Scaling Internet Routers Using Optics
UW, October 16th, 2003
Nick McKeown
Joint work with research groups of: David Miller, Mark Horowitz, Olav Solgaard. Students: Isaac Keslassy, Shang-Tse Chuang, Kyoungsik Yu.
Department of Electrical Engineering, Stanford University
Paper: http://klamath.stanford.edu/~nickm/papers/sigcomm2003.pdfWeb site: http://klamath.stanford.edu/or
![Page 2: Scaling Internet Routers Using Optics UW, October 16 th, 2003 Nick McKeown Joint work with research groups of: David Miller, Mark Horowitz, Olav Solgaard](https://reader030.vdocuments.us/reader030/viewer/2022032800/56649d385503460f94a10d33/html5/thumbnails/2.jpg)
Backbone router capacity
1986 1988 1990 1992 1994 1996 1998 2000 2002 2004
1Tb/s
1Gb/s
10Gb/s
100Gb/s
Router capacity per rack2x every 18 months
![Page 3: Scaling Internet Routers Using Optics UW, October 16 th, 2003 Nick McKeown Joint work with research groups of: David Miller, Mark Horowitz, Olav Solgaard](https://reader030.vdocuments.us/reader030/viewer/2022032800/56649d385503460f94a10d33/html5/thumbnails/3.jpg)
Backbone router capacity
1986 1988 1990 1992 1994 1996 1998 2000 2002 2004
1Tb/s
1Gb/s
10Gb/s
100Gb/s
Router capacity per rack2x every 18 months
Traffic2x every year
![Page 4: Scaling Internet Routers Using Optics UW, October 16 th, 2003 Nick McKeown Joint work with research groups of: David Miller, Mark Horowitz, Olav Solgaard](https://reader030.vdocuments.us/reader030/viewer/2022032800/56649d385503460f94a10d33/html5/thumbnails/4.jpg)
Extrapolating
2003 2005 2007 2009 2011 2013 2015
1Tb/s
Router capacity2x every 18 months
Traffic2x every year
100Tb/s 2015: 16x disparity
![Page 5: Scaling Internet Routers Using Optics UW, October 16 th, 2003 Nick McKeown Joint work with research groups of: David Miller, Mark Horowitz, Olav Solgaard](https://reader030.vdocuments.us/reader030/viewer/2022032800/56649d385503460f94a10d33/html5/thumbnails/5.jpg)
Consequence
Unless something changes, operators will need: 16 times as many routers, consuming 16 times as much space, 256 times the power, Costing 100 times as much.
Actually need more than that…
![Page 6: Scaling Internet Routers Using Optics UW, October 16 th, 2003 Nick McKeown Joint work with research groups of: David Miller, Mark Horowitz, Olav Solgaard](https://reader030.vdocuments.us/reader030/viewer/2022032800/56649d385503460f94a10d33/html5/thumbnails/6.jpg)
Stanford 100Tb/s Internet Router
Goal: Study scalability Challenging, but not impossible Two orders of magnitude faster than deployed routers We will build components to show feasibility
40Gb/s
40Gb/s
40Gb/s
40Gb/s
OpticalOpticalSwitchSwitch
• Line termination
• IP packet processing
• Packet buffering
• Line termination• IP packet processing
• Packet buffering
Electronic
Linecard #1Electronic
Linecard #1ElectronicLinecard #625
ElectronicLinecard #625160-
320Gb/s
160Gb/s
160-320Gb/s
100Tb/s = 640 * 160Gb/s
![Page 7: Scaling Internet Routers Using Optics UW, October 16 th, 2003 Nick McKeown Joint work with research groups of: David Miller, Mark Horowitz, Olav Solgaard](https://reader030.vdocuments.us/reader030/viewer/2022032800/56649d385503460f94a10d33/html5/thumbnails/7.jpg)
Throughput Guarantees
Operators increasingly demand throughput guarantees: To maximize use of expensive long-haul links For predictability and planning
Despite lots of effort and theory, no commercial router today has a throughput guarantee.
