![Page 1: Residence Inn by Marriott Stamford, Connecticut David Walenga -Structural Option AE Senior Thesis – April 14, 2004](https://reader033.vdocuments.us/reader033/viewer/2022051316/56649cb75503460f9497cb8b/html5/thumbnails/1.jpg)
Residence Inn by Marriott Stamford, Connecticut
David Walenga -Structural Option
AE Senior Thesis – April 14, 2004
![Page 2: Residence Inn by Marriott Stamford, Connecticut David Walenga -Structural Option AE Senior Thesis – April 14, 2004](https://reader033.vdocuments.us/reader033/viewer/2022051316/56649cb75503460f9497cb8b/html5/thumbnails/2.jpg)
Residence Inn by Marriott Stamford, Connecticut
Topics
Project BackgroundStructural Design Depth StudyBreadth Study 1 : Construction ManagementBreadth Study 2 : Mechanical Design
Questions?
Final Conclusions
![Page 3: Residence Inn by Marriott Stamford, Connecticut David Walenga -Structural Option AE Senior Thesis – April 14, 2004](https://reader033.vdocuments.us/reader033/viewer/2022051316/56649cb75503460f9497cb8b/html5/thumbnails/3.jpg)
Residence Inn by Marriott Stamford, Connecticut
Project BackgroundProject Team
Owner/Developer - F.D. Rich CompanyArchitect – BBGM Architects and InteriorsGeneral Contractor – Haynes ConstructionStructural Engineer – Holbert Apple Associates, Inc.M.E.P. – Collective Design Associates, LLCCivil Engineer – Redniss & Mead, Inc.
![Page 4: Residence Inn by Marriott Stamford, Connecticut David Walenga -Structural Option AE Senior Thesis – April 14, 2004](https://reader033.vdocuments.us/reader033/viewer/2022051316/56649cb75503460f9497cb8b/html5/thumbnails/4.jpg)
Residence Inn by Marriott Stamford, Connecticut
Building Location
![Page 5: Residence Inn by Marriott Stamford, Connecticut David Walenga -Structural Option AE Senior Thesis – April 14, 2004](https://reader033.vdocuments.us/reader033/viewer/2022051316/56649cb75503460f9497cb8b/html5/thumbnails/5.jpg)
Residence Inn by Marriott Stamford, Connecticut
Building Site and UseBuilding SiteStructure replaces a small one story commercial building and is built on the former site of a YMCA. Building UseThe Residence Inn by Marriott is a hotel offering one and two bedroom suites complete with kitchenettes and private baths.
![Page 6: Residence Inn by Marriott Stamford, Connecticut David Walenga -Structural Option AE Senior Thesis – April 14, 2004](https://reader033.vdocuments.us/reader033/viewer/2022051316/56649cb75503460f9497cb8b/html5/thumbnails/6.jpg)
Residence Inn by Marriott Stamford, Connecticut
Building Cost
Hotel: $24,947,000
Pre-cast garage: $2,631,000
Total: $27,578,000
![Page 7: Residence Inn by Marriott Stamford, Connecticut David Walenga -Structural Option AE Senior Thesis – April 14, 2004](https://reader033.vdocuments.us/reader033/viewer/2022051316/56649cb75503460f9497cb8b/html5/thumbnails/7.jpg)
Residence Inn by Marriott Stamford, Connecticut
Building Size
- 120,000 square feet- 164 guest suites
- 13 occupied floors
- 404 space attached precast parking garage
- 2 mechanical penthouse levels- 1 basement level with pool
![Page 8: Residence Inn by Marriott Stamford, Connecticut David Walenga -Structural Option AE Senior Thesis – April 14, 2004](https://reader033.vdocuments.us/reader033/viewer/2022051316/56649cb75503460f9497cb8b/html5/thumbnails/8.jpg)
Residence Inn by Marriott Stamford, Connecticut
Architecture
-Slender-wall cladding system-Cantilevered balconies on floors 9 through 13-Suspended mezzanine level above ground floor-L-shaped plan design, levels on short leg end at 5th floor.
![Page 9: Residence Inn by Marriott Stamford, Connecticut David Walenga -Structural Option AE Senior Thesis – April 14, 2004](https://reader033.vdocuments.us/reader033/viewer/2022051316/56649cb75503460f9497cb8b/html5/thumbnails/9.jpg)
Residence Inn by Marriott Stamford, Connecticut
Architecture
Typical One Bedroom Suite
Floor Plans of Typical Suites to come.
