Download - SD 110 Step 1 Training Engine
![Page 1: SD 110 Step 1 Training Engine](https://reader034.vdocuments.us/reader034/viewer/2022052213/55cf9d31550346d033ac9e10/html5/thumbnails/1.jpg)
D5 Engine TrainingD5 Engine Training
Road machine
![Page 2: SD 110 Step 1 Training Engine](https://reader034.vdocuments.us/reader034/viewer/2022052213/55cf9d31550346d033ac9e10/html5/thumbnails/2.jpg)
Engine Identification - 010102g
Engine serial number
Engine identification plate Also on engine cover
Volvo Construction EquipmentGlobal CST- Training
D5 engine training Road machine
168 2012-12-20
Engine serial number
![Page 3: SD 110 Step 1 Training Engine](https://reader034.vdocuments.us/reader034/viewer/2022052213/55cf9d31550346d033ac9e10/html5/thumbnails/3.jpg)
Engine Identification plate - 010103g p
Engine Type plate: Engine model• Engine model
• Engine spec No• Engine serial number (8 digits)• Rated engine speedRated engine speed• Injection timing and type of cam shaft• Injection pump code• Piston class
Volvo Construction EquipmentGlobal CST- Training
D5 engine training Road machine
169 2012-12-20
![Page 4: SD 110 Step 1 Training Engine](https://reader034.vdocuments.us/reader034/viewer/2022052213/55cf9d31550346d033ac9e10/html5/thumbnails/4.jpg)
Engine view from right g g
1. Crank case breather2. Lubricating oil filling3 Injection pump3. Injection pump4. Lubricating oil stick5. Lube oil cooler6. Lube oil replacement filterp7. Lubricating oil drain plug8. Exchangeable fuel filter N/A9. V-belts10. Generator
Volvo Construction EquipmentGlobal CST- Training
Paver D5 engine
170 2012-12-20
![Page 5: SD 110 Step 1 Training Engine](https://reader034.vdocuments.us/reader034/viewer/2022052213/55cf9d31550346d033ac9e10/html5/thumbnails/5.jpg)
Engine view from leftg
1 C b ti i i l t1. Combustion air inlet2. Coolant out let3. Coolant inlet4 Connection charge air cooler4. Connection charge air cooler5. Exhaust outlet6. Starter
Volvo Construction EquipmentGlobal CST- Training
Paver D5 engine
171 2012-12-20
![Page 6: SD 110 Step 1 Training Engine](https://reader034.vdocuments.us/reader034/viewer/2022052213/55cf9d31550346d033ac9e10/html5/thumbnails/6.jpg)
Engine Ignition order - 010104g g
Di ti f t ti C t l k iDirection of rotation: Counter clockwiseAs seen from the fly wheel
Engine Ignition order : 1 – 3 – 4 - 2
Volvo Construction EquipmentGlobal CST- Training
D5 engine training Road machine
172 2012-12-20
g g
![Page 7: SD 110 Step 1 Training Engine](https://reader034.vdocuments.us/reader034/viewer/2022052213/55cf9d31550346d033ac9e10/html5/thumbnails/7.jpg)
Cylinder head valves - 010202y
Valves:
• There are some difference in valve guide• There are some difference in valve guide
• The valve springs of D5D / D7D have nospecial direction of installation and arespecial direction of installation and arereplaceable
• D5D / D7D valve guide are seal with ‘O” rings
Volvo Construction EquipmentGlobal CST- Training
D5 engine training Road machine
173 2012-12-20
![Page 8: SD 110 Step 1 Training Engine](https://reader034.vdocuments.us/reader034/viewer/2022052213/55cf9d31550346d033ac9e10/html5/thumbnails/8.jpg)
Crank mechanism - 010301
• Crank mechanism
Volvo Construction EquipmentGlobal CST- Training
D5 engine training Road machine
174 2012-12-20
![Page 9: SD 110 Step 1 Training Engine](https://reader034.vdocuments.us/reader034/viewer/2022052213/55cf9d31550346d033ac9e10/html5/thumbnails/9.jpg)
Crank mechanism - 010302
D5D & D7D: Wet liner replaceableD5D & D7D: Wet liner replaceable
Volvo Construction EquipmentGlobal CST- Training
