![Page 1: Route 7 Widening and Bridge Rehabilitation Over Dulles Toll Road … · 2014-05-27 · Project Overview (Section 2.0) • Route 7 Widening and Bridge Rehabilitation over Dulles Toll](https://reader034.vdocuments.us/reader034/viewer/2022042713/5fafafac2549245a7723d094/html5/thumbnails/1.jpg)
May 23, 2014 Arif Rahman, PE – Project Manager Steve Kindy, PE – APD Project Manager and POC
Route 7 Widening and Bridge Rehabilitation Over Dulles Toll Road and
Airport Access Highway RFQ Information Meeting
![Page 2: Route 7 Widening and Bridge Rehabilitation Over Dulles Toll Road … · 2014-05-27 · Project Overview (Section 2.0) • Route 7 Widening and Bridge Rehabilitation over Dulles Toll](https://reader034.vdocuments.us/reader034/viewer/2022042713/5fafafac2549245a7723d094/html5/thumbnails/2.jpg)
2
Introduction
• Project Overview • RFQ Information Package • RFQ Summary • Questions / Answers
![Page 3: Route 7 Widening and Bridge Rehabilitation Over Dulles Toll Road … · 2014-05-27 · Project Overview (Section 2.0) • Route 7 Widening and Bridge Rehabilitation over Dulles Toll](https://reader034.vdocuments.us/reader034/viewer/2022042713/5fafafac2549245a7723d094/html5/thumbnails/3.jpg)
Project Location
Tyco Road
Project Site
Route-267 (Dulles Airport Toll Road)
I-495 Route-7(Leesburg Pike) Project Limits
Jarred Valley Dr.
Route-7(Leesburg Pike)
Project Site
http://www.bing.com/maps/default.aspx?q=route+7+bridge+over+dulles+airport+toll+road&mkt=en&FORM=HDRSC4
![Page 4: Route 7 Widening and Bridge Rehabilitation Over Dulles Toll Road … · 2014-05-27 · Project Overview (Section 2.0) • Route 7 Widening and Bridge Rehabilitation over Dulles Toll](https://reader034.vdocuments.us/reader034/viewer/2022042713/5fafafac2549245a7723d094/html5/thumbnails/4.jpg)
4
Project Overview
• Structure & Bridge • Survey • Environmental • Geotechnical • Hydraulics • Traffic Control Devices • Transportation Management Plan • Utility Relocations, Adjustments and
Coordination
![Page 5: Route 7 Widening and Bridge Rehabilitation Over Dulles Toll Road … · 2014-05-27 · Project Overview (Section 2.0) • Route 7 Widening and Bridge Rehabilitation over Dulles Toll](https://reader034.vdocuments.us/reader034/viewer/2022042713/5fafafac2549245a7723d094/html5/thumbnails/5.jpg)
5
Project Overview (Section 2.0)
• Route 7 Widening and Bridge Rehabilitation over Dulles Toll Road and Airport Access Highway
• Project limits: From: 0.564 Miles West of Tyco Road To: 0.134 Miles West of Tyco Road
• Route 7 Improvements:
• Bridge improvements: o Replace superstructure and widen to a total of 149 feet o Replace abutments o Raise superstructure
![Page 6: Route 7 Widening and Bridge Rehabilitation Over Dulles Toll Road … · 2014-05-27 · Project Overview (Section 2.0) • Route 7 Widening and Bridge Rehabilitation over Dulles Toll](https://reader034.vdocuments.us/reader034/viewer/2022042713/5fafafac2549245a7723d094/html5/thumbnails/6.jpg)
Project Overview (Section 2.0)
• Intersection improvements: o Widen to a 6 lane facility o Add shared use paths o Adjust ramps for Route 7 widening o 8 Pedestrian underpasses & 1 at-grade crossing
6
![Page 7: Route 7 Widening and Bridge Rehabilitation Over Dulles Toll Road … · 2014-05-27 · Project Overview (Section 2.0) • Route 7 Widening and Bridge Rehabilitation over Dulles Toll](https://reader034.vdocuments.us/reader034/viewer/2022042713/5fafafac2549245a7723d094/html5/thumbnails/7.jpg)
7
Project Overview (Section 2.0)
