The Players
Owner & owner’s representative Architect
Interior design & furniture consultant
Acoustical & lighting consultants Contractor
Construction manager
Project supervisor
![Page 3: Responsibilities of the Owners Representative in a Construction Project Jonathan Franklin University of Washington School of Law Jim Hambleton Texas Wesleyan](https://reader036.vdocuments.us/reader036/viewer/2022062619/55165654550346a2698b4dc8/html5/thumbnails/3.jpg)
Owner’s Representative
§ 3.2
The Owner shall designate … a representative who shall have express authority to bind the Owner with respect to all matters requiring the Owner’s approval or authorization.
![Page 4: Responsibilities of the Owners Representative in a Construction Project Jonathan Franklin University of Washington School of Law Jim Hambleton Texas Wesleyan](https://reader036.vdocuments.us/reader036/viewer/2022062619/55165654550346a2698b4dc8/html5/thumbnails/4.jpg)
The Design Pieces
The program ABA Standards 701 – 704
Defining your program Pre-design Schematic design Design development Construction documents
![Page 5: Responsibilities of the Owners Representative in a Construction Project Jonathan Franklin University of Washington School of Law Jim Hambleton Texas Wesleyan](https://reader036.vdocuments.us/reader036/viewer/2022062619/55165654550346a2698b4dc8/html5/thumbnails/5.jpg)
ABA Standards
701: General requirements
702: Law Library
703: Research & study space
704: Technological Capacities
![Page 6: Responsibilities of the Owners Representative in a Construction Project Jonathan Franklin University of Washington School of Law Jim Hambleton Texas Wesleyan](https://reader036.vdocuments.us/reader036/viewer/2022062619/55165654550346a2698b4dc8/html5/thumbnails/6.jpg)
The Design Pieces
The program ABA Standards 701 – 704
Defining your program Pre-design Schematic design Design development Construction documents
![Page 7: Responsibilities of the Owners Representative in a Construction Project Jonathan Franklin University of Washington School of Law Jim Hambleton Texas Wesleyan](https://reader036.vdocuments.us/reader036/viewer/2022062619/55165654550346a2698b4dc8/html5/thumbnails/7.jpg)
The Construction Pieces
RFI: request for information
PCO: proposed change order
PR: proposal request
![Page 8: Responsibilities of the Owners Representative in a Construction Project Jonathan Franklin University of Washington School of Law Jim Hambleton Texas Wesleyan](https://reader036.vdocuments.us/reader036/viewer/2022062619/55165654550346a2698b4dc8/html5/thumbnails/8.jpg)
![Page 9: Responsibilities of the Owners Representative in a Construction Project Jonathan Franklin University of Washington School of Law Jim Hambleton Texas Wesleyan](https://reader036.vdocuments.us/reader036/viewer/2022062619/55165654550346a2698b4dc8/html5/thumbnails/9.jpg)
The Construction Pieces
RFI: request for information
PCO: proposed change order
PR: proposal request
Submittal
![Page 10: Responsibilities of the Owners Representative in a Construction Project Jonathan Franklin University of Washington School of Law Jim Hambleton Texas Wesleyan](https://reader036.vdocuments.us/reader036/viewer/2022062619/55165654550346a2698b4dc8/html5/thumbnails/10.jpg)
![Page 11: Responsibilities of the Owners Representative in a Construction Project Jonathan Franklin University of Washington School of Law Jim Hambleton Texas Wesleyan](https://reader036.vdocuments.us/reader036/viewer/2022062619/55165654550346a2698b4dc8/html5/thumbnails/11.jpg)
The Construction Pieces
RFI: request for information
PCO: proposed change order
PR: proposal request
Submittal
Punch list
![Page 12: Responsibilities of the Owners Representative in a Construction Project Jonathan Franklin University of Washington School of Law Jim Hambleton Texas Wesleyan](https://reader036.vdocuments.us/reader036/viewer/2022062619/55165654550346a2698b4dc8/html5/thumbnails/12.jpg)
![Page 13: Responsibilities of the Owners Representative in a Construction Project Jonathan Franklin University of Washington School of Law Jim Hambleton Texas Wesleyan](https://reader036.vdocuments.us/reader036/viewer/2022062619/55165654550346a2698b4dc8/html5/thumbnails/13.jpg)
The Process: Construction Weekly OAC Meeting
Attendees: players plus subcontractors
Agenda: Construction schedule PCO log Old business New business RFI log Submittal log
![Page 14: Responsibilities of the Owners Representative in a Construction Project Jonathan Franklin University of Washington School of Law Jim Hambleton Texas Wesleyan](https://reader036.vdocuments.us/reader036/viewer/2022062619/55165654550346a2698b4dc8/html5/thumbnails/14.jpg)
The Process: Construction Weekly OAC Meeting
Attendees: players plus subcontractors
![Page 15: Responsibilities of the Owners Representative in a Construction Project Jonathan Franklin University of Washington School of Law Jim Hambleton Texas Wesleyan](https://reader036.vdocuments.us/reader036/viewer/2022062619/55165654550346a2698b4dc8/html5/thumbnails/15.jpg)
