BACKGROUND TO THE PROJECT
Who Is The Process Initiator?
What is the RMP?
• Definition of RMP
o Old Approach
• RMP Mandate
• Legal Framework
• What is a Government Waterworks (GWWs)?
How is the RMP developed?
• Process Facilitator
• Overview of the Study Area
• RMP Stages
AGENDA CONTINUE…
PURPOSE OF AUTHORITY MEETING
SWOT Analysis
Vision for Nandoni Dam
CLOSURE
NWRI: STRUCTURE
Strategic
Support
CD: Operations
D: Southern
Operations
CD:
Infrastructure
Development
CD: Construction
Management
DDG:NWRI
D: Northern
Operations
Development of
RMP for prioritised
Dams
D: IEED: Eastern
Operations
D:Central
Operations
Implementation of
RMP
CD: Engineering
Services
DEFINITION OF RMP
RMP is a tool which aims to manage the utilisation of water resource and the surrounding
environment in ways which promote community participation and beneficiation,
environmental sustainability and to unlock socio-economic potential of the water resource.
OLD APPROACH
ZONING PLANS
• Traditionally Applied only to State Dams
• Spatial and Environmental in Nature
• Not Consider Economic and Social Issues
• Lacked Guidelines Regarding Institutionalisation
SUSTAINABLE UTILISATION PLAN (SUP)
• Focus on implementation : Business Plan and Common Goals
• Builds trust by showing that the needs and expectations of the community are
important and essential for participatory planning.
• Incorporation in to Local Municipal Development Planning initiatives:
Integrated Development Plans (IDPs) etc.
RMP MANDATE
Reference To Section 113 of The National Water Act (NWA) 36 of 1998
• The water of a government waterwork (GWW) and the surrounding state-owned land
may be made available for recreational purposes, either generally or for a specific
purpose, on the conditions and to the persons determined by the minister.
LEGAL FRAMEWORK
These are the policies that have been developed in relation to the use of GWWs:
• The Regulations in respect of government dams and surrounding State-owned
land, No. R654 of 1964.
• Recreational Water Use Manual Policy (2004).
• RMP Guideline RWU GP2 (2006).
• General Strategic Plan for Commercialisation for Tourism Public Private
Partnership at GWW (2009).
GOVERNMENT WATERWORKS (GWWS)
Refers to any borehole, structure, earthwork or equipment installed in connection with
water use which is owned or controlled by the minister and includes the land on which it
is situated.
Examples of waterworks include:
• Water storage dams;
• Water transfer schemes; and
• Flood attenuation works.
PURCHASED BOUNDARY
HOW IS THE RMP DEVELOPED?
PROFESSIONAL SERVICES PROVIDER BACKGROUND
Engineerex (PTY) Ltd (PSP) has been appointed as professional service provider by
Department of Water And Sanitation (DWS) to undertake the development of the Resource
Management Plans (RMPs) including its supporting business plans for (GWWs) nationwide.
The PSP is the Process Facilitator in the project responsible for Process Facilitation in
terms of :
• Setting of objective;
• Research – information collection and collation;
• Managing public consultation;
• Producing thorough, readable and informative reports; and
• Producing DRAFT RMP
OVERVIEW OF THE STUDY AREA
LOCALITY MAP
PHASE 4:
Research/
Information
Generation
PHASE 1:
Evaluating Process
Trigger
PHASE 2:
Project Preparation &
Encumbrance Survey
PHASE 3:
Objective
Identification
PHASE 7:
Operationalisation
PHASE 6:
Evaluation & Decision
Making
PHASE 5:
Integrated Management,
Zoning, Institutional
Planning & Financial
Planning
RMP PROCESS STAGES
PHASE 1PROCESS TRIGGER
Resource Management
• Legislation section 2 of the NWA (redress past imbalance, equity, dam safety,
pollution prevention, etc.)
