Rapid Community WASH Recovery Support Project
Process Documentation: Rapid Vulnerability Need Assessment Background As part of the earthquake recovery and reconstruction, a consortium of CARE International UK (lead), Save the Children International and DanChurchAid (DCA) have been implementing “Rapid Community WASH Recovery Support to Vulnerable Communities in Gorkha, Dhading, Nuwakot and Rasuwa”, shortly known as “DFID-WASH” project since September, 2016. The project has three major components: component A- Repair, rehabilitation and construction of community WASH infrastructure, component B- Promotion of good sanitation and hygiene practices and component C- Improvement of information on water sources, systems and supply projects. Further, the project has mainstreamed cross cutting themes such as conflict sensitivity, community led planning and management, transparency and accountability, competitive inclusive staff and Gender Equality and Social Inclusion (GESI) and Protection. The project aims to meet the on-going WASH needs of total 1, 15,036 poor, vulnerable and socially excluded people focusing on female headed households and differently able population in the target districts. Though a rapid recovery project, this project has ensured a highly participatory and accountable approach for identification of its target groups and considering their needs and voices during the project implementation. The project has carried out rapid vulnerability need assessment at the beginning of the project to identify and prioritize drinking water schemes for repair, rehabilitation and construction with focus to benefit the poor, vulnerable and socially excluded people. Objectives of Rapid Vulnerability Need Assessment The main objectives of the assessment are:
- To identify the disaster affected target communities
- To identify, verify and take update the existing data of water supply schemes for project
support.
- To prioritize the water supply schemes for repair, rehabilitation and construction in the
project areas.
Criteria for Rapid Vulnerability Need Assessment The project has adopted ten vulnerable criteria to select the water supply schemes in all the districts. The criteria adopted are as follow:
SN Criteria Weightage Range
Score (If criteria is not significant at all put weightage 0, if highly significant put maximum weightage; if partially significant put the in-between weightage)
1. Communities with low access to water supply
0-3
2. Communities/VDC that have not been declared Open Defecation Free (i.e. practicing open defecation)
0-3
3. Communities with record of high frequency of water borne diseases (need to check data from health centre)
0-3
4. Communities with limited services of government and other supporting agencies
0-2
5. Communities with low/limited access to market and service centres
0-2
6. Communities with low literacy rate
0-1
7. Communities which have suffered comparatively higher level of damage due to the earthquake
0-3
8. Communities with at least 20% marginalized population; Dalit, Janajati
0-3
9. Communities prioritized by the government line agencies
0-3
SN Criteria Weightage Range
Score (If criteria is not significant at all put weightage 0, if highly significant put maximum weightage; if partially significant put the in-between weightage)
10. Communities at high risk from natural disasters (landslide, flood etc.)
0-2
Total 25
Rapid Vulnerability Need Assessment Process
The rapid need assessment was carried out through consultative need assessment process in three level as follows: a. District level: The project carried out rapid consultation meetings with district stakeholders
regarding the working areas, vulnerability criteria for the selection of the target
communities and water supply schemes. Based on recommendation of the consultation
meetings, the project working VDCs were revised in some districts to avoid overlapping
with other agencies and target the most target disaster affected communities. The
vulnerability criteria for the selection of the drinking water schemes were discussed and
endorsed by DWASHCC. Various data regarding earthquake damage drinking water
schemes available with the WSSDO and DWASHCC were also collected.
Further the working VDCs and vulnerability criteria were also shared during the district
level inception workshops in all working districts. During the district inception workshops,
the district stakeholders suggested to prioritize the pumping water schemes, focus on the
protection and preservation of the water sources and give priority to cover the schemes
with larger coverage.
b. VDC level: VDC level inception meetings were conducted VDCs with the introduction of the
project objectives in the target in participation of key stakeholders as the Village WASH
Coordination Committee (V-WASH-CC), VDC secre tary, members from ward citizen forum,
members from LDRMP/LAPA committee (where available), women’s right forum, local
politicians, health facility incharge, water user committees, other agencies working in the
VDC, local politicians, and CBOs. A list of water supply schemes damaged from earthquake
obtained from district from the WSSDO for recovery requests were reviewed and verified.
In many target VDCs, the meeting carried out an power mapping which identified the
pocket areas in the VDC in which the most vulnerable and disadvantaged groups live in.
