Commissioning:The Most Important Component
of LEED®
byRick Miller, PE, LEED AP
RNM Engineering, Inc.San Luis Obispo, CA
![Page 2: San Luis Obispo, CA RNM Engineering, Inc. Rick Miller, PE ... · of LEED® by Rick Miller, PE, LEED AP ... •Which school used the LEED Cx process? In Conclusion •Commissioning](https://reader034.vdocuments.us/reader034/viewer/2022052005/6018af77a358a566d57c4f10/html5/thumbnails/2.jpg)
LEED® and Commissioning
• EA Prerequisite Fundamental Commissioning of Building Energy Systems
• EA Credit 3 Enhanced Commissioning2 Points
![Page 3: San Luis Obispo, CA RNM Engineering, Inc. Rick Miller, PE ... · of LEED® by Rick Miller, PE, LEED AP ... •Which school used the LEED Cx process? In Conclusion •Commissioning](https://reader034.vdocuments.us/reader034/viewer/2022052005/6018af77a358a566d57c4f10/html5/thumbnails/3.jpg)
Fundamental Commissioning
• Designate an individual as the commissioning authority (CxA) – CxA must have documented CxA experience.– CxA must be independent of the project design and
construction management.– CxA must report results, findings and
recommendations directly to the owner.– For projects smaller than 50,000 gross square feet,
the CxA may be a qualified person on the design or construction team who has the required experience.
![Page 4: San Luis Obispo, CA RNM Engineering, Inc. Rick Miller, PE ... · of LEED® by Rick Miller, PE, LEED AP ... •Which school used the LEED Cx process? In Conclusion •Commissioning](https://reader034.vdocuments.us/reader034/viewer/2022052005/6018af77a358a566d57c4f10/html5/thumbnails/4.jpg)
Fundamental Commissioning
• The owner must prepare Owner’s Project Requirements (OPR).
• The design team must develop the Basis Of Design (BOD).
• The CxA must review these documents for clarity and completeness.
• The owner and design team must be responsible for updates to their respective documents.
![Page 5: San Luis Obispo, CA RNM Engineering, Inc. Rick Miller, PE ... · of LEED® by Rick Miller, PE, LEED AP ... •Which school used the LEED Cx process? In Conclusion •Commissioning](https://reader034.vdocuments.us/reader034/viewer/2022052005/6018af77a358a566d57c4f10/html5/thumbnails/5.jpg)
Fundamental Commissioning
• Develop and incorporate commissioning requirements into the construction documents.
• Develop and implement a commissioning plan.
• Verify the installation and performance of the systems to be commissioned.
• Complete a summary commissioning report.
![Page 6: San Luis Obispo, CA RNM Engineering, Inc. Rick Miller, PE ... · of LEED® by Rick Miller, PE, LEED AP ... •Which school used the LEED Cx process? In Conclusion •Commissioning](https://reader034.vdocuments.us/reader034/viewer/2022052005/6018af77a358a566d57c4f10/html5/thumbnails/6.jpg)
Fundamental Commissioning
• Commissioning process activities must be completed for the following energy-related systems: – HVACR – Lighting and Daylighting Controls– Domestic Hot Water Systems– Renewable Energy Systems (e.g. wind, solar)
![Page 7: San Luis Obispo, CA RNM Engineering, Inc. Rick Miller, PE ... · of LEED® by Rick Miller, PE, LEED AP ... •Which school used the LEED Cx process? In Conclusion •Commissioning](https://reader034.vdocuments.us/reader034/viewer/2022052005/6018af77a358a566d57c4f10/html5/thumbnails/7.jpg)
Enhanced Commissioning
• Intent: To begin the commissioning process early in the design process and execute additional activities after systems performance verification is completed.
![Page 8: San Luis Obispo, CA RNM Engineering, Inc. Rick Miller, PE ... · of LEED® by Rick Miller, PE, LEED AP ... •Which school used the LEED Cx process? In Conclusion •Commissioning](https://reader034.vdocuments.us/reader034/viewer/2022052005/6018af77a358a566d57c4f10/html5/thumbnails/8.jpg)
Enhanced Commissioning
• The commissioning authority (CxA): – Must have documented CxA experience.– Must be independent of the project design and
construction management.– Must not be an employee of the design firm,
but may be contracted through them.– Must not be an employee of, or contracted
through, a contractor or CM holding construction contracts.