![Page 16: Responsibilities of the Owners Representative in a Construction Project Jonathan Franklin University of Washington School of Law Jim Hambleton Texas Wesleyan](https://reader036.vdocuments.us/reader036/viewer/2022062619/55165654550346a2698b4dc8/html5/thumbnails/16.jpg)
The Process: Construction Weekly OAC Meeting
Attendees: players plus subcontractors
Agenda: Construction schedule
![Page 17: Responsibilities of the Owners Representative in a Construction Project Jonathan Franklin University of Washington School of Law Jim Hambleton Texas Wesleyan](https://reader036.vdocuments.us/reader036/viewer/2022062619/55165654550346a2698b4dc8/html5/thumbnails/17.jpg)
![Page 18: Responsibilities of the Owners Representative in a Construction Project Jonathan Franklin University of Washington School of Law Jim Hambleton Texas Wesleyan](https://reader036.vdocuments.us/reader036/viewer/2022062619/55165654550346a2698b4dc8/html5/thumbnails/18.jpg)
The Process: Construction Weekly OAC Meeting
Attendees: players plus subcontractors
Agenda: Construction schedule
PCO log
![Page 19: Responsibilities of the Owners Representative in a Construction Project Jonathan Franklin University of Washington School of Law Jim Hambleton Texas Wesleyan](https://reader036.vdocuments.us/reader036/viewer/2022062619/55165654550346a2698b4dc8/html5/thumbnails/19.jpg)
![Page 20: Responsibilities of the Owners Representative in a Construction Project Jonathan Franklin University of Washington School of Law Jim Hambleton Texas Wesleyan](https://reader036.vdocuments.us/reader036/viewer/2022062619/55165654550346a2698b4dc8/html5/thumbnails/20.jpg)
The Process: Construction Weekly OAC Meeting
Attendees: players plus subcontractors
Agenda: Construction schedule PCO log Old business New business RFI log Submittal log
![Page 21: Responsibilities of the Owners Representative in a Construction Project Jonathan Franklin University of Washington School of Law Jim Hambleton Texas Wesleyan](https://reader036.vdocuments.us/reader036/viewer/2022062619/55165654550346a2698b4dc8/html5/thumbnails/21.jpg)
![Page 22: Responsibilities of the Owners Representative in a Construction Project Jonathan Franklin University of Washington School of Law Jim Hambleton Texas Wesleyan](https://reader036.vdocuments.us/reader036/viewer/2022062619/55165654550346a2698b4dc8/html5/thumbnails/22.jpg)
The Process: Construction Responsibilities of the Owner’s Rep
Be thoroughly familiar with the blueprints Construction plans
Elec/tele/data plan
Finish plan
Reflected ceiling plan
Millwork detail
Furniture plan
Door & finish schedules
![Page 23: Responsibilities of the Owners Representative in a Construction Project Jonathan Franklin University of Washington School of Law Jim Hambleton Texas Wesleyan](https://reader036.vdocuments.us/reader036/viewer/2022062619/55165654550346a2698b4dc8/html5/thumbnails/23.jpg)
The Process: Construction Responsibilities of the Owner’s Rep
Construction oversight consistent with the AIA contract
Coordinating the owner’s vendors with the contractor’s vendors
![Page 24: Responsibilities of the Owners Representative in a Construction Project Jonathan Franklin University of Washington School of Law Jim Hambleton Texas Wesleyan](https://reader036.vdocuments.us/reader036/viewer/2022062619/55165654550346a2698b4dc8/html5/thumbnails/24.jpg)
The Process: Construction Responsibilities of the Owner’s Rep
Construction oversight consistent with the AIA contract
Coordinating the owner’s vendors with the contractor’s vendors
Walk the construction site on a regular basis
![Page 25: Responsibilities of the Owners Representative in a Construction Project Jonathan Franklin University of Washington School of Law Jim Hambleton Texas Wesleyan](https://reader036.vdocuments.us/reader036/viewer/2022062619/55165654550346a2698b4dc8/html5/thumbnails/25.jpg)
![Page 26: Responsibilities of the Owners Representative in a Construction Project Jonathan Franklin University of Washington School of Law Jim Hambleton Texas Wesleyan](https://reader036.vdocuments.us/reader036/viewer/2022062619/55165654550346a2698b4dc8/html5/thumbnails/26.jpg)
The Process: Construction Responsibilities of the Owner’s Rep
Construction oversight consistent with the AIA contract
Coordinating the owner’s vendors with the contractor’s vendors
Walk the construction site on a regular basis
Punch list
![Page 27: Responsibilities of the Owners Representative in a Construction Project Jonathan Franklin University of Washington School of Law Jim Hambleton Texas Wesleyan](https://reader036.vdocuments.us/reader036/viewer/2022062619/55165654550346a2698b4dc8/html5/thumbnails/27.jpg)
![Page 28: Responsibilities of the Owners Representative in a Construction Project Jonathan Franklin University of Washington School of Law Jim Hambleton Texas Wesleyan](https://reader036.vdocuments.us/reader036/viewer/2022062619/55165654550346a2698b4dc8/html5/thumbnails/28.jpg)
Summary
Communicate with your constituencies Defer to the professionals Don’t settle for something that is not
right Make decisions and be ready to explain
those decisions to your supervisor Keep a sense of perspective and a
sense of humor