Further, the
community selection
criteria based on
vulnerability were
discussed and were
agreed. Based on
the agreed criteria,
water supply
schemes were
prioritized for the
recovery support.
The list of prioritized
water supply
schemes in the
target VDCs is given
in Annex I.
Once the feasibility studies and community level consultation were completed, the final list
of water supply schemes and their budget, target beneficiaries and key technical features
were shared and endorsed through public hearing in the VDC level.
c. Community/Ward level: The technical consultancy firms were mobilized for the feasibility
study of the prioritized water supply schemes. The team worked in close coordination with
the community people and water user committees. The feasibility study covered the
technical mapping of the physical location and environment of drinking water facilities,
status of the scheme, and type of water source, source reliability and sufficiency, quality,
risks to vulnerability of the scheme and the estimated cost of the prioritized schemes. At
the same time, the project field team was also mobilized for collection of detail social data
and consultation in order to indentify the needs, concerns and priorities of the
communities with focus on the marginalized and vulnerable marginalised groups (such as
children, women and girls, FHHs, PWDs, the elderly, ethnic castes and religious minorities)
ensuring community ownership, accountability and transparency. Information were also
collected regarding knowledge, attitudes and practices related to water, sanitation and
hygiene with specific focus on GESI issues such as access, protection, division of labour and
gender relations in order to support designing of water supply scheme.
Based on the findings of the feasibility study and consultation, the detail design and
estimation of feasible water supply schemes were carried out. Once the design and
estimation of the water supply schemes completed, it was shared and endorsed with the
community level through public hearing event at the community level. The some designs
were modified based on the recommendation of the community.
Results: Based on the rapid vulnerability assessment process, total 140 water supply schemes from four working districts were selected for the recovery support. The status of prioritized water supply schemes that were selected for the recovery support by the project has been mentioned in annex I. Additional 8 water supply schemes were selected in later phase of the project in consultation with district and VDC level stakeholders in order to cover the target population of the project.
Annex 1: List prioritized drinking water schemes during vulnerability need assessment process at VDC level
SN
Consortiu
m Partner
Implementing
Partner District
Name of VDC
Priority Rank
Name of DWS Ward No
Total HHs
Type of work
(New/ rehab)
Selected by DFID
WASH (Y/N)
Remarks
1 DCA ECO
Nepal Dhadin