• Route 7 Widening and Bridge Rehabilitation Over Dulles Toll Road and Airport Access Highway
![Page 8: Route 7 Widening and Bridge Rehabilitation Over Dulles Toll Road … · 2014-05-27 · Project Overview (Section 2.0) • Route 7 Widening and Bridge Rehabilitation over Dulles Toll](https://reader034.vdocuments.us/reader034/viewer/2022042713/5fafafac2549245a7723d094/html5/thumbnails/8.jpg)
8
Project Overview (Section 2.0)
• Route 7 Widening and Bridge Rehabilitation Over Dulles Toll Road and Airport Access Highway
![Page 9: Route 7 Widening and Bridge Rehabilitation Over Dulles Toll Road … · 2014-05-27 · Project Overview (Section 2.0) • Route 7 Widening and Bridge Rehabilitation over Dulles Toll](https://reader034.vdocuments.us/reader034/viewer/2022042713/5fafafac2549245a7723d094/html5/thumbnails/9.jpg)
9
Project Overview (Section 2.0)
• Route 7 Widening and Bridge Rehabilitation Over Dulles Toll Road and Airport Access Highway
![Page 10: Route 7 Widening and Bridge Rehabilitation Over Dulles Toll Road … · 2014-05-27 · Project Overview (Section 2.0) • Route 7 Widening and Bridge Rehabilitation over Dulles Toll](https://reader034.vdocuments.us/reader034/viewer/2022042713/5fafafac2549245a7723d094/html5/thumbnails/10.jpg)
10
Project Scope • Replace Bridge Over Dulles Airport Toll Road • Widening of Route-7 from 2 to 3 Lanes • Shared Use path (Underpass) • Potential Noise Wall • SWM & Drainage • Right of Way Acquisition • Utility Relocations • Erosion & Sediment Control • Signals • Transportation Management Plan (Construction
Stages & Traffic Control Mitigation)
![Page 11: Route 7 Widening and Bridge Rehabilitation Over Dulles Toll Road … · 2014-05-27 · Project Overview (Section 2.0) • Route 7 Widening and Bridge Rehabilitation over Dulles Toll](https://reader034.vdocuments.us/reader034/viewer/2022042713/5fafafac2549245a7723d094/html5/thumbnails/11.jpg)
General Information
Route 7 - Urban Principal Arterial Two Bridges Over Dulles Airport Toll Road (DATR) –
Built 1961 Existing bridges are steel multi-beam girder
concrete deck Route 7 - Urban Principal Arterial Two Bridges Over Dulles Airport Toll Road (DATR) –
Built 1961 Existing bridges are steel multi-beam girder concrete
deck VDOT inspects and monitors the bridge
Presently classified as WB Bridge Structurally Deficient
Sufficiency Rating is 55.6 (WB) and 62.1 (EB) out of 100
![Page 12: Route 7 Widening and Bridge Rehabilitation Over Dulles Toll Road … · 2014-05-27 · Project Overview (Section 2.0) • Route 7 Widening and Bridge Rehabilitation over Dulles Toll](https://reader034.vdocuments.us/reader034/viewer/2022042713/5fafafac2549245a7723d094/html5/thumbnails/12.jpg)
Physical Condition of the Bridges Over DATR
Cracking and Delaminated are Cracking and Delaminated area in pier and girder end
Crack with Efflorescence in beam side overhang
Open Utility Box
![Page 13: Route 7 Widening and Bridge Rehabilitation Over Dulles Toll Road … · 2014-05-27 · Project Overview (Section 2.0) • Route 7 Widening and Bridge Rehabilitation over Dulles Toll](https://reader034.vdocuments.us/reader034/viewer/2022042713/5fafafac2549245a7723d094/html5/thumbnails/13.jpg)
OVERALL CONDITION – FAIR
• Sub-standard bridge rail and approach guardrails
• Adhesion failure and edge spalls along expansion joint
• Cracks, spalls, and delaminated areas in substructures
• Surface rust, rust swells & pitting on bearings and girders
• Cracks and delaminated areas in wearing surface and curbs
• One utility boxes and broken conduits with exposed wires.
