Safety and Environment Management Plans for
Construction Contractors
Daryl Browne – Senior Project ManagerDuncan Cross – WHS Manager
Darwin Convention Centre – Room A0930h 30 May 2013
![Page 2: Safety and Environment Management Plans for Construction Contractors](https://reader036.vdocuments.us/reader036/viewer/2022062323/56815cc5550346895dcac9ee/html5/thumbnails/2.jpg)
Background
![Page 3: Safety and Environment Management Plans for Construction Contractors](https://reader036.vdocuments.us/reader036/viewer/2022062323/56815cc5550346895dcac9ee/html5/thumbnails/3.jpg)
Background• Legislation:
– Requirement to demonstrate positive commitment to legal obligations.• WHS (NUL) Act 2011• Environmental Offences and Penalties Act 2011
![Page 4: Safety and Environment Management Plans for Construction Contractors](https://reader036.vdocuments.us/reader036/viewer/2022062323/56815cc5550346895dcac9ee/html5/thumbnails/4.jpg)
Managing Risks and Impacts• Our policy outlines commitment to
undertaking all activities in an responsible manner and effectively managing risks that may effect:– People– Property– Environment
![Page 5: Safety and Environment Management Plans for Construction Contractors](https://reader036.vdocuments.us/reader036/viewer/2022062323/56815cc5550346895dcac9ee/html5/thumbnails/5.jpg)
Environment
![Page 6: Safety and Environment Management Plans for Construction Contractors](https://reader036.vdocuments.us/reader036/viewer/2022062323/56815cc5550346895dcac9ee/html5/thumbnails/6.jpg)
Environmental Management• The RFT will contain expectations for Contractor
environmental management.• Projects with a high risk of environmental impact
will have specific requirements:– Environmental Management Plan (EMP);– Erosion and Sediment Control Plans (ESCP); – Weed Management Plans (WMP); and– Cultural Heritage Restrictions (Refer AAPA).
![Page 7: Safety and Environment Management Plans for Construction Contractors](https://reader036.vdocuments.us/reader036/viewer/2022062323/56815cc5550346895dcac9ee/html5/thumbnails/7.jpg)
Minimising Environment Impact
![Page 8: Safety and Environment Management Plans for Construction Contractors](https://reader036.vdocuments.us/reader036/viewer/2022062323/56815cc5550346895dcac9ee/html5/thumbnails/8.jpg)
Environmental Approvals• DoI intent is to have relevant environmental approvals in
place for all projects:– Environmental Risk Assessment (ERA);– Land Council;– Impact Statement; and– Notice of Intent
• DoI Environment Services available at all periods of the contract for advice regarding contract requirements
![Page 9: Safety and Environment Management Plans for Construction Contractors](https://reader036.vdocuments.us/reader036/viewer/2022062323/56815cc5550346895dcac9ee/html5/thumbnails/9.jpg)
Safety
![Page 10: Safety and Environment Management Plans for Construction Contractors](https://reader036.vdocuments.us/reader036/viewer/2022062323/56815cc5550346895dcac9ee/html5/thumbnails/10.jpg)
Safety Management Plan• Audit focus on ‘Construction Projects’
– Projects value $250,000 or >– Review of plans to confirm compliance to
tender and contract requirements.• DoI intent is to support positive safety
outcomes for all key stakeholders.
![Page 11: Safety and Environment Management Plans for Construction Contractors](https://reader036.vdocuments.us/reader036/viewer/2022062323/56815cc5550346895dcac9ee/html5/thumbnails/11.jpg)
Plan Reviews
![Page 12: Safety and Environment Management Plans for Construction Contractors](https://reader036.vdocuments.us/reader036/viewer/2022062323/56815cc5550346895dcac9ee/html5/thumbnails/12.jpg)
Model Codes• Expectation is that your works conducted in
accordance with:– NT WorkSafe Model Code of Practice for
Construction.– National Code of Practice for the Construction
Industry (Federal)– For all Federal Safety Commissioner Accreditation,
refer• http://www.fsc.gov.au/sites/fsc
![Page 13: Safety and Environment Management Plans for Construction Contractors](https://reader036.vdocuments.us/reader036/viewer/2022062323/56815cc5550346895dcac9ee/html5/thumbnails/13.jpg)
References• International Erosion Control Association (IECA)
– http://www.austieca.com.au• Erosion and Sediment Control Manual- Version 1.2:
– www.sunshinecoast.qld.gov.au • NT WorkSafe Model Codes of Practice
– http://www.worksafe.nt.gov.au• National Code of Practice for the Construction Industry
– http://foi.deewr.gov.au/documents• Department of Infrastructure Tenderer and Contractor
assistance:– http://www.nt.gov.au/infrastructure/techspecs