned, 25
California Reporting, LLC
(510) 224-4476
97
they will begin construction at a couple of overpass 1
locations, prior to the end of this year. 2
Critical issues and mitigating actions, we've had 3
the critical issues with right-of-way. And again, the real 4
focus there is the critical parcels, getting the parcels 5
needed for construction. 6
Utility conflicts and relocation, I've touched on 7
that and some of the improvements we've made. Railroad 8
intrusion protection barrier requirements, that's a change 9
to our contract for the most part. There was a smaller 10
amount that was bid upon. Most of it has changed, so we're 11
working with the railroads and the contractor to come up 12
with more cost efficient ways of -- instead of the concrete 13
intrusion protection barrier. 14
And northern extension work, we were looking at 15
ways of how can we really efficiently deliver this work. 16
It's being done by change order. We believe that we could 17
probably get some more competitive prices through a 18
competitive bidding process. So we're looking at some 19
alternatives there, as far as where we can maybe cut that 20
work off and look to competitively bid for future work on 21
the north extension. 22
One of the major changes we did make in the 23
design though is we revised the alignment to avoid the need 24
for an intrusion protection barrier. So that was a 25
California Reporting, LLC
(510) 224-4476
98
significant savings in the range of about $40 million on 1
the north extension. 2
CP2-3 critical issues, again there's really a 3
consistent theme throughout the Central Valley, railroad 4
issues, right-of-way, and again we're really focused on 5
executive partnering on CP2-3 to work through some of those 6
major challenges. 7
CP4, railroad intrusions for additional cost 8
pressures, some right-of-way parcel delay, not as 9
significant as CP1 and CP2-3. 10
So this is a lot of details kind of showing where 11
we're at on the contingency on the projects. I'll just say 12
if you go to the far right you can see we're at 6 percent 13
in July on CP1, which is low. We want to be 10 percent or 14
more. And that's part of why we had the Board item today 15
for shifting of funds to provide some additional funding 16
for change order work. 17
CP1 schedule, we are ahead of the re-baseline 18
schedule based upon the time extension that has been 19
provided to the contractor. 20
CP2-3 contingency, plenty of money in the 21
contingency at this point, but as we look forward we do see 22
some significant risks on CP2-3. And CP2-3 is behind. The 23
blue is the contractor's original schedule. This is based 24
upon the amount of work that they've performed, the earned 25
California Reporting, LLC
(510) 224-4476
99
value and you can see that they are behind their original 1
plan, but close to what we had predicted, based upon a 2
forecast that we had established in June. 3
And CP4, if you look on the far right, you see 15 4
percent contingency. So again we do have some significant 5
money in the contingency on CP4, but there are risks that 6
we're managing that I outlined. But CP4 is probably the 7
contract we feel the most comfortable at this time, from a 8
financial management standpoint. And CP4 is behind their 9
original plan. But with construction starting later this 10
year we expect that brown forecast line to be moving up 11
sharply to ultimately intersect with the plan. 12
Okay. So with that, that's a very high level 13
trip through program delivery status and I'd be happy to 14
answer any questions if you have any. 15
CHAIRMAN RICHARD: Just right at the end on CP4, 16
it was moving pretty fast. But I thought the contract 17
amount was 446, but the estimate at the end of the right 18
was 453? Is that a discrepancy that (indiscernible) -- 19
MR. JARVIS: Well, that would include the change 20
order amount, I mean ultimately. Yeah. 21
CHAIRMAN RICHARD: Okay. And is that an approved 22
change order or an anticipated change order? 23
MR. JARVIS: I believe that's approved, yes. 24
CHAIRMAN RICHARD: Okay. Other questions? 25
California Reporting, LLC
(510) 224-4476
100
BOARD MEMBER CAMACHO: Mr. Chairman? 1
CHAIRMAN RICHARD: Yes, Mr. Camacho? 2
BOARD MEMBER CAMACHO: You glossed over CP2-3. 3
What is the magnitude of the problems that there are in 4
terms of dollars? 5
MR. JARVIS: Their claims are hundreds of 6
millions of dollars. 7
BOARD MEMBER CAMACHO: I'm sorry? 8
MR. JARVIS: Hundreds of millions of dollars is 9
their claim amount. So there're major issues that we're 10