D5 engine training Road machine
175 2012-12-20
![Page 10: SD 110 Step 1 Training Engine](https://reader034.vdocuments.us/reader034/viewer/2022052213/55cf9d31550346d033ac9e10/html5/thumbnails/10.jpg)
Crank mechanism - 010303
Connecting rod:
• The connecting rod is made of forged steel and the bearing cap (1) is guided using two guide pin (3)using two guide pin (3)
• Locating lug (2) are provided in bearing shellsbearing shells
• Connecting rod and bearing are marked (4)a ed ( )
• Marking (5) on the piston is to face the fly wheel
Volvo Construction EquipmentGlobal CST- Training
D5 engine training Road machine
176 2012-12-20
![Page 11: SD 110 Step 1 Training Engine](https://reader034.vdocuments.us/reader034/viewer/2022052213/55cf9d31550346d033ac9e10/html5/thumbnails/11.jpg)
Piston - 010304
Max injection pressure 1500 bar
• The pistons are made of special aluminum alloy. The piston is slightly off – Centrep p y p g y(A) in relation to the piston guide pin
• The piston must be installed with fly wheel symbol on the piston top facing the fly wheel
• There are three piston rings. The top ring has a ring carrier made of cast iron
6 h l l
Volvo Construction EquipmentGlobal CST- Training
D5 engine training Road machine
177 2012-12-20
• 6 hole nozzle
![Page 12: SD 110 Step 1 Training Engine](https://reader034.vdocuments.us/reader034/viewer/2022052213/55cf9d31550346d033ac9e10/html5/thumbnails/12.jpg)
Selecting gasket - 010305g g
Gasket holesGasket holes1, 2 & 3
Piston crown clearance:• To obtain the power, fuel consumption and exhaust gas emission specified
for engine the piston height above the block face has to me measured andcorrect thickness for the cylinder head gasket has to be determined
• The piston height is measured using a dial gauge (1) fixture (2) and spacer (3)• The procedure is described in service manual
Volvo Construction EquipmentGlobal CST- Training
D5 engine training Road machine
178 2012-12-20
![Page 13: SD 110 Step 1 Training Engine](https://reader034.vdocuments.us/reader034/viewer/2022052213/55cf9d31550346d033ac9e10/html5/thumbnails/13.jpg)
Engine Timing gear - 010401g g g
1. Governor gearg2. Transfer gear
3. Cam shaft gear
4. Crank shaft gear
Volvo Construction EquipmentGlobal CST- Training
D5 engine training Road machine
179 2012-12-20
![Page 14: SD 110 Step 1 Training Engine](https://reader034.vdocuments.us/reader034/viewer/2022052213/55cf9d31550346d033ac9e10/html5/thumbnails/14.jpg)
Lubricating oil diagramg g
1. Lubricating oil sump2 Lubricating oil pump2. Lubricating oil pump3. Pressure limiting valve TCD20134. Lube oil cooler5. Check valve TCD 20125. Check valve TCD 20126. Bypass valve7. Bypass valve8. Pressure control valve9. Lubricating oil filter10. Main lube oil channel11. Piston cooling nozzle12. Rocker arm13. Internally switched exhaust gas return14. Turbo charger15 Air compressor
Volvo Construction EquipmentGlobal CST- Training
Paver D5 engine
180 2012-12-20
15. Air compressor
![Page 15: SD 110 Step 1 Training Engine](https://reader034.vdocuments.us/reader034/viewer/2022052213/55cf9d31550346d033ac9e10/html5/thumbnails/15.jpg)
Lubrication system - 020103y
Lubrication system D5D
7. Lube oil filter with integrated by pass valve 2.5 bar
8. By pass valve oil cooler located in oilcooler housing 4.0 bar
9 Oil l l d i il l9. Oil pressure valve located in oil coolerhousing 10 bar
10 Lube oil pump 90 l/min at 2500 rpm10. Lube oil pump 90 l/min at 2500 rpm
Volvo Construction EquipmentGlobal CST- Training
D5 engine training Road machine
181 2012-12-20
