![Page 1: Review of Rural Highway Traffic Counts Can the Trans-Texas Corridor be Justified? By Erik Slotboom Toll & Corridor Summit Meeting November 13, 2004](https://reader035.vdocuments.us/reader035/viewer/2022062718/56649e765503460f94b77cbc/html5/thumbnails/1.jpg)
Review of Rural Highway Traffic Counts
Can the Trans-Texas Corridor be Justified?
By Erik SlotboomToll & Corridor Summit Meeting
November 13, 2004
![Page 2: Review of Rural Highway Traffic Counts Can the Trans-Texas Corridor be Justified? By Erik Slotboom Toll & Corridor Summit Meeting November 13, 2004](https://reader035.vdocuments.us/reader035/viewer/2022062718/56649e765503460f94b77cbc/html5/thumbnails/2.jpg)
Also by Erik Slotboom
FireRicWilliamson.com HoustonFreeways.com
Founded by Erik Slotboom: TexasFreeway.com
![Page 3: Review of Rural Highway Traffic Counts Can the Trans-Texas Corridor be Justified? By Erik Slotboom Toll & Corridor Summit Meeting November 13, 2004](https://reader035.vdocuments.us/reader035/viewer/2022062718/56649e765503460f94b77cbc/html5/thumbnails/3.jpg)
Trans-Texas Corridor Overall Conclusions
• Only one corridor may justify a relief route:I-35, San Antonio to Hillsboro
• Existing Interstates are adequate in all other cases
• Some sections of existing Interstates will need a 3rd lane in each direction by 2034
• Trans-Texas corridor cannot be justified
![Page 4: Review of Rural Highway Traffic Counts Can the Trans-Texas Corridor be Justified? By Erik Slotboom Toll & Corridor Summit Meeting November 13, 2004](https://reader035.vdocuments.us/reader035/viewer/2022062718/56649e765503460f94b77cbc/html5/thumbnails/4.jpg)
How much traffic can existing Interstates handle?
Approximate
![Page 5: Review of Rural Highway Traffic Counts Can the Trans-Texas Corridor be Justified? By Erik Slotboom Toll & Corridor Summit Meeting November 13, 2004](https://reader035.vdocuments.us/reader035/viewer/2022062718/56649e765503460f94b77cbc/html5/thumbnails/5.jpg)
Typical 4-lane Rural Interstate
Interstate 35W South of Fort Worth
![Page 6: Review of Rural Highway Traffic Counts Can the Trans-Texas Corridor be Justified? By Erik Slotboom Toll & Corridor Summit Meeting November 13, 2004](https://reader035.vdocuments.us/reader035/viewer/2022062718/56649e765503460f94b77cbc/html5/thumbnails/6.jpg)
Typical 4 lane InterstateHow much traffic can it carry?
Vehicles/day
Rural I-35 S of Waco
I-45 S of Huntsville
56,000
45,000
Urban I-45 S of Conroe
US 59 Sugar Land (1999)
I-820 Fort Worth
102,000
129,000
124,000
• A 4-lane freeway can serve > 100,000 vehicles/daywith reduced service
![Page 7: Review of Rural Highway Traffic Counts Can the Trans-Texas Corridor be Justified? By Erik Slotboom Toll & Corridor Summit Meeting November 13, 2004](https://reader035.vdocuments.us/reader035/viewer/2022062718/56649e765503460f94b77cbc/html5/thumbnails/7.jpg)
Typical 6-lane Interstate
I-35 North of New Braunfels
![Page 8: Review of Rural Highway Traffic Counts Can the Trans-Texas Corridor be Justified? By Erik Slotboom Toll & Corridor Summit Meeting November 13, 2004](https://reader035.vdocuments.us/reader035/viewer/2022062718/56649e765503460f94b77cbc/html5/thumbnails/8.jpg)
![Page 9: Review of Rural Highway Traffic Counts Can the Trans-Texas Corridor be Justified? By Erik Slotboom Toll & Corridor Summit Meeting November 13, 2004](https://reader035.vdocuments.us/reader035/viewer/2022062718/56649e765503460f94b77cbc/html5/thumbnails/9.jpg)
Typical 6 lane InterstateHow much traffic can it carry?