– May be a qualified employee or consultant of the owner.
![Page 9: San Luis Obispo, CA RNM Engineering, Inc. Rick Miller, PE ... · of LEED® by Rick Miller, PE, LEED AP ... •Which school used the LEED Cx process? In Conclusion •Commissioning](https://reader034.vdocuments.us/reader034/viewer/2022052005/6018af77a358a566d57c4f10/html5/thumbnails/9.jpg)
Enhanced Commissioning
• Must conduct 1 or more commissioning design reviews of the OPR, BOD, and design documents prior to the mid-CD phase and back-check the review comments in the subsequent design submission.
![Page 10: San Luis Obispo, CA RNM Engineering, Inc. Rick Miller, PE ... · of LEED® by Rick Miller, PE, LEED AP ... •Which school used the LEED Cx process? In Conclusion •Commissioning](https://reader034.vdocuments.us/reader034/viewer/2022052005/6018af77a358a566d57c4f10/html5/thumbnails/10.jpg)
Enhanced Commissioning
• Must review contractor submittals applicable to systems being commissioned for compliance with the OPR and BOD. This review must be concurrent with the review by the architect or engineer and submitted to the design team and the owner.
![Page 11: San Luis Obispo, CA RNM Engineering, Inc. Rick Miller, PE ... · of LEED® by Rick Miller, PE, LEED AP ... •Which school used the LEED Cx process? In Conclusion •Commissioning](https://reader034.vdocuments.us/reader034/viewer/2022052005/6018af77a358a566d57c4f10/html5/thumbnails/11.jpg)
Enhanced Commissioning
• Must develop a Systems Manual that gives future operating staff the information needed to understand and optimally operate the commissioned systems.
![Page 12: San Luis Obispo, CA RNM Engineering, Inc. Rick Miller, PE ... · of LEED® by Rick Miller, PE, LEED AP ... •Which school used the LEED Cx process? In Conclusion •Commissioning](https://reader034.vdocuments.us/reader034/viewer/2022052005/6018af77a358a566d57c4f10/html5/thumbnails/12.jpg)
Enhanced Commissioning
• Must verify that the requirements for training operating personnel and building occupants have been completed.
![Page 13: San Luis Obispo, CA RNM Engineering, Inc. Rick Miller, PE ... · of LEED® by Rick Miller, PE, LEED AP ... •Which school used the LEED Cx process? In Conclusion •Commissioning](https://reader034.vdocuments.us/reader034/viewer/2022052005/6018af77a358a566d57c4f10/html5/thumbnails/13.jpg)
Enhanced Commissioning
• Must be involved in reviewing the operation of the building with operations and maintenance (O&M) staff and occupants within 10 months after substantial completion. A plan for resolving outstanding commissioning related issues must be included.
![Page 14: San Luis Obispo, CA RNM Engineering, Inc. Rick Miller, PE ... · of LEED® by Rick Miller, PE, LEED AP ... •Which school used the LEED Cx process? In Conclusion •Commissioning](https://reader034.vdocuments.us/reader034/viewer/2022052005/6018af77a358a566d57c4f10/html5/thumbnails/14.jpg)
10 School Campuses
• 3 of these schools were new constructions• 7 were major modernization projects• Projects required enhanced Cx for HVAC
systems and controls• 700 issues were noted
![Page 15: San Luis Obispo, CA RNM Engineering, Inc. Rick Miller, PE ... · of LEED® by Rick Miller, PE, LEED AP ... •Which school used the LEED Cx process? In Conclusion •Commissioning](https://reader034.vdocuments.us/reader034/viewer/2022052005/6018af77a358a566d57c4f10/html5/thumbnails/15.jpg)
700 Cx Issues
• Operational & Maintenance - 32%• Comfort & Indoor Air Quality – 37%• Energy – 26%• Safety – 6%
![Page 16: San Luis Obispo, CA RNM Engineering, Inc. Rick Miller, PE ... · of LEED® by Rick Miller, PE, LEED AP ... •Which school used the LEED Cx process? In Conclusion •Commissioning](https://reader034.vdocuments.us/reader034/viewer/2022052005/6018af77a358a566d57c4f10/html5/thumbnails/16.jpg)
Operational & Maintenance
• Excessive play or gap in dampers• Overly noisy & vibrating equipment• Improper/unsafe installation; not code• Equipment poorly labeled• Missing covers & fasteners• Incomplete training• As-built and Ops Manual incomplete• Condensate piping improperly installed• Incomplete/incorrect mapping of points