![Page 16: SD 110 Step 1 Training Engine](https://reader034.vdocuments.us/reader034/viewer/2022052213/55cf9d31550346d033ac9e10/html5/thumbnails/16.jpg)
Oil pump - 020202p p
1 Suction1. Suction
2. Pressure chamber to crank housing
3. Inner Rotor
4. Outer Rotor
5. Driven from crank shaft
6. Safety valve
Volvo Construction EquipmentGlobal CST- Training
D5 engine training Road machine
182 2012-12-20
![Page 17: SD 110 Step 1 Training Engine](https://reader034.vdocuments.us/reader034/viewer/2022052213/55cf9d31550346d033ac9e10/html5/thumbnails/17.jpg)
Piston Cooling Nozzle - 020301g
• The piston cooling nozzle made of plastic are fitted in the main bearingpedestals
Volvo Construction EquipmentGlobal CST- Training
D5 engine training Road machine
183 2012-12-20
![Page 18: SD 110 Step 1 Training Engine](https://reader034.vdocuments.us/reader034/viewer/2022052213/55cf9d31550346d033ac9e10/html5/thumbnails/18.jpg)
Fuel system - 030101y
• Change unit injector pump for cylinder number 3 on D5D with injection timer• Read off EP code for cylinder No 3 on the engine identification plate under
column EP (1)• Read sequence
Line 1 = cylinder 1Li 2 li d 2 d
Volvo Construction EquipmentGlobal CST- Training
D5 engine training Road machine
184 2012-12-20
Line 2 = cylinder 2 and so on……
![Page 19: SD 110 Step 1 Training Engine](https://reader034.vdocuments.us/reader034/viewer/2022052213/55cf9d31550346d033ac9e10/html5/thumbnails/19.jpg)
Fuel system - 030104 1 Injection pumpy 1. Injection pump
2. Delivery pipe
3. Engine block
4. Shim
5. Roller tappet
6 C h ft6. Cam shaft
7. Fuel rack
8. Fuel duct
9 Injector
Volvo Construction EquipmentGlobal CST- Training
D5 engine training Road machine
185 2012-12-20
9. Injector
![Page 20: SD 110 Step 1 Training Engine](https://reader034.vdocuments.us/reader034/viewer/2022052213/55cf9d31550346d033ac9e10/html5/thumbnails/20.jpg)
Mechanical single injection pump systemg j p p y
Volvo Construction EquipmentGlobal CST- Training
Paver D5 engine
186 2012-12-20
![Page 21: SD 110 Step 1 Training Engine](https://reader034.vdocuments.us/reader034/viewer/2022052213/55cf9d31550346d033ac9e10/html5/thumbnails/21.jpg)
Fuel system - 030105y
Volvo Construction EquipmentGlobal CST- Training
D5 engine training Road machine
187 2012-12-20
![Page 22: SD 110 Step 1 Training Engine](https://reader034.vdocuments.us/reader034/viewer/2022052213/55cf9d31550346d033ac9e10/html5/thumbnails/22.jpg)
Fuel schematic
1. Fuel tank2. Fuel pre-filter3 Fuel pump3. Fuel pump4. Exchangeable fuel filter5. Fuel supply line to the FCU6. Control block fuel control unit7. High pressure pump8. Rail (Not applicable)9. Injector10. Fuel return to fuel tank
Volvo Construction EquipmentGlobal CST- Training
Paver D5 engine
188 2012-12-20
![Page 23: SD 110 Step 1 Training Engine](https://reader034.vdocuments.us/reader034/viewer/2022052213/55cf9d31550346d033ac9e10/html5/thumbnails/23.jpg)
Fuel schematic
Volvo Construction EquipmentGlobal CST- Training
Paver D5 engine
189 2012-12-20
![Page 24: SD 110 Step 1 Training Engine](https://reader034.vdocuments.us/reader034/viewer/2022052213/55cf9d31550346d033ac9e10/html5/thumbnails/24.jpg)
Fuel block diagramg
1. Diesel Tank 2. Water separator 3. Feed pump
4. Fuel filter 5. Fuel supply to fuel control unit / Control block
6. U. I High pressure pump 7. Injector
8. Excess leak return 9. Diesel Tank
Volvo Construction EquipmentGlobal CST- Training190 2012-12-20
D5 engine training Road machine
8 cess ea e u
![Page 25: SD 110 Step 1 Training Engine](https://reader034.vdocuments.us/reader034/viewer/2022052213/55cf9d31550346d033ac9e10/html5/thumbnails/25.jpg)
