Download - SCOPE Sessions AM12 Day 4
![Page 1: SCOPE Sessions AM12 Day 4](https://reader035.vdocuments.us/reader035/viewer/2022062411/568c48a91a28ab4916910e09/html5/thumbnails/1.jpg)
SCOPE Sessions AM12Day 4
![Page 2: SCOPE Sessions AM12 Day 4](https://reader035.vdocuments.us/reader035/viewer/2022062411/568c48a91a28ab4916910e09/html5/thumbnails/2.jpg)
![Page 3: SCOPE Sessions AM12 Day 4](https://reader035.vdocuments.us/reader035/viewer/2022062411/568c48a91a28ab4916910e09/html5/thumbnails/3.jpg)
Roll Call
![Page 4: SCOPE Sessions AM12 Day 4](https://reader035.vdocuments.us/reader035/viewer/2022062411/568c48a91a28ab4916910e09/html5/thumbnails/4.jpg)
Excemption 40% unilateral quota
• Argentina
![Page 5: SCOPE Sessions AM12 Day 4](https://reader035.vdocuments.us/reader035/viewer/2022062411/568c48a91a28ab4916910e09/html5/thumbnails/5.jpg)
Bylaw discussions
![Page 6: SCOPE Sessions AM12 Day 4](https://reader035.vdocuments.us/reader035/viewer/2022062411/568c48a91a28ab4916910e09/html5/thumbnails/6.jpg)
Candidate Presentations 2012- 13
SCOPE D:
David Ekow Arku (FGMSA Ghana)
LORMA:
Maria Aroca (AECS Catalonia)
![Page 7: SCOPE Sessions AM12 Day 4](https://reader035.vdocuments.us/reader035/viewer/2022062411/568c48a91a28ab4916910e09/html5/thumbnails/7.jpg)
Presentation new NMOs
• Kenya• Morocco• Belgium• China
![Page 8: SCOPE Sessions AM12 Day 4](https://reader035.vdocuments.us/reader035/viewer/2022062411/568c48a91a28ab4916910e09/html5/thumbnails/8.jpg)
New Database
• http://www.ifmsa.org
• Login > sign up > register with username: firstname.lastname and official NEO E-mail address
• Approval by NTSDD or SCOPE D
![Page 9: SCOPE Sessions AM12 Day 4](https://reader035.vdocuments.us/reader035/viewer/2022062411/568c48a91a28ab4916910e09/html5/thumbnails/9.jpg)
New Database: Contracts 2013- 14
1. Back- up: sign contracts in old database (www.ifmsa.net) but DON‘T USE THEM
2. Postponed contracts: postpone them in old database + transfer them later manually to the new database
3. TRIAL of new database August 13th to August 31st 2012: all NEOs sign contracts and go through all „normal steps“ of exchange
4. Google document: sharing of problems, bugs, improvement tips ONLY NEOs
5. Start September 1st 2012: New database on „reset“. Official signing of contracts 2013- 14 in new database (www.ifmsa.org) and start of OFFICIAL USE OF NEW DATABASE
![Page 10: SCOPE Sessions AM12 Day 4](https://reader035.vdocuments.us/reader035/viewer/2022062411/568c48a91a28ab4916910e09/html5/thumbnails/10.jpg)
Timeline New Database
• Contract with old database (www.ifmsa.net) valid until July 2013 (with option to prolong) = BACK- UP
• August 13th – August 31st final TRIAL all NEOs
• September 1st: FULL USAGE NEW DATABASE
http://www.ifmsa.org
![Page 11: SCOPE Sessions AM12 Day 4](https://reader035.vdocuments.us/reader035/viewer/2022062411/568c48a91a28ab4916910e09/html5/thumbnails/11.jpg)
SWGs SCOPE sessions AM12
![Page 12: SCOPE Sessions AM12 Day 4](https://reader035.vdocuments.us/reader035/viewer/2022062411/568c48a91a28ab4916910e09/html5/thumbnails/12.jpg)
SWGs SCOPE sessions AM12
![Page 13: SCOPE Sessions AM12 Day 4](https://reader035.vdocuments.us/reader035/viewer/2022062411/568c48a91a28ab4916910e09/html5/thumbnails/13.jpg)
Check- out