Vehicles/day
Rural I-35 N of San Marcos 76,000
UrbanI-10 West Houston
Loop 1 Mopac Austin
220,000
170,000
• A 6-lane freeway can serve > 200,000 vehicles/daywith reduced service
![Page 10: Review of Rural Highway Traffic Counts Can the Trans-Texas Corridor be Justified? By Erik Slotboom Toll & Corridor Summit Meeting November 13, 2004](https://reader035.vdocuments.us/reader035/viewer/2022062718/56649e765503460f94b77cbc/html5/thumbnails/10.jpg)
Implied Tran-Texas Corridor Traffic
6-lane Trans-Texas
10-lane Trans-Texas
Existing Interstate
50,000 50,000
Trans-Texas + 100,000 + 200,000
Total Traffic 150,000 250,000
![Page 11: Review of Rural Highway Traffic Counts Can the Trans-Texas Corridor be Justified? By Erik Slotboom Toll & Corridor Summit Meeting November 13, 2004](https://reader035.vdocuments.us/reader035/viewer/2022062718/56649e765503460f94b77cbc/html5/thumbnails/11.jpg)
What kind of traffic counts do we have in 2003?
Is it anywhere approaching Trans-Texas capacity?
![Page 12: Review of Rural Highway Traffic Counts Can the Trans-Texas Corridor be Justified? By Erik Slotboom Toll & Corridor Summit Meeting November 13, 2004](https://reader035.vdocuments.us/reader035/viewer/2022062718/56649e765503460f94b77cbc/html5/thumbnails/12.jpg)
2003 traffic data
Source: TxDOT
![Page 13: Review of Rural Highway Traffic Counts Can the Trans-Texas Corridor be Justified? By Erik Slotboom Toll & Corridor Summit Meeting November 13, 2004](https://reader035.vdocuments.us/reader035/viewer/2022062718/56649e765503460f94b77cbc/html5/thumbnails/13.jpg)
• Existing traffic volumes are easily handled by existing 4-lane Interstates
Will traffic grow to Trans-Texas proportions?
![Page 14: Review of Rural Highway Traffic Counts Can the Trans-Texas Corridor be Justified? By Erik Slotboom Toll & Corridor Summit Meeting November 13, 2004](https://reader035.vdocuments.us/reader035/viewer/2022062718/56649e765503460f94b77cbc/html5/thumbnails/14.jpg)
Interstate 10Houston to San Antonio
2003 Traffic Data
![Page 15: Review of Rural Highway Traffic Counts Can the Trans-Texas Corridor be Justified? By Erik Slotboom Toll & Corridor Summit Meeting November 13, 2004](https://reader035.vdocuments.us/reader035/viewer/2022062718/56649e765503460f94b77cbc/html5/thumbnails/15.jpg)
![Page 16: Review of Rural Highway Traffic Counts Can the Trans-Texas Corridor be Justified? By Erik Slotboom Toll & Corridor Summit Meeting November 13, 2004](https://reader035.vdocuments.us/reader035/viewer/2022062718/56649e765503460f94b77cbc/html5/thumbnails/16.jpg)
Interstate 45Houston to Dallas
2003 traffic data
![Page 17: Review of Rural Highway Traffic Counts Can the Trans-Texas Corridor be Justified? By Erik Slotboom Toll & Corridor Summit Meeting November 13, 2004](https://reader035.vdocuments.us/reader035/viewer/2022062718/56649e765503460f94b77cbc/html5/thumbnails/17.jpg)
![Page 18: Review of Rural Highway Traffic Counts Can the Trans-Texas Corridor be Justified? By Erik Slotboom Toll & Corridor Summit Meeting November 13, 2004](https://reader035.vdocuments.us/reader035/viewer/2022062718/56649e765503460f94b77cbc/html5/thumbnails/18.jpg)
Interstate 35San Antonio to Laredo
“NAFTA Corridor”
• There has not been a NAFTA traffic boom
• Traffic counts stagnant since 2000
2003 traffic data
![Page 19: Review of Rural Highway Traffic Counts Can the Trans-Texas Corridor be Justified? By Erik Slotboom Toll & Corridor Summit Meeting November 13, 2004](https://reader035.vdocuments.us/reader035/viewer/2022062718/56649e765503460f94b77cbc/html5/thumbnails/19.jpg)
NAFTA Influence
• Strong growth in 1990s
• Stagnant since 1999
• Traffic Count still very low
![Page 20: Review of Rural Highway Traffic Counts Can the Trans-Texas Corridor be Justified? By Erik Slotboom Toll & Corridor Summit Meeting November 13, 2004](https://reader035.vdocuments.us/reader035/viewer/2022062718/56649e765503460f94b77cbc/html5/thumbnails/20.jpg)
![Page 21: Review of Rural Highway Traffic Counts Can the Trans-Texas Corridor be Justified? By Erik Slotboom Toll & Corridor Summit Meeting November 13, 2004](https://reader035.vdocuments.us/reader035/viewer/2022062718/56649e765503460f94b77cbc/html5/thumbnails/21.jpg)
Interstate 69 Corridor
• Can it justify a Trans-Texas corridor?