Coolant diagram (example)g ( p )
1. Cooler2 Cooler inlet2. Cooler inlet3. Coolant pump4. Coolant partial flow to the lubricating oil cooler5. Lube oil cooler56. Coolant supply for engine cooling7. Cylinder pipe head cooling8. Connection possibility for cab heating9. Heat exchanger10. Return line11. Coolant return to thermostat12 C l t t l t12. Coolant out let13. Compensation line14. Venting pipe
Volvo Construction EquipmentGlobal CST- Training
Paver D5 engine
191 2012-12-20
![Page 26: SD 110 Step 1 Training Engine](https://reader034.vdocuments.us/reader034/viewer/2022052213/55cf9d31550346d033ac9e10/html5/thumbnails/26.jpg)
Schematic outlet controlled cooling systemg y
Expansion Tank
Water out let
Water inlet
Water out let
Thermostat
Water PumpWater Pump
RadiatorEngine oil cooler
Volvo Construction EquipmentGlobal CST- Training
Paver D5 engine
192 2012-12-20
![Page 27: SD 110 Step 1 Training Engine](https://reader034.vdocuments.us/reader034/viewer/2022052213/55cf9d31550346d033ac9e10/html5/thumbnails/27.jpg)
Coolant block diagram (example)g ( p )
1. Oil cooler inlet 2. Water pump 3. Engine cooler
4. Engine block / Head / Engine cylinder Head
5. Thermostat cooler out let 6. By pass thru special lines
7. Oil cooler outlet
Volvo Construction EquipmentGlobal CST- Training193 2012-12-20
D5 engine training Road machine
![Page 28: SD 110 Step 1 Training Engine](https://reader034.vdocuments.us/reader034/viewer/2022052213/55cf9d31550346d033ac9e10/html5/thumbnails/28.jpg)
Working descriptiong p
The coolant pump (“water pump”) draws in the coolant via hose lines directlyfrom the cooler and delivers it first via the engine-integrated lube oil coolerfrom the cooler and delivers it first via the engine integrated lube oil cooler,thereafter enters the engine, flows along the cylinder, upwards into thecylinder head and to the thermostat at the coolant outlet. From there, the coolant is directed via special lines to the cooler inlet.p
When the engine is still cold the coolant is short circuited through the engineuntil thermostat response temperature has been reached (starting opening)according to the volume of hot coolant flowing off, the water pump draws incold coolant from the cooler
Volvo Construction EquipmentGlobal CST- Training
Paver D5 engine
194 2012-12-20
![Page 29: SD 110 Step 1 Training Engine](https://reader034.vdocuments.us/reader034/viewer/2022052213/55cf9d31550346d033ac9e10/html5/thumbnails/29.jpg)
Coolant thermostat
Checking the thermostat when removed
1. Measure dimension “a” on thermostat
Note: “a” starts of lift at approx 83+2 (T1)Note: a starts of lift at approx. 83+2 (T1)“b” end of lift at approx. 95+5 (T2)
Lift movement with indicated temp T2,Min. 8 mm
Volvo Construction EquipmentGlobal CST- Training195 2012-12-20
D5 engine training Road machine
![Page 30: SD 110 Step 1 Training Engine](https://reader034.vdocuments.us/reader034/viewer/2022052213/55cf9d31550346d033ac9e10/html5/thumbnails/30.jpg)
Fuel system cylinder No positions -y y p030113
Volvo Construction EquipmentGlobal CST- Training
D5 engine training Road machine
196 2012-12-20
![Page 31: SD 110 Step 1 Training Engine](https://reader034.vdocuments.us/reader034/viewer/2022052213/55cf9d31550346d033ac9e10/html5/thumbnails/31.jpg)
Internal exhaust gas recirculationg
1 Additional cam for exhaust gas recirculation1. Additional cam for exhaust gas recirculation
Inlet valve opens briefly during the outlet cycleand emits an exhaust gas partial flow to theand emits an exhaust gas partial flow to thesuction system.