• Invasive alien species: integration of Cooperative Inland Waterways Safety
Programme in GWWs (introduction of washdays on GWWs)
• Water Quality Issues: implementation of UPN system (cell phone sms based
system used in dams for life threatening emergencies and pollution)
PHASE 1PROCESS TRIGGER CONTINUES…
Recreational Industry Involvement
• Public safety: prevent conflict of users (people swimming where boats are
operating) and determining the carrying capacity of each dam.
• Identification of socio-economic developmental potential: Implementation of
General Strategic Plan for tourism PPPs at GWWs approved in (2009).
• Prevent of uncontrolled development within dam basin: Effective Zoning
Mapping.
PHASE 1PROCESS TRIGGER CONTINUES…
Community Participation and Beneficiation
• Addressing physical access and access to the recreational economy of the resource
by the communities
• Creation of appropriate institutional arrangement that involves community
participation.
Public Policy
• The GWW can be identified as a local development objective in terms of other
planning initiatives such as IDP’s, SDF and EMF.
PHASE 2 PROJECT PREPARATION AND ENCUMBRANCE SURVEY
Definition
• To ensure the effective addressing of the objectives of the project.
• Investigate hindrances or challenges within and around the GWWs and other factors
that may influence the development and implementation of the RMP.
Examples
• Legal - land ownership; land claims; agreements; etc.
• Social – language; mobility; expectations (raised expectations regarding the
contribution that the dam can make to poverty alleviation and eradication)
• Biophysical – vegetation; topography, geology, climate, hydrology, etc.
Outcome
• ENCUMBRANCE REPORT
PHASE 3 OBJECTIVE IDENTIFICATION
Definition
• Clarify objectives to be met by the RMP.
• Consult with stakeholders to ascertain common goal and formulate into one
document.
The objective should address the following questions:
• What do we want?
• How are we going to achieve this?
• Who will be involved?
• By when would we want to achieve our goals?
• Why would we want to achieve our goal?
Outcome
• OBJECTIVE IDENTIFICATION MATRIX REPORT
PHASE 4RESEARCH/INFORMATION GENERATION
Outcome
• Research Report: which will entails the following:
• Status quo and characteristics of the GWW
• Summary of encumbrance and objective identification reports
• Detail Information on:
o Current Institutional Structure
o Biophysical Data
o Cultural Data
o Socio-Economic Data
o User Data
o Hydrological information pertaining to water levels, specifically safe
operational levels and levels where the use impacts on water quality.
PHASE 5
INTEGRATED MANAGEMENT, ZONING, INSTITUTIONAL PLANNING & FINANCIAL PLANNING
• Establishment of the
effective structure that can
manage resources and must
be representative of all
Stakeholder.
• Institutional options and
legal aspects to create this.
• Site Planning
• Zonation
Draft RMP
Institutional
Plan
• Carrying capacity of the resource
• Development potential
requirements
• Programmes and plans to unlock
the potential of the water
resource
• SWOT Analysis
• Encumbrance & Objectives
Strategic Plan Business Plan
Integrated
Management
Plan
Zoning Plan
Financial Plan
PHASE 6EVALUATION & DECISION MAKING
Facilitate the approval from DWS and relevant authorities and compile the final RMP.
Outcome
• Final RMP
PHASE 7OPERATIONALISATION
Outcome
• Gazette the approved RMP.
• The institutional proposal be established and formalised.
SUMMARY OF THE RMP PROCESS(WHERE TO FROM HERE?)
Project Steering Committee (PSC)
• Review all documents and assist in the corporation of stakeholder inputs.
Process Duration
• Eight (8) months depending on the encumbrances encountered.
Stakeholder Involvement
• Public review of the draft and final RMP.
PURPOSE OF THE AUTHORITY MEETING
VISION FOR NANDONI DAM
CLOSURE
THANK YOU
ANY QUESTIONS?
THANK YOU
ANY QUESTIONS ?
CONTACTS
FOR TECHNICAL ENQUIRIES:
MS. ETHINAH SIBANDA & MR KABEDI MASHILO
96 JEAN AVENUE,
DORINGKLOOF, CENTURION, 0157
TEL: 012 667 1085
EMAIL: [email protected]/ [email protected]