![Page 8: Scaling Internet Routers Using Optics UW, October 16 th, 2003 Nick McKeown Joint work with research groups of: David Miller, Mark Horowitz, Olav Solgaard](https://reader030.vdocuments.us/reader030/viewer/2022032800/56649d385503460f94a10d33/html5/thumbnails/8.jpg)
Requirements of our router
100Tb/s capacity 100% throughput for all traffic Must work with any set of linecards present Use technology available within 3 years Conform to RFC 1812
![Page 9: Scaling Internet Routers Using Optics UW, October 16 th, 2003 Nick McKeown Joint work with research groups of: David Miller, Mark Horowitz, Olav Solgaard](https://reader030.vdocuments.us/reader030/viewer/2022032800/56649d385503460f94a10d33/html5/thumbnails/9.jpg)
What limits router capacity?
0
2
4
6
8
10
12
1990 1993 1996 1999 2002 2003
Power
(kW
)
Approximate power consumption per rack
Power density is the limiting factor today
![Page 10: Scaling Internet Routers Using Optics UW, October 16 th, 2003 Nick McKeown Joint work with research groups of: David Miller, Mark Horowitz, Olav Solgaard](https://reader030.vdocuments.us/reader030/viewer/2022032800/56649d385503460f94a10d33/html5/thumbnails/10.jpg)
Crossbar
Linecards
Switch Linecards
Trend: Multi-rack routersReduces power density
![Page 11: Scaling Internet Routers Using Optics UW, October 16 th, 2003 Nick McKeown Joint work with research groups of: David Miller, Mark Horowitz, Olav Solgaard](https://reader030.vdocuments.us/reader030/viewer/2022032800/56649d385503460f94a10d33/html5/thumbnails/11.jpg)
Alcatel 7670 RSP Juniper TX8/T640
TX8
ChiaroAvici TSR
![Page 12: Scaling Internet Routers Using Optics UW, October 16 th, 2003 Nick McKeown Joint work with research groups of: David Miller, Mark Horowitz, Olav Solgaard](https://reader030.vdocuments.us/reader030/viewer/2022032800/56649d385503460f94a10d33/html5/thumbnails/12.jpg)
Limits to scaling
Overall power is dominated by linecards Sheer number Optical WAN components Per packet processing and buffering.
But power density is dominated by switch fabric
![Page 13: Scaling Internet Routers Using Optics UW, October 16 th, 2003 Nick McKeown Joint work with research groups of: David Miller, Mark Horowitz, Olav Solgaard](https://reader030.vdocuments.us/reader030/viewer/2022032800/56649d385503460f94a10d33/html5/thumbnails/13.jpg)
Trend: Multi-rack routersReduces power density
Switch Linecards
Limit today ~2.5Tb/s Electronics Scheduler scales <2x every 18 months Opto-electronic conversion
![Page 14: Scaling Internet Routers Using Optics UW, October 16 th, 2003 Nick McKeown Joint work with research groups of: David Miller, Mark Horowitz, Olav Solgaard](https://reader030.vdocuments.us/reader030/viewer/2022032800/56649d385503460f94a10d33/html5/thumbnails/14.jpg)
In
OutWAN
Linecard
InWAN
Multi-rack routers
Out
Switch fabric
![Page 15: Scaling Internet Routers Using Optics UW, October 16 th, 2003 Nick McKeown Joint work with research groups of: David Miller, Mark Horowitz, Olav Solgaard](https://reader030.vdocuments.us/reader030/viewer/2022032800/56649d385503460f94a10d33/html5/thumbnails/15.jpg)
Question
Instead, can we use an optical fabric at 100Tb/s with 100% throughput?
Conventional answer: No. Need to reconfigure switch too often 100% throughput requires complex
electronic scheduler.
![Page 16: Scaling Internet Routers Using Optics UW, October 16 th, 2003 Nick McKeown Joint work with research groups of: David Miller, Mark Horowitz, Olav Solgaard](https://reader030.vdocuments.us/reader030/viewer/2022032800/56649d385503460f94a10d33/html5/thumbnails/16.jpg)
Outline
How to guarantee 100% throughput? How to eliminate the scheduler? How to use an optical switch fabric? How to make it scalable and practical?
![Page 17: Scaling Internet Routers Using Optics UW, October 16 th, 2003 Nick McKeown Joint work with research groups of: David Miller, Mark Horowitz, Olav Solgaard](https://reader030.vdocuments.us/reader030/viewer/2022032800/56649d385503460f94a10d33/html5/thumbnails/17.jpg)
In
In
In
Out
Out
Out
R
R
R
R
R
R
Router capacity = NRSwitch capacity = N2R
100% Throughput?
?
?
?
?
?
?
?
?