This partial volume is sucked back in the nextpsuction cycle
Volvo Construction EquipmentGlobal CST- Training
Paver D5 engine
197 2012-12-20
![Page 32: SD 110 Step 1 Training Engine](https://reader034.vdocuments.us/reader034/viewer/2022052213/55cf9d31550346d033ac9e10/html5/thumbnails/32.jpg)
Charging C
g gTurbine
Compressor
Turbo charger with charge air cooling
Advantages:
From filter
g
Volumetric efficiency of engine increasesIncrease Horse PowerEmission improvedCompact in size
To CAC
Volvo Construction EquipmentGlobal CST- Training
Paver D5 engine
198 2012-12-20
![Page 33: SD 110 Step 1 Training Engine](https://reader034.vdocuments.us/reader034/viewer/2022052213/55cf9d31550346d033ac9e10/html5/thumbnails/33.jpg)
Charging piping connectiong g p p g
Air filter
Compressor
CAC
Engine Inlet manifold
Engine exhaust
Volvo Construction EquipmentGlobal CST- Training
Paver D5 engine
199 2012-12-20
![Page 34: SD 110 Step 1 Training Engine](https://reader034.vdocuments.us/reader034/viewer/2022052213/55cf9d31550346d033ac9e10/html5/thumbnails/34.jpg)
Fuel shut off solenoid
Resistance 4.9 ohms
1. Fuel shut off solenoid operates whenth i i iti l 2nd itithere is ignition supply – 2nd position
2. Fuel shut off solenoid + excess fuelsolenoid in 3rd start position
Volvo Construction EquipmentGlobal CST- Training
D5 engine training Road machine
200 2012-12-20
![Page 35: SD 110 Step 1 Training Engine](https://reader034.vdocuments.us/reader034/viewer/2022052213/55cf9d31550346d033ac9e10/html5/thumbnails/35.jpg)
Excess fuel solenoid
1. Excess fuel solenoid
2. Sensor Not applicable
1. Fuel shut off solenoid operates whenth i i iti l 2nd itithere is ignition supply – 2nd position
2. Fuel shut off solenoid + excess fuelsolenoid in 3rd start position
Volvo Construction EquipmentGlobal CST- Training
Electrical Harness Installation –SD110
201 2012-12-20
![Page 36: SD 110 Step 1 Training Engine](https://reader034.vdocuments.us/reader034/viewer/2022052213/55cf9d31550346d033ac9e10/html5/thumbnails/36.jpg)
Engine oil pressure switchg p
Engine oil pressure switchEngine oil pressure switch
Volvo Construction EquipmentGlobal CST- Training
D5 engine training Road machine
202 2012-12-20
![Page 37: SD 110 Step 1 Training Engine](https://reader034.vdocuments.us/reader034/viewer/2022052213/55cf9d31550346d033ac9e10/html5/thumbnails/37.jpg)
Engine water temperature switchg p
Engine Water temperature switchEngine Water temperature switch
Volvo Construction EquipmentGlobal CST- Training
D5 engine training Road machine
203 2012-12-20
![Page 38: SD 110 Step 1 Training Engine](https://reader034.vdocuments.us/reader034/viewer/2022052213/55cf9d31550346d033ac9e10/html5/thumbnails/38.jpg)
Engine glow plugg g p g
Engine Glow plugEngine Glow plug
Time - 8 seconds
Temperature 950 0 c
Volvo Construction EquipmentGlobal CST- Training
D5 engine training Road machine
204 2012-12-20
![Page 39: SD 110 Step 1 Training Engine](https://reader034.vdocuments.us/reader034/viewer/2022052213/55cf9d31550346d033ac9e10/html5/thumbnails/39.jpg)
Diesel tank fuel sender
Fuel sender
Volvo Construction EquipmentGlobal CST- Training
D5 engine training Road machine
205 2012-12-20
![Page 40: SD 110 Step 1 Training Engine](https://reader034.vdocuments.us/reader034/viewer/2022052213/55cf9d31550346d033ac9e10/html5/thumbnails/40.jpg)
Mechanical governorg
Governor adjustment screws
Full load “G”J
Torque maximum “E”
EG
NA based fuel charge “J”
Excess fuel start solenoid