g Kumpur 1 Pipaltar 5,7 117 New Y low access to water supply
2 DCA ECO
Nepal Dhadin
g Kumpur 2 Acharya Gaun 4 233 Rehab Y
High level of damage due to earthquake
3 DCA ECO
Nepal Dhadin
g Goganpani 1 Chanditan
Makkhuntar 6 119 Rehab Y low access to water supply
4 DCA ECO
Nepal Dhadin
g Goganpani 2 Kartika Gaun 8 55 New Y low access to water supply
5 DCA ECO
Nepal Dhadin
g Goganpani 3 Ranimala 4 68 New Y low access to water supply
6 DCA ECO
Nepal Dhadin
g Goganpani 4 Chakmake 4,6 40 Rehab Y
High level of damage due to earthquake
7 DCA ECO
Nepal Dhadin
g Goganpani 5 Melabar 3 106 New Y low access to water supply
8 DCA ECO
Nepal Dhadin
g Goganpani 6 Sarki gaun 3 57 New Y
Community includes socially excluded castes (Dalit)
9 DCA ECO Dhadin Salang 1 Nibuwatar 5,6 60 Rehab Y low access to water
SN
Consortiu
m Partner
Implementing
Partner District
Name of VDC
Priority Rank
Name of DWS Ward No
Total HHs
Type of work
(New/ rehab)
Selected by DFID
WASH (Y/N)
Remarks
Nepal g supply
10 DCA ECO
Nepal Dhadin
g Salang 2 Arubas 7,8 100 Rehab Y "
11 DCA ECO
Nepal Dhadin
g Salang 3 Salang Maidan 5 123 Rehab Y
Community includes marginalized population
12 DCA ECO
Nepal Dhadin
g Nalang 1 Mathilotar
Nalang 3 60 New Y low access to water supply
13 DCA ECO
Nepal Dhadin
g Nalang 2 Khirrevanjang 4 64 New Y
Community includes marginalized population
14 DCA ECO
Nepal Dhadin
g Jogimara 1 Fajimtar 9 35 New Y low access to water supply
15 DCA ECO
Nepal Dhadin
g Jogimara 2 Hudikhola 1 112 New Y low access to water supply
16 DCA ECO
Nepal Dhadin
g Jogimara 3 Yaibang 6 45 New Y
Community with limited access to market/Low access to water supply/ high risk of natural disaster
17 DCA ECO
Nepal Dhadin
g Jogimara 4 Laitak 1 37 New Y
Community includes marginalized
SN
Consortiu
m Partner
Implementing
Partner District
Name of VDC
Priority Rank
Name of DWS Ward No
Total HHs
Type of work
(New/ rehab)
Selected by DFID
WASH (Y/N)
Remarks
population
18 DCA ECO
Nepal Dhadin
g Dhola 1 Tari 7 40 Rehab Y
low access to water supply, no any option
19 DCA ECO
Nepal Dhadin
g Dhola 2 Kuwapani 42 New Y
low access to water supply, no any option
20 DCA ECO
Nepal Dhadin
g Maidi 1 Tinpate 1 36 New Y
low access to water supply, no any option
21 DCA ECO
Nepal Dhadin
g Maidi 2 Sadobato 8 110 Rehab Y
High level of damage due to earthquake
22 DCA ECO
Nepal Dhadin
g Kiranchow
k 1 Majuwa 2 48 New Y
low access to water supply, no any option
23 DCA ECO
Nepal Dhadin
g Kiranchow
k 2 Prawang 1,2 146 New Y
low access to water supply, no any option
24 DCA ECO
Nepal Dhadin
g Khari 1 Galedanda 7 45 New Y
low access to water supply, no any option
25 DCA ECO
Nepal Dhadin
g Khari 3 Dhuseni 1,2 202 New Y
low access to water supply, no any option
SN
Consortiu
m Partner
Implementing
Partner District
Name of VDC
Priority Rank
Name of DWS Ward No
Total HHs
Type of work
(New/ rehab)
Selected by DFID
WASH (Y/N)
Remarks
26 DCA ECO
Nepal Dhadin
g Khari 2 Kot Maidan 5 268 New Y
