![Page 1: RESTORATION OF PÄRNU RIVER BASIN...restoration on pÄrnu riverbasin timeframe: 27.03.2015 –31.12.2023 budget: 15 200 000 euros, 85% cohesion fund, 15% estonian state budget; main](https://reader036.vdocuments.us/reader036/viewer/2022071213/6041a25a4e1f9f19c51ca769/html5/thumbnails/1.jpg)
RESTORATION OF PÄRNU RIVER BASIN
![Page 2: RESTORATION OF PÄRNU RIVER BASIN...restoration on pÄrnu riverbasin timeframe: 27.03.2015 –31.12.2023 budget: 15 200 000 euros, 85% cohesion fund, 15% estonian state budget; main](https://reader036.vdocuments.us/reader036/viewer/2022071213/6041a25a4e1f9f19c51ca769/html5/thumbnails/2.jpg)
SOME FACTS ABOUT PÄRNU RIVER
• SECOND LONGEST RIVER IN ESTONIA, 144 KM
• CATCHMENT AREA ~7000 KM²; COVERS 17% ESTONIAS
TERRITORY
• 270 TRIBUTARIES (RIVERS AND STREAMS), LONGEST OF THEM
NAVESTI RIVER (100 KM), ALL TOGEHTHER MORE THAN 3000
KM
• PÄRNU RIVER IS PART OF THE NATURA 2000 NETWORK
• SALMONIDS RIVER BIGGER THAN ALL 10 OHTER SALMONIDS
RIVERS IN ESTONIA ALLTOGETHER
• 22 FISH SPIECES DEPEND ON THE SPAWNING AREAS IN PÄRNU
RIVER BASIN
![Page 3: RESTORATION OF PÄRNU RIVER BASIN...restoration on pÄrnu riverbasin timeframe: 27.03.2015 –31.12.2023 budget: 15 200 000 euros, 85% cohesion fund, 15% estonian state budget; main](https://reader036.vdocuments.us/reader036/viewer/2022071213/6041a25a4e1f9f19c51ca769/html5/thumbnails/3.jpg)
RESTORATION ON PÄRNU RIVERBASIN
TIMEFRAME: 27.03.2015 – 31.12.2023
BUDGET: 15 200 000 EUROS, 85% COHESION FUND, 15%
ESTONIAN STATE BUDGET;
MAIN ACTIVITIES: 3 DAM REMOVALS ON PÄRNU RIVER,
INCLUDING SINDI DAM, 5 REMOVALS ON TRIBUTARIES,
THE LARGEST NATURE PROTECTION PROJECT IN ESTONIA
![Page 4: RESTORATION OF PÄRNU RIVER BASIN...restoration on pÄrnu riverbasin timeframe: 27.03.2015 –31.12.2023 budget: 15 200 000 euros, 85% cohesion fund, 15% estonian state budget; main](https://reader036.vdocuments.us/reader036/viewer/2022071213/6041a25a4e1f9f19c51ca769/html5/thumbnails/4.jpg)
![Page 5: RESTORATION OF PÄRNU RIVER BASIN...restoration on pÄrnu riverbasin timeframe: 27.03.2015 –31.12.2023 budget: 15 200 000 euros, 85% cohesion fund, 15% estonian state budget; main](https://reader036.vdocuments.us/reader036/viewer/2022071213/6041a25a4e1f9f19c51ca769/html5/thumbnails/5.jpg)
1832
1922
![Page 6: RESTORATION OF PÄRNU RIVER BASIN...restoration on pÄrnu riverbasin timeframe: 27.03.2015 –31.12.2023 budget: 15 200 000 euros, 85% cohesion fund, 15% estonian state budget; main](https://reader036.vdocuments.us/reader036/viewer/2022071213/6041a25a4e1f9f19c51ca769/html5/thumbnails/6.jpg)
THE THIRD SINDI RIVER DAM, 1977150 M WIDE, 4,5 M HIGH
![Page 7: RESTORATION OF PÄRNU RIVER BASIN...restoration on pÄrnu riverbasin timeframe: 27.03.2015 –31.12.2023 budget: 15 200 000 euros, 85% cohesion fund, 15% estonian state budget; main](https://reader036.vdocuments.us/reader036/viewer/2022071213/6041a25a4e1f9f19c51ca769/html5/thumbnails/7.jpg)
October 2013
![Page 8: RESTORATION OF PÄRNU RIVER BASIN...restoration on pÄrnu riverbasin timeframe: 27.03.2015 –31.12.2023 budget: 15 200 000 euros, 85% cohesion fund, 15% estonian state budget; main](https://reader036.vdocuments.us/reader036/viewer/2022071213/6041a25a4e1f9f19c51ca769/html5/thumbnails/8.jpg)
October 2018
![Page 9: RESTORATION OF PÄRNU RIVER BASIN...restoration on pÄrnu riverbasin timeframe: 27.03.2015 –31.12.2023 budget: 15 200 000 euros, 85% cohesion fund, 15% estonian state budget; main](https://reader036.vdocuments.us/reader036/viewer/2022071213/6041a25a4e1f9f19c51ca769/html5/thumbnails/9.jpg)
HOW WE GOT THERE?
• Boldminister and a bitof luck
• EU + STATE FUNDING
• Publicservantswith a mission
• WFWD
• NATD
LEGAL OBLIGATIONS
SYSTEM AND TEAM
POLITICS MONEY
![Page 10: RESTORATION OF PÄRNU RIVER BASIN...restoration on pÄrnu riverbasin timeframe: 27.03.2015 –31.12.2023 budget: 15 200 000 euros, 85% cohesion fund, 15% estonian state budget; main](https://reader036.vdocuments.us/reader036/viewer/2022071213/6041a25a4e1f9f19c51ca769/html5/thumbnails/10.jpg)
April 2019
![Page 11: RESTORATION OF PÄRNU RIVER BASIN...restoration on pÄrnu riverbasin timeframe: 27.03.2015 –31.12.2023 budget: 15 200 000 euros, 85% cohesion fund, 15% estonian state budget; main](https://reader036.vdocuments.us/reader036/viewer/2022071213/6041a25a4e1f9f19c51ca769/html5/thumbnails/11.jpg)
…AND WE PLAN THAT IT LOOKS SOMETHING LIKE THIS IN 2 YEARS
![Page 12: RESTORATION OF PÄRNU RIVER BASIN...restoration on pÄrnu riverbasin timeframe: 27.03.2015 –31.12.2023 budget: 15 200 000 euros, 85% cohesion fund, 15% estonian state budget; main](https://reader036.vdocuments.us/reader036/viewer/2022071213/6041a25a4e1f9f19c51ca769/html5/thumbnails/12.jpg)
IF TOU HAVE ANY FURTHER QUESTIONS, CONTACT
THE PROJECT MANAGER:
KÜLLI TAMMUR
+372 5669 6476
THANK YOU!