NO.
A conventional 4-lane interstate will serve traffic needs
6-lane sections needed approaching Houston
![Page 22: Review of Rural Highway Traffic Counts Can the Trans-Texas Corridor be Justified? By Erik Slotboom Toll & Corridor Summit Meeting November 13, 2004](https://reader035.vdocuments.us/reader035/viewer/2022062718/56649e765503460f94b77cbc/html5/thumbnails/22.jpg)
2003 traffic data
![Page 23: Review of Rural Highway Traffic Counts Can the Trans-Texas Corridor be Justified? By Erik Slotboom Toll & Corridor Summit Meeting November 13, 2004](https://reader035.vdocuments.us/reader035/viewer/2022062718/56649e765503460f94b77cbc/html5/thumbnails/23.jpg)
![Page 24: Review of Rural Highway Traffic Counts Can the Trans-Texas Corridor be Justified? By Erik Slotboom Toll & Corridor Summit Meeting November 13, 2004](https://reader035.vdocuments.us/reader035/viewer/2022062718/56649e765503460f94b77cbc/html5/thumbnails/24.jpg)
Interstate 35San Antonio to Hillsboro
• The only corridor that could possibly justify something resembling a Trans-Texas corridor
• Original TxDOT plan:widen existing facility to 6 (rural) and 8 (urban) lanes
![Page 25: Review of Rural Highway Traffic Counts Can the Trans-Texas Corridor be Justified? By Erik Slotboom Toll & Corridor Summit Meeting November 13, 2004](https://reader035.vdocuments.us/reader035/viewer/2022062718/56649e765503460f94b77cbc/html5/thumbnails/25.jpg)
2003 traffic data
• 4-lane sections south of Hillsboro need added lane in each direction immediately
• Expansion on hold pending Trans-Texas plan
I-35 2004 Status
![Page 26: Review of Rural Highway Traffic Counts Can the Trans-Texas Corridor be Justified? By Erik Slotboom Toll & Corridor Summit Meeting November 13, 2004](https://reader035.vdocuments.us/reader035/viewer/2022062718/56649e765503460f94b77cbc/html5/thumbnails/26.jpg)
![Page 27: Review of Rural Highway Traffic Counts Can the Trans-Texas Corridor be Justified? By Erik Slotboom Toll & Corridor Summit Meeting November 13, 2004](https://reader035.vdocuments.us/reader035/viewer/2022062718/56649e765503460f94b77cbc/html5/thumbnails/27.jpg)
![Page 28: Review of Rural Highway Traffic Counts Can the Trans-Texas Corridor be Justified? By Erik Slotboom Toll & Corridor Summit Meeting November 13, 2004](https://reader035.vdocuments.us/reader035/viewer/2022062718/56649e765503460f94b77cbc/html5/thumbnails/28.jpg)
![Page 29: Review of Rural Highway Traffic Counts Can the Trans-Texas Corridor be Justified? By Erik Slotboom Toll & Corridor Summit Meeting November 13, 2004](https://reader035.vdocuments.us/reader035/viewer/2022062718/56649e765503460f94b77cbc/html5/thumbnails/29.jpg)
Financial Case Study
• What if we build a Trans Texas Corridor from Georgetown to Hillsboro?
This is the only corridor section that has a remote chance of being viable
![Page 30: Review of Rural Highway Traffic Counts Can the Trans-Texas Corridor be Justified? By Erik Slotboom Toll & Corridor Summit Meeting November 13, 2004](https://reader035.vdocuments.us/reader035/viewer/2022062718/56649e765503460f94b77cbc/html5/thumbnails/30.jpg)
How Much Would It Cost?