low access to water supply, no any option
27 CAR
E RIMs Dhadin
g Mulpani 1 Thulopadhero
DWS 4 65 Lifting/
New Y thulopadhero source
28 CAR
E RIMs Dhadin
g Mulpani 2 Tidugairi DWS 3 40 Rehab Y Aahale source
29 CAR
E RIMs Dhadin
g Mulpani 3 Tallopadhero
DWS 2 57 New Y Gairkhet source
30 CAR
E RIMs Dhadin
g Mulpani 4 Masaarbasti
DWS 9 10 Rehab Y Masaar source
31 CAR
E RIMs Dhadin
g Aginchwok 1 Golang DWS 1,2,3 140 Lifting/r
ehab Y Madanekhola source
32 CAR
E RIMs Dhadin
g Aginchwok 2 MaththiloGaun
Birta DWS 5 25 Lifting/n
ew Y Sadh khola source
33 CAR
E RIMs Dhadin
g Aginchwok 3 Kharibot DWS 9 45 New/gr
avity Y Lakuridahra source
34 CAR
E RIMs Dhadin
g Aginchwok 4 GairidharaThulopadhero DWS 7 50
New/gravity Y Gairidhara source
35 CAR
E RIMs Dhadin
g Phulkharka 1
Thulochhango DWS 7 49
New/gravity Y
Majuwa source
Thulochhango DWS mahavir source
36 CAR
E RIMs Dhadin
g Phulkharka 2 Keradhap/kukurdhara 4 76
New/gravity Y keradhap source
37 CAR RIMs Dhadin Phulkharka 2 Kholamul 4 66 Y Phirke source
SN
Consortiu
m Partner
Implementing
Partner District
Name of VDC
Priority Rank
Name of DWS Ward No
Total HHs
Type of work
(New/ rehab)
Selected by DFID
WASH (Y/N)
Remarks
E g
38 CAR
E RIMs Dhadin
g Phulkharka 3 Gyansingkhola
DWS 2 62 New/gr
avity Y Gyangshingkhola source
39 CAR
E RIMs Dhadin
g Phulkharka 4 Chisokhola
DWS 6 71 New/gr
avity Y Sukuvanjyng source
40 CAR
E RIMs Dhadin
g Budhathu
m 1 Ghyangkhola
DWS ‘A’ 3,4,5 167
Repair/rehab/ gravity Y Ghyangkhola
41 CAR
E RIMs Dhadin
g Budhathu
m 2
GhyangkholaDhaje DWS ‘B’(Dhaje,
vorle, ratamate) 1 57
Rehab/gravity Y Ghyangkhola
42 CAR
E RIMs Dhadin
g Budhathu
m 3
Ghyangkhola DWS
‘C’(ghagateghari) 1,3 11
Rehab/gravity Y Ghyangkhola
43 CAR
E RIMs Dhadin
g Budhathu
m 4 Adherikhola
DWS 8,9 150 Rehab/g
ravity Y Adherikhola
44 CAR
E RIMs Dhadin
g Baseri 1 Dalit DWS 1 80 Rehab/g
ravity Y Marankikhola
45 CAR
E RIMs Dhadin
g Baseri 2 Chisapani DWS 5 98 Rehab/g
ravity Y chisakhola
46 CAR
E RIMs Dhadin
g Baseri 3 Sadhikhola
DWS 6 46 Rehab/g
ravity Y sadhikhola
47 CAR RIMs Dhadin Baseri 4 Kaprekhola 9 52 Rehab/g Y Kaprekhola
SN
Consortiu
m Partner
Implementing
Partner District
Name of VDC
Priority Rank
Name of DWS Ward No
Total HHs
Type of work
(New/ rehab)
Selected by DFID
WASH (Y/N)
Remarks
E g DWS ravity
48 DCA Action Nepal Gorkha Makaising 1 Butar DWS 2 92 Rebab Y
Community includes marzinalized population, low acess to water supply
49 DCA Action Nepal Gorkha Makaising 2 Prajabasti DWS 3 20 New Y
Community includes marginalized population, low access to water supply,
50 DCA Action Nepal Gorkha Makaising 3
Chilnedhad DWS 6 52 Rehab Y
low access to water supply
51 DCA Action Nepal Gorkha Makaising 4
ThuloKhola DWS 3 47 New Y
Community includes marginalized population
52 DCA Action Nepal Gorkha
Bhumlichowk 1 Bantar DWS 2 70 New y
Community includes marginalized population
53 DCA Action Nepal Gorkha
Bhumlichowk 2
Changkhola DWS 1 29 New Y
Community includes marginalized
SN
Consortiu
m Partner
Implementing
