Part I Review of General Revisions
Specification Changes
-
7/29/2019 S27_Part 1 Review of General Provisions Specification Changes_LTC2013
2/23
DOTD StaffBrian Buckel Barry LacyMasood Rasoulian Vince RussoRandy Sanders Tim Strohschein
Ed Wedge John Wells
Mark Stinson FHWA
Bama Hinton Gerace ConstructionChad Juneau Gilchrist Construction
Special Assistance from DOTD Staff:Jeff David, Fred Gholston, Henry Reed and Margaret Thompson
-
7/29/2019 S27_Part 1 Review of General Provisions Specification Changes_LTC2013
3/23
Section 101 Revised 101.01 Voice/Mood and References
This specification book uses the active voice, imperative mood whendescribing the contractors responsibility. For example:
Active Voice/Imperative Mood: Provide competent supervision.The subject of a sentence written in the active voice/imperative mood is not
explicitly stated. In these specifications, the implied subject of such asentence is typically the contractor, although in certain situations, thesubject may also be a vendor, fabricator, or manufacturer engaged by thecontractor to supply material, products, or equipment for use on theproject. Prior to award of a contract, the imperative statements are directed
to the bidder; it is only after the contract has been awarded that theimperatives are directed to the contractor.Section and Subsection titles and headings provide reference only, not
interpretation.A cross-reference to a specific Subsection of these specifications includes all
general requirements of the Section of which the Subsection is a part.Unless specified by year or date, cited publications refer to the most recent
issue, including interim publications, in effect on the bid closing date
-
7/29/2019 S27_Part 1 Review of General Provisions Specification Changes_LTC2013
4/23
Section 101 Cont
Added acronyms for CPM, DBE, IRI, LTRC, PCCP
Revised/Added definitions for: Acts of God Approved Producer/Supplier
Disqualification
Falcon
Fresh Concrete
Notice of Contract Execution
Project Limits
Qualified Brand Name
Railway/Railroad
Specifications
Work Order
-
7/29/2019 S27_Part 1 Review of General Provisions Specification Changes_LTC2013
5/23
Section 101 (Cont)
Added the following to 101.o4 Understood Works orExpressions
Where the party responsible for the work, testing, or samplingdescribed is not specifically identified, the work is to be performedbythe contractor
-
7/29/2019 S27_Part 1 Review of General Provisions Specification Changes_LTC2013
6/23
Section 102
Added the following to 102.o2 Contractors Licensing Laws The contractor will be required to ensure all work performed
conforms to Louisiana licensing laws and permit requirements
102.06 Examination of Bid Documents and Site of Work Added that contact be through Falcon.
102.11 Withdrawal or Revision of Bids
Specifically added Paper Bids
-
7/29/2019 S27_Part 1 Review of General Provisions Specification Changes_LTC2013
7/23
Section 103
Added the following to 103.o1.1 Rejection of Low Bid The low bidder is prohibited from bidding or working on any
federally funded project by FHWA. This reason applies for state orfederally funded projects
Added the following to 103.02 Award of Contract An enforceable contract is not created until it is fully executed by all
parties
-
7/29/2019 S27_Part 1 Review of General Provisions Specification Changes_LTC2013
8/23
Section 104
Added the following to 104.o2 Alteration of the Contract Verbal approval of a change order at the proper level for Category 1,
2, or 3 Change Order will be allowed to begin critical activities.Force Account type records shall be maintained until a fullexecuted Change Order is approved
Revised first two paragraphs of 104.03 Maintenance of Traffic The contractor shall provide for and maintain through and local
traffic at all times and shall conduct his operations in such manneras to cause the least possible interference with traffic at junctionswith roads, streets and driveways in accordance with Section 402,unless otherwise noted in plans or special provisions
-
7/29/2019 S27_Part 1 Review of General Provisions Specification Changes_LTC2013
9/23
Section 104 Cont
Revised first paragraph of 104.05 Guarantees Except as noted elsewhere, the contractor guarantees, by signing
the contract, the quality of materials and workmanship, includingthat of payments and structures, provided under the contract for aperiod of 3 years after final acceptance. For National HighwaySystem (NHS) projects, the period shall be 1 year
-
7/29/2019 S27_Part 1 Review of General Provisions Specification Changes_LTC2013
10/23
Section 105
Added to 105.03 Conformity with Plans and Specifications Other corrective actions submitted by the contractor will be
considered by the engineer and if accepted, will be performed by thecontractor at no direct pay
Removed from 105.03 The amount of such design cost will be the salary cost of design
personnel plus 110 percent
-
7/29/2019 S27_Part 1 Review of General Provisions Specification Changes_LTC2013
11/23
Section 105 Cont
Added to 105.07 Cooperation Between Contractors When a contract is let within, adjoining, or adjacent to the limits of
existing project(s), the existing project(s) schedule of work takesprecedence over the subsequent project
Revised 105.08 Construction Stakes, Lines and Grades States the Contractor shall set, not the Engineer
Added to 105.11 Inspection of Work Force account records shall be kept to document possible
reimbursement
-
7/29/2019 S27_Part 1 Review of General Provisions Specification Changes_LTC2013
12/23
Section 105 Cont
Revised first paragraph of 105.12.1 Approval for Shipment Concrete girders, piles and major structural members are stamped.