dealing with. Of course, many of them are in dispute and 11
that's why we're going through the process of resolution. 12
CHAIRMAN RICHARD: Can I suggest that we -- 13
BOARD MEMBER CAMACHO: For the -- I'm sorry. 14
CHAIRMAN RICHARD: This probably is something -- 15
I just want to say that some of this I think probably ought 16
to be discussed in closed session, because it's a matter of 17
claims and potential litigation. And I think that you 18
should get all the answers that you want to get, but I do 19
think that some of this we should probably -- 20
BOARD MEMBER CAMACHO: I just want to couch the 21
question in terms of are we in fact looking at mitigating 22
these, this contract? 23
MR. JARVIS: Absolutely. 24
BOARD MEMBER CAMACHO: Thank you. 25
California Reporting, LLC
(510) 224-4476
101
MR. JARVIS: Yes. 1
CHAIRMAN RICHARD: Right. Yeah, I mean I think 2
it falls into two categories. One is what do we think the 3
cost should be. And what do they think the cost should be. 4
BOARD MEMBER CAMACHO: Of course. 5
CHAIRMAN RICHARD: So I think those numbers are 6
far apart at this moment, all right? 7
Other questions? Okay. Thank you. Thanks, 8
Scott. 9
MR. JARVIS: You're welcome. All right, I'll 10
turn it over to Jon. 11
BOARD MEMBER PASKETT: May I ask just a -- 12
CHAIRMAN RICHARD: Yeah. 13
BOARD MEMBER PASKETT: -- quick comment? This I 14
don't know, might have been more instructive for me anyway 15
to hear this presentation or maybe it's Tom, before the 16
contract vote. 17
CHAIRMAN RICHARD: I'm sorry. I didn't 18
understand what you're saying, it would have been -- 19
BOARD MEMBER PASKETT: Maybe in the future when 20
we have these presentations, if it makes sense on the 21
agenda to front load it and to give us context as Board 22
Members prior to voting on some of the contract changes. 23
CHAIRMAN RICHARD: Oh, to have this presentation 24
before? Right, okay. 25
California Reporting, LLC
(510) 224-4476
102
BOARD MEMBER PASKETT: Right. 1
CHAIRMAN RICHARD: Yeah, and that's a very good 2
point. I think we generally try to arrange the agenda so 3
that we get action items first, in case Board Members have 4
to leave. But there should be exceptions to that and I 5
understand what you're saying, so that's worthy of 6
consideration. 7
MR. TAPPING: Good, I think it may be afternoon, 8
but Jon Tapping back at you. 9
CHAIRMAN RICHARD: It may well be, yeah. There's 10
a risk that it's afternoon already, yes. (Laughter.) 11
MR. TAPPING: A 90 percent probability, I'm here 12
in my risk management capacity as part of the Finance and 13
Audit Committee briefing that we do routinely. I wanted to 14
go in a slightly different direction, because of my acting 15
assignment of Chief Operating Officer, has opened the door 16
really to a lot of organizational issues and risks that 17
we've been facing. 18
We have been tracking organizational risks and 19
monitoring them, but it's with our Executive Committee, 20
with Ross Fong and Tom we've been given the opportunity, I 21
think, to make some real change. And we have already made 22
some real change with the organization and how we run the 23
organization. So I wanted to talk a little bit about the 24
organizational risk and what we're doing to mitigate the 25
California Reporting, LLC
(510) 224-4476
103
organization risks, as we move forward in managing this 1
program. 2
This is basically just your five quadrant 3
standard risk process. You identify them, prioritize, 4
analyze, manage, monitor and control. And so as a risk 5
manager we do that with the costs and schedule risk. We 6
run the complicated Monte Carlo analyses to get a level of 7
confidence. But we also do it on a qualitative basis, with 8
a number of risks, including organizational risk. So when 9
we look at our program we have definitely the project 10
delivery risk that Scott talked about in detail today, 11
programmatic risks that span over all of the projects and 12
organizational risk. 13
So some of the enterprise or organizational risks 14
that we've identified through various processes in the past 15
are integration of all of our functional units, some people 16
call them silos or cylinders of excellence. As we have 17
grown rapidly, we've been maturing lately and we've done a 18
reorganization that breaks down some of these barriers. 19
Let's move on. I think Scott touched upon, and I 20
just wanted to drive home again, that we do the 21
quantitative and project level risk management. This is I 22
think Scott spoke to a lot of these in his presentation, so 23
I'm going to move on to organizational risks. 24
