SECTION
I P a g e INSTALLATION
1.1 Handling1.2 Cleaning1.3 Floor Plan1.4 Foundation Power Supply1.5 Initial Setting Anciliary Equipment
II
Ill
IV
2.1 Machine Controls2.2 J-Head Controls2.3 2J2-Head Controls2.4 Mechanical Table Feed2.5 Infinitely Variable Table Feed2.6 M-Head Controls2.7 E-Head Controls2.8 Heidenhain Digital Read Out VRZ 7 10
OPERATION
LUBRICATION
3.1 Basic Machine3.2 J-Head3.3 2 J2-Head3.4 Feed Boxes3.5 M and E-Head
M A I N T E N A N C E
G E N E R A L4.1 Table Screw Assembly4.2 Cross Screw Assembly4.3 Gib Strip Adjustment
J-HEAD4.4 Belt Replacement
Brake Shoe Replacement4.5 Balance Spring Replacement
Feed Trip Adjustment4.6 Collet.Aligning Screw4.7 Quill Removal
ZJZ-HEAD4.8 Motor Removal4.9 Belt Replacement4.10 Brake Shoe Replacement
Index