R
R
R
R
R
R
R
R
R
RRRR
![Page 18: Scaling Internet Routers Using Optics UW, October 16 th, 2003 Nick McKeown Joint work with research groups of: David Miller, Mark Horowitz, Olav Solgaard](https://reader030.vdocuments.us/reader030/viewer/2022032800/56649d385503460f94a10d33/html5/thumbnails/18.jpg)
R
In
In
In
Out
Out
Out
R
R
R
R
R
R/N
R/N
R/N
R/NR/N
R/N
R/N
R/N
R/N
If traffic is uniform
RNR /NR /NR /
R
NR / NR /
![Page 19: Scaling Internet Routers Using Optics UW, October 16 th, 2003 Nick McKeown Joint work with research groups of: David Miller, Mark Horowitz, Olav Solgaard](https://reader030.vdocuments.us/reader030/viewer/2022032800/56649d385503460f94a10d33/html5/thumbnails/19.jpg)
Real traffic is not uniform
R
In
In
In
Out
Out
Out
R
R
R
R
R
R/N
R/N
R/N
R/N
R/N
R/N
R/N
R/N
R/N
RNR /NR /NR /
R
RNR /NR /NR /
R
RNR /NR /NR /
R
R
R
R
?
![Page 20: Scaling Internet Routers Using Optics UW, October 16 th, 2003 Nick McKeown Joint work with research groups of: David Miller, Mark Horowitz, Olav Solgaard](https://reader030.vdocuments.us/reader030/viewer/2022032800/56649d385503460f94a10d33/html5/thumbnails/20.jpg)
Out
Out
Out
R
R
R
R/N
R/N
R/N
R/N
R/N
R/N
R/N
R/N
R/N
Two-stage load-balancing switch
Load-balancing stage Switching stage
In
In
In
Out
Out
Out
R
R
R
R/N
R/N
R/N
R/N
R/N
R/N
R/N
R/N
R/N
R
R
R
100% throughput for weakly mixing, stochastic traffic.[C.-S. Chang, Valiant]
![Page 21: Scaling Internet Routers Using Optics UW, October 16 th, 2003 Nick McKeown Joint work with research groups of: David Miller, Mark Horowitz, Olav Solgaard](https://reader030.vdocuments.us/reader030/viewer/2022032800/56649d385503460f94a10d33/html5/thumbnails/21.jpg)
Out
Out
Out
R
R
R
R/N
R/N
R/N
R/N
R/N
R/N
R/N
R/N
R/N
In
In
In
R
R
R
R/N
R/N
R/N
R/N
R/N
R/N
R/N
R/N
R/N
33 1
2
3
3333
![Page 22: Scaling Internet Routers Using Optics UW, October 16 th, 2003 Nick McKeown Joint work with research groups of: David Miller, Mark Horowitz, Olav Solgaard](https://reader030.vdocuments.us/reader030/viewer/2022032800/56649d385503460f94a10d33/html5/thumbnails/22.jpg)
Out
Out
Out
R
R
R
R/N
R/N
R/N
R/N
R/N
R/N
R/N
R/N
R/N
In
In
In
R
R
R
R/N
R/N
R/N
R/N
R/N
R/N
R/N
R/N
R/N33
1
2
3
33
33
![Page 23: Scaling Internet Routers Using Optics UW, October 16 th, 2003 Nick McKeown Joint work with research groups of: David Miller, Mark Horowitz, Olav Solgaard](https://reader030.vdocuments.us/reader030/viewer/2022032800/56649d385503460f94a10d33/html5/thumbnails/23.jpg)
Chang’s load-balanced switchGood properties
1. 100% throughput for broad class of traffic
1. No scheduler needed
Scalable
![Page 24: Scaling Internet Routers Using Optics UW, October 16 th, 2003 Nick McKeown Joint work with research groups of: David Miller, Mark Horowitz, Olav Solgaard](https://reader030.vdocuments.us/reader030/viewer/2022032800/56649d385503460f94a10d33/html5/thumbnails/24.jpg)
Chang’s load-balanced switchBad properties
FOFF: Load-balancing algorithm Packet sequence maintained No pathological patterns 100% throughput - always Delay within bound of ideal (See paper for details)
FOFF: Load-balancing algorithm Packet sequence maintained No pathological patterns 100% throughput - always Delay within bound of ideal (See paper for details)
1. Packet mis-sequencing
2. Pathological traffic patterns
Throughput 1/N-th of capacity
3. Uses two switch fabrics
Hard to package
4. Doesn’t work with some linecards missing
Impractical
![Page 25: Scaling Internet Routers Using Optics UW, October 16 th, 2003 Nick McKeown Joint work with research groups of: David Miller, Mark Horowitz, Olav Solgaard](https://reader030.vdocuments.us/reader030/viewer/2022032800/56649d385503460f94a10d33/html5/thumbnails/25.jpg)
In
In
In
Out
Out
Out
R
R
R
R
R
R