Typical Two Bedroom Suite
![Page 10: Residence Inn by Marriott Stamford, Connecticut David Walenga -Structural Option AE Senior Thesis – April 14, 2004](https://reader033.vdocuments.us/reader033/viewer/2022051316/56649cb75503460f9497cb8b/html5/thumbnails/10.jpg)
Residence Inn by Marriott Stamford, Connecticut
Project Situation
-Original start date: January 2004-Original completion date: June 2005-Due to budgetary concerns, project construction has been delayed 5 months to allow for the redesign of certain building components in order to lower the overall cost of construction.-Updated start date: June 2004-Updated completion date: November 2005
![Page 11: Residence Inn by Marriott Stamford, Connecticut David Walenga -Structural Option AE Senior Thesis – April 14, 2004](https://reader033.vdocuments.us/reader033/viewer/2022051316/56649cb75503460f9497cb8b/html5/thumbnails/11.jpg)
Residence Inn by Marriott Stamford, Connecticut
Topics
Project BackgroundStructural Design Depth StudyBreadth Study 1 : Construction ManagementBreadth Study 2 : Mechanical Design
Questions?
Final Conclusions
![Page 12: Residence Inn by Marriott Stamford, Connecticut David Walenga -Structural Option AE Senior Thesis – April 14, 2004](https://reader033.vdocuments.us/reader033/viewer/2022051316/56649cb75503460f9497cb8b/html5/thumbnails/12.jpg)
Residence Inn by Marriott Stamford, Connecticut
Structural Design Depth StudyOriginal Design
Flat plate concrete gravity systemConcrete moment frame lateral systemFoundation system modifications
Miscellaneous structural items
Design Code change
Conclusions
![Page 13: Residence Inn by Marriott Stamford, Connecticut David Walenga -Structural Option AE Senior Thesis – April 14, 2004](https://reader033.vdocuments.us/reader033/viewer/2022051316/56649cb75503460f9497cb8b/html5/thumbnails/13.jpg)
Residence Inn by Marriott Stamford, Connecticut
Original Design
-Gravity System:-Steel framed
superstructure-8” precast concrete hollow-core plank slab with gypcrete topping-Composite steel construction on mezzanine level
![Page 14: Residence Inn by Marriott Stamford, Connecticut David Walenga -Structural Option AE Senior Thesis – April 14, 2004](https://reader033.vdocuments.us/reader033/viewer/2022051316/56649cb75503460f9497cb8b/html5/thumbnails/14.jpg)
Residence Inn by Marriott Stamford, Connecticut
Original Design
-Gravity System:
Typical Ball Framing planAnd typical floor plan
![Page 15: Residence Inn by Marriott Stamford, Connecticut David Walenga -Structural Option AE Senior Thesis – April 14, 2004](https://reader033.vdocuments.us/reader033/viewer/2022051316/56649cb75503460f9497cb8b/html5/thumbnails/15.jpg)
Residence Inn by Marriott Stamford, Connecticut
Original Design
-Foundation System:
Foundation system described
![Page 16: Residence Inn by Marriott Stamford, Connecticut David Walenga -Structural Option AE Senior Thesis – April 14, 2004](https://reader033.vdocuments.us/reader033/viewer/2022051316/56649cb75503460f9497cb8b/html5/thumbnails/16.jpg)
Residence Inn by Marriott Stamford, Connecticut
Original Design
-Lateral System:
Foundation system described, including figures, plans, elevations.
![Page 17: Residence Inn by Marriott Stamford, Connecticut David Walenga -Structural Option AE Senior Thesis – April 14, 2004](https://reader033.vdocuments.us/reader033/viewer/2022051316/56649cb75503460f9497cb8b/html5/thumbnails/17.jpg)
Residence Inn by Marriott Stamford, Connecticut
Original Design
-Advantages and Disadvantages:
Table listing advantages and disadvantages.