![Page 17: San Luis Obispo, CA RNM Engineering, Inc. Rick Miller, PE ... · of LEED® by Rick Miller, PE, LEED AP ... •Which school used the LEED Cx process? In Conclusion •Commissioning](https://reader034.vdocuments.us/reader034/viewer/2022052005/6018af77a358a566d57c4f10/html5/thumbnails/17.jpg)
Comfort & Indoor Air Quality
• Improper setpoints• Overly noisy equipment• Dirty filters / coils• Malfunctioning exhausts fans• Improper flue exhaust• Improper CO2 based purge operation• Improper air balance• Unapproved relocation of supply grills
![Page 18: San Luis Obispo, CA RNM Engineering, Inc. Rick Miller, PE ... · of LEED® by Rick Miller, PE, LEED AP ... •Which school used the LEED Cx process? In Conclusion •Commissioning](https://reader034.vdocuments.us/reader034/viewer/2022052005/6018af77a358a566d57c4f10/html5/thumbnails/18.jpg)
Energy
• Excessive play or gap in dampers• Equipment interlock not working• Malfunctioning power exhausts• Inoperative dampers/actuators• Malfunctioning economizer controls• Incorrect programmed SOO/control wiring• Oversized fans (design)• Field modifications made without approval.• Direct wired exhaust fans – Always ON
![Page 19: San Luis Obispo, CA RNM Engineering, Inc. Rick Miller, PE ... · of LEED® by Rick Miller, PE, LEED AP ... •Which school used the LEED Cx process? In Conclusion •Commissioning](https://reader034.vdocuments.us/reader034/viewer/2022052005/6018af77a358a566d57c4f10/html5/thumbnails/19.jpg)
Safety
• Water leakage on electrical equipment• Unsecured/improperly mounted equipment• Unsealed roof openings/electrical conduits• Improper switching of exhaust fans• Flue exhaust proximity to air intake• Construction debris left on/around units• Unsecured exposed wires inside the unit
![Page 20: San Luis Obispo, CA RNM Engineering, Inc. Rick Miller, PE ... · of LEED® by Rick Miller, PE, LEED AP ... •Which school used the LEED Cx process? In Conclusion •Commissioning](https://reader034.vdocuments.us/reader034/viewer/2022052005/6018af77a358a566d57c4f10/html5/thumbnails/20.jpg)
Outside Air Damper Repair
![Page 21: San Luis Obispo, CA RNM Engineering, Inc. Rick Miller, PE ... · of LEED® by Rick Miller, PE, LEED AP ... •Which school used the LEED Cx process? In Conclusion •Commissioning](https://reader034.vdocuments.us/reader034/viewer/2022052005/6018af77a358a566d57c4f10/html5/thumbnails/21.jpg)
Air Straightener Damaged
![Page 22: San Luis Obispo, CA RNM Engineering, Inc. Rick Miller, PE ... · of LEED® by Rick Miller, PE, LEED AP ... •Which school used the LEED Cx process? In Conclusion •Commissioning](https://reader034.vdocuments.us/reader034/viewer/2022052005/6018af77a358a566d57c4f10/html5/thumbnails/22.jpg)
Pumps Throttled Excessively
![Page 23: San Luis Obispo, CA RNM Engineering, Inc. Rick Miller, PE ... · of LEED® by Rick Miller, PE, LEED AP ... •Which school used the LEED Cx process? In Conclusion •Commissioning](https://reader034.vdocuments.us/reader034/viewer/2022052005/6018af77a358a566d57c4f10/html5/thumbnails/23.jpg)
Water Collecting in AHU
![Page 24: San Luis Obispo, CA RNM Engineering, Inc. Rick Miller, PE ... · of LEED® by Rick Miller, PE, LEED AP ... •Which school used the LEED Cx process? In Conclusion •Commissioning](https://reader034.vdocuments.us/reader034/viewer/2022052005/6018af77a358a566d57c4f10/html5/thumbnails/24.jpg)
Dirt on AHU Dampers
![Page 25: San Luis Obispo, CA RNM Engineering, Inc. Rick Miller, PE ... · of LEED® by Rick Miller, PE, LEED AP ... •Which school used the LEED Cx process? In Conclusion •Commissioning](https://reader034.vdocuments.us/reader034/viewer/2022052005/6018af77a358a566d57c4f10/html5/thumbnails/25.jpg)
A Tale of Two Projects
![Page 26: San Luis Obispo, CA RNM Engineering, Inc. Rick Miller, PE ... · of LEED® by Rick Miller, PE, LEED AP ... •Which school used the LEED Cx process? In Conclusion •Commissioning](https://reader034.vdocuments.us/reader034/viewer/2022052005/6018af77a358a566d57c4f10/html5/thumbnails/26.jpg)
A Tale of Two Projects
• School #1 had a total of 19 warranty requests over a period of a year. These 19 requests were related to 38 issues of which eight were recurring issues.
