KEY:STRUCTURAL ENGINEER:NAME : PHFAXPO BOXEMAIL
SERVICES ENGINEER:NAME : PHFAXPO BOXEMAIL
FIRE ENGINEER:NAME : Holmes Fire & SafteyPHFAXPO BOXEMAIL
No. Description Date
1 : 1 @ A1 - Half Scale @A3
Drawing List
19-16Waitohi Picton Ferry PrecinctRedevelopment
RC.A.T.00-
19-16Waitohi Picton Ferry PrecinctRedevelopment
Ferry Terminal BuildingRC.A.TFOR RESOURCE CONSENT22.07.2020
Resource Consent Drawing List
SheetNumber Sheet Name
Current RevisionDescription
CurrentRevisionDate
CurrentRevision
RC.A.T.00 Drawing List Resource Consent 22/07/2020 ARC.A.T.01 Site Plan Resource Consent 22/07/2020 ARC.A.T.02 Terminal Precinct Plan Resource Consent 22/07/2020 ARC.A.T.03 Terminal GA Plans Resource Consent 22/07/2020 ARC.A.T.04 Floor Plan Axonometrics Resource Consent 22/07/2020 ARC.A.T.05 Elevations Resource Consent 22/07/2020 ARC.A.T.06 Transverse Sections Resource Consent 22/07/2020 ARC.A.T.07 Longitudinal Sections Resource Consent 22/07/2020 ARC.A.T.08 Terminal Precinct Axonometric View Resource Consent 22/07/2020 ARC.A.T.09 EPW- Plan and Elevations Resource Consent 22/07/2020 ARC.A.T.10 EPW- Typical Section and Elevations Resource Consent 22/07/2020 ARC.A.T.11 3D View- Southeast corner Resource Consent 22/07/2020 ARC.A.T.12 3D View- Northeast Corner Resource Consent 22/07/2020 ARC.A.T.13 3D View- North-west Corner Resource Consent 22/07/2020 ARC.A.T.14 3D View- South-west corner Resource Consent 22/07/2020 ARC.A.T.15 3D View- Elevated Passenger Walkway Resource Consent 22/07/2020 ARC.A.T.16 Iwi/ Community artworks and markers Resource Consent 22/07/2020 A
A Resource Consent 22/07/2020
B 85 V eh ic l e ( R ea li st i c mi n r a di us ) (2 0 0 4)
B85 V eh ic l e ( R ea li st i c mi n r a di us ) (2 0 0 4)
Semi-Trailer
Sem i-Trailer
Semi-Trailer
NOPARKING
HWC
N 828536362E 417163458
REFER TO ATHFIELD ARCHITECTS LIMITED DRAWINGS RC.A.T.01-14 & REPORT RC.A.TR.01 FOR TERMINAL AND TERMINAL PRECINCT
REFER TO ATHFIELD ARCHITECTS LIMITED REPORT RC.A.RSR FOR RAILWAY STATION CANOPIES
EXISTING PICTON RAILWAY STATION
REFER TO WSP DOCUMENTATION FOR VEHICLE MARSHALLING YARDS AND INFRASTRUCTURE
REFER TO ATHFIELD ARCHITECTS LIMITED DRAWINGS RC.A.A.01-13 FOR ANCILLARY BUILDINGS IN MARSHALLING YARD
REFER TO WSP DOCUMENTATION FOR RAIL CORRIDOR & RAILWAY STATION PLATFORM
