RVS First Look (WP6200)
J.-M. Désert, G. Hébrard , A. Lecavelier, R. Ferlet, A. Vidal-Madjar
Institut d’astrophysique de Paris (IAP)
Workshop RVS Calibration
IAP-November 24th, 2005
Plan
1. GAIA First Look
2. Overall RVS First Look
3. Details of each RVS First Look steps
Calibration: pixel level
Structure of the coordination unit “C6 Spectroscopic reduction” in the framework of the Gaia Data Processing Consortium.
(Katz et al. « SPE-CU-001 »)
GAIA First LookProblematic
Problems: - Fast monitoring of the GAIA spacecraft - Check the raw telemetry dataflow as soon as it is downloaded- An instantaneous first quick calibration is required- Self calibrating instrument. However, GIS possible only after 6 months.- First analyses of data quality and consistency is required in a daily basis
Solution:
First Look, else risk of losing many months of data and mission time.
Method: Monitoring of the satellite health and the data quality
Remark for RVS:
Advantage: numerous a priori calibration objects exist in the sky
What?– Instrumental follow up– Data sanity check– Quick calibration/analyses
GAIA First Look
Why?– Quick reaction to a problem on the satellite/data chain
– Technical diagnostics and alerts
– Data diagnostics and alerts
Who?– Ground Segment (GS)
– Data Processing Center (DPC)
Data Analysis Consortium (=> Coordination Unit DU1000)
How?– Different level of processing at different time executed under different responsabilities
– Ground Algorithms applied on onboard processed data (RAW)
– Close relations between the 3 instruments
• Time:– Real time– Within ~24 hours
• Diagnostics: – Technical data: instruments (and bus?) control– Scientific data: sanity check and first spectral calibration
• Responsability:– Who makes diagnostics– Who reacts
GAIA First LookDifferent FL tasks
Overall RVS First Look
Quick Look Science Quick Look Detailed First Look
Initial Data TreatmentInput Pipeline
Raw Telemetry
Satellite
Diagnostics: Instrument data Scientific data
Responsability: GS DPC
Time: Real time ~24h
Further data reduction
Input PipelineInput: telemetry stream from Gaia. Output: image-type data
Input PipelineGaia-RVS Ground Processing (RVS-MSC-004)
M. Cropper, D.Katz
First On Ground processing steps
• Stripping of telemetry packaging• Data reformatting • Adding time information • Adding spacecraft coarse attitude• Adding instrument parameters and housekeeping data • Automated Quick Look analysis • Adding starmapper data • Retrieval of relevant astrometric data from Astro database • Ingestion into image products database (IPD)• Science Quick Look
Overall RVS First Look
Quick Look Science Quick Look Detailed First Look
Initial Data TreatmentInput Pipeline
Raw Telemetry
Satellite
Diagnostics: Instrument data Scientific data
Responsability: GS DPC
Time: Real time ~24h
Further data reduction
IDTFirst part of the scientic data reduction chain performed
• Data ingestion• Cross Matching• Generation of elementary data
QLAll GS activities concerning satellite health (i.e. bus and instrument). Uses telemetry stream from GAIA (housekeeping (HK), attitude control system (ACS) data, etc…)
ScQLAll activities concerning scientific data health.Simple and not precise to safe observation time.Generates telecommanding or alerts the scientific.
DFLIn-depth scientific assessment of the quality of the Gaia observations About 24 hours after telemetry reception at the DPC. Produce diagnostics of the status of the satellite and instrument in a more sophisticated manner than can be performed within QL and ScQL.
QL, ScQL & DFL in more details…
QL: Telescope and Instrument follow up
1. Basic telescope informations– Effective area– Optic path– Telescope reflective index
2. Instrument monitoringControl of the instrumental stability:– Thermal – Mechanical– Optical– Global efficiency– PSF / Filter PSF– Wavelength contamination (Blue / Red)
RVS => 100-150 106 sources at ~93 epoch.• Subset of sources which will be bright and stable (astrometrically, photometrically and spectros). • These sources will be monitored daily all along the mission.• Use to self-calibrate the RVS
Trace the evolution of the characteristics of the instrument.
ScQL : data sanity check
• Analyses of the onboard processing outflow parameters
• Long and short term effects– Compare with outflow parameters of the previous day– Compare with outflow parameters of the previous month
• Check the quality of some scientific parameters on a subset of stars– Tests on ribbon of data (bias, bkckgd,etc …)– Xmatch – Quick calibration ->
ScQL : From Ribbons to spectra• Radial velocity (V < 16-17):
– principles: • slitless spectroscopy using Ca triplet (848-874 nm)
– applications:• third component of space motion, perspective acceleration• dynamics, population studies, binaries• spectra: chemistry, rotation
Examples of single transit RVS-like spectra of an F5V star for the apparent magnitudes: V=8, V=10, V=12 and V=14.
GEPI/GAIA-RVS/TN/017.01, F. Crifo, D. Katz
Calibrate detector image Quick spectral extraction
• Extract standard star spectrum ~ 2000°2/day ~ 1/20 of ~2000 Standard Stars
• Background Sky background + Zodiacal Background flux + Diffused light +
Instrumental noise (Readout…) )
• Crowding, star densities and faint stars• Wavelength and flux calibrations
=> Quick Diagnostics (Rv)
QL & ScQL : Raw telemetry Product types
The On-board Processing processing tasks in sequence are as follows:
1. CCD gain correction2. Blemish reduction (Fabrication or radiation) 3. Scan law and Across Scan optical distortion correction4. Along Scan optical distortion correction5. Cosmic ray removal6. Co-adding (Pixels? / Over 10 CCDs??)7. Output data selection (Selected pixel on the detector using starmapper)8. Lossless compression
(Cropper et al. « RVS: Technical issues »)
QL & ScQL need to analyse the result of these steps
DFL : higher level of diagnostics and calibrations
• All the target or Subsets ( Vlimit)• Extract physical parameters
– Extract RV (~1 km/s)– Stellar + interstellar parameters– Early science processing steps - Core processing
• Use all scientific data to assess data and instrument health– Quick Extraction of all physical parameters on all data (?)– Combine spectra from several scans.– Various levels of combined spectra, and derived parameters may exist,
depending on the stage of the mission.
• Feed back with science alerts and object processing
Detailed First Look
Initial Data Treatment
Input Pipeline
Raw Telemetry
Satellite
Calibration Pipeline (SGIS)
Single transit pipeline
Multiple transit pipeline
FL needed for the SGIS Especially at the beginning of the telescope lifetime and in between two nominal calibrations
?
DFL : higher level of diagnostics and calibrations
Gaia-RVS Ground Processing (RVS-MSC-004)
M. Cropper, D.Katz
A. Guerrier
Need to doQuantify: what? why? who? how?
- Define which questions should be answered by the RVS-FL - Explicit relations with other instrument FL? (Heidelberg 2 Dec 2005)
Define RVS FL in the GAIA FL framework? I/O flux in between FL of the 3 Instruments:
-Astrometry => Attitude-Sky Mapper => Xmatch With Photometry and RVS
- Define and quantify QL, ScQL and DFL I/O flux, routines and diagnostic parameters.- Quantify real time and subsets? Subsets for QL, SCQL and DFL?- Give a list of a priori calibrator- Auxilliary data? (same as the pipelines?)
- Clarify who is in charge of the dvpt of QL, ScQL and DFL?
To be continued…