Partner District
Name of VDC
Priority Rank
Name of DWS Ward No
Total HHs
Type of work
(New/ rehab)
Selected by DFID
WASH (Y/N)
Remarks
population
54 DCA Action Nepal Gorkha
Bhumlichowk 3
Korak Archanabas
DWS 9 43 New y
Community includes marginalized population
55 DCA Action Nepal Gorkha
Bhumlichowk 4 Kulbesi DWS 2 14 New y
Community includes marginalized population
56 DCA Action Nepal Gorkha
Tanglichowk 1 Baspani DWS 6 72 New Y
low access to water supply
57 DCA Action Nepal Gorkha
Tanglichowk 2
Furkeswara DWS 6 55 New y
Community includes marginalized population, low access to water supply
58 DCA Action Nepal Gorkha
Tanglichowk 3
Gairidhara DWS 3,4 57 New y
low access to water supply
59 DCA Action Nepal Gorkha
Tanglichowk 4
Dikuwa Khola DWS 5 N
Not sufficient discharge in the source
60 DCA Action Nepal Gorkha
Ghyalchowk 1 Nayagau DWS 9 N
Planned to support from other agencies
SN
Consortiu
m Partner
Implementing
Partner District
Name of VDC
Priority Rank
Name of DWS Ward No
Total HHs
Type of work
(New/ rehab)
Selected by DFID
WASH (Y/N)
Remarks
61 DCA Action Nepal Gorkha
Ghyalchowk 2
Dadhkhola DWS 2,7 N
Planned to support from other agencies
62 DCA Action Nepal Gorkha
Ghyalchowk 3
Simaltar Govintar DWS 5 15 N
Integrated in Janashakti DWS
63 DCA Action Nepal Gorkha
Ghyalchowk 4 Swara DWS 5 N
Planned to support from other agencies
64 DCA Action Nepal Gorkha
Ghyalchowk 5 Ittar DWS 5 N
To be contributed by Fund Board
65 DCA Action Nepal Gorkha
Ghyalchowk 6 Benigau DWS 4 N
To be contributed by Fund Board
66 DCA Action Nepal Gorkha
Ghyalchowk 7 Benitar DWS 3 18 N
To be contributed by UNICEF
67 DCA Action Nepal Gorkha
Ghyalchowk 8
Luga dhune DWS 9 71 N
To be contributed by UNICEF
68 DCA Action Nepal Gorkha
Ghyalchowk 9
Janashakti DWS 1 70 New Y
low access to water supply
69 DCA Action Nepal Gorkha
Ghyalchowk 10
Dharapani kholsa DWS 5 70 N Conflict in source
70 DCA Action Nepal Gorkha
Ghyalchowk 11
Jyamireswara DWS 5 N Conflict in source
71 DCA Action Nepal Gorkha
Ghyalchowk 12
Kadampani DWS 8,9 55 New y
low access to water supply
72 DCA Action Nepal Gorkha
Ghyalchowk 13 Chainpur DWS 7 40 New y
Community includes
SN
Consortiu
m Partner
Implementing
Partner District
Name of VDC
Priority Rank
Name of DWS Ward No
Total HHs
Type of work
(New/ rehab)
Selected by DFID
WASH (Y/N)
Remarks
marginalized population
73 DCA Action Nepal Gorkha
Ghyalchowk 14
Dhawadikhola DWS 5 306 N
Planned to support from other agencies
74 DCA Action Nepal Gorkha Dhawa 1
BatuleKhola DWS 7,9 80 N
Conflict in source and water use purpose
75 DCA Action Nepal Gorkha Dhawa 2 Aalepani DWS 2 70 N
Conflict in source and water use purpose
76 DCA Action Nepal Gorkha Dhawa 3 Phalate DWS 6 70 N
Conflict in source and water use purpose
77 DCA Action Nepal Gorkha Dhawa 4
Upallopadero DWS 3,4 89 New Y
low access to water supply
78 DCA Action Nepal Gorkha Dhawa 5
Phaharepani DWS 5 84 New Y
low access to water supply
79 DCA Action Nepal Gorkha Dhawa 6 Kuwapani DWS 5 80 New Y
