ITEM MATERIAL DESCRIPTIONS UNIT QUANTITY UNIT COST TOTAL COST

1 TILES Pcs. 220 30 66002 TILE ADHESIVE BAG 10 250 25003 CEMENT BAG 5 250 12504 SAND BAG 10 210 21005 PLYWOOD PCS. 15 350 52506 PRIMER 701 WHITE PAINT PAIL 3 2500 75007 WALL PAINT (semi gloss) PAIL 3 2600 78008 PAINT BRUSH # 1 Pcs. 2 100 2009 PAINT BRUSH # 2 Pcs. 2 100 200

10 ROLLER # 7 Pcs. 3 120 36011 BABY ROLLER Pcs. 3 100 30012 SKIMCOAT BAG 10 220 220013 SANDING PAPER # 150 Pcs. 50 50 250014 0

038760

ITEM SKILLED WORKERS DURATION LABOR RATE TOTAL COST

1 MASON 1 5 400 20002 PAINTER 2 5 400 20003 INSTALLER 1 5 400 20004 LABOR (HELPER) 2 5 250 1250

7250

MATERIAL COST 38,760.00LABOR COST 7,250.00TOTAL COST 46,010.00

SAY 50,000.00