![Page 27: San Luis Obispo, CA RNM Engineering, Inc. Rick Miller, PE ... · of LEED® by Rick Miller, PE, LEED AP ... •Which school used the LEED Cx process? In Conclusion •Commissioning](https://reader034.vdocuments.us/reader034/viewer/2022052005/6018af77a358a566d57c4f10/html5/thumbnails/27.jpg)
A Tale of Two Projects
• School #1 had a total of 19 warranty requests over a period of a year. These 19 requests were related to 38 issues of which eight were recurring issues.
• School #2 had 4 warranty requests related to 4 issues – none of which were repeats.
![Page 28: San Luis Obispo, CA RNM Engineering, Inc. Rick Miller, PE ... · of LEED® by Rick Miller, PE, LEED AP ... •Which school used the LEED Cx process? In Conclusion •Commissioning](https://reader034.vdocuments.us/reader034/viewer/2022052005/6018af77a358a566d57c4f10/html5/thumbnails/28.jpg)
A Tale of Two Projects
• School #1 had a total of 19 warranty requests over a period of a year. These 19 requests were related to 38 issues of which eight were recurring issues.
• School #2 had 4 warranty requests related to 4 issues – none of which were repeats.
• Which school used the LEED Cx process?
![Page 29: San Luis Obispo, CA RNM Engineering, Inc. Rick Miller, PE ... · of LEED® by Rick Miller, PE, LEED AP ... •Which school used the LEED Cx process? In Conclusion •Commissioning](https://reader034.vdocuments.us/reader034/viewer/2022052005/6018af77a358a566d57c4f10/html5/thumbnails/29.jpg)
In Conclusion
• Commissioning is important
![Page 30: San Luis Obispo, CA RNM Engineering, Inc. Rick Miller, PE ... · of LEED® by Rick Miller, PE, LEED AP ... •Which school used the LEED Cx process? In Conclusion •Commissioning](https://reader034.vdocuments.us/reader034/viewer/2022052005/6018af77a358a566d57c4f10/html5/thumbnails/30.jpg)
In Conclusion
• Commissioning is the most important
![Page 31: San Luis Obispo, CA RNM Engineering, Inc. Rick Miller, PE ... · of LEED® by Rick Miller, PE, LEED AP ... •Which school used the LEED Cx process? In Conclusion •Commissioning](https://reader034.vdocuments.us/reader034/viewer/2022052005/6018af77a358a566d57c4f10/html5/thumbnails/31.jpg)
In Conclusion
• Commissioning is the most important• Saves energy• Reduces O & M costs• Improves IAQ• Enhances safety
![Page 32: San Luis Obispo, CA RNM Engineering, Inc. Rick Miller, PE ... · of LEED® by Rick Miller, PE, LEED AP ... •Which school used the LEED Cx process? In Conclusion •Commissioning](https://reader034.vdocuments.us/reader034/viewer/2022052005/6018af77a358a566d57c4f10/html5/thumbnails/32.jpg)
Credits
• Andrew Collins• Greg Cunningham• Dean Francis • Vivek Mittal