![Page 18: Residence Inn by Marriott Stamford, Connecticut David Walenga -Structural Option AE Senior Thesis – April 14, 2004](https://reader033.vdocuments.us/reader033/viewer/2022051316/56649cb75503460f9497cb8b/html5/thumbnails/18.jpg)
Residence Inn by Marriott Stamford, Connecticut
Structural Design Depth StudyOriginal Design
Flat plate concrete gravity systemConcrete moment frame lateral systemFoundation system modifications
Miscellaneous structural items
Design Code change
Conclusions
![Page 19: Residence Inn by Marriott Stamford, Connecticut David Walenga -Structural Option AE Senior Thesis – April 14, 2004](https://reader033.vdocuments.us/reader033/viewer/2022051316/56649cb75503460f9497cb8b/html5/thumbnails/19.jpg)
Residence Inn by Marriott Stamford, Connecticut
Design Code Change
-Original Design Code: BOCA 1996-Code for redesign: IBC 2000-Connecticut plans to adopt IBC 2003 in 2005 as the state’s governing code.-IBC 2000 used in lieu of IBC 2003 since it is currently more common.
![Page 20: Residence Inn by Marriott Stamford, Connecticut David Walenga -Structural Option AE Senior Thesis – April 14, 2004](https://reader033.vdocuments.us/reader033/viewer/2022051316/56649cb75503460f9497cb8b/html5/thumbnails/20.jpg)
Residence Inn by Marriott Stamford, Connecticut
Effects of Code Change: Wind
-BOCA 96 Basic Wind Speed: 90 mph-IBC 2000 Basic Wind Speed: 110 mph-Five second gust required by IBC 2000-Wind base shear increased by ~30%
-Include Pressure and shear profiles-
![Page 21: Residence Inn by Marriott Stamford, Connecticut David Walenga -Structural Option AE Senior Thesis – April 14, 2004](https://reader033.vdocuments.us/reader033/viewer/2022051316/56649cb75503460f9497cb8b/html5/thumbnails/21.jpg)
Residence Inn by Marriott Stamford, Connecticut
Effects of Code Change: Seismic
-Include shear tables-
-Describe code differences-
![Page 22: Residence Inn by Marriott Stamford, Connecticut David Walenga -Structural Option AE Senior Thesis – April 14, 2004](https://reader033.vdocuments.us/reader033/viewer/2022051316/56649cb75503460f9497cb8b/html5/thumbnails/22.jpg)
Residence Inn by Marriott Stamford, Connecticut
Structural Design Depth StudyOriginal Design
Flat plate concrete gravity systemConcrete moment frame lateral systemFoundation system modifications
Miscellaneous structural items
Design Code change
Conclusions
![Page 23: Residence Inn by Marriott Stamford, Connecticut David Walenga -Structural Option AE Senior Thesis – April 14, 2004](https://reader033.vdocuments.us/reader033/viewer/2022051316/56649cb75503460f9497cb8b/html5/thumbnails/23.jpg)
Residence Inn by Marriott Stamford, Connecticut
Flat Plate Concrete System
-Include sections, plans-
-Describe design assumptions--Describe design results-
![Page 24: Residence Inn by Marriott Stamford, Connecticut David Walenga -Structural Option AE Senior Thesis – April 14, 2004](https://reader033.vdocuments.us/reader033/viewer/2022051316/56649cb75503460f9497cb8b/html5/thumbnails/24.jpg)
Residence Inn by Marriott Stamford, Connecticut
Flat Plate Concrete System
-System cost, schedule-
![Page 25: Residence Inn by Marriott Stamford, Connecticut David Walenga -Structural Option AE Senior Thesis – April 14, 2004](https://reader033.vdocuments.us/reader033/viewer/2022051316/56649cb75503460f9497cb8b/html5/thumbnails/25.jpg)
Residence Inn by Marriott Stamford, Connecticut
Flat Plate Concrete System
-System advantages, disadvantages table-
![Page 26: Residence Inn by Marriott Stamford, Connecticut David Walenga -Structural Option AE Senior Thesis – April 14, 2004](https://reader033.vdocuments.us/reader033/viewer/2022051316/56649cb75503460f9497cb8b/html5/thumbnails/26.jpg)
Residence Inn by Marriott Stamford, Connecticut
Structural Design Depth StudyOriginal Design
Flat plate concrete gravity systemConcrete moment frame lateral systemFoundation system modifications