2R/N
2R/N
2R/N
2R/N
2R/N
2R/N
2R/N
2R/N
2R/N
Single Mesh Switch
One linecard
![Page 26: Scaling Internet Routers Using Optics UW, October 16 th, 2003 Nick McKeown Joint work with research groups of: David Miller, Mark Horowitz, Olav Solgaard](https://reader030.vdocuments.us/reader030/viewer/2022032800/56649d385503460f94a10d33/html5/thumbnails/26.jpg)
In
In
In
R
R
R
Out
Out
Out
Backplane
R
R
R
Packaging2R/N
2R/N
2R/N
2R/N
2R/N
2R/N
2R/N
2R/N
R/N
![Page 27: Scaling Internet Routers Using Optics UW, October 16 th, 2003 Nick McKeown Joint work with research groups of: David Miller, Mark Horowitz, Olav Solgaard](https://reader030.vdocuments.us/reader030/viewer/2022032800/56649d385503460f94a10d33/html5/thumbnails/27.jpg)
Many fabric options
OptionsSpace: Full uniform meshTime: Round-robin crossbarWavelength: Static WDM
Any permutationnetwork
C1, C2, …, CN
C1
C2
C3
CN
In Out
In Out
In Out
In Out
N channels each at rate 2R/N
![Page 28: Scaling Internet Routers Using Optics UW, October 16 th, 2003 Nick McKeown Joint work with research groups of: David Miller, Mark Horowitz, Olav Solgaard](https://reader030.vdocuments.us/reader030/viewer/2022032800/56649d385503460f94a10d33/html5/thumbnails/28.jpg)
In Out
In Out
In Out
In Out
Static WDM switching
Array Waveguide
Router(AWGR)
Passive andAlmost Zero
Power
A
B
C
D
A, B, C, D
A, B, C, D
A, B, C, D
A, B, C, D
A, A, A, A
B, B, B, B
C, C, C, C
D, D, D, D
4 WDM channels, each at rate 2R/N
![Page 29: Scaling Internet Routers Using Optics UW, October 16 th, 2003 Nick McKeown Joint work with research groups of: David Miller, Mark Horowitz, Olav Solgaard](https://reader030.vdocuments.us/reader030/viewer/2022032800/56649d385503460f94a10d33/html5/thumbnails/29.jpg)
RWDM
1
N
ROut
WDM
1
N
WDM
1
N
R R
2
R
R
4
21
Linecard dataflow
WDM
1
N
22
22
22
22 22 22
11
33
11
11
11111111
R R
3
In
11 11 11 11
![Page 30: Scaling Internet Routers Using Optics UW, October 16 th, 2003 Nick McKeown Joint work with research groups of: David Miller, Mark Horowitz, Olav Solgaard](https://reader030.vdocuments.us/reader030/viewer/2022032800/56649d385503460f94a10d33/html5/thumbnails/30.jpg)
Problems of scale
For N < 64, WDM is a good solution. We want N = 640. Need to decompose.
![Page 31: Scaling Internet Routers Using Optics UW, October 16 th, 2003 Nick McKeown Joint work with research groups of: David Miller, Mark Horowitz, Olav Solgaard](https://reader030.vdocuments.us/reader030/viewer/2022032800/56649d385503460f94a10d33/html5/thumbnails/31.jpg)
Decomposing the mesh
2R/81
2
3
4
5
6
7
8
1
2
3
4
5
6
7
8
![Page 32: Scaling Internet Routers Using Optics UW, October 16 th, 2003 Nick McKeown Joint work with research groups of: David Miller, Mark Horowitz, Olav Solgaard](https://reader030.vdocuments.us/reader030/viewer/2022032800/56649d385503460f94a10d33/html5/thumbnails/32.jpg)
Decomposing the mesh
2R/42R/8
2R/8
2R/8
2R/8
1
2
3
4
5
6
7
8
1
2
3
4
5
6
7
8
TDMWDM
![Page 33: Scaling Internet Routers Using Optics UW, October 16 th, 2003 Nick McKeown Joint work with research groups of: David Miller, Mark Horowitz, Olav Solgaard](https://reader030.vdocuments.us/reader030/viewer/2022032800/56649d385503460f94a10d33/html5/thumbnails/33.jpg)
When N is too largeDecompose into groups (or racks)
1, 2, …, G
1
Array Waveguide
Router(AWGR)
2
L
2R2R
2R
1
2
L
2R2R
2R
Group/Rack 1
Group/Rack G
1
G1, 2, …, G
![Page 34: Scaling Internet Routers Using Optics UW, October 16 th, 2003 Nick McKeown Joint work with research groups of: David Miller, Mark Horowitz, Olav Solgaard](https://reader030.vdocuments.us/reader030/viewer/2022032800/56649d385503460f94a10d33/html5/thumbnails/34.jpg)
When a linecard is missing
Each linecard spreads its data equally over every other linecard.