Existing Condition Photo of the Bridges over DATR
OVERALL CONDITION – FAIR
Spalled and Delaminated area in bottom of deck and sidewalk laminated area in bottom of deck and sidewalk
![Page 14: Route 7 Widening and Bridge Rehabilitation Over Dulles Toll Road … · 2014-05-27 · Project Overview (Section 2.0) • Route 7 Widening and Bridge Rehabilitation over Dulles Toll](https://reader034.vdocuments.us/reader034/viewer/2022042713/5fafafac2549245a7723d094/html5/thumbnails/14.jpg)
Condition Rating History
West Bound Bridge und Bridge
East Bound Bridge
In 1993, WB Deck was repaired by VDOT WMAA cleaned and painted all steel and repair
slope protection WMAA cleaned and painted all steel and repair
slope protection WB Deck was repaired by VDOT WMAA cleaned and painted all steel and repair
slope protection
In 1981, WB Deck was repaired by VDOT Patched exposed steel WB Deck was repaired by VDOT Patched exposed steel
2011 Structural Assessment •Deck Condition Deteriorate •Structurally Deficient •Sufficiency Rating is 55.6 out of 100
2011 Structural Assessment •Deck Condition Deteriorate •Not Structurally Deficient •Sufficiency Rating is 62.1 out of 100
![Page 15: Route 7 Widening and Bridge Rehabilitation Over Dulles Toll Road … · 2014-05-27 · Project Overview (Section 2.0) • Route 7 Widening and Bridge Rehabilitation over Dulles Toll](https://reader034.vdocuments.us/reader034/viewer/2022042713/5fafafac2549245a7723d094/html5/thumbnails/15.jpg)
Existing Bridge Plan
15
![Page 16: Route 7 Widening and Bridge Rehabilitation Over Dulles Toll Road … · 2014-05-27 · Project Overview (Section 2.0) • Route 7 Widening and Bridge Rehabilitation over Dulles Toll](https://reader034.vdocuments.us/reader034/viewer/2022042713/5fafafac2549245a7723d094/html5/thumbnails/16.jpg)
Existing Bridge
16
Looking WB Route-7
Looking EB Route-7
![Page 17: Route 7 Widening and Bridge Rehabilitation Over Dulles Toll Road … · 2014-05-27 · Project Overview (Section 2.0) • Route 7 Widening and Bridge Rehabilitation over Dulles Toll](https://reader034.vdocuments.us/reader034/viewer/2022042713/5fafafac2549245a7723d094/html5/thumbnails/17.jpg)
Existing Bridge
17 Looking WB Dulles Airport Toll Road
![Page 18: Route 7 Widening and Bridge Rehabilitation Over Dulles Toll Road … · 2014-05-27 · Project Overview (Section 2.0) • Route 7 Widening and Bridge Rehabilitation over Dulles Toll](https://reader034.vdocuments.us/reader034/viewer/2022042713/5fafafac2549245a7723d094/html5/thumbnails/18.jpg)
Proposed Bridge Plan
18
![Page 19: Route 7 Widening and Bridge Rehabilitation Over Dulles Toll Road … · 2014-05-27 · Project Overview (Section 2.0) • Route 7 Widening and Bridge Rehabilitation over Dulles Toll](https://reader034.vdocuments.us/reader034/viewer/2022042713/5fafafac2549245a7723d094/html5/thumbnails/19.jpg)
Existing & Proposed Bridge and Underpass Typical
19
![Page 20: Route 7 Widening and Bridge Rehabilitation Over Dulles Toll Road … · 2014-05-27 · Project Overview (Section 2.0) • Route 7 Widening and Bridge Rehabilitation over Dulles Toll](https://reader034.vdocuments.us/reader034/viewer/2022042713/5fafafac2549245a7723d094/html5/thumbnails/20.jpg)
Replace and Widening Existing Bridge Decks
Edges of Proposed Bridge
Existing Bridges
![Page 21: Route 7 Widening and Bridge Rehabilitation Over Dulles Toll Road … · 2014-05-27 · Project Overview (Section 2.0) • Route 7 Widening and Bridge Rehabilitation over Dulles Toll](https://reader034.vdocuments.us/reader034/viewer/2022042713/5fafafac2549245a7723d094/html5/thumbnails/21.jpg)
Adjacent & Overlapping Projects
-Existing Route 7 VDOT Project – UPC 52328 -Dulles Rail Phase 1 -Fairfax County Planning – Tysons Dulles Toll Road Ramp Study
Route 7 – UPC 52328
Dulles Rail Phase 1 Silver Line improvements
to Route 7
Tysons Ramp Study
This Project
![Page 22: Route 7 Widening and Bridge Rehabilitation Over Dulles Toll Road … · 2014-05-27 · Project Overview (Section 2.0) • Route 7 Widening and Bridge Rehabilitation over Dulles Toll](https://reader034.vdocuments.us/reader034/viewer/2022042713/5fafafac2549245a7723d094/html5/thumbnails/22.jpg)
North/West side of Route 7 Bridge over DATR
Route 7 (Westbound)
Route 7 (Eastbound)
Lane drop at ramp
Three through lanes East Bound after Jarrett Valley Dr.