Miscellaneous structural items
Design Code change
Conclusions
![Page 27: Residence Inn by Marriott Stamford, Connecticut David Walenga -Structural Option AE Senior Thesis – April 14, 2004](https://reader033.vdocuments.us/reader033/viewer/2022051316/56649cb75503460f9497cb8b/html5/thumbnails/27.jpg)
Residence Inn by Marriott Stamford, Connecticut
Concrete Moment Frames
-Describe design assumptions-
-Describe design results-
![Page 28: Residence Inn by Marriott Stamford, Connecticut David Walenga -Structural Option AE Senior Thesis – April 14, 2004](https://reader033.vdocuments.us/reader033/viewer/2022051316/56649cb75503460f9497cb8b/html5/thumbnails/28.jpg)
Residence Inn by Marriott Stamford, Connecticut
Concrete Moment Frames
-Table of advantages and disadvantages-
![Page 29: Residence Inn by Marriott Stamford, Connecticut David Walenga -Structural Option AE Senior Thesis – April 14, 2004](https://reader033.vdocuments.us/reader033/viewer/2022051316/56649cb75503460f9497cb8b/html5/thumbnails/29.jpg)
Residence Inn by Marriott Stamford, Connecticut
Structural Design Depth StudyOriginal Design
Flat plate concrete gravity systemConcrete moment frame lateral systemFoundation system modifications
Miscellaneous structural items
Design Code change
Conclusions
![Page 30: Residence Inn by Marriott Stamford, Connecticut David Walenga -Structural Option AE Senior Thesis – April 14, 2004](https://reader033.vdocuments.us/reader033/viewer/2022051316/56649cb75503460f9497cb8b/html5/thumbnails/30.jpg)
Residence Inn by Marriott Stamford, Connecticut
Foundation System
-Describe changes- loss of mats… etc.--Include figure of typical spread ftg.-
![Page 31: Residence Inn by Marriott Stamford, Connecticut David Walenga -Structural Option AE Senior Thesis – April 14, 2004](https://reader033.vdocuments.us/reader033/viewer/2022051316/56649cb75503460f9497cb8b/html5/thumbnails/31.jpg)
Residence Inn by Marriott Stamford, Connecticut
Structural Design Depth StudyOriginal Design
Flat plate concrete gravity systemConcrete moment frame lateral systemFoundation system modifications
Miscellaneous structural items
Design Code change
Conclusions
![Page 32: Residence Inn by Marriott Stamford, Connecticut David Walenga -Structural Option AE Senior Thesis – April 14, 2004](https://reader033.vdocuments.us/reader033/viewer/2022051316/56649cb75503460f9497cb8b/html5/thumbnails/32.jpg)
Residence Inn by Marriott Stamford, Connecticut
Balconies and Mezzanine
-Describe design results-
-Include figure/diagrams-
![Page 33: Residence Inn by Marriott Stamford, Connecticut David Walenga -Structural Option AE Senior Thesis – April 14, 2004](https://reader033.vdocuments.us/reader033/viewer/2022051316/56649cb75503460f9497cb8b/html5/thumbnails/33.jpg)
Residence Inn by Marriott Stamford, Connecticut
Structural Design Depth StudyOriginal Design
Flat plate concrete gravity systemConcrete moment frame lateral systemFoundation system modifications
Miscellaneous structural items
Design Code change
Conclusions
![Page 34: Residence Inn by Marriott Stamford, Connecticut David Walenga -Structural Option AE Senior Thesis – April 14, 2004](https://reader033.vdocuments.us/reader033/viewer/2022051316/56649cb75503460f9497cb8b/html5/thumbnails/34.jpg)
Residence Inn by Marriott Stamford, Connecticut
Conclusions
-Conclusions-
-Include overall comparison chart-
![Page 35: Residence Inn by Marriott Stamford, Connecticut David Walenga -Structural Option AE Senior Thesis – April 14, 2004](https://reader033.vdocuments.us/reader033/viewer/2022051316/56649cb75503460f9497cb8b/html5/thumbnails/35.jpg)
Residence Inn by Marriott Stamford, Connecticut
Topics
Project BackgroundStructural Design Depth StudyBreadth Study 1 : Construction ManagementBreadth Study 2 : Mechanical Design
Questions?
