Hotchkiss Timeline
Hopewell purchases first parcel
Annexation
Growth Management Initiated by City
South Shepard ASP initiated by City of Calgary
Infrastructure constructed for Hotchkiss ($7M)*
South Shepard ASP approved
Developer Funded ASP's initiated
Developer funded ASP's approved
Hopewell makes land use application
Hotchkiss GMO removal recommended by PFC
Hotchkiss GMO removal tabled by Council to Ql 2018
Hotchkiss GMO removal tabled by Council to Q2 2018
If Recommended for Approval July 30, 2018:
GMO Removal Public Hearing
Land Use Redesignation
Stripping and Grading ($9M)
Underground and surface construction ($15.4M)
Show home construction start ($6M)
Lift Station Construction ($7.SM)
Show home opening
Phase 2 Construction ($13M)
Roundabout Construction ($13.SM)
2004
2007
2011
2012
2013
May 2013
December 2013
Sept.2014-Dec.2015
April 2016
June 2017
July 2017
January 2018
September 2018
October 2018
Spring 2019
Summer 2019
Fall 2019
Fall/Winter 2019
Spring 2020
2020
2019/2020
Notes: Assumed absorptions are 300 SF units per year starting in 2021
First residents of Hotchkiss in January 2021
Approx. investment shown in brackets above
* lnfratructure previously constructed for Hotchkiss includes the Mahogany Lift
Station, Mahogany Storm Trunk and East McKenzie Feedermain. Approximate
cost allocated to Hotchkiss is $7M.
East Regional Context Study Map2
Future Planning Cells
Legend
City Limits
Railway
LJ Transportation/ Utility Corridor
- • Study Area Boundary
[:i:J Planning Cell
0
Kilometres
As amended by Calgary City Council. Areas do not correspond with maps B, C, F, G and H in Appendix A.
This map is conceptual only No measurements of dislances or areas should be laken from Lhis map
CA'i:GARY LAND USE PLANXING & POLICY
X:\111_Easl_Annexation_Regional_Conlex.t_Sludy\Business_Tech_Serv\GIS\documenl_maps\planning_areas mxd
Part 1 - The East Regional Context Study
Vision 1
Approved: 2009/04/06 Amended:
5
... V,
East Regional Context Study
Map 3
Land Use Concept & Transportation
legend
-·-·- City Limits
----- Railway
LJ Transportation/ Utility Corridor
- Commercial/ Retail
Industrial
Open Space
Residential
Water/ Pond
Cemetery
= Expressway/ Freeway
- Major Street
0 Full Other Interchange
0 Proposed Partial Interchange
0 Full Provincial Fixed Interchange
0 Partial Provincial Fixed Interchange
0 Full Potential Interchange
Possible Future Interchange O (subject to funding and approval
by the Province of Alberta)
® Possible Future Overpass
Interchange Pedestrian/Pathway Crossings
0 No Pedestrian/Pathway Crossing
Cl> Pedestrian/Pathway Overpass
~ Pedestrian/Pathway Underpass
0 North Side Pedestrian/Pathway Crossing
0 South Side Pedestrian/Pathway Crossing
······" Existing Pathway
0 0000= Proposed Pathway Connection
Potential Greenway Alignment ..... (Conceptual Only)
11111111 Potential BRT Route
0
Approved: 2009/0•/06 Amended:
2 3
Kilometres
This map is co11ceptual only. No measuremcnls of distances or Jreas should be laken from this map.
THE CITY OF
CALGARY
4
LAND USE PLANNING & POLICY
5
l -
X:\ 111 _Ea51_ Annexalion _Reglonal_ Context_Sludy\Busil)ess_ Tedl _ Se1V\GIS\document_maps\landuse_1ransport.m)(d
_J
-1-
MARKET SHARE VS. ACTIVE COMMU NITIES 35
90%
30
80%
70% 25
60% 20
- satellites 50%
- Calgary
15 -Active Calgary Communities 40%
30% 10
20%
5
10%
0% 0
2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017