Volvo Construction EquipmentGlobal CST- Training
Paver D5 engine
206 2012-12-20
![Page 41: SD 110 Step 1 Training Engine](https://reader034.vdocuments.us/reader034/viewer/2022052213/55cf9d31550346d033ac9e10/html5/thumbnails/41.jpg)
Engine V- beltg
Procedure Change Engine V beltProcedure Change Engine V belt
V – belt AVX 11 (Width 11 mm)
Belt tensioning – Automatic tensioningSpring – loaded clamping roller
Volvo Construction EquipmentGlobal CST- Training207 2012-12-20
D5 engine training Road machine
![Page 42: SD 110 Step 1 Training Engine](https://reader034.vdocuments.us/reader034/viewer/2022052213/55cf9d31550346d033ac9e10/html5/thumbnails/42.jpg)
Removing the Starter motorg
Volvo Construction EquipmentGlobal CST- Training208 2012-12-20
D5 engine training Road machine
![Page 43: SD 110 Step 1 Training Engine](https://reader034.vdocuments.us/reader034/viewer/2022052213/55cf9d31550346d033ac9e10/html5/thumbnails/43.jpg)
Installing the Starter motorg
Volvo Construction EquipmentGlobal CST- Training209 2012-12-20
D5 engine training Road machine
![Page 44: SD 110 Step 1 Training Engine](https://reader034.vdocuments.us/reader034/viewer/2022052213/55cf9d31550346d033ac9e10/html5/thumbnails/44.jpg)
EK code - 030114
Volvo Construction EquipmentGlobal CST- Training
D5 engine training Road machine
210 2012-12-20
![Page 45: SD 110 Step 1 Training Engine](https://reader034.vdocuments.us/reader034/viewer/2022052213/55cf9d31550346d033ac9e10/html5/thumbnails/45.jpg)
A measurement - 030115
Volvo Construction EquipmentGlobal CST- Training
D5 engine training Road machine
211 2012-12-20
![Page 46: SD 110 Step 1 Training Engine](https://reader034.vdocuments.us/reader034/viewer/2022052213/55cf9d31550346d033ac9e10/html5/thumbnails/46.jpg)
Dimensions, definitions - 030116
Volvo Construction EquipmentGlobal CST- Training
D5 engine training Road machine
212 2012-12-20
![Page 47: SD 110 Step 1 Training Engine](https://reader034.vdocuments.us/reader034/viewer/2022052213/55cf9d31550346d033ac9e10/html5/thumbnails/47.jpg)
Theoretical shim thickness - 030118
Volvo Construction EquipmentGlobal CST- Training
D5 engine training Road machine
213 2012-12-20
![Page 48: SD 110 Step 1 Training Engine](https://reader034.vdocuments.us/reader034/viewer/2022052213/55cf9d31550346d033ac9e10/html5/thumbnails/48.jpg)
Actual shim thickness - 030119
Volvo Construction EquipmentGlobal CST- Training
D5 engine training Road machine
214 2012-12-20
![Page 49: SD 110 Step 1 Training Engine](https://reader034.vdocuments.us/reader034/viewer/2022052213/55cf9d31550346d033ac9e10/html5/thumbnails/49.jpg)
Reinstallation - 030120
Volvo Construction EquipmentGlobal CST- Training
D5 engine training Road machine
215 2012-12-20
![Page 50: SD 110 Step 1 Training Engine](https://reader034.vdocuments.us/reader034/viewer/2022052213/55cf9d31550346d033ac9e10/html5/thumbnails/50.jpg)
Special tools - 030121p
Volvo Construction EquipmentGlobal CST- Training
D5 engine training Road machine
216 2012-12-20
![Page 51: SD 110 Step 1 Training Engine](https://reader034.vdocuments.us/reader034/viewer/2022052213/55cf9d31550346d033ac9e10/html5/thumbnails/51.jpg)
Unit pump installation - 030122p p
Volvo Construction EquipmentGlobal CST- Training
D5 engine training Road machine
217 2012-12-20
![Page 52: SD 110 Step 1 Training Engine](https://reader034.vdocuments.us/reader034/viewer/2022052213/55cf9d31550346d033ac9e10/html5/thumbnails/52.jpg)
Unit pump installation - 030123p p