Construction $1.38 billion $28.2 million/mile
Right-of-Way $300 million (est.) $6 million/mile
Compare to SH 130, Austin to Georgetown: 6 lanes, 102 miles
Assume a minimal Trans-Texas corridor, 4 highway lanes only but on a wide corridor
Cost per mile 110 miles
Construction $20 million $2.2 billion
Right-of-way $4 million $440 million
2.64 billion
Other costs .11 billion
Total 2.75 billion
![Page 31: Review of Rural Highway Traffic Counts Can the Trans-Texas Corridor be Justified? By Erik Slotboom Toll & Corridor Summit Meeting November 13, 2004](https://reader035.vdocuments.us/reader035/viewer/2022062718/56649e765503460f94b77cbc/html5/thumbnails/31.jpg)
How Much Traffic Will Use It?
Compare to Hardy Toll Road / I-45 Corridor in
Houston to determine I-35 / Trans-Texas split
• Interstate 45 north in Houston is one of the most heavily loaded freeways in the United States (per lane-mile)
![Page 32: Review of Rural Highway Traffic Counts Can the Trans-Texas Corridor be Justified? By Erik Slotboom Toll & Corridor Summit Meeting November 13, 2004](https://reader035.vdocuments.us/reader035/viewer/2022062718/56649e765503460f94b77cbc/html5/thumbnails/32.jpg)
![Page 33: Review of Rural Highway Traffic Counts Can the Trans-Texas Corridor be Justified? By Erik Slotboom Toll & Corridor Summit Meeting November 13, 2004](https://reader035.vdocuments.us/reader035/viewer/2022062718/56649e765503460f94b77cbc/html5/thumbnails/33.jpg)
Conclusion
• Toll road traffic has been consistent at 15% of corridor traffic in spite of severe congestion on I-45
• Motorists will endure severe congestion to avoid tolls
![Page 34: Review of Rural Highway Traffic Counts Can the Trans-Texas Corridor be Justified? By Erik Slotboom Toll & Corridor Summit Meeting November 13, 2004](https://reader035.vdocuments.us/reader035/viewer/2022062718/56649e765503460f94b77cbc/html5/thumbnails/34.jpg)
Analysis Assumption
• Toll percent of corridor traffic stays low until I-35 is severely congested
I-35 TrafficVehicles per day
Toll Traffic as % of Total
<75,000 10%
75,000-100,000 40% of traffic over 75,000
>100,000 80% of traffic over 100,000
![Page 35: Review of Rural Highway Traffic Counts Can the Trans-Texas Corridor be Justified? By Erik Slotboom Toll & Corridor Summit Meeting November 13, 2004](https://reader035.vdocuments.us/reader035/viewer/2022062718/56649e765503460f94b77cbc/html5/thumbnails/35.jpg)
Other Assumptions
• No capacity improvements to I-35;4-lane sections remain 4 lanes forever
• $10 toll Georgetown-Hillsboro ($.09/mile)increasing at 3% per year
• 10% corridor traffic increase after 20 years due to induced demand
• Assume 4.5% interest, 40 year term on $2.75 billion in bonds. Annual Payment: $149 million
![Page 36: Review of Rural Highway Traffic Counts Can the Trans-Texas Corridor be Justified? By Erik Slotboom Toll & Corridor Summit Meeting November 13, 2004](https://reader035.vdocuments.us/reader035/viewer/2022062718/56649e765503460f94b77cbc/html5/thumbnails/36.jpg)
![Page 37: Review of Rural Highway Traffic Counts Can the Trans-Texas Corridor be Justified? By Erik Slotboom Toll & Corridor Summit Meeting November 13, 2004](https://reader035.vdocuments.us/reader035/viewer/2022062718/56649e765503460f94b77cbc/html5/thumbnails/37.jpg)
![Page 38: Review of Rural Highway Traffic Counts Can the Trans-Texas Corridor be Justified? By Erik Slotboom Toll & Corridor Summit Meeting November 13, 2004](https://reader035.vdocuments.us/reader035/viewer/2022062718/56649e765503460f94b77cbc/html5/thumbnails/38.jpg)
Financial Shortfall
• About 25 years of subsidy required
Where will the money come from?
![Page 39: Review of Rural Highway Traffic Counts Can the Trans-Texas Corridor be Justified? By Erik Slotboom Toll & Corridor Summit Meeting November 13, 2004](https://reader035.vdocuments.us/reader035/viewer/2022062718/56649e765503460f94b77cbc/html5/thumbnails/39.jpg)
Toll Interstate 35!
