Transcript

!.

!.

!.

!. !"#5

|}33£¤101

|}41

|}46

|}41

JackRanch Cafe

Rest Stop

McM

illan

Cyn

Rd

Brown M

ateria

l Rd

|}58

PasoRobles

Bakersfield

Shandon

to

Antelope Grade

KERN

FRESNO

MONTEREYKINGS

SAN LUIS OBISPO

Segment III

Union

Segment I

Segment II

Seg IV-B

Whitley 2A

Cholame

Whitley 1 Whitley 2B

Wye

Seg IV-A

Source: Esri, DigitalGlobe, GeoEye, Earthstar Geographics, CNES/Airbus DS, USDA, USGS, AEX, Getmapping, Aerogrid, IGN, IGP, swisstopo, and the GIS UserCommunity

J

COMPLETED

CONSTRUCTION

DESIGN / ROW

UNPROGRAMMED

ROUTE 46 CORRIDORROUTE 46 CORRIDOR(US 101 TO INTERSTATE 5)(US 101 TO INTERSTATE 5)

May 2016Source: CIP Report 3-30-2016 * unescalatedS:\slo\05-3307a\gis\gisproj\2016\PM

SEGMENT LENGTH (MILES) PHASE CONSTR. COST (MILLIONS)

Union 5.0 COMPLETED  $33.3 (actual)Whitley 1 4.0 COMPLETED  $52.1 (actual)Whitley 2A 5.1 COMPLETED  $38.1 (allocated)Whitley 2B 4.0 CONSTRUCTION  $45.7 (allocated)Cholame 4.4 DESIGN / ROW  $46.0 (programmed)Wye 3.2 UNPROGRAMMED  $90.0 (unfunded need)*Antelope Gr 3.1 UNPROGRAMMED  $43.2 (unfunded need)*Segment II 7.3 COMPLETED  $24.3 (actual)Segment III 12.5 COMPLETED  $45.3 (actual)Segment I 7.7 COMPLETED  $24.2 (actual)Segment IV‐A 3.0 DESIGN / ROW  $17.5 (programmed)Segment IV‐B 3.0 UNPROGRAMMED  $50.0 (unfunded need)