8/14/2019 Revision# 20 /2009-10 Effective From 0000 Hrs
1/5
Revision# 20 /2009-10Effective from 0000 hrs of 14.01.2010
Date: 12-01-2010
To :123 GM (SLDC), DTL, New Delhi.4 CE (Plg.&Comml.),HVPNL, Panchkula, Haryana.5 CE, (HPPC), Panchkula, Haryana.Fax No.0172-25868366 CE (SP), HPSEB, Shimla (HP).7 CE (SO),PDD, J&K, Jammu, (J&K).8 CE (SO&C), PSEB, Patiala (Punjab).9 CE (LD), RVPN, Jaipur (Rajasthan).10 CE (RPCC), Jaipur (Rajasthan).11 Director (Transmission), UPPCL, Lucknow (UP).
12 Director (Operation), UPCL, Dehradun (Uttarakhand).13 Station Director, NAPS, NPCIL,Narora (UP).14 Site Director, RAPS-3&4, NPCIL,Rawatbhata, Kota (Raj.).15 Executive Director (F), NPCIL, Mumbai.16 ED (Comml.), NHPC, Faridabad(Haryana)17 ED (Comml.), NTPC, New Delhi.18 ED (NCR), NTPC, Noida (UP).19 ED (NR), NTPC, Lucknow(UP).20 GM (C & SO), SJVNL, Himfed Building, New Shimla(HP).21 AGM(Comml.), THDC, Rishikesh, Uttarakhand.
Revision No - 20/ 2009-10
18-A,Institutional area, Shaheed Jeet Singh Marg,Katwaria Sarai, New Delhi 110 016
FAX MESSAGE
No: NRPC / SE (O) / Allocations / 2009 - 10
Government of IndiaMinistry of Power
Central Electricity AuthorityNorthern Regional Power Committee
Keeping in view the demand for power in Uttarakhand during forthcoming Kumbh Mela, Ministry of Power
vide order No. 1/24/2009-OM dated 11th
January, 2010 has made additional specific allocation of 64 MWpower to Uttarakhand from the Unallocated Power of Central Generating Stations of Northern Region. Thespecific allocation of 64MW to Uttarakhand for Kumbh mela shall be derived from all the CGSs in theNorthern Region in proportion to their respective contribution to the unallocated power pool after allocatingspecific allocation to the Railways and the HVDC stations of POWERGRID. The balance quantum of unallocated power of CGSs of Northern Region shall be allocated among the beneficiaries of the region as perthe existing percentages.
CEA vide order No. 5 / NR / CSA / GM - 2010 / DATED - 12.01.2010 ( MOP vide order No.1/24/2009 - OMdated 11.01.2010 has given specific allocation of 64 MW to Uttarakhand from the unallocated power ofCG stations of Northern Region.
From : Member Secretary, NRPC, New Delhi.
GM, NRLDC, New Delhi.S.E.(Elect.-Op.), U.T., Chanadigarh.
Subject : Allocation of unallocated power from Central Sector Power Stations of NR:
-
8/14/2019 Revision# 20 /2009-10 Effective From 0000 Hrs
2/5
Revision# 20 /2009-10Effective from 0000 hrs of 14-01-2010
Summary
A. Allocations from N.R.
Chandigarh 0.00 5.00 0.00 5.00 Chandigarh 0.00 0.00 0.00 0.00Delhi 0.00 4.00 0.00 4.00 Delhi 0.00 0.00 0.00 3.18Haryana 14.00 11.00 14.00 11.00 Haryana 2.50 0.00 3.75 0.00H.P. 7.00 11.00 12.00 12.00 H.P. 0.00 0.00 0.00 0.00J & K 26.00 33.00 26.00 33.00 J & K 0.00 0.00 0.00 0.00
Punjab 7.00 2.00 7.00 3.00 Punjab 3.18 3.18 1.25 0.00Rajasthan 10.00 7.00 7.00 7.00 Rajasthan 5.91 8.41 7.50 8.41U.P. 30.00 23.00 28.00 22.00 U.P. 3.41 3.41 2.50 3.41Uttarakhand 6.00 4.00 6.00 3.00 Uttarakhand 0.00 0.00 0.00 0.00
Total 100.00 100.00 100.00 100.00 Total 15.00 15.00 15.00 15.00
PERCENTAGE SHARES AND ENTITLEMENTS OF NORTHERN REGION UTILITIESIN VARIOUS CENTRAL SECTOR GENERATING STATIONS
(All figures in %)
10-18hrs
18-23hrs
U.A.(66 MW)- RAPS:B # 3 & 4State/UTState/UT 00-06 &
23-24 hrs06-10
hrs
U.A.-Pooled 1306 MW excluding RAPP #3&418-23hrs
00-06 &23-24 hrs
06-10hrs
10-18hrs
-
8/14/2019 Revision# 20 /2009-10 Effective From 0000 Hrs
3/5
-
8/14/2019 Revision# 20 /2009-10 Effective From 0000 Hrs
4/5
-
8/14/2019 Revision# 20 /2009-10 Effective From 0000 Hrs
5/5