REFER WSP DOCUMENTATION FOR WHARFS AND LINKSPANS
SURVEY POINT ELAINE CAIRN
REFER TO ATHFIELD ARCHITECTS LIMITED DRAWINGS FOR ELEVATED PASSENGER WALKWAY
REFER WSP DRAWINGS FOR WAITOHI CULVERT STRUCTURAL UPGRADES
KEY:STRUCTURAL ENGINEER:NAME : PHFAXPO BOXEMAIL
SERVICES ENGINEER:NAME : PHFAXPO BOXEMAIL
FIRE ENGINEER:NAME : Holmes Fire & SafteyPHFAXPO BOXEMAIL
No. Description Date
1 : 1000 @ A1 - Half Scale @A3
Site Plan
19-16Waitohi Picton Ferry PrecinctRedevelopment
RC.A.T.01-
N A Resource Consent 22/07/2020
SemiT
Semi-Trailer
NOPARKING
NEW SHIP LINKSPAN
NO.1 WHARF
BACK-UP BERTH & LINKSPAN
COMMERCIAL JETTIES
harbo
ur ed
ge pr
omen
ade
upper carparkTERMINAL PRECINCT
staff/ service carpark
lower ca
rpark
railw
ay statio
n carpark
RAILWAY STATION PLATFORM AND CANOPY
RAIL CORRIDOR
PICTON FORSHORE
RENTAL CARS
TERMINAL BUILDING VEHICLE TRACKING FOR BACKUP LINKSPAN
VEHICLE OVERPASS TO UPPER LINKSPAN
EXISTING BULDINGS OUTSIDE OF PROJECT SCOPE
ELEVATED PASSENGER WALKWAY OVER SHOWN DASHED
WAITOHI CULVERT MOUTH-CULVERT SHOWN DASHED
KEY:STRUCTURAL ENGINEER:NAME : PHFAXPO BOXEMAIL
SERVICES ENGINEER:NAME : PHFAXPO BOXEMAIL
FIRE ENGINEER:NAME : Holmes Fire & SafteyPHFAXPO BOXEMAIL
No. Description Date
1 : 500 @ A1 - Half Scale @A3
Terminal Precinct Plan
19-16Waitohi Picton Ferry PrecinctRedevelopment
RC.A.T.02-
N A Resource Consent 22/07/2020
1
D
2 3 4 5 6
A
7 8
E
9
C
B
1
D
2 3 4 5 6
A
7 8
E
9
C
B
1 2 3 4 5 6
A
7 8 9
B
NOTES:
KEY:
STRUCTURAL ENGINEER:NAMEPHFAXPO BOXEMAIL
SERVICES ENGINEER:NAMEPHFAXPO BOXEMAIL
FIRE ENGINEER:NAMEPHFAXPO BOXEMAIL
No. Desription Date
1 : 250 @ A1 - Half Scale @A3
Terminal GA Plans
19-16Waitohi Picton FerryPrecinct Redevelopment
RC.A.T.03-
N
1 : 250A0.0.01RC L.0G GA Plan1
1 : 250A0.0.01RC L.01 GA Plan2
1 : 250A0.0.01RC L.02 GA Plan3
A Resource Consent 22/07/2020
NOTES:
KEY:
STRUCTURAL ENGINEER:NAMEPHFAXPO BOXEMAIL
SERVICES ENGINEER:NAMEPHFAXPO BOXEMAIL
FIRE ENGINEER:NAMEPHFAXPO BOXEMAIL
No. Desription Date
@ A1 - Half Scale @A3
Floor Plan Axonometrics
19-16Waitohi Picton FerryPrecinct Redevelopment
RC.A.T.04-
RC - Floor Plan Axo L.0G1
RC - Floor Plan Axo L.012
RC - Floor Plan Axo L.023
RC - Floor Plan Axo L.Roof4
A Resource Consent 22/07/2020
R.L. 8400 L.01
R.L. 0 NZVD
R.L. 3500 L.0G
R.L. 14000 L.02