Volvo Construction EquipmentGlobal CST- Training
D5 engine training Road machine
218 2012-12-20
![Page 53: SD 110 Step 1 Training Engine](https://reader034.vdocuments.us/reader034/viewer/2022052213/55cf9d31550346d033ac9e10/html5/thumbnails/53.jpg)
Assembly injection pumpy j p p
Volvo Construction EquipmentGlobal CST- Training
D5 engine training Road machine
219 2012-12-20
![Page 54: SD 110 Step 1 Training Engine](https://reader034.vdocuments.us/reader034/viewer/2022052213/55cf9d31550346d033ac9e10/html5/thumbnails/54.jpg)
Unit injection pump systemj p p y
Volvo Construction EquipmentGlobal CST- Training
D5 engine training Road machine
220 2012-12-20
![Page 55: SD 110 Step 1 Training Engine](https://reader034.vdocuments.us/reader034/viewer/2022052213/55cf9d31550346d033ac9e10/html5/thumbnails/55.jpg)
Explanation Lo & EP- code for D5D enginesp g
Volvo Construction EquipmentGlobal CST- Training
D5 engine training Road machine
221 2012-12-20
![Page 56: SD 110 Step 1 Training Engine](https://reader034.vdocuments.us/reader034/viewer/2022052213/55cf9d31550346d033ac9e10/html5/thumbnails/56.jpg)
EP-Code on identification platep
Volvo Construction EquipmentGlobal CST- Training
D5 engine training Road machine
222 2012-12-20
![Page 57: SD 110 Step 1 Training Engine](https://reader034.vdocuments.us/reader034/viewer/2022052213/55cf9d31550346d033ac9e10/html5/thumbnails/57.jpg)
Determination compensation shimp
Volvo Construction EquipmentGlobal CST- Training
D5 engine training Road machine
223 2012-12-20
![Page 58: SD 110 Step 1 Training Engine](https://reader034.vdocuments.us/reader034/viewer/2022052213/55cf9d31550346d033ac9e10/html5/thumbnails/58.jpg)
From value TS to SSS S
Volvo Construction EquipmentGlobal CST- Training
D5 engine training Road machine
224 2012-12-20
![Page 59: SD 110 Step 1 Training Engine](https://reader034.vdocuments.us/reader034/viewer/2022052213/55cf9d31550346d033ac9e10/html5/thumbnails/59.jpg)
F I P installation, step 1p
Volvo Construction EquipmentGlobal CST- Training
D5 engine training Road machine
225 2012-12-20
![Page 60: SD 110 Step 1 Training Engine](https://reader034.vdocuments.us/reader034/viewer/2022052213/55cf9d31550346d033ac9e10/html5/thumbnails/60.jpg)
F I P installation, step 2p
Volvo Construction EquipmentGlobal CST- Training
D5 engine training Road machine
226 2012-12-20
![Page 61: SD 110 Step 1 Training Engine](https://reader034.vdocuments.us/reader034/viewer/2022052213/55cf9d31550346d033ac9e10/html5/thumbnails/61.jpg)
Example – Lubricating oil consumptionp g p(at least 100 operating hours) engine in high load operation
Op. h Fuel Lts Lube oil Date Driver Example9 423 2 15.2 12 Paul12 551 2 16.2.1213 523 2 17.2.1213 523 2 17.2.1211 600 2 18.2.12 Shashi13 620 2 19.2.1214 590 2 20 2 1214 590 2 20.2.1210 450 2 21.2.12 Ballal11 597 2 22.2.1212 580 2 23.2.1213 620 2 24.2.12 Ramalu
118 5554 20
Volvo Construction EquipmentGlobal CST- Training227 2012-12-20
118 5554 20
D5 engine training Road machine
![Page 62: SD 110 Step 1 Training Engine](https://reader034.vdocuments.us/reader034/viewer/2022052213/55cf9d31550346d033ac9e10/html5/thumbnails/62.jpg)
Example – Lubricating oil consumptionp g p(at least 100 operating hours) engine in high load operation
Calculation example:
Fuel consumption = 5554 lLubricating oil consumption = 20 l
Calculation:
5554 l = 100%
20 l = x
100 %20 L
5554 L= 0.36 %X =
20 l = x
Volvo Construction EquipmentGlobal CST- Training228 2012-12-20
D5 engine training Road machine