For other minor members or items, the shipping list or manifestwill be stamped
Added to 105.12.1 Application of the inspectors stamp does not transfer risk of loss of
the fabricated material to the Department
Added to 105.15 Maintenance During Construction . periodic mowing (not to exceed 4 times per calendar year)
-
7/29/2019 S27_Part 1 Review of General Provisions Specification Changes_LTC2013
13/23
Section 105 Cont
Added to 105.17.2 Final Acceptance If contract time is stopped by the engineer, all corrections shall be
completed within 30 calendar days or the contract time will resumealong with any additional stipulated damages
-
7/29/2019 S27_Part 1 Review of General Provisions Specification Changes_LTC2013
14/23
Section 106
Revised wording of 106.01 Source of Supply and QualityRequirements
If it is found after installation that sources of supply for previouslyapproved materials do not produce specified products or results, thecontractor shall furnish materials from other sources or makenecessary changes to provide acceptable materials
Added to 106.04 Certificates If the contract has a Buy America provision, the certificates must
indicate compliance with the provision
-
7/29/2019 S27_Part 1 Review of General Provisions Specification Changes_LTC2013
15/23
Section 106 Cont
Added to 106.05 Contractor Quality Control Contractor personnel shall have appropriate training and
experience in testing procedures and methods of construction forthe work they are overseeing
-
7/29/2019 S27_Part 1 Review of General Provisions Specification Changes_LTC2013
16/23
Section 107
Removed second paragraph of 107.05 Federal AidParticipation
Concerning federal aid form PR-47
Added to 107.06 Sanitary, Health and Safety Provisions The contractor shall comply with all Occupational Safety and
Health Administration (OSHA) regulations
Re-write of second paragraph 107.07 Public Convenience andSafety When the highway under construction is to be kept open for traffic,
the subgrade and surfacing shall be kept in such condition that thepublic can travel in safety
-
7/29/2019 S27_Part 1 Review of General Provisions Specification Changes_LTC2013
17/23
Section 107 Cont
Added to 107.08 Railway Highway Provisions It is the Contractor s responsibility to contact the railroad to
determine the railroads requirements for work within the railroadright of way and to comply with the requirements. The Contractorshall attend any safety orientation/training required by theRailroad
Other changes to 107.08 Specifically state proof of Railroad Insurance is required at the
Project Site
State the Certificate of Release and Contractors Affidavit can befound on DOTD website
-
7/29/2019 S27_Part 1 Review of General Provisions Specification Changes_LTC2013
18/23
Section 107 Cont
Added to 107.14 Environmental Protection For construction operations in waters of the US, It is the
responsibility of the contractor to ensure all appropriate permits areobtained prior to commencement of operations
Attention is further directed to the federal , state and local airpollution control programs and their rules and regulationsregarding air pollution, especially open burning, fugitive dust and
asphalt concrete plant restrictions
-
7/29/2019 S27_Part 1 Review of General Provisions Specification Changes_LTC2013
19/23
Section 107 Cont
Added to 107.19 Contractors Responsibility for Work Department will reimburse, When responsible parties cannot be
identified
Unavoidable damage, except for materials and equipment that arenot incorporated into the work due to Acts of God
-
7/29/2019 S27_Part 1 Review of General Provisions Specification Changes_LTC2013
20/23
Section 107 Cont
Re-wrote 107.27 Archaeological Findings and Unmarked Burials
If the contractor encounters evidence of archaeology, operations in the
area of the discovery shall be discontinued. The engineer will contactthe DOTD Environmental Section in order that an appropriateassessment may be made to determine the disposition thereof andnecessary actions relative to the site. Borrow and muck disposal areasfurnished by the contractor will be subject to such assessment by thecontractor prior to use.
If the contractor discovers unmarked burial sites, human skeletalremains, or burial artifacts, operations in the area of the discovery shall bediscontinued. The contractor will notify the proper authorities, as well asthe DOTD Engineer and Environmental Section in compliance with theLouisiana Unmarked Human Burial Sites Preservation Act (RS 8:680-681)
-
7/29/2019 S27_Part 1 Review of General Provisions Specification Changes_LTC2013
21/23
Section 108
Re-wrote 108.09 Default and Termination of Contract
-
7/29/2019 S27_Part 1 Review of General Provisions Specification Changes_LTC2013
22/23
Section 109
Added to 109.02 Scope of Payment The contractor shall accept the summation of the products of the
unit prices bid on the schedule of items multiplied by the actualquantity of units of measure performed for each item, as audited byDOTD, as full and final payment for all work, labor and materialsnecessary to complete the subject change only for change ordersapproved by the DOTD Chief Engineer or his designee
-
7/29/2019 S27_Part 1 Review of General Provisions Specification Changes_LTC2013
23/23
Some issues were not fully resolved:
108.04.2, Disqualification,
108.04.3, Disqualification Review Board,
108.08, Failure to Complete on Time,
108.09, Default and Termination of Contract,
108.11, Termination of Contract
109.03, Compensation for Altered Quantities
108.01, Subletting of Contract