![Page 23: Route 7 Widening and Bridge Rehabilitation Over Dulles Toll Road … · 2014-05-27 · Project Overview (Section 2.0) • Route 7 Widening and Bridge Rehabilitation over Dulles Toll](https://reader034.vdocuments.us/reader034/viewer/2022042713/5fafafac2549245a7723d094/html5/thumbnails/23.jpg)
South/East side of Route 7 Bridge over DATR
Route 7 (Westbound)
Route 7 (Eastbound)
Lane drop at ramp
Three through lanes East under Silver Line
Ramp from East Bound Dulles Toll Road to
Westbound Route 7 is still a STOP condition
Silver Line Lane drop at ramp
![Page 24: Route 7 Widening and Bridge Rehabilitation Over Dulles Toll Road … · 2014-05-27 · Project Overview (Section 2.0) • Route 7 Widening and Bridge Rehabilitation over Dulles Toll](https://reader034.vdocuments.us/reader034/viewer/2022042713/5fafafac2549245a7723d094/html5/thumbnails/24.jpg)
Provisions for Future Tysons Ramp Project
This project replaces the existing abutments with full
height abutment walls to accommodate the future CD Roads for the Tysons Ramp
project
![Page 25: Route 7 Widening and Bridge Rehabilitation Over Dulles Toll Road … · 2014-05-27 · Project Overview (Section 2.0) • Route 7 Widening and Bridge Rehabilitation over Dulles Toll](https://reader034.vdocuments.us/reader034/viewer/2022042713/5fafafac2549245a7723d094/html5/thumbnails/25.jpg)
Shared Use Path
Shared Use Path Option – Underpass
• Connectivity with existing and proposed SUP on future Route 7 widening project from Jarred Valley to Reston Pkwy
• Connectivity to Metro Station Access
![Page 26: Route 7 Widening and Bridge Rehabilitation Over Dulles Toll Road … · 2014-05-27 · Project Overview (Section 2.0) • Route 7 Widening and Bridge Rehabilitation over Dulles Toll](https://reader034.vdocuments.us/reader034/viewer/2022042713/5fafafac2549245a7723d094/html5/thumbnails/26.jpg)
SUP -Underpass Looking East
![Page 27: Route 7 Widening and Bridge Rehabilitation Over Dulles Toll Road … · 2014-05-27 · Project Overview (Section 2.0) • Route 7 Widening and Bridge Rehabilitation over Dulles Toll](https://reader034.vdocuments.us/reader034/viewer/2022042713/5fafafac2549245a7723d094/html5/thumbnails/27.jpg)
SUP–Underpass Looking Toward the Direction of the Dulles Airport
![Page 28: Route 7 Widening and Bridge Rehabilitation Over Dulles Toll Road … · 2014-05-27 · Project Overview (Section 2.0) • Route 7 Widening and Bridge Rehabilitation over Dulles Toll](https://reader034.vdocuments.us/reader034/viewer/2022042713/5fafafac2549245a7723d094/html5/thumbnails/28.jpg)
SUP Option–Underpass Section Looking East
![Page 29: Route 7 Widening and Bridge Rehabilitation Over Dulles Toll Road … · 2014-05-27 · Project Overview (Section 2.0) • Route 7 Widening and Bridge Rehabilitation over Dulles Toll](https://reader034.vdocuments.us/reader034/viewer/2022042713/5fafafac2549245a7723d094/html5/thumbnails/29.jpg)
SUP – Underpass Spring Hill Metro Station Access At Tyco Road
![Page 30: Route 7 Widening and Bridge Rehabilitation Over Dulles Toll Road … · 2014-05-27 · Project Overview (Section 2.0) • Route 7 Widening and Bridge Rehabilitation over Dulles Toll](https://reader034.vdocuments.us/reader034/viewer/2022042713/5fafafac2549245a7723d094/html5/thumbnails/30.jpg)
Potential Noise Wall
30
![Page 31: Route 7 Widening and Bridge Rehabilitation Over Dulles Toll Road … · 2014-05-27 · Project Overview (Section 2.0) • Route 7 Widening and Bridge Rehabilitation over Dulles Toll](https://reader034.vdocuments.us/reader034/viewer/2022042713/5fafafac2549245a7723d094/html5/thumbnails/31.jpg)
Project Website
Route 7 over Dulles Airport Toll Road Route_7_Final_02.wmv
31