low access to water supply
80 DCA Action Nepal Gorkha Dhawa 7
NimireKhola DWS 7,8 200 N
Conflict in source & water use
81 DCA Action Nepal Gorkha Dhawa 8
Dharapani DWS 3 90 New Y
82 DCA Action Nepal Gorkha Dhawa 9 Gadapani DWS 2 40 N
Planned to support from other
SN
Consortiu
m Partner
Implementing
Partner District
Name of VDC
Priority Rank
Name of DWS Ward No
Total HHs
Type of work
(New/ rehab)
Selected by DFID
WASH (Y/N)
Remarks
agencies
83 DCA Action Nepal Gorkha Dhawa 10 Simalfedi DWS 1 35 N Conflict in source
84 DCA Action Nepal Gorkha Dhawa 11 Dundure DWS 8 48 New Y
85 DCA Action Nepal Gorkha Dhawa 12
Kathegauda DWS 8 86 N
86 DCA Action Nepal Gorkha Baguwa 1
Baguwa Pumping DWS 2,9 303 Rehab Y
Only option for water supply due to source dry in near by area
87 DCA Action Nepal Gorkha Baguwa 2
Thulokhola DWS N
Covered by Baguwa Pumping
88 DCA Action Nepal Gorkha Baguwa 3
Khanchowk DWS 3 55 New Y
low access to water supply
89 DCA Action Nepal Gorkha Baguwa 4 Sikhre DWS 1 54 New Y
low access to water supply
90 DCA Action Nepal Gorkha Baguwa 5
Kasingthok DWS 9 18 New Y
low access to water suply
91 DCA Action Nepal Gorkha Baguwa 6
Samakhoriya DWS 2 38 New Y
low acess to water suply
92 DCA Action Nepal Gorkha Baguwa 7
Phahare Khangkhoriya
DWS 2 19 N
93 DCA Action Nepal Gorkha Baguwa 8
Bhanjhyang Khola DWS N
SN
Consortiu
m Partner
Implementing
Partner District
Name of VDC
Priority Rank
Name of DWS Ward No
Total HHs
Type of work
(New/ rehab)
Selected by DFID
WASH (Y/N)
Remarks
94 DCA Action Nepal Gorkha Baguwa 9
Betini Pumping DWS N
95 DCA Action Nepal Gorkha Baguwa 10
Machhapokhari DWS 6 94 N
96 CAR
E UNN Gorkha Namjung 1
1.Chautare Danda
Drinking Water Scheme 9 35 Rehab Y
97 CAR
E UNN Gorkha Namjung 2
2. Gauthale Drinking Water
Scheme 4,5 31 Rehab Y
98 CAR
E UNN Gorkha Namjung 3
3 Kanle khola Drinking Water
Scheme 5,6,7
,8 83 Rehab Y
99 CAR
E UNN Gorkha Chhoprak 1
1. Thumka Chamdanda
Bhaireni Maita gaun Drinking Water Scheme 7,8,9 32 New Y
100 CAR
E UNN Gorkha Chhoprak 2
2. Bamkhola Kharkhola and Bimire Shwara Drinking Water
Scheme 1,2 83 Rehab Y
101 CAR
E UNN Gorkha Chhoprak 3 3. Baugali
Gaun 6,7,8 70 Rehab Y
SN
Consortiu
m Partner
Implementing
Partner District
Name of VDC
Priority Rank
Name of DWS Ward No
Total HHs
Type of work
(New/ rehab)
Selected by DFID
WASH (Y/N)
Remarks
Aduwabari ChamDanda
Drinking Scheme
102 CAR
E UNN Gorkha Chhoprak 4
4. Jogidhara Sanopadheri Khawa and
CharpiKhola Drinking Water
Scheme 3,4 32 Rehab Y
103 CAR
E UNN Gorkha Chhoprak 4
4. Charpi Ballahari
Drinking Water Scheme 4 45 Rehab Y
It is the part of Jogidhara Sanopadheri Khawa and CharpiKhola Drinking Water Scheme so it is also the prioritized no 4.
104 CAR
E UNN Gorkha Chhoprak 5
5. Satrabise Maruwakuna
Drinking Water Scheme 5 62 Rehab Y
Last period of the project we coordinate local stack holder and selected it because we have some remaining budget and it covers more vulnerability
SN
Consortiu