D AE C B
R.L. 18000 L.0R
R.L. 2000 Ex Ground
New Terminal ASSL 0
Lower Roof ASSL 9500
Main Roof ASSL 13300
Upper Roof ASSL 16600
ExRL 0
ExRL 11000
ExRL 14800
ExRL 18100
RT-A
WT-A / LT-A
S-B
CW-A
CW-C
WT-C
CW-E
RT-B
LT-BWT-ACW-A
RT-D / S-A
WT-G
RT-C
LT-A
CW-E
R.L. 8400 L.01
R.L. 0 NZVD
R.L. 3500 L.0G
R.L. 14000 L.02
DA ECB
R.L. 18000 L.0R
R.L. 2000 Ex Ground
RT-A
WT-A
S-B
WT-B WT-C
WT-C
RT-B
RT-B
RT-C / S-ART-C / S-A
CW-A
RT-C
RT-C
RT-D / LT-C
R.L. 8400 L.01
R.L. 0 NZVD
R.L. 3500 L.0G
R.L. 14000 L.02
1 2 3 4 5 6 7 8 9
R.L. 18000 L.0R
CW-A
WT-CRT-A
R.L. 2000 Ex Ground
New Terminal ASSL 0
Lower Roof ASSL 9500
Main Roof ASSL 13300
Upper Roof ASSL 16600
New Wharf ExRL 2100
ExRL 0
ExRL 11000
ExRL 14800
ExRL 18100RT-B
WT-A
RT-D
WT-A CW-AWT-C RT-C CW-D
WT-CCW-E
S-B
RT-C
CW-B
RT-C
WT-G
LT-C
LT-A
LT-B
WT-D
R.L. 8400 L.01
R.L. 0 NZVD
R.L. 3500 L.0G
R.L. 14000 L.02
123456789
R.L. 18000 L.0R
R.L. 2000 Ex Ground
New Terminal ASSL 0
Lower Roof ASSL 9500
Main Roof ASSL 13300
Upper Roof ASSL 16600
New Wharf ExRL 2100
ExRL 0
ExRL 11000
ExRL 14800
ExRL 18100WT-C RT-B CW-EWT-GCW-B
WT-B WT-BWT-D WT-CCW-E
RT-B RT-A S-B
RT-C
RT-C / S-A S-A
RT-DRT-C
LT-C
EXTERNAL WALL TYPESWT-AMetal cassette cladding
WT-BPrecast concrete panels
WT-CExtruded aluminium plan cladding
WT-D Exterior concrete nibs
WT-EProfiled Metal cladding
WT-F150mm unitised curtain wall system
WT-GInsulated panel cladding
CURTAIN WALL TYPESCW-A unitised curtainwall suite aluminium joinery, seismic frames.
CW-B 40mm commercial suite aluminium joinery, seismic frames.
CW-C External sliding doors, 100mm suite aluminium joinery.
CW-D 2 sided framed automatic entry & wind lobby doorsets. Single glazed units.
CW-E 100mm architectural suite aluminium joinery.
ROOF TYPESRT-A Membrane warm roof system.
RT-B Profiled Metal warm roof system.
RT-C External Canopy. membrane roof system
RT-D External plant roof deck membrane roof system
SOFFIT TYPES:S-A Fibrecement sheet soffit
S-B Timber board & batten lined soffits to feature areas.
S-C External Canopy Soffit
LOUVRE TYPES:LT-A Feature Facade louvres, vertical steel slatted screening to primary elevations.
LT-B Feature Balustrade, primary steel structure and vertical timber battens.
LT-C Aluminium Louvre enclosure to screen Plant Deck from view.