![Page 32: Route 7 Widening and Bridge Rehabilitation Over Dulles Toll Road … · 2014-05-27 · Project Overview (Section 2.0) • Route 7 Widening and Bridge Rehabilitation over Dulles Toll](https://reader034.vdocuments.us/reader034/viewer/2022042713/5fafafac2549245a7723d094/html5/thumbnails/32.jpg)
CII/SSI form
32
![Page 33: Route 7 Widening and Bridge Rehabilitation Over Dulles Toll Road … · 2014-05-27 · Project Overview (Section 2.0) • Route 7 Widening and Bridge Rehabilitation over Dulles Toll](https://reader034.vdocuments.us/reader034/viewer/2022042713/5fafafac2549245a7723d094/html5/thumbnails/33.jpg)
33
Project Overview (RFQ Section 2.0)
• Public Involvement / Relations • Quality Assurance and Quality Control • Construction Engineering and Inspection • Overall Project Management
![Page 34: Route 7 Widening and Bridge Rehabilitation Over Dulles Toll Road … · 2014-05-27 · Project Overview (Section 2.0) • Route 7 Widening and Bridge Rehabilitation over Dulles Toll](https://reader034.vdocuments.us/reader034/viewer/2022042713/5fafafac2549245a7723d094/html5/thumbnails/34.jpg)
34
RFQ Information Package
• Includes all Items listed in Section 2.8 • Available through purchase of a CD obtained
through VDOT Scheduling and Contract Division (Order Form Attachment 2.8)
• Important Considerations • Information Purposes only • Subject to Change (updated regulations, specifications,
conditions etc.)
![Page 35: Route 7 Widening and Bridge Rehabilitation Over Dulles Toll Road … · 2014-05-27 · Project Overview (Section 2.0) • Route 7 Widening and Bridge Rehabilitation over Dulles Toll](https://reader034.vdocuments.us/reader034/viewer/2022042713/5fafafac2549245a7723d094/html5/thumbnails/35.jpg)
35
RFQ Summary
• VDOT POC Stephen D. Kindy, P.E. Alternate Project Delivery Office 1401 East Broad Street Richmond, Virginia 23219 Phone: (804) 786-6016 Fax: (804) 786-7221 E-mail: [email protected]
• Two-Phase Low Bid Procurement • Short-List 3 Highest Ranked Teams • Anticipated Scope of Work Outlined Section 2.2 • Estimated Contract Value: $29,700,000
![Page 36: Route 7 Widening and Bridge Rehabilitation Over Dulles Toll Road … · 2014-05-27 · Project Overview (Section 2.0) • Route 7 Widening and Bridge Rehabilitation over Dulles Toll](https://reader034.vdocuments.us/reader034/viewer/2022042713/5fafafac2549245a7723d094/html5/thumbnails/36.jpg)
36
Request for Qualifications (RFQ) Anticipated Schedule (Section 2.5)
RFQ Questions to VDOT 05/29/14 VDOT Response to Questions 06/05/14 Statement of Qualifications Due Date 06/19/14 Notification of Shortlist 08/07/14 RFP Release Date 08/21/14 Letter of Submittal Due 10/23/14 Price Proposals Due 10/30/14 Anticipated Award Date 12/03/14 Anticipated Final Completion Date 06/01/17
![Page 37: Route 7 Widening and Bridge Rehabilitation Over Dulles Toll Road … · 2014-05-27 · Project Overview (Section 2.0) • Route 7 Widening and Bridge Rehabilitation over Dulles Toll](https://reader034.vdocuments.us/reader034/viewer/2022042713/5fafafac2549245a7723d094/html5/thumbnails/37.jpg)
37
FORM C-78 (ATTACHMENT 2.10)
• Watch VDOT’s Design-Build RFQ website for responses to RFQ questions and Addendums http://www.virginiadot.org/business/request-for-qualifications.asp
• If VDOT issues an addendum, a revised C-78 form will be included with the addendum • Sign, date and include the C-78 with Statement of Qualifications
![Page 38: Route 7 Widening and Bridge Rehabilitation Over Dulles Toll Road … · 2014-05-27 · Project Overview (Section 2.0) • Route 7 Widening and Bridge Rehabilitation over Dulles Toll](https://reader034.vdocuments.us/reader034/viewer/2022042713/5fafafac2549245a7723d094/html5/thumbnails/38.jpg)
38
Contents of Statements of Qualifications (SOQ)
• Letter of Submittal (Section 3.2) • POC, Prequalification, Debarment, Surety, SCC, DPOR • 8% DBE Goal