![Page 40: Review of Rural Highway Traffic Counts Can the Trans-Texas Corridor be Justified? By Erik Slotboom Toll & Corridor Summit Meeting November 13, 2004](https://reader035.vdocuments.us/reader035/viewer/2022062718/56649e765503460f94b77cbc/html5/thumbnails/40.jpg)
![Page 41: Review of Rural Highway Traffic Counts Can the Trans-Texas Corridor be Justified? By Erik Slotboom Toll & Corridor Summit Meeting November 13, 2004](https://reader035.vdocuments.us/reader035/viewer/2022062718/56649e765503460f94b77cbc/html5/thumbnails/41.jpg)
Conclusion
• Tolling existing rural interstates is the only way to make any Trans-Texas corridor viable
– Bribe rural counties with a cut of the money to defuse rural opposition
![Page 42: Review of Rural Highway Traffic Counts Can the Trans-Texas Corridor be Justified? By Erik Slotboom Toll & Corridor Summit Meeting November 13, 2004](https://reader035.vdocuments.us/reader035/viewer/2022062718/56649e765503460f94b77cbc/html5/thumbnails/42.jpg)
Other Financial Risks
• High gasoline cost – lower traffic counts
• Faulty assumptions (eg NAFTA)
• Lower than forecast population growth
• Predominantly Hispanic population
– Hispanic regions most anti-toll
– Lower income groups can’t afford tolls
![Page 43: Review of Rural Highway Traffic Counts Can the Trans-Texas Corridor be Justified? By Erik Slotboom Toll & Corridor Summit Meeting November 13, 2004](https://reader035.vdocuments.us/reader035/viewer/2022062718/56649e765503460f94b77cbc/html5/thumbnails/43.jpg)
Slower Population Growth?
Dallas Morning News, October 4, 2004
![Page 44: Review of Rural Highway Traffic Counts Can the Trans-Texas Corridor be Justified? By Erik Slotboom Toll & Corridor Summit Meeting November 13, 2004](https://reader035.vdocuments.us/reader035/viewer/2022062718/56649e765503460f94b77cbc/html5/thumbnails/44.jpg)
NAFTA: what happened?
1990s assumption:
future traffic boom
2000s reality:
Everything is being made in China
Result:
Flat traffic volume to Mexico
![Page 45: Review of Rural Highway Traffic Counts Can the Trans-Texas Corridor be Justified? By Erik Slotboom Toll & Corridor Summit Meeting November 13, 2004](https://reader035.vdocuments.us/reader035/viewer/2022062718/56649e765503460f94b77cbc/html5/thumbnails/45.jpg)
Alameda Corridor in Los AngelesPaying the Price for Faulty Assumptions
• $2.5 billion spent on rail lineNow it is grossly underutilized
“In the nearly two decades it took to plan and build the corridor, the shipping business changed so dramatically that the economic assumptions underpinning the project became obsolete.” L.A. Times, August 22, 2004
![Page 46: Review of Rural Highway Traffic Counts Can the Trans-Texas Corridor be Justified? By Erik Slotboom Toll & Corridor Summit Meeting November 13, 2004](https://reader035.vdocuments.us/reader035/viewer/2022062718/56649e765503460f94b77cbc/html5/thumbnails/46.jpg)
A Better Way to Meet Our Needs
• Add extra lanes to existing interstates as needed
• Rebuilding a 4-lane interstate to a 6-lane interstate costs about $10 million per mile, half the cost of a Trans-Texas corridor
![Page 47: Review of Rural Highway Traffic Counts Can the Trans-Texas Corridor be Justified? By Erik Slotboom Toll & Corridor Summit Meeting November 13, 2004](https://reader035.vdocuments.us/reader035/viewer/2022062718/56649e765503460f94b77cbc/html5/thumbnails/47.jpg)
Actual needs in the next 30 years
Can be doneWITHOUT TOLLS
![Page 48: Review of Rural Highway Traffic Counts Can the Trans-Texas Corridor be Justified? By Erik Slotboom Toll & Corridor Summit Meeting November 13, 2004](https://reader035.vdocuments.us/reader035/viewer/2022062718/56649e765503460f94b77cbc/html5/thumbnails/48.jpg)
The Engineer SaysTraffic counts can’t even remotely justify Trans-Texas Corridor
The Financial Analyst SaysTolling will only pay a tiny fraction of the cost for decades
The Concerned TexanWorries about steep tolls on existing Interstates to pay for it