So we have a number of initiatives that we have 25
California Reporting, LLC
(510) 224-4476
104
done over the last year or so. We've got quality process 1
assessments where we look at things like communication 2
roles, accountability, who's responsible, who's accountable 3
in basically looking at who makes decisions? And how are 4
our decisions sustainable? We've done surveys and we've 5
done evaluations. And so we've identified basically our 6
risk drivers as integration, alignment, rules, 7
responsibilities, requirement clarity and those other items 8
that you see there. 9
So those have been really the focus of what we're 10
looking at now, in our Executive Committee in how to manage 11
this program moving forward -- really just prioritizing. 12
You know, a lot of it is communication, getting the right 13
people in the right room to make the right decisions at the 14
right time and making sustainable decisions. 15
I want to touch upon the org chart very briefly. 16
So we've reorganized to have our rail delivery -- and you 17
can see there on the bottom, one of the yellow boxes -- an 18
infrastructure delivery as well as Chief Engineer Scott, 19
who is really the custodian of the standards and the 20
policies and procedures for engineering. And then there's 21
support services, which would include project controls. 22
So we've consolidated all those functions under a 23
Project Delivery Office, and under myself, as the Acting 24
Chief Operating Officer. And that's really been an 25
California Reporting, LLC
(510) 224-4476
105
improvement in getting, for example, there's competing 1
values or discussions between infrastructure delivery and 2
rail delivery. And so it has really helped in opening up 3
that communication. 4
And we put in place a committee structure, which 5
I'll talk a little bit about later, which actually feeds 6
into what Russ talked about, the Business Oversight 7
Committee. 8
I’m going to skip through this slide, in the 9
interest of time. And so in managing all of these risks: 10
integration, roles, responsibilities we have a number of 11
initiatives under way. Program review, we've been having 12
workshops in the regions to clarify organization charts 13
below those yellow pillars, which I've showed you on our 14
general organizational chart. Clarifying roles and 15
responsibilities, accountability for who makes decisions, 16
responsibility for carrying out the decisions, and who's 17
consulted and who's informed. So really clarifying how we 18
make decisions as we move forward. 19
I don't want you to think that we're bureaucratic 20
with all these committees, because they're really -- we 21
have a Program Delivery Committee, which is all of the 22
program delivery pillars, which I mentioned. But we have 23
an operations meeting every week, with everyone in the room 24
and, you know, we have action items and papers and 25
California Reporting, LLC
(510) 224-4476
106
decisions that we make through that committee structure. 1
And likewise we have an Executive Committee. It 2
consists of Tom Fellenz, myself and Russ Fong, which 3
basically meets to confer on those Executive level 4
decisions that may flow out of the program and delivery 5
committee meeting. And as Russ had an excellent 6
presentation on the Business Oversight Committee one of the 7
things we want to do as we move forward is have a more 8
robust financial and budgeting and change control process. 9
So these are all things that we've put in place 10
in the last two months. It's been very exciting to be part 11
of this effort and to be given the autonomy really, to set 12
up this organization in a manner that we think is the best 13
functioning for how we move forward. 14
So moving on to basically -- so basically that's 15
my discussion on organizational risk. It's been, it’s fun. 16
We're moving forward. We're making decisions. And it's 17
really been exciting, actually. We're enjoying it. 18
These are just current other, on my risk 19
management role, things that we've been undertaking. We 20
talked about the CP1 through 4 risk informing contingency 21
analysis update, which is ongoing. We've started our 22
Valley-to-Valley programmatic risk assessment, looking at 23
schedule and applying schedule risks. And there's a lot of 24
support work that you see, that we're doing in support of 25
California Reporting, LLC
(510) 224-4476
107
the 2018 Business Plan. 1
And so that really concludes my presentation. 2
And I'll be happy to take any questions at this point. 3
CHAIRMAN RICHARD: Questions for Mr. Tapping? 4
