ICE 2008 Chartered Professional Review Project Report
APPENDIX AOrganization Chart of Contractors Project Team
APPENDIX BPipe Gallery Drawing (Extracts)
APPENDIX C
Sketches and Photos for Pipe Gallery Construction Sequence
APPENDIX D
Photos for Temporary Saltwater Supply System Construction
APPENDIX ETower Crane Proposal and Footing Drawings (Extracts)APPENDIX FWorking Programme (Extracts)APPENDIX GSite Logistics PlanAPPENDIX HSample of Risk AssessmentAPPENDIX ISample of Site Instruction
Candidate: CHEUNG Ying Hei, Rex
ICE Ref.: ICE/Professional Reviews/60751585