Problem: If one is missing, or failed, then the spreading no longer works.
![Page 35: Scaling Internet Routers Using Optics UW, October 16 th, 2003 Nick McKeown Joint work with research groups of: David Miller, Mark Horowitz, Olav Solgaard](https://reader030.vdocuments.us/reader030/viewer/2022032800/56649d385503460f94a10d33/html5/thumbnails/35.jpg)
When a linecard fails
In
In
Out
Out
Out
R
R
R
2R/3
2R/3
2R/3
2R/32R/32R/3
2R/3
2R/3
2R/3
InR
R
R
2R/3 + 2R/6
2R/3 + 2R/6
2R/3 + 2R/6 + 2R/3 + 2R/6 = 2R
2R/3 + 2R/6
2R/3 + 2R/6
Solution:1. Move light beams
Replace AWGR with MEMS switch. Reconfigure when linecard added, removed or
fails.2. Finer channel granularity
Multiple paths.
2R/3 + 2R/3 = (4/3)R
![Page 36: Scaling Internet Routers Using Optics UW, October 16 th, 2003 Nick McKeown Joint work with research groups of: David Miller, Mark Horowitz, Olav Solgaard](https://reader030.vdocuments.us/reader030/viewer/2022032800/56649d385503460f94a10d33/html5/thumbnails/36.jpg)
SolutionUse transparent MEMS switches
1
2
L
2R2R
2R
1
2
L
2R2R
2R
Group/Rack 1
Group/Rack G=40
MEMSSwitch
1
G
MEMSSwitch
1
G
MEMSSwitch
1
G
Theorems: 1. Require L+G-1 MEMS switches2. Polynomial time reconfiguration algorithm
MEMS switches reconfigured only when linecard added, removed or fails.
![Page 37: Scaling Internet Routers Using Optics UW, October 16 th, 2003 Nick McKeown Joint work with research groups of: David Miller, Mark Horowitz, Olav Solgaard](https://reader030.vdocuments.us/reader030/viewer/2022032800/56649d385503460f94a10d33/html5/thumbnails/37.jpg)
First-Stage
GxGMiddleSwitch
Group 1
LxMLocal
Switch
Linecard 1
Linecard 2
Linecard L
Group 2
LxMLocal
Switch
Linecard 1
Linecard 2
Linecard L
LxMLocal
Switch
Linecard 1
Linecard 2
Linecard L
Group G
MxLLocal
Switch
Linecard 1
Linecard 2
Linecard L
Final-Stage
Group 1
MxLLocal
Switch
Linecard 1
Linecard 2
Linecard L
Group 2
MxLLocal
Switch
Linecard 1
Linecard 2
Linecard L
Group G
GxGMiddleSwitch
GxGMiddleSwitch
GxGMiddleSwitch
1
2
3
M
Middle-Stage
1
2
3
M
1
2
3
M
1
2
3
M
1
2
3
M
1
2
3
M
1
2
3
M
Hybrid Architecture: Logical View
![Page 38: Scaling Internet Routers Using Optics UW, October 16 th, 2003 Nick McKeown Joint work with research groups of: David Miller, Mark Horowitz, Olav Solgaard](https://reader030.vdocuments.us/reader030/viewer/2022032800/56649d385503460f94a10d33/html5/thumbnails/38.jpg)
Hybrid Electro-Optical ArchitectureFixedLasers
ElectronicSwitches
GxGMEMS
Group 1
LxMCrossbar
Linecard 1
Linecard 2
Linecard L
Group 2
LxMCrossbar
Linecard 1
Linecard 2
Linecard L
LxMCrossbar
Linecard 1
Linecard 2
Linecard L
Group G
MxLCrossbar
Linecard 1
Linecard 2
Linecard L
ElectronicSwitches
OpticalReceivers
Group 1
MxLCrossbar
Linecard 1
Linecard 2