RC LEVELSALL LEVELS SHOWN BY THE SYMBOL
ARE MEASURED ABOVE STRUCTURAL SLAB LEVEL (ASSL) OF PROPOSED TERMINAL (NZVD 2016 DATUM RL+3500 )
ALL LEVELS SHOWN BY THE SYMBOL
ARE MEASURED ABOVE THE AVERAGE EXISTING GROUND LEVEL (NZVD 2016 DATUM RL+2000 )
ASSL
ExRL
KEY:STRUCTURAL ENGINEER:NAME : PHFAXPO BOXEMAIL
SERVICES ENGINEER:NAME : PHFAXPO BOXEMAIL
FIRE ENGINEER:NAME : Holmes Fire & SafteyPHFAXPO BOXEMAIL
No. Description Date
As indicated @ A1 - Half Scale@A3
Elevations
19-16Waitohi Picton Ferry PrecinctRedevelopment
RC.A.T.05-
1 : 250RC - North East Elevation1
1 : 250RC - South West Elevation2
1 : 250RC - South East Elevation3
1 : 250RC - North West Elevation4
A Resource Consent 22/07/2020
R.L. 8400 L.01
R.L. 0 NZVD
R.L. 3500 L.0G
R.L. 14000 L.02
DA ECB
R.L. 18000 L.0R
1RC.A.T.07
2RC.A.T.07
3RC.A.T.07
New Terminal ASSL 0
Lower Roof ASSL 9500
Main Roof ASSL 13300
Upper Roof ASSL 16600
ExRL 0
ExRL 11000
ExRL 14800
ExRL 18100
R.L. 8400 L.01
R.L. 0 NZVD
R.L. 3500 L.0G
R.L. 14000 L.02
DA ECB
R.L. 18000 L.0R
1RC.A.T.07
2RC.A.T.07
3RC.A.T.07
New Terminal ASSL 0
Lower Roof ASSL 9500
Main Roof ASSL 13300
Upper Roof ASSL 16600
ExRL 0
ExRL 11000
ExRL 14800
ExRL 18100
R.L. 8400 L.01
R.L. 0 NZVD
R.L. 3500 L.0G
R.L. 14000 L.02
DA ECB
R.L. 18000 L.0R
1RC.A.T.07
2RC.A.T.07
3RC.A.T.07
New Terminal ASSL 0
Lower Roof ASSL 9500
Main Roof ASSL 13300
Upper Roof ASSL 16600
ExRL 0
ExRL 11000
ExRL 14800
ExRL 18100
R.L. 8400 L.01
R.L. 0 NZVD
R.L. 3500 L.0G
R.L. 14000 L.02
DA ECB
R.L. 18000 L.0R
1RC.A.T.07
2RC.A.T.07
3RC.A.T.07
New Terminal ASSL 0
Lower Roof ASSL 9500
Main Roof ASSL 13300
Upper Roof ASSL 16600
ExRL 0
ExRL 11000
ExRL 14800
ExRL 18100
RC LEVELSALL LEVELS SHOWN BY THE SYMBOL
ARE MEASURED ABOVE STRUCTURAL SLAB LEVEL (ASSL) OF PROPOSED TERMINAL (NZVD 2016 DATUM RL+3500 )
ALL LEVELS SHOWN BY THE SYMBOL
ARE MEASURED ABOVE THE AVERAGE EXISTING GROUND LEVEL (NZVD 2016 DATUM RL+2000 )
ASSL
ExRL
KEY:STRUCTURAL ENGINEER:NAME : PHFAXPO BOXEMAIL
SERVICES ENGINEER:NAME : PHFAXPO BOXEMAIL
FIRE ENGINEER:NAME : Holmes Fire & SafteyPHFAXPO BOXEMAIL
No. Description Date
As indicated @ A1 - Half Scale@A3
Transverse Sections
19-16Waitohi Picton Ferry PrecinctRedevelopment
RC.A.T.06-
1 : 250A5.3.00RC - Section S11
1 : 250RC.A.T.07RC - Section S22
1 : 250RC.A.T.07RC - Section S33
1 : 250RC.A.T.07RC - Section S44
A Resource Consent 22/07/2020
R.L. 8400 L.01
R.L. 0 NZVD
R.L. 3500 L.0G
R.L. 14000 L.02
1 2 3 4 5 6 7 8 9
R.L. 18000 L.0R
2RC.A.T.06
3RC.A.T.06
4RC.A.T.06
1RC.A.T.06
