Woes of a Project LeaderWoes of a Project Leader
• Life for a Project Leader isn’t easy:– Has to heard Lions! (not just Cats)– Has to organise people
• Who don’t want to be organised
– Has to give talks at important colateral functions– Has to set up agendas
• In every agenda– There is a First Talk
• Project Leader
– There is a Final Talk• Project Leader
– There are all the talks in between• The important people who do real work
– There is the Penultimate Talk• Extremely Dangerous:
You never know what he will say He will steal your best slides And he will say something about what you wanted to say …
» but probably not quite how you wanted to say it.
January 13, 2010 B.M. Barnett - STFC/RAL - Heidelberg 3
What does a System Run Coordinator Do?What does a System Run Coordinator Do?
• Represents you at the weekly meetings– Negociates time slots
• Combined running• Calibration
– Expresses the opinion of the management• Might sneak in one or two of his/her own
• Keeps track of and schedules system activities– In between beam fills– During “Technical Stops”
• Coordinates system configuration updates– Calibrations, firmware updates, patches, etc.
• An “Equivalent to” system run coordinator– Doesn’t know about OTP or OTSMOU
January 13, 2010 B.M. Barnett - STFC/RAL - Heidelberg 4
Calorimeter Trigger: Commissioning HistoryCalorimeter Trigger: Commissioning History
• Hardware:– 2007:
• Running in ATLAS since M3 (June 2007)– 2008:
• Installation complete Q1 2008
• LTPIs and combined partitions Q2 2008
• Ready for first physics Q3 2008
– 2009• Frequent cosmic running
All L1Calo triggers commissioned and running• Regular Wednesday LArg/L1Calo sessions
Refinements of timing Energy calibration Noise hunting
• Firmware consolidation Algorithms, readout Studies of problematic channels Now running combined digital-error free @ 85 kHz
• Optimized setup Digital filtering (FIR filters) for “bunch-crossing ID” (BCID)
• On to REAL Physics!
January 13, 2010 B.M. Barnett - STFC/RAL - Heidelberg 5
What is in a Run Report?What is in a Run Report?
• Summary of configurations– Calibrations– Triggers– Timings– Receiver settings– Bad channel history
• A look backward– 2009
• A look forward– 2010
January 13, 2010 B.M. Barnett - STFC/RAL - Heidelberg 6
But now we have Many Nice ToolsBut now we have Many Nice Tools
January 13, 2010 B.M. Barnett - STFC/RAL - Heidelberg 7
Noise TrackingNoise Tracking
• List of – Disabled and noisy L1Calo Trigger Pre-Processor channels – https://atlas-l1calo.web.cern.ch/atlas-l1calo/cgi-bin/l1cbadchn.cgi
• And • Yes
• Savannah reporting will appear
January 13, 2010 B.M. Barnett - STFC/RAL - Heidelberg 8
Rate Monitoring HistoriesRate Monitoring Histories
• History of individual– Tower rates and– Trigger rates
• https://twiki.cern.ch/twiki/bin/view/Atlas/LevelOneCaloTriggerRates
Calorimeter Week
Calo with TRT Trigger
Studies
January 13, 2010 B.M. Barnett - STFC/RAL - Heidelberg 9
And Many Competent CollaboratorsAnd Many Competent Collaborators
• Who summarise things:– (Eg, up to run 142195)– http://indico.cern.ch/getFile.py/access?contribId=0&resId=0&materialId=slides&confId=76
272
• So• Most information is already accessible through
the web or databases directly
January 13, 2010 B.M. Barnett - STFC/RAL - Heidelberg 10
What were we Expecting in 2009?What were we Expecting in 2009?
• And they played the game• More or less to plan
• In fact, better! • Beam arrived early …
11
Recorded data samples Number of Integrated luminosity events (< 30% uncertainty)
Total ~ 920k ~ 20 μb-1
With stable beams ( tracker fully on) ~ 540k ~ 12 μb-1
At √s=2.36 TeV (flat top) ~ 34k ≈ 1 μb-1
Average data-taking efficiency: ~ 90%
Max peak luminosity seen by ATLAS : ~ 7 x 1026 cm-2 s-1
Overview of 2009 RunningOverview of 2009 Running
12
K0S
Λ
And Some Textbook PhysicsAnd Some Textbook Physics
January 13, 2010 B.M. Barnett - STFC/RAL - Heidelberg 13
L1Calo History: TimingL1Calo History: Timing
January 13, 2010 B.M. Barnett - STFC/RAL - Heidelberg 14
L1Calo History: ReceiversL1Calo History: Receivers
• Calibration:– 18.11.09 17:05
138746 for Larg 139139 for Tile
– 20.11.09 10:09 140087 for Larg 139139 for Tile
– 10.12.09 14:20• These calibrations now include the sick
TBB region and most of Tile 141361 for Larg 141951 for Tile
• Receiver Overlap Strategy:• 20.11.09 08:58
• EtConversion:CalibGains:MskOvAlt1
• Checkerboard EMEC/EMB• 04.12.09 14:52
• EtConversion:CalibGains:
MskOvEmecOnly• EMEC Only
January 13, 2010 B.M. Barnett - STFC/RAL - Heidelberg 15
A Good Year: Splashes and FirstsA Good Year: Splashes and Firsts
January 13, 2010 B.M. Barnett - STFC/RAL - Heidelberg 16
A Good Year: CosmicsA Good Year: Cosmics
Some of them In coincidence with beam …Some of them In coincidence with beam …
January 13, 2010 B.M. Barnett - STFC/RAL - Heidelberg 17
Run Plans 2010Run Plans 2010
January 13, 2010 B.M. Barnett - STFC/RAL - Heidelberg 18
Run Plans 2010Run Plans 2010
But evolution of energy … 2.36 … 7 … 10 TeV is not yet definiteBut evolution of energy … 2.36 … 7 … 10 TeV is not yet definite
January 13, 2010 B.M. Barnett - STFC/RAL - Heidelberg 19
Luminosity Evolution?Luminosity Evolution?
Lumi curve fromF.Zimmermann : Nov Upgrade
Week? ?
January 13, 2010 B.M. Barnett - STFC/RAL - Heidelberg 20
Future Fun Future Fun
• Eddy currents and image currents– What happens to ATLAS when there is significant beam– Do you remember the hemispherical bump on a flat infinite plane?
• More energy and luminosity with trigger rates that are easy to see
– 2009 running wasn't really the year of L1Calo!
• Oh ... – and calibrations.
January 13, 2010 B.M. Barnett - STFC/RAL - Heidelberg 21
And more reflections …And more reflections …