Okay. Thank you, Jon. 5
MR. TAPPING: Thank you very much. 6
CHAIRMAN RICHARD: Okay. Our last item on the 7
public session is a discussion of the 2018 Business Plan. 8
Mr. Fellenz? 9
MR. FELLENZ: Yes. Good afternoon, Mr. Chairman 10
and Board Members. We're going to have a PowerPoint 11
presentation. 12
CHAIRMAN RICHARD: Of course we are. 13
MR. FELLENZ: Okay, just click it. Okay, there 14
we go, the 2018 Business Plan is how we title this, but 15
we're going to do a little bit more than that. So the 16
purpose of today's briefing is to review the following 17
matter, the statutory requirements for the Business Plan. 18
We're going to go over three prior business plans: 2012, 19
2014 and 2016. I’m also going to show you the guiding 20
principles and core values that we embodied in the most 21
recent 2016 Business Plan. What key events have occurred 22
since the 2016 Business Plan and then finally, the timeline 23
for developing the draft and final 2018 Business Plan. 24
The Authority is required to prepare, publish and 25
California Reporting, LLC
(510) 224-4476
108
adopt and submit to the Legislature a business plan every 1
two years. It's due May 1st of every even year, so it's 2
due on May 1st, 2018. Before submitting the plan to the 3
Legislature, the Authority must publish a draft, hold a 4
public hearing, and have a 60-day public comment period. 5
So what we plan to do is release that draft in early 6
February to allow the public comment period to transpire, 7
the 60 days, and to allow enough time for us to go to the 8
April Board meeting for you to have presented to you, for 9
your consideration, the approval of the final Business 10
Plan. At that time, we will also summarize the comments 11
and information that we receive from the public during that 12
60-day period. 13
The Public Utilities Code outlines a series of 14
required elements in the Business Plan and I show them 15
here. It has to show a description of the service to be 16
provided, proposed environmental and construction 17
schedules, capital cost estimates, ridership and revenue 18
forecasts, operation and maintenance costs, a break-even 19
analysis and that's for purposes of complying with 20
Proposition 1A or our bond funding mechanism. 21
And we have to show what the sources of the 22
funding that the Authority has and intends to access, and 23
any written agreements that we have with public or private 24
entities to fund system components. We have a requirement 25
California Reporting, LLC
(510) 224-4476
109
to show public, private development strategies for 1
delivering Phase 1. 2
And then finally reasonable risks that the 3
project may encounter and how we intend to manage those. 4
Going back to 2012 we wanted to go back to this 5
business plan, because this was a significant change or 6
turning point I believe, for the project. Prior to this, 7
there were business plans, but we had really been purely a 8
planning organization and in 2012, we now had the potential 9
to have access to large amounts of funds to use for 10
construction and move the project into a completely 11
different position, which we have done. 12
And so I've shown here the three stages of phased 13
implementation that we set out in the 2012 Business Plan. 14
We looked at an initial operating section north: San Jose 15
to Bakersfield, south: Merced to San Fernando Valley. And 16
the IOS South was identified as the initial operation 17
section that would be the first to be constructed at that 18
time although we didn't really have funding, outside of the 19
Central Valley identified, because the Cap and Trade 20
Program hadn't yet been implemented. We didn't have funds 21
to build the entire IOS at that time, but we had selected 22
the south as the first one. 23
We also, at this time created the foundation for 24
what's called a blended strategy, where we integrate at the 25
California Reporting, LLC
(510) 224-4476
110
ends of our system, which we call the Caltrain Peninsula 1
area and the Los Angeles Metropolitan area. And we wanted 2
to integrate the high-speed trains with the existing inner 3
city or regional systems. Those operated by LA Metro in 4
the south and then Caltrain in the north. So that was the 5
blended concept that we had placed in this 2012 Business 6
Plan and carried all through 2016. 7
We also put high-speed rail in the context of 8
state-wide rail modernization, because there's a lot of 9
rail systems existing with this state. It's important that 10
we connect up with these. There was $950 million of Prop 11