Linecard L
Group 2
MxLCrossbar
Linecard 1
Linecard 2
Linecard L
Group G
GxGMEMS
GxGMEMS
GxGMEMS
1
2
3
M
StaticMEMS
1
2
3
M
1
2
3
M
1
2
3
M
1
2
3
M
1
2
3
M
1
2
3
M
![Page 39: Scaling Internet Routers Using Optics UW, October 16 th, 2003 Nick McKeown Joint work with research groups of: David Miller, Mark Horowitz, Olav Solgaard](https://reader030.vdocuments.us/reader030/viewer/2022032800/56649d385503460f94a10d33/html5/thumbnails/39.jpg)
Number of MEMS Switches
Linecard 1
Linecard 2
Linecard 3
Crossbar
Crossbar
Crossbar
Crossbar
Linecard 1
Linecard 2
Linecard 3
R
RR
R
Linecard 1
Linecard 2
Linecard 3
Crossbar
Crossbar
Crossbar
Crossbar
Linecard 1
Linecard 2
Linecard 3
StaticMEMS
Linecard 4 Linecard 4
Linecard 3 Linecard 4
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
![Page 40: Scaling Internet Routers Using Optics UW, October 16 th, 2003 Nick McKeown Joint work with research groups of: David Miller, Mark Horowitz, Olav Solgaard](https://reader030.vdocuments.us/reader030/viewer/2022032800/56649d385503460f94a10d33/html5/thumbnails/40.jpg)
Number of MEMS SwitchesLinecard 1
Linecard 2
Linecard 3
Crossbar
Crossbar
Crossbar
Crossbar
Linecard 1
Linecard 2
Linecard 3
4R/3
2R/32R/3
R/3
Linecard 1
Linecard 2
Linecard 3
Crossbar
Crossbar
Crossbar
Crossbar
Linecard 1
Linecard 2
Linecard 3
StaticMEMS
R
R/3
2R/3
R/3
2R/3
R
R
R
R
R
R
R
R
R
R
R
R
![Page 41: Scaling Internet Routers Using Optics UW, October 16 th, 2003 Nick McKeown Joint work with research groups of: David Miller, Mark Horowitz, Olav Solgaard](https://reader030.vdocuments.us/reader030/viewer/2022032800/56649d385503460f94a10d33/html5/thumbnails/41.jpg)
Number of MEMS needed for a schedule
Li: number of linecards in group i, 1 ≤ i ≤ G. Group i needs to send to group j:
1
( )( ), G
ji i
i
LL R where N L
N
Assume each group can send at most R to each MEMS. Number of MEMS
needed between groups i and j:
1( )( ) j i j
ij i
L L LA L R
N R N
![Page 42: Scaling Internet Routers Using Optics UW, October 16 th, 2003 Nick McKeown Joint work with research groups of: David Miller, Mark Horowitz, Olav Solgaard](https://reader030.vdocuments.us/reader030/viewer/2022032800/56649d385503460f94a10d33/html5/thumbnails/42.jpg)
Number of MEMS needed for a schedule
The number of MEMS needed for group i to send to group j is Aij.
The total number of MEMS needed for group i is the sum of the Aij’s
1 1 1
1G G G
i j i jij i
j j j
L L L LA L G
N N
1, max( ) iL G where L L
![Page 43: Scaling Internet Routers Using Optics UW, October 16 th, 2003 Nick McKeown Joint work with research groups of: David Miller, Mark Horowitz, Olav Solgaard](https://reader030.vdocuments.us/reader030/viewer/2022032800/56649d385503460f94a10d33/html5/thumbnails/43.jpg)