Final Conclusions
![Page 36: Residence Inn by Marriott Stamford, Connecticut David Walenga -Structural Option AE Senior Thesis – April 14, 2004](https://reader033.vdocuments.us/reader033/viewer/2022051316/56649cb75503460f9497cb8b/html5/thumbnails/36.jpg)
Residence Inn by Marriott Stamford, Connecticut
Benefits of Delayed Construction
-Describe benefits for delaying-
![Page 37: Residence Inn by Marriott Stamford, Connecticut David Walenga -Structural Option AE Senior Thesis – April 14, 2004](https://reader033.vdocuments.us/reader033/viewer/2022051316/56649cb75503460f9497cb8b/html5/thumbnails/37.jpg)
Residence Inn by Marriott Stamford, Connecticut
Costs of Delayed Construction
-Describe costs for delaying-
![Page 38: Residence Inn by Marriott Stamford, Connecticut David Walenga -Structural Option AE Senior Thesis – April 14, 2004](https://reader033.vdocuments.us/reader033/viewer/2022051316/56649cb75503460f9497cb8b/html5/thumbnails/38.jpg)
Residence Inn by Marriott Stamford, Connecticut
Conclusions on Decision to Delay
-Conclusions/Recommendation-
![Page 39: Residence Inn by Marriott Stamford, Connecticut David Walenga -Structural Option AE Senior Thesis – April 14, 2004](https://reader033.vdocuments.us/reader033/viewer/2022051316/56649cb75503460f9497cb8b/html5/thumbnails/39.jpg)
Residence Inn by Marriott Stamford, Connecticut
Topics
Project BackgroundStructural Design Depth StudyBreadth Study 1 : Construction ManagementBreadth Study 2 : Mechanical Design
Questions?
Final Conclusions
![Page 40: Residence Inn by Marriott Stamford, Connecticut David Walenga -Structural Option AE Senior Thesis – April 14, 2004](https://reader033.vdocuments.us/reader033/viewer/2022051316/56649cb75503460f9497cb8b/html5/thumbnails/40.jpg)
Residence Inn by Marriott Stamford, Connecticut
Original Mechanical System
-Describe original system, including cost and performance-
![Page 41: Residence Inn by Marriott Stamford, Connecticut David Walenga -Structural Option AE Senior Thesis – April 14, 2004](https://reader033.vdocuments.us/reader033/viewer/2022051316/56649cb75503460f9497cb8b/html5/thumbnails/41.jpg)
Residence Inn by Marriott Stamford, Connecticut
Redesigned Mechanical System
-Describe new system, including cost and performance-
![Page 42: Residence Inn by Marriott Stamford, Connecticut David Walenga -Structural Option AE Senior Thesis – April 14, 2004](https://reader033.vdocuments.us/reader033/viewer/2022051316/56649cb75503460f9497cb8b/html5/thumbnails/42.jpg)
Residence Inn by Marriott Stamford, Connecticut
Recommendation
-Advantages and disadvantages chart--Include recommendation-
![Page 43: Residence Inn by Marriott Stamford, Connecticut David Walenga -Structural Option AE Senior Thesis – April 14, 2004](https://reader033.vdocuments.us/reader033/viewer/2022051316/56649cb75503460f9497cb8b/html5/thumbnails/43.jpg)
Residence Inn by Marriott Stamford, Connecticut
Topics
Project BackgroundStructural Design Depth StudyBreadth Study 1 : Construction ManagementBreadth Study 2 : Mechanical Design
Questions?
Final Conclusions
![Page 44: Residence Inn by Marriott Stamford, Connecticut David Walenga -Structural Option AE Senior Thesis – April 14, 2004](https://reader033.vdocuments.us/reader033/viewer/2022051316/56649cb75503460f9497cb8b/html5/thumbnails/44.jpg)
Residence Inn by Marriott Stamford, Connecticut
Final Conclusions
-Recap recommendations/conclusions-
![Page 45: Residence Inn by Marriott Stamford, Connecticut David Walenga -Structural Option AE Senior Thesis – April 14, 2004](https://reader033.vdocuments.us/reader033/viewer/2022051316/56649cb75503460f9497cb8b/html5/thumbnails/45.jpg)
Residence Inn by Marriott Stamford, Connecticut
Topics
Project BackgroundStructural Design Depth StudyBreadth Study 1 : Construction ManagementBreadth Study 2 : Mechanical Design
Questions?
Final Conclusions
![Page 46: Residence Inn by Marriott Stamford, Connecticut David Walenga -Structural Option AE Senior Thesis – April 14, 2004](https://reader033.vdocuments.us/reader033/viewer/2022051316/56649cb75503460f9497cb8b/html5/thumbnails/46.jpg)
Residence Inn by Marriott Stamford, Connecticut
Questions?
![Page 47: Residence Inn by Marriott Stamford, Connecticut David Walenga -Structural Option AE Senior Thesis – April 14, 2004](https://reader033.vdocuments.us/reader033/viewer/2022051316/56649cb75503460f9497cb8b/html5/thumbnails/47.jpg)
Residence Inn by Marriott Stamford, Connecticut
Thank you to:……