1A bonds for connectivity projects, which have all been 12
allocated for those projects and many are underway. But 13
we're building more than just a high-speed rail system. 14
We're building a statewide rail system and we're part of a 15
statewide rail plan that agency and Caltrans puts out. And 16
you'll see that at the end of this calendar year. We're 17
going to -- CalSTA, the transportation agency, is going to 18
put out the statewide rail plan. 19
We also updated ridership and revenue forecasts 20
and cost estimates at that time. And I showed the Phase 1 21
estimate of cost at 64.4 billion at the time. And we had 22
sufficient funding at that time, as I mentioned, to fund 23
the Central Valley. Those two funding sources were Prop 1A 24
and federal funds. We also created an initial business 25
California Reporting, LLC
(510) 224-4476
111
model framework that we've continued to use. 1
And we provided the basis for an appropriation, 2
in 2012, under SB 1029, where the federal funds that we had 3
in the grant programs and the Prop 1A funds for the Central 4
Valley as matching funds were appropriated. 5
Then in 2014, I've listed here some of the 6
elements of that particular business plan. We reported on 7
our progress since 2012. We continued with this three-8
stage phase implementation, initial operating section, a 9
Bay-to-Basin, and a Phase 1. Statute requires that we 10
report specifically on Phase 1 for example, as well as 11
other smaller section. 12
We also updated our forecasts for ridership and 13
had some external reviews by the Union of Railroads, the 14
Government Accounting Office and others. We just think 15
this was very important to verify the credibility of the 16
plans that we were putting out. 17
We introduced a risk-based break-even analysis to 18
show financial viability. It's called Monte Carlo approach 19
and at that time, our capital cost estimate was 67.6 20
billion. And we had sufficient fundings at that time, 21
again same as in 2012, to fund the Central Valley 22
construction. But we also were working with the 23
Legislature and the Governor to become part of the Cap and 24
Trade Program. So we did some important work for advancing 25
California Reporting, LLC
(510) 224-4476
112
that program, which became law and we received significant 1
funding under that program, in the summer of 2014. 2
Then I have a picture here of the 2016 Business 3
Plan map and some other facts about the 2016 Business Plan. 4
Again, we updated our forecasts and estimates. We had 5
reduced the capital cost estimate down to 64.2 and we 6
updated the funding plan to include now the Cap and Trade 7
Program and the funds that we would be receiving under that 8
Cap and Trade Program. 9
We also showed that if the Cap and Trade Program 10
had extended out to 2015, and had had a $500 million per 11
year revenue stream to high-speed rail, that we potentially 12
could fund 20.8 billion, assuming also that there were some 13
opportunity to get private financing using that Cap and 14
Trade revenue. And that would have allowed us to look at 15
the possibility of finishing the Valley-to-Valley, which we 16
describe in our Business Plan as the Silicon Valley to the 17
Central Valley, as an operating section. 18
We changed, or course, the implementation 19
strategy to deliver the north first. And that was because 20
of us having a better shot of receiving enough financing to 21
have an operating system at that time. And we emphasize a 22
commitment to make concurrent investments to Southern 23
California, between Burbank and the Los Angeles Corridor. 24
And we had previously, in SB 1029 the Legislature had 25
California Reporting, LLC
(510) 224-4476
113
appropriated $500 million for projects along those 1
corridors in the south. Recently of which, we've had an 2
approval by this Board in the Rosecrans/Marquardt to grade 3
separation. 4
And then finally, we reemphasized our commitment 5
to seek additional federal funds. 6
We did develop some guiding principles and core 7
values in the 2016 Business Plan. So I share those with 8
you for your consideration on continuing to adopt these, or 9
to refine them in an appropriate manner. The guiding 10
principles are to fulfill our Prop 1A commitment, to 11
provide for California a true high-speed rail system. I 12
think we just talked about that, the trains that run at the 13
faster speeds, just as set out in statute. 14
And we evaluate new opportunities and adapt to 15
changing circumstance to deliver the system as quickly and 16
as efficiently as possible. And we also look to reduce 17
