Page 1: Sakhalin Energy: DROPS Prevention in Offices and Accommodation

Sakhalin Energy:

DROPS Prevention in Offices and Accommodation

Page 2: Sakhalin Energy: DROPS Prevention in Offices and Accommodation

Sakhalin-2 Project

Page 3: Sakhalin Energy: DROPS Prevention in Offices and Accommodation

Lifting Beam Failure

Page 4: Sakhalin Energy: DROPS Prevention in Offices and Accommodation

DROPS statistics

Page 5: Sakhalin Energy: DROPS Prevention in Offices and Accommodation

Ceiling collapsed as a result of fire suppression system leakage

Page 6: Sakhalin Energy: DROPS Prevention in Offices and Accommodation

Part of rainwater installation has fallen down the roof

Page 7: Sakhalin Energy: DROPS Prevention in Offices and Accommodation

Cupboard fell down in coffee room

Page 8: Sakhalin Energy: DROPS Prevention in Offices and Accommodation

Main causes of incidents

Page 9: Sakhalin Energy: DROPS Prevention in Offices and Accommodation

SEIC DROPS Programme

Page 10: Sakhalin Energy: DROPS Prevention in Offices and Accommodation

Programme Achievements

Page 11: Sakhalin Energy: DROPS Prevention in Offices and Accommodation

Actions to prevent incidents in offices and in company housing facility