m Partner
Implementing
Partner District
Name of VDC
Priority Rank
Name of DWS Ward No
Total HHs
Type of work
(New/ rehab)
Selected by DFID
WASH (Y/N)
Remarks
peoples, Dalit, janjati too
105 CAR
E UNN Gorkha Gankhu 1
1. Namle Khola Drinking Water
Scheme 1,2 63 Rehab Y
106 CAR
E UNN Gorkha Gankhu 2
2. Gangate Drinking Water
Scheme 5 23 New Y
107 CAR
E UNN Gorkha Gankhu 3
3. Farse Khola Drinking Water
Scheme 8 52 Rehab Y
108 CAR
E UNN Gorkha Gankhu 4
4. Nayabazaar Drinking Water
Scheme 7 61 New Y
109 CAR
E UNN Gorkha Muchchok 1
1 . ManeGaun Ramche Saune Drinking Water
Scheme 1 36 New Y
110 CAR
E UNN Gorkha Muchchok 2
2. Jalkeni Drinking Water
Scheme 6 103 New Y
111 CAR
E UNN Gorkha Muchchok 3 3. Madale
Namki 7 New N
SN
Consortiu
m Partner
Implementing
Partner District
Name of VDC
Priority Rank
Name of DWS Ward No
Total HHs
Type of work
(New/ rehab)
Selected by DFID
WASH (Y/N)
Remarks
Drinking Water Scheme
112 CAR
E UNN Gorkha Muchchok 4
4.Rainchet Padhera
Drinking Water Scheme 9 New N
113 CAR
E UNN Gorkha Kerauja 1
1. Om Jomson "A" Drinking
Water Scheme 5 New N
114 CAR
E UNN Gorkha Kerauja 2
2. Om Jomson "B" Drinking
water Scheme 5 New N
115 CAR
E UNN Gorkha Kerauja 3
3. Om Gi Drinking Water
Scheme 3 19 New Y
116 CAR
E UNN Gorkha Kerauja 4
4. Lom Tong Drinking Water
Scheme 3 New N
117 CAR
E SSICDC Gorkha Chhekamp
ar 1 Phurbe DWS 7 20 New Y
118 CAR
E SSICDC Gorkha Chhekamp
ar 2 Chhule WDS 8 28 Rehab Y
119 CAR
E SSICDC Gorkha Chhekamp
ar 3 Nile DWS 9 15 Rehab N
120 CAR
E SSICDC Gorkha Chumchet 1 Chumchet
DWS 3,4 & 5 16 Rehab N
SN
Consortiu
m Partner
Implementing
Partner District
Name of VDC
Priority Rank
Name of DWS Ward No
Total HHs
Type of work
(New/ rehab)
Selected by DFID
WASH (Y/N)
Remarks
121 CAR
E SSICDC Gorkha Chumchet 2 Khargumba
DWS 7 30 Rehab N
122 CAR
E SSICDC Gorkha Chumchet 3 Renjam DWS 7 9 Rehab N
123 CAR
E SSICDC Gorkha Sirdibas 1 Bhaluwan DWS 1 19 Rehab Y
124 CAR
E SSICDC Gorkha Sirdibas 2 Jagat Bagar
DWS 1 28 Rehab Y
125 CAR
E SSICDC Gorkha Sirdibas 3 Salleri DWS 1 23 Rehab Y
126 CAR
E SSICDC Gorkha Sirdibas 4 Philim DWS 8 25 Rehab N
127 CAR
E SSICDC Gorkha Sirdibas 5 Rangdal DWS 7,8 & 9 40 Rehab N
128 CAR
E SSICDC Gorkha Gumda 1 Chunkhola
DWS 6,7,8 & 9 294 Rehab Y
Water source depletion due to EQ in previous system
129 CAR
E SSICDC Gorkha Gumda 2 Machhakhola
DWS 5 67 New N
130 CAR
E SSICDC Gorkha Gumda 3 Kahanebesi
DWS 5 20 Rehab N
131 CAR
E SSICDC Gorkha Harmi 1 Makundada
DWS 7 31 New N
132 CAR
E SSICDC Gorkha Harmi 2 Balepani DWS 8 &
9 158 Rehab Y
SN
Consortiu
m Partner
Implementing
Partner District
Name of VDC
Priority Rank
Name of DWS Ward No
Total HHs
Type of work
(New/ rehab)
Selected by DFID
WASH (Y/N)
Remarks
133 CAR
E SSICDC Gorkha Harmi 3 Nimare DWS 5 65 Rehab N
134 CAR
E SSICDC Gorkha Harmi 4
Bhirkhet Gairechautara
DWS 6 16 Rehab Y
135 CAR
E SSICDC Gorkha Thumi 1 Kewarpani
DWS 6 24 Rehab N
136 CAR
E SSICDC Gorkha Thumi 2 Kokhetar DWS 5 38 Rehab Y
137 CAR
E SSICDC Gorkha Thumi 3 Aarkhet DWS 5 182 New Y