New Terminal ASSL 0
Lower Roof ASSL 9500
Main Roof ASSL 13300
Upper Roof ASSL 16600
New Wharf ExRL 2100
ExRL 0
ExRL 11000
ExRL 14800
ExRL 18100
R.L. 8400 L.01
R.L. 0 NZVD
R.L. 3500 L.0G
R.L. 14000 L.02
1 2 3 4 5 6 7 8 9
R.L. 18000 L.0R
2RC.A.T.06
3RC.A.T.06
4RC.A.T.06
1RC.A.T.06
New Terminal ASSL 0
Lower Roof ASSL 9500
Main Roof ASSL 13300
Upper Roof ASSL 16600
New Wharf ExRL 2100
ExRL 0
ExRL 11000
ExRL 14800
ExRL 18100
R.L. 8400 L.01
R.L. 0 NZVD
R.L. 3500 L.0G
R.L. 14000 L.02
1 2 3 4 5 6 7 8 9
R.L. 18000 L.0R
2RC.A.T.06
3RC.A.T.06
4RC.A.T.06
1RC.A.T.06
New Terminal ASSL 0
Lower Roof ASSL 9500
Main Roof ASSL 13300
Upper Roof ASSL 16600
New Wharf ExRL 2100
ExRL 0
ExRL 11000
ExRL 14800
ExRL 18100
RC LEVELSALL LEVELS SHOWN BY THE SYMBOL
ARE MEASURED ABOVE STRUCTURAL SLAB LEVEL (ASSL) OF PROPOSED TERMINAL (NZVD 2016 DATUM RL+3500 )
ALL LEVELS SHOWN BY THE SYMBOL
ARE MEASURED ABOVE THE AVERAGE EXISTING GROUND LEVEL (NZVD 2016 DATUM RL+2000 )
ASSL
ExRL
KEY:STRUCTURAL ENGINEER:NAME : PHFAXPO BOXEMAIL
SERVICES ENGINEER:NAME : PHFAXPO BOXEMAIL
FIRE ENGINEER:NAME : Holmes Fire & SafteyPHFAXPO BOXEMAIL
No. Description Date
As indicated @ A1 - Half Scale@A3
Longitudinal Sections
19-16Waitohi Picton Ferry PrecinctRedevelopment
RC.A.T.07-
1 : 250RC.A.T.06RC - Section A22
1 : 250RC.A.T.06RC - Section A33
1 : 250RC.A.T.06RC - Section A11
A Resource Consent 22/07/2020
KEY:STRUCTURAL ENGINEER:NAME : PHFAXPO BOXEMAIL
SERVICES ENGINEER:NAME : PHFAXPO BOXEMAIL
FIRE ENGINEER:NAME : Holmes Fire & SafteyPHFAXPO BOXEMAIL
No. Description Date
@ A1 - Half Scale @A3
Terminal Precinct Axonometric View
19-16Waitohi Picton Ferry PrecinctRedevelopment
RC.A.T.08-
N A Resource Consent 22/07/2020
Semi-Trailer
NOPARKING
3RC
.A.T.09
2 RC.A.T.09
1:211:211:211:211:211:211:21
1:21
TERMINAL BUILDING
seismic "bridge"
L.02 terminal
cLElevated passenger walkway
Fire Egress Stair 2
No.1 Wharf
Fire Egress Stair 1
centreline of ship boarding pod
ship boarding pod
boarding pod bridge
outline of ship
void
1A2.1.01
2 A2.1.01
3A2
.1.01
4A2.1.01
1A.9.5.00
2 A.9.5.00
4A5
.3.00
4RC.A.T.10
ship boarding pod
boarding pod bridge
structural tower
fire egress stair 1structural tower
fire egress stair 1 structural towerstructural tower
terminal building
seismic bridge
marine fire fighting water cannon marine fire fighting
water cannon marine fire fighting water cannon
2A.9.5.01
R.L. 8400 L.01
R.L. 0 NZVD
R.L. 3500 L.0G
R.L. 14000 L.02
R.L. 18000 L.0R
1RC.A.T.10
ship boarding pod
boarding pod bridge