• Offeror’s Team Structure (Section 3.3) • Key Personnel • Org Chart and Narrative • Clear separation between QA and QC programs for construction
activities
• Experience of Offeror’s Team (Section 3.4) • Lead Contractor Work History Form • Lead Designer Work History Form
• Project Risks (Section 3.5) • Identify 3 Critical Project Risks
![Page 39: Route 7 Widening and Bridge Rehabilitation Over Dulles Toll Road … · 2014-05-27 · Project Overview (Section 2.0) • Route 7 Widening and Bridge Rehabilitation over Dulles Toll](https://reader034.vdocuments.us/reader034/viewer/2022042713/5fafafac2549245a7723d094/html5/thumbnails/39.jpg)
39
Evaluation Criteria (Section 4)
• Offeror’s Team Structure 20% • Experience of Offeror’s Team 40% • Project Risks 40% Total 100% • Scoring Range Application
• Numerical score based on a 1-10 scale • Evaluation Criteria included for each submittal requirement
• Design-Build Evaluation Guidelines, October 2011 (On VDOT’S DB Website)
![Page 40: Route 7 Widening and Bridge Rehabilitation Over Dulles Toll Road … · 2014-05-27 · Project Overview (Section 2.0) • Route 7 Widening and Bridge Rehabilitation over Dulles Toll](https://reader034.vdocuments.us/reader034/viewer/2022042713/5fafafac2549245a7723d094/html5/thumbnails/40.jpg)
40
Submittal Requirements (Section 5.0) • Deadline for submitting a Statement of Qualifications
is June 19, 2014 at 4:00PM • 1 original paper version with original signatures • 1 CD-ROM with entire SOQ • 8 abbreviated paper copies • Statements of Qualifications shall be:
• Securely bound • No more than 15 pages • Typed on one-side only • Separated by numbered tabs • Original shall include all required documentation • Written in Times New Roman with a 12 point font • Prepared on 8.5” x 11” white paper
![Page 41: Route 7 Widening and Bridge Rehabilitation Over Dulles Toll Road … · 2014-05-27 · Project Overview (Section 2.0) • Route 7 Widening and Bridge Rehabilitation over Dulles Toll](https://reader034.vdocuments.us/reader034/viewer/2022042713/5fafafac2549245a7723d094/html5/thumbnails/41.jpg)
41
RFQ Questions (Section 6.0)
• All questions and request for clarifications shall be submitted in writing.
• Deadline for submitting questions is May 29, 2014. • Responses will be posted on VDOT’s RFQ website by
June 5, 2014.
![Page 42: Route 7 Widening and Bridge Rehabilitation Over Dulles Toll Road … · 2014-05-27 · Project Overview (Section 2.0) • Route 7 Widening and Bridge Rehabilitation over Dulles Toll](https://reader034.vdocuments.us/reader034/viewer/2022042713/5fafafac2549245a7723d094/html5/thumbnails/42.jpg)
Conflict of Interest (Section 11.2)
•Parsons Brinkerhoff •GeoConcepts Engineering, Inc.
42
• The following firms have been determined to have a conflict of interest:
![Page 43: Route 7 Widening and Bridge Rehabilitation Over Dulles Toll Road … · 2014-05-27 · Project Overview (Section 2.0) • Route 7 Widening and Bridge Rehabilitation over Dulles Toll](https://reader034.vdocuments.us/reader034/viewer/2022042713/5fafafac2549245a7723d094/html5/thumbnails/43.jpg)
43
• Each Offeror shall identify potential conflicts of interest. Offerors are on notice that prior or existing contractual obligations between a company and a federal or state agency relative to the Project or VDOT’s Design-Build program may present a conflict of interest or a competitive advantage. If a potential conflict of interest or competitive advantage is identified, the Offeror shall submit in writing the pertinent information to VDOT’s POC.
![Page 44: Route 7 Widening and Bridge Rehabilitation Over Dulles Toll Road … · 2014-05-27 · Project Overview (Section 2.0) • Route 7 Widening and Bridge Rehabilitation over Dulles Toll](https://reader034.vdocuments.us/reader034/viewer/2022042713/5fafafac2549245a7723d094/html5/thumbnails/44.jpg)
44
Questions ?