Constraints for the TDM Schedule
1. Latin Square: In any period N, each transmitting linecard is connected to each receiving linecard exactly once.
2. MEMS constraint: In any time-slot, there are at most Aij connections between transmitting group i and receiving group j, where:
i jij
L LA
N
![Page 44: Scaling Internet Routers Using Optics UW, October 16 th, 2003 Nick McKeown Joint work with research groups of: David Miller, Mark Horowitz, Olav Solgaard](https://reader030.vdocuments.us/reader030/viewer/2022032800/56649d385503460f94a10d33/html5/thumbnails/44.jpg)
Example
Assume L1=3, L2=2, L3=1
Then
E.g., at most 2 packets from the first group to the first group at each time-slot
2 1 1
1 1 1
1 1 1
i j
ij
ij
L LA
N
![Page 45: Scaling Internet Routers Using Optics UW, October 16 th, 2003 Nick McKeown Joint work with research groups of: David Miller, Mark Horowitz, Olav Solgaard](https://reader030.vdocuments.us/reader030/viewer/2022032800/56649d385503460f94a10d33/html5/thumbnails/45.jpg)
Bad TDM Transmit Schedule
t = 0 t = 1 t = 2 t = 3 t = 4 t = 5
LC 1 1 2 3 4 5 6
LC 2 6 1 2 3 4 5
LC 3 5 6 1 2 3 4
LC 4 4 5 6 1 2 3
LC 5 3 4 5 6 1 2
LC 6 2 3 4 5 6 1
![Page 46: Scaling Internet Routers Using Optics UW, October 16 th, 2003 Nick McKeown Joint work with research groups of: David Miller, Mark Horowitz, Olav Solgaard](https://reader030.vdocuments.us/reader030/viewer/2022032800/56649d385503460f94a10d33/html5/thumbnails/46.jpg)
Good TDM Transmit Schedule
t = 0 t = 1 t = 2 t = 3 t = 4 t = 5
LC 1 1 2 3 4 5 6
LC 2 5 1 2 3 6 4
LC 3 6 5 4 1 2 3
LC 4 2 3 1 6 4 5
LC 5 4 6 5 2 3 1
LC 6 3 4 6 5 1 2
![Page 47: Scaling Internet Routers Using Optics UW, October 16 th, 2003 Nick McKeown Joint work with research groups of: David Miller, Mark Horowitz, Olav Solgaard](https://reader030.vdocuments.us/reader030/viewer/2022032800/56649d385503460f94a10d33/html5/thumbnails/47.jpg)
Configuration Algorithm
1. Assign connections between groups, so MEMS constraint is satisfied.
2. Assign group connections to specific linecards, so there is exactly one connection per linecard pair in the schedule.
Comments: Algorithm is surprisingly complex. Best running time so far: 40 seconds for 640 linecards.
![Page 48: Scaling Internet Routers Using Optics UW, October 16 th, 2003 Nick McKeown Joint work with research groups of: David Miller, Mark Horowitz, Olav Solgaard](https://reader030.vdocuments.us/reader030/viewer/2022032800/56649d385503460f94a10d33/html5/thumbnails/48.jpg)
Challenges
RWDM
1
G
GROut
WDM
1
G
WDMPkt
Switch
1
G
R R
G
G2
R=160Gb/s
R
4
21
WDM
1
G
GAddressLookup
11
R R
3
In
How to build a 250ms
160Gb/s buffer?
Low-cost, low-power
optoelectronic conversion?
![Page 49: Scaling Internet Routers Using Optics UW, October 16 th, 2003 Nick McKeown Joint work with research groups of: David Miller, Mark Horowitz, Olav Solgaard](https://reader030.vdocuments.us/reader030/viewer/2022032800/56649d385503460f94a10d33/html5/thumbnails/49.jpg)
What we are building
Buffer Manager
90nm ASIC
Buffer Manager
90nm ASIC
250ms DRAM
160Gb/s 160Gb/s
320Gb/sChip #1: 160Gb/s Packet Buffer
CMOS ASIC
16 x 10Gb/s
To Linecards To Optical Fabric
Chip #2: 16 x 55 Opto-electronic crossbar
55 x 10Gb/s55 x 10Gb/s
1500nm Optical source
Optical DetectorOptical Modulator
![Page 50: Scaling Internet Routers Using Optics UW, October 16 th, 2003 Nick McKeown Joint work with research groups of: David Miller, Mark Horowitz, Olav Solgaard](https://reader030.vdocuments.us/reader030/viewer/2022032800/56649d385503460f94a10d33/html5/thumbnails/50.jpg)
100Tb/s Load-Balanced Router
L = 16160Gb/s linecards
Linecard Rack G = 40
L = 16160Gb/s linecards
Linecard Rack 1
L = 16160Gb/s linecards
55 56
1 2
40 x 40MEMS
Switch Rack < 100W