costs and construction time using our blended 18
implementation strategies, which I had gone over the 19
blended system. 20
We also, as a guiding principle, match projects 21
with available funding and deliver them under appropriate 22
business models. And finally advance other strategic early 23
investments, with our partners, many of them in the rail 24
transportation business. 25
California Reporting, LLC
(510) 224-4476
114
And we also have, as you should see here, the 1
core values, safety and security, partnership with the 2
public and private sector, training and employment 3
opportunities including disadvantaged workers. We have a 4
robust small business DBBE program. And we also are 5
committing to sustainable land use and economic planning. 6
There's a number of key events since 2016 that I 7
wanted to point out. We've made a lot of progress in 8
construction in the Central Valley, 14 active construction 9
sites. I saw that Scott had put down 13. I guess I'm just 10
updating and there's 14 now, over 113 miles. 11
The design and environmental clearances have 12
advanced considerably at the project level. 13
The funding plans have been approved by this 14
Board for the San Francisco to San Jose peninsula and 15
Rosecrans/Marquardt grade separations. Those unlock Prop 16
1A funds that this Board had committed, in both the 17
bookends north and south. 18
And we initiated procurement for an early 19
operator. In fact, those proposals for the four operators 20
are due today. 21
We also presented to the Board just in the last 22
couple of months, an economic report that shows the 23
significant benefit and economic benefit that this project 24
has had. And it's 2.3 billion have been invested and 25
California Reporting, LLC
(510) 224-4476
115
that's yielded 3-and-half to 4 billion in other economic 1
benefits over the 10-year period for 2006 to 2016. 2
We anticipate 2.5 billion of the American 3
Recovery and Reinvestment Act funds to be fully expended. 4
As Russ had mentioned, we're very close. And we did get 5
this summer, thanks to our Legislature, an extension of the 6
Cap and Trade Program to 2030. It had only been out to 7
2020 previously. 8
And then, I believe this is the last slide. This 9
just shows the development of the draft and final Business 10
Plan, the timeline verbally described there. And this 11
summer and fall we've been working on capital cost 12
estimates, operating and maintenance cost estimates, 13
ridership estimates. And we started to draft the plan 14
itself. 15
By December and January, we anticipate finalizing 16
all the forecasts of cash flow and continue with the 17
drafting. February, we're going to release the draft; 18
February to April, public comment; April Board, present it 19
to the Board, including that errata sheet I mentioned to 20
show any technical corrections and also comments from the 21
public that we received in writing, a summary of that. And 22
then finally if the Board approves it we will submit it to 23
the Legislature by the due date, May 1st. 24
I'm happy to answer any questions. 25
California Reporting, LLC
(510) 224-4476
116
CHAIRMAN RICHARD: Questions for Mr. Fellenz? 1
Okay. 2
Director Miller? 3
BOARD MEMBER MILLER: Turning it on or turning it 4
off (setting up mic) April Board meeting and then you have 5
to submit it to the Legislature May 1? 6
MR. FELLENZ: Correct. 7
BOARD MEMBER MILLER: Does that allow you enough 8
time, you think, to incorporate if there's questions or is 9
that -- 10
MR. FELLENZ: Yes. It's a mad rush to do that, 11
but will be probably be about a two-week period. So we 12
essentially have a draft. We consider public comments, and 13
to the extent that there are changes that we think are 14
appropriate we would have a couple of versions, possibly 15
the original, and listen to the Board's -- 16
CHAIRMAN RICHARD: In the past what's happened is 17
that there's been extensive public outreach. And so, 18
there's I think a statutory requirement for at least one 19
public hearing. 20
MR. FELLENZ: Right. 21
CHAIRMAN RICHARD: Which we usually have 22
contemporaneously with the Board meeting. But occasionally 23
in the past we've had more than one public hearing -- 24
MR. FELLENZ: Yes. 25
California Reporting, LLC
(510) 224-4476
117
CHAIRMAN RICHARD: -- because it's a minimum, 1
it's not the maximum. And in 2012, for example, when there 2
were major programmatic changes being suggested we had 3
several public hearings. We had quite an extensive record 4
of comments. So there was a lot of that that was in the 5
