SUPERB SITE ISSUES
S. Tomassini, INFN-LNFOn behalf of SuperB Collaboration
Mini MAC, Frascati, July 17th
![Page 2: S UPER B SITE ISSUES S. Tomassini, INFN-LNF On behalf of SuperB Collaboration Mini MAC, Frascati, July 17 th](https://reader034.vdocuments.us/reader034/viewer/2022051314/55168aa4550346a2698b61b4/html5/thumbnails/2.jpg)
Outline
• The Torvergata Site
• Preliminary Geological Analysis
• SPARX project
• SuperB project
• SPARX-SuperB synergy
• Conclusions
![Page 3: S UPER B SITE ISSUES S. Tomassini, INFN-LNF On behalf of SuperB Collaboration Mini MAC, Frascati, July 17 th](https://reader034.vdocuments.us/reader034/viewer/2022051314/55168aa4550346a2698b61b4/html5/thumbnails/3.jpg)
The TORVERGATA Site
TorvergataAREA for the SuperB and
SPARX Projects
![Page 4: S UPER B SITE ISSUES S. Tomassini, INFN-LNF On behalf of SuperB Collaboration Mini MAC, Frascati, July 17 th](https://reader034.vdocuments.us/reader034/viewer/2022051314/55168aa4550346a2698b61b4/html5/thumbnails/4.jpg)
Roman Villa
Sport CityUniversity Campus
CNR
SPARX & SuperB
![Page 5: S UPER B SITE ISSUES S. Tomassini, INFN-LNF On behalf of SuperB Collaboration Mini MAC, Frascati, July 17 th](https://reader034.vdocuments.us/reader034/viewer/2022051314/55168aa4550346a2698b61b4/html5/thumbnails/5.jpg)
SPARX 1st stage SuperB LINAC SPARX future
![Page 6: S UPER B SITE ISSUES S. Tomassini, INFN-LNF On behalf of SuperB Collaboration Mini MAC, Frascati, July 17 th](https://reader034.vdocuments.us/reader034/viewer/2022051314/55168aa4550346a2698b61b4/html5/thumbnails/6.jpg)
![Page 7: S UPER B SITE ISSUES S. Tomassini, INFN-LNF On behalf of SuperB Collaboration Mini MAC, Frascati, July 17 th](https://reader034.vdocuments.us/reader034/viewer/2022051314/55168aa4550346a2698b61b4/html5/thumbnails/7.jpg)
S.1
S.2
S.3
S.4
S.5
• Formed by the Colli Albani volcano more than 600000 years ago
• Very Stable volcanic rock
Geological analysis
Soil
Sea
Le
vel A
ltitu
de (
m)
Brown Pyroclastic Rock
Gray Pyroclastic RockPrelim
inary
![Page 8: S UPER B SITE ISSUES S. Tomassini, INFN-LNF On behalf of SuperB Collaboration Mini MAC, Frascati, July 17 th](https://reader034.vdocuments.us/reader034/viewer/2022051314/55168aa4550346a2698b61b4/html5/thumbnails/8.jpg)
Seismic map• http://
zonesismiche.mi.ingv.it/documenti/mappa_opcm3519.pdf
• Maximum ground acceleration, with a 10% probability of exceeding it in 50 years.