structural tower
fire egress stair 1structural towerfire egress stair 1structural tower
structural tower
terminal building
seismic bridge
marine fire fighting water cannon
marine fire fighting water cannonmarine fire fighting
water cannon
ASSL 23000 ExRL 24500
ExRL 16900ASSL 15400
1A.9.5.01
RC LEVELSALL LEVELS SHOWN BY THE SYMBOL
ARE MEASURED ABOVE STRUCTURAL SLAB LEVEL (ASSL) OF PROPOSED TERMINAL (NZVD 2016 DATUM RL+3500 )
ALL LEVELS SHOWN BY THE SYMBOL
ARE MEASURED ABOVE THE AVERAGE EXISTING GROUND LEVEL (NZVD 2016 DATUM RL+2000 )
ASSL
ExRL
KEY:STRUCTURAL ENGINEER:NAME : PHFAXPO BOXEMAIL
SERVICES ENGINEER:NAME : PHFAXPO BOXEMAIL
FIRE ENGINEER:NAME : Holmes Fire & SafteyPHFAXPO BOXEMAIL
No. Description Date
As indicated @ A1 - Half Scale@A3
EPW- Plan and Elevations
19-16Waitohi Picton Ferry PrecinctRedevelopment
RC.A.T.09-
N
1 : 400A0.0.01RC EPW GA Plan1
1 : 400A.9.5.00RC Elevation_EPW West2
1 : 400A.9.5.00RC Elevation_EPW East3
A Resource Consent 22/07/2020
100% glazing
CW-B
RT-A
S-Astructural tower
fire egress stair 1
marine fire fighting water cannon
structural tower
fire egress stair 1
marine fire fighting water cannon
floor slab to falls, TBC
full height curtainwall, 100% glazed
soffit
250SHS structural frame/ truss
acoustic ceiling
wall/ roof buildup
wall build-up allow 30% surface area for vertical glazing strips
CW-B
RT-A
S-A
WT-G
EXTERNAL WALL TYPESWT-AMetal cassette cladding
WT-BPrecast concrete panels
WT-CExtruded aluminium plan cladding
WT-D Exterior concrete nibs
WT-EProfiled Metal cladding
WT-F150mm unitised curtain wall system
WT-GInsulated panel cladding
CURTAIN WALL TYPESCW-A unitised curtainwall suite aluminium joinery, seismic frames.
CW-B 40mm commercial suite aluminium joinery, seismic frames.
CW-C External sliding doors, 100mm suite aluminium joinery.
CW-D 2 sided framed automatic entry & wind lobby doorsets. Single glazed units.
CW-E 100mm architectural suite aluminium joinery.
ROOF TYPESRT-A Membrane warm roof system.
RT-B Profiled Metal warm roof system.
RT-C External Canopy. membrane roof system
RT-D External plant roof deck membrane roof system
SOFFIT TYPES:S-A Fibrecement sheet soffit
S-B Timber board & batten lined soffits to feature areas.
S-C External Canopy Soffit
LOUVRE TYPES:LT-A Feature Facade louvres, vertical steel slatted screening to primary elevations.
LT-B Feature Balustrade, primary steel structure and vertical timber battens.
LT-C Aluminium Louvre enclosure to screen Plant Deck from view.
