Transcript

Rex Project Report Draft

ICE 2008 Chartered Professional Review Project Report

APPENDIX AOrganization Chart of Contractors Project Team

APPENDIX BPipe Gallery Drawing (Extracts)

APPENDIX C

Sketches and Photos for Pipe Gallery Construction Sequence

APPENDIX D

Photos for Temporary Saltwater Supply System Construction

APPENDIX ETower Crane Proposal and Footing Drawings (Extracts)APPENDIX FWorking Programme (Extracts)APPENDIX GSite Logistics PlanAPPENDIX HSample of Risk AssessmentAPPENDIX ISample of Site Instruction

Candidate: CHEUNG Ying Hei, Rex

ICE Ref.: ICE/Professional Reviews/60751585


Top Related