![Page 9: S UPER B SITE ISSUES S. Tomassini, INFN-LNF On behalf of SuperB Collaboration Mini MAC, Frascati, July 17 th](https://reader034.vdocuments.us/reader034/viewer/2022051314/55168aa4550346a2698b61b4/html5/thumbnails/9.jpg)
SPARX-FEL
SO
UR
CE
PU
LS
ED
SE
LF
AM
PL
IFIE
D
RA
DIA
TIO
N
X
Composed by:
• One LINAC at 1.2 GeV and 2.4 GeV
• Three Undulators Lines
• Six Experimental Lines
![Page 10: S UPER B SITE ISSUES S. Tomassini, INFN-LNF On behalf of SuperB Collaboration Mini MAC, Frascati, July 17 th](https://reader034.vdocuments.us/reader034/viewer/2022051314/55168aa4550346a2698b61b4/html5/thumbnails/10.jpg)
SPARX-FEL: mid energy LINAC
EmergencyExit
ElectricalSubstation
Room forCooling plant
Room forAir conditioning
![Page 11: S UPER B SITE ISSUES S. Tomassini, INFN-LNF On behalf of SuperB Collaboration Mini MAC, Frascati, July 17 th](https://reader034.vdocuments.us/reader034/viewer/2022051314/55168aa4550346a2698b61b4/html5/thumbnails/11.jpg)
SPARX-FEL: undulator hall
![Page 12: S UPER B SITE ISSUES S. Tomassini, INFN-LNF On behalf of SuperB Collaboration Mini MAC, Frascati, July 17 th](https://reader034.vdocuments.us/reader034/viewer/2022051314/55168aa4550346a2698b61b4/html5/thumbnails/12.jpg)
SPARX-FEL: experimental hall
![Page 13: S UPER B SITE ISSUES S. Tomassini, INFN-LNF On behalf of SuperB Collaboration Mini MAC, Frascati, July 17 th](https://reader034.vdocuments.us/reader034/viewer/2022051314/55168aa4550346a2698b61b4/html5/thumbnails/13.jpg)
SPARX
SuperB: LINAC Tunnel
Ground Level
Modulators & Klystrons Tunnel
LINAC Tunnel
400 m
5 m
4 m
5 m
600 m500 m
![Page 14: S UPER B SITE ISSUES S. Tomassini, INFN-LNF On behalf of SuperB Collaboration Mini MAC, Frascati, July 17 th](https://reader034.vdocuments.us/reader034/viewer/2022051314/55168aa4550346a2698b61b4/html5/thumbnails/14.jpg)
SuperB: Damping Ring
Damping Ring
200 m
20 m18 m
![Page 15: S UPER B SITE ISSUES S. Tomassini, INFN-LNF On behalf of SuperB Collaboration Mini MAC, Frascati, July 17 th](https://reader034.vdocuments.us/reader034/viewer/2022051314/55168aa4550346a2698b61b4/html5/thumbnails/15.jpg)
SuperB: Storage Rings Tunnel
600 m500 m
5.8 m
It will be tunneled by means of a tunneling machine, the same that is now tunneling the C-line subway in Rome
![Page 16: S UPER B SITE ISSUES S. Tomassini, INFN-LNF On behalf of SuperB Collaboration Mini MAC, Frascati, July 17 th](https://reader034.vdocuments.us/reader034/viewer/2022051314/55168aa4550346a2698b61b4/html5/thumbnails/16.jpg)
SuperB: Storage Rings Tunnel Occupancy
4.5 m
2 m
0.7 m0.4 m0.7 m
0.7 m
![Page 17: S UPER B SITE ISSUES S. Tomassini, INFN-LNF On behalf of SuperB Collaboration Mini MAC, Frascati, July 17 th](https://reader034.vdocuments.us/reader034/viewer/2022051314/55168aa4550346a2698b61b4/html5/thumbnails/17.jpg)
SuperB: Electrical Substations
• 9 electrical substations for SuperB
• 2 electrical substations for SparX
• about 40 Mw total electrical power needed
![Page 18: S UPER B SITE ISSUES S. Tomassini, INFN-LNF On behalf of SuperB Collaboration Mini MAC, Frascati, July 17 th](https://reader034.vdocuments.us/reader034/viewer/2022051314/55168aa4550346a2698b61b4/html5/thumbnails/18.jpg)
SuperB: Experimental Hall & Transfer Line
-+
![Page 19: S UPER B SITE ISSUES S. Tomassini, INFN-LNF On behalf of SuperB Collaboration Mini MAC, Frascati, July 17 th](https://reader034.vdocuments.us/reader034/viewer/2022051314/55168aa4550346a2698b61b4/html5/thumbnails/19.jpg)
SPARX future
![Page 20: S UPER B SITE ISSUES S. Tomassini, INFN-LNF On behalf of SuperB Collaboration Mini MAC, Frascati, July 17 th](https://reader034.vdocuments.us/reader034/viewer/2022051314/55168aa4550346a2698b61b4/html5/thumbnails/20.jpg)
Conclusions
• The feasibility study of the SuperB project on the Torvergata site has been done.
• A preliminary geological study of the area has given excellent results on the stability of the site.
• A strong synergy with the SPARX-FEL project exists, giving the possibility of using the SuperB LINAC as the injector of the fel.