KEY:STRUCTURAL ENGINEER:NAME : PHFAXPO BOXEMAIL
SERVICES ENGINEER:NAME : PHFAXPO BOXEMAIL
FIRE ENGINEER:NAME : Holmes Fire & SafteyPHFAXPO BOXEMAIL
No. Description Date
As indicated @ A1 - Half Scale@A3
EPW- Typical Section andElevations
19-16Waitohi Picton Ferry PrecinctRedevelopment
RC.A.T.10-
1 : 200RC.A.T.09RC Elevation_EPW East - Typical Bay1
1 : 50RC EPW Typical Section3
1 : 200RC.A.T.09RC Elevation_EPW West - Typical Bay4
A Resource Consent 22/07/2020
KEY:STRUCTURAL ENGINEER:NAME : PHFAXPO BOXEMAIL
SERVICES ENGINEER:NAME : PHFAXPO BOXEMAIL
FIRE ENGINEER:NAME : Holmes Fire & SafteyPHFAXPO BOXEMAIL
No. Description Date
1 : 1 @ A1 - Half Scale @A3
3D View- Southeast corner
19-16Waitohi Picton Ferry PrecinctRedevelopment
RC.A.T.11-
1 : 1RC - South Corner Perspective2
A Resource Consent 22/07/2020
KEY:STRUCTURAL ENGINEER:NAME : PHFAXPO BOXEMAIL
SERVICES ENGINEER:NAME : PHFAXPO BOXEMAIL
FIRE ENGINEER:NAME : Holmes Fire & SafteyPHFAXPO BOXEMAIL
No. Description Date
1 : 1 @ A1 - Half Scale @A3
3D View- Northeast Corner
19-16Waitohi Picton Ferry PrecinctRedevelopment
RC.A.T.12-
1 : 1RC - East Perspective2
A Resource Consent 22/07/2020
KEY:STRUCTURAL ENGINEER:NAME : PHFAXPO BOXEMAIL
SERVICES ENGINEER:NAME : PHFAXPO BOXEMAIL
FIRE ENGINEER:NAME : Holmes Fire & SafteyPHFAXPO BOXEMAIL
No. Description Date
1 : 1 @ A1 - Half Scale @A3
3D View- North-west Corner
19-16Waitohi Picton Ferry PrecinctRedevelopment
RC.A.T.13-
1 : 1RC - North Perspective2
A Resource Consent 22/07/2020
KEY:STRUCTURAL ENGINEER:NAME : PHFAXPO BOXEMAIL
SERVICES ENGINEER:NAME : PHFAXPO BOXEMAIL
FIRE ENGINEER:NAME : Holmes Fire & SafteyPHFAXPO BOXEMAIL
No. Description Date
1 : 1 @ A1 - Half Scale @A3
3D View- South-west corner
19-16Waitohi Picton Ferry PrecinctRedevelopment
RC.A.T.14-
1 : 1RC - South Perspective2
A Resource Consent 22/07/2020
KEY:STRUCTURAL ENGINEER:NAME : PHFAXPO BOXEMAIL
SERVICES ENGINEER:NAME : PHFAXPO BOXEMAIL
FIRE ENGINEER:NAME : Holmes Fire & SafteyPHFAXPO BOXEMAIL
No. Description Date
1 : 1 @ A1 - Half Scale @A3
3D View- Elevated PassengerWalkway
19-16Waitohi Picton Ferry PrecinctRedevelopment
RC.A.T.15-
1 : 1RC - Elevated Passenger Walkway Perspective1
A Resource Consent 22/07/2020
B85 Vehic le ( Realistic min radiu s) (2 00 4)
B8 5 Ve hic le ( Realistic m in ra diu s) (2 00 4)
Semi-Trailer
Semi-T rai ler
Semi-Trail er
NOPARKING
HWC2
1
8
4
3
5
7
6
1 Site entry marker- south- possible pou/ marker position
Internal site marker- centered on site at key decision point
Passenger arrival/departures marker - at threshold point
Waitohi Pa marker - position would need to be considered, close proximity to harbour edge, would require associated interpretation & history information
Site blessing & location of Mauri stone - position would need to be agreed, but central to building location/ life/ activity
Building name- potential Te Atiawa to consider an appropriate name and gift to the project
Integrated artworks - potential for these to be incorporated throughout the building.
Waitohi Awa markers
2
3
4
5
6
7
8
Iwi and Community artworks and markers
KEY:STRUCTURAL ENGINEER:NAME : PHFAXPO BOXEMAIL
SERVICES ENGINEER:NAME : PHFAXPO BOXEMAIL
FIRE ENGINEER:NAME : Holmes Fire & SafteyPHFAXPO BOXEMAIL
No. Description Date
As indicated @ A1 - Half Scale@A3
Iwi/ Community artworks andmarkers
19-16Waitohi Picton Ferry PrecinctRedevelopment
RC.A.T.16-
N A Resource Consent 22/07/2020