Download - School Developments
Transcript
![Page 1: School Developments](https://reader036.vdocuments.us/reader036/viewer/2022062519/568152aa550346895dc0cced/html5/thumbnails/1.jpg)
School Developments
Tudor Jones
![Page 2: School Developments](https://reader036.vdocuments.us/reader036/viewer/2022062519/568152aa550346895dc0cced/html5/thumbnails/2.jpg)
• Easter Bush– New Teaching Building– EBVC main building– The Hospital Garden
• Summerhall• Sustainability
Current Developments
![Page 3: School Developments](https://reader036.vdocuments.us/reader036/viewer/2022062519/568152aa550346895dc0cced/html5/thumbnails/3.jpg)
New Teaching Building
• Phase 2 move completed in July 2011
• Teaching from August 2011
• 27th September official opening
• Artwork
![Page 4: School Developments](https://reader036.vdocuments.us/reader036/viewer/2022062519/568152aa550346895dc0cced/html5/thumbnails/4.jpg)
EBVC Main Building• “Front” wing and PM suite to be demolished late 2011• “Middle” Wing (Wellcome unit) to be redeveloped • Redevelopment of “The View” block
![Page 5: School Developments](https://reader036.vdocuments.us/reader036/viewer/2022062519/568152aa550346895dc0cced/html5/thumbnails/5.jpg)
The Hospital Garden
![Page 6: School Developments](https://reader036.vdocuments.us/reader036/viewer/2022062519/568152aa550346895dc0cced/html5/thumbnails/6.jpg)
The SummerhallBuildings
• Final decommissioning programme• Transfer of site to new ownership on 11th
November 2011.• Use as Festival Venue 2011.• Future for Summerhall.
![Page 7: School Developments](https://reader036.vdocuments.us/reader036/viewer/2022062519/568152aa550346895dc0cced/html5/thumbnails/7.jpg)
Sustainability
• Travel & Transport• Energy• Waste & Recycling