run-up between the draft document and the final document. 6
And then many of those were incorporated in what the staff 7
presented to us. But by that time I think the Board had 8
become familiar with the general thinking of the direction 9
of public comments, so it wasn't as though there was some 10
sharp inflection point at the Board adoption that then had 11
to get reflected into the final document. 12
Having said that, certainly we want to make sure 13
that the Board has ample opportunity to reflect, to direct 14
and so forth and I think part of this as well is it gets 15
into production dynamics, which is that people like to 16
produce a nice readable version of this. But in terms of 17
meeting our statutory requirements to present something to 18
the Legislature, it may that there's enough time to get 19
that done with the polished document following afterwards. 20
BOARD MEMBER MILLER: Okay. So between that -- 21
when it's out for public comment, it's obviously a public 22
draft. So you bring it and present it to the Board? 23
MR. FELLENZ: Yes. 24
BOARD MEMBER MILLER: During that time period? 25
California Reporting, LLC
(510) 224-4476
118
MR. FELLENZ: Yes. In February, we'll present it 1
to the Board. 2
BOARD MEMBER MILLER: You'll come and -- thank 3
you. 4
MR. FELLENZ: To the Board, yes, yes. 5
BOARD MEMBER PASKETT: So? 6
CHAIRMAN RICHARD: Director Paskett? 7
BOARD MEMBER PASKETT: So I probably have more of 8
a statement than a question. At the last approval vote I 9
was reluctant to support the plan, because it deemphasized 10
the Southern California investments. But I understood why. 11
And it was a difficult, but critical decision to do so. 12
So as we start this process and you begin to take 13
in information and suggestions, my hope is that you'll 14
consider the Southern California piece of this and maybe 15
with all the creativity of the staff and the collective 16
intelligence, there will be opportunities to show more of a 17
benefit for the Southern California portions, particularly 18
with the positive development with Cap and Trade and that 19
certainty. 20
MR. FELLENZ: Okay. Yes, definitely, we'll look 21
at all those possibilities. 22
CHAIRMAN RICHARD: Other questions? 23
MR. FELLENZ: Thank you. 24
CHAIRMAN RICHARD: Okay. Thank you very much, 25
California Reporting, LLC
(510) 224-4476
119
Tom. 1
Now, that completes our public agenda. I know 2
it's getting late, but I'm going to suggest that we have a 3
recess to a closed session of the Board, at least to 4
address a few items. And after that we will report back. 5
So the Board will now enter into closed session in the 6
anti-room off of this main conference room. And we'll 7
report back any actions after the closed session. Thank 8
you, all. 9
(The Board convened into Closed Session at 12:37 p.m.) 10
CHAIRMAN RICHARD: Okay. The Board has completed 11
its closed session. There are no items to report. And 12
with that, this meeting is adjourned. Thank you. 13
(The Board reconvened from Closed Session at 1:43 p.m. 14
Having no further business, Chairman Dan Richards adjourned 15
the Board Meeting at 1:43 p.m.) 16
--oOo-- 17
18
19
20
21
22
23
24
25
California Reporting, LLC
(510) 224-4476
120
REPORTER’S CERTIFICATE
I do hereby certify that the testimony in
the foregoing hearing was taken at the time and
place therein stated; that the testimony of
said witnesses were reported by me, a certified
electronic court reporter and a disinterested
person, and was under my supervision thereafter
transcribed into typewriting.
And I further certify that I am not of
counsel or attorney for either or any of the
parties to said hearing nor in any way interested
in the outcome of the cause named in said
caption.
IN WITNESS WHEREOF, I have hereunto set my
hand this 10th day of October, 2017.
PETER PETTY
CER**D-493
Notary Public
California Reporting, LLC
(510) 224-4476
121
TRANSCRIBER'S CERTIFICATE
I do hereby certify that the testimony
in the foregoing hearing was taken at the time and
place therein stated; that the testimony of said
witnesses were transcribed by me, a certified
transcriber and a disinterested person, and was under
my supervision thereafter transcribed into
typewriting.
And I further certify that I am not of
counsel or attorney for either or any of the parties to
said hearing nor in any way interested in the outcome
of the cause named in said caption.
IN WITNESS WHEREOF, I have hereunto set
my hand this 10th day of October, 2017.
_________________
Myra Severtson
Certified Transcriber
AAERT No. CET**D-852