HPGRs in Hard Rock Applications
A Technology Broke Barriers
Egbert Burch ardt & Rilmar Ojeda
-
7/27/2019 RILMAR OJEDA
2/17
First Approach of HPGRs to the Copper Industry
metallurgically
considered as a big
success!
widely percepted as afailure due to
unresolved wear issues!
Cyprus Sierrita
1994 1996
POLYCOM 22/13
-
7/27/2019 RILMAR OJEDA
3/17
Growth of HPGRs in Minerals Applications
Diamonds
Iron ore
Hard rock
-
7/27/2019 RILMAR OJEDA
4/17
Latest Trends in Copper / Mineral Ore Processing
traditional SABC circuit
New ore bodies have often been harder and lower grade
=> ultimate need to
to build high capacity concentrators
to minimise operating cost
in order to make these projects feasible at all
=> application of the most energy efficient technologies required
in order to mininise energy and consequently wear cost!
Energy requirements of SAG
Mills are about 4 to 16 kWh/t
-
7/27/2019 RILMAR OJEDA
5/17
Freeport Cerro Verde, Peru
First Copper Concentrator built on HPGR technology
Freeport -Cerro Verde
Design capacity: 108,000 mtpd
in operation since 2006
(> 120.000 tpd achieveable)
-
7/27/2019 RILMAR OJEDA
6/17
Freeport
PTFI Grasberg
Freeport PTFI
Grasberg, Indonesia
First quaternary HPGRs
in a brownfield copper application
Quaternary crushing mode
brownfield installation
Objectives:
1. capacity increase @ same grind
2. higher recovery @ finer grind
2 x POLYCOM 20 / 15
2 x 1,800 kW (each)
-
7/27/2019 RILMAR OJEDA
7/17
Sierrita quaternary open circuit
Bagdad tertiary closed circuit
Freeport Sierrita Mine and Bagdad Mine, USA
LOI for largest HPGRs ever built - brownfield copper applications
Testwo rk fo r Sierr ita Mine
suggested potent ial to:
reduce BM energy
by up to 22 %
increase throughput
by up to 25 %
2 x POLYCOM 26/18
1 x POLYCOM 26/18
2 x 3,300 kW (each)
3,000 3,600 tph
(design)
LOI was cancelled in2008 due to
economical crisis
Freeport
Sierrita Mine
Bagdad Mine
-
7/27/2019 RILMAR OJEDA
8/17
Anglo Platinum Mogalakwena North, RSA
First Platinum Concentrator built on HPGR technolgy
Anglo Platinum
Mogalakwena North
-
7/27/2019 RILMAR OJEDA
9/17
Newmont Boddington Gold Mine, Australia
First Gold Concentrator built on HPGR Technolgy
96.000 tpd plant
4 x POLYCOM 24/17
2 x 2,800 kW (each)
> 2.100 tph
(design each)
up to 3,000 tph
start-up in 2009
-
7/27/2019 RILMAR OJEDA
10/17
AngloGold Ashanti Tarkwa Mine, Ghana
First commercial HPGR for heap leaching of gold ore
AngloGold Ashanti
Tarkwa Mine
In operation since 2009
Freeport
Cerro Verde
Anglo Platinum
Mogalakwena North
Freeport
Grasberg
Newmont
Boddington Gold Mine
-
7/27/2019 RILMAR OJEDA
11/17
Goldcorp Inc. Penasquito, Mexico
First HPGR for pebble crushing in a hard rock application
Goldcorp Inc
Penasquito
Start up in 2010
-
7/27/2019 RILMAR OJEDA
12/17
Operating Plants & Upcoming Installations
Vale
Salobo Project
Anglo Ferrous
Minas Rio ProjectBKM Assmang (2008)
Northam Platinum (2008)
Gindalbie
Mt. Karara
Moly Mines
Spinnefex Ridge
-
7/27/2019 RILMAR OJEDA
13/17
Future Trends in Mineral Ore Processing:
Reduction of CO2 emissions to avoid global warming
introduction of CO2 certificates would translate into available power;
available power and required energy translates into maximum capacity
CO2 certificates may limit the capacities of future concentrators
Drastic need to reduce energy consumption even more!Studies to minimise energy input with HPGRs
More revolutionary concepts may be required!
-
7/27/2019 RILMAR OJEDA
14/17
Future Trends in Mineral Ore Processing
Shortage of water and minimised energy requirements
Could favour
heap leach applications
less energy required
no wet grinding or wet flotation process required
HPGRs have the potential to elevate the lower recoveries!
dry grinding applications
-
7/27/2019 RILMAR OJEDA
15/17
Future Trends in Mineral Ore Processing
Dry HPGR grinding of
hard limestones
BWI up to 16 kWh/mt
320 370 tph capacity
Fineness: 80 85 % < 90 m
10.5 to 11.5 kWh/t energy input(HPGR, fan, separator and bucket elavator)
50 % grinding energy required
as compared to ball mill
-
7/27/2019 RILMAR OJEDA
16/17
Future Trends in Mineral Ore Processing
Dry grinding:
saves energy & water,
reduces CO2
emissions!
-
7/27/2019 RILMAR OJEDA
17/17
HPGRs in Hard Rock Comminution
A Technology Broke Barriers
Questions?