138 CAR
E SSICDC Gorkha Khoplang 1 Maindada
DWS 7 20 New Y
139 CAR
E SSICDC Gorkha Khoplang 2 Jogidada DWS
(Jogigufa) 3 48 Rehab Y
140 CAR
E SSICDC Gorkha Khoplang 3 Koirale DWS 6 88 Rehab N
141 CAR
E SSICDC Gorkha Khoplang 4 Jungekholsi 3 31 Rehab Y
142 CAR
E SSICDC Gorkha Khoplang 5 Sibligandada
DWS 2 &
4 73 New N
143 CAR
E SSICDC Gorkha Lapu 1 Liding DWS 1 56 Rehab Y
144 CAR
E SSICDC Gorkha Lapu 2 Hulkhola DWS 2 17 Rehab Y
145 CAR SSICDC Gorkha Lapu 3 Jhyatung Khola 1 20 New N
SN
Consortiu
m Partner
Implementing
Partner District
Name of VDC
Priority Rank
Name of DWS Ward No
Total HHs
Type of work
(New/ rehab)
Selected by DFID
WASH (Y/N)
Remarks
E DWS
146 CAR
E SSICDC Gorkha Lapu 4 Lapubesi DWS 4 New N
147 SCI CDC Nuwak
ot Chauthe 4 Rumdekhola
WSS 1 45 New N
148 SCI CDC Nuwak
ot Chauthe 1 Bhorlekhola
WSS 6 74 New Y
149 SCI CDC Nuwak
ot Chauthe 2 Baluwakhola
WSS 7 51 New Y
150 SCI CDC Nuwak
ot Chauthe 3 Patlekhola
WSS 3 40 New Y
151 SCI CDC Nuwak
ot Chauthe 6 Bachbichhe
WSS 4 76 New N
152 SCI CDC Nuwak
ot Chauthe 5 Harrabot WSS 8 45 New N
153 SCI CDC Nuwak
ot Kumari 1 Jogikobarkobo
t WSS 3 117 New Y
154 SCI CDC Nuwak
ot Kumari 5 Maimante
WSS 9 45 New N
155 SCI CDC Nuwak
ot Kumari 6 Simlabot WSS 8 49 New N
156 SCI CDC Nuwak
ot Kumari 2 Gairikhet WSS 3 20 New Y
157 SCI CDC Nuwak
ot Kumari 3 Biraute WSS 5 25 New Y
158 SCI CDC Nuwak Kumari 4 Kattike WSS 9 65 New N
SN
Consortiu
m Partner
Implementing
Partner District
Name of VDC
Priority Rank
Name of DWS Ward No
Total HHs
Type of work
(New/ rehab)
Selected by DFID
WASH (Y/N)
Remarks
ot
159 SCI CDC Nuwak
ot Duipipal 3 Timurebot
WSS 7 51 New Y
160 SCI CDC Nuwak
ot Duipipal 4 Bhanjyangbaar
WSS 3 25 New Y
161 SCI CDC Nuwak
ot Duipipal 5 Khaharekhola
WSS 9 35 New N
162 SCI CDC Nuwak
ot Duipipal 7 Tarebhir WSS 6 70 New N
163 SCI CDC Nuwak
ot Duipipal 6 Archale WSS 6 45 New N
164 SCI CDC Nuwak
ot Duipipal 2 Belini WSS 8 9 Rehab Y
165 SCI CDC Nuwak
ot Duipipal 1 Chhap WSS 8 28 Rehab Y
166 SCI CDC Nuwak
ot Gorsyang 2 Lapsikhola
WSS 2 28 Rehab Y
167 SCI CDC Nuwak
ot Gorsyang 3 Chautaredada
WSS 3 25 New Y
168 SCI CDC Nuwak
ot Gorsyang 1 Sirangkhola
WSS 7 57 Rehab Y
169 SCI CDC Nuwak
ot Gorsyang 4 Aderikhola
WSS 4 24 New Y
170 SCI CDC Nuwak
ot Gorsyang 8 Kabre WSS 2 13 New N
171 SCI CDC Nuwak Gorsyang 7 Kaleridada 4 18 New N
SN
Consortiu
m Partner
Implementing
Partner District
Name of VDC
Priority Rank
Name of DWS Ward No
Total HHs
Type of work
(New/ rehab)
Selected by DFID
WASH (Y/N)
Remarks
ot Baseri WSS
172 SCI CDC Nuwak
ot Gorsyang 11 Gangata WSS 4 15 New N
173 SCI CDC Nuwak
ot Gorsyang 10 Siran Gangata 8 10 New N
174 SCI CDC Nuwak
ot Gorsyang 9 Kalle WSS 5 15 Rehab N
175 SCI CDC Nuwak
ot Gorsyang 6 Bastitol WSS 7 10 Rehab N
176 SCI CDC Nuwak
ot Gorsyang 5 Dang WSS 6 22 Rehab Y
177 SCI CDC Nuwak
ot Dangsing 1 Kharyangkhuru
ng WSS 4 50 New Y
178 SCI CDC Nuwak
ot Dangsing 3 Chhange Khola
WSS 7 45 New Y
179 SCI CDC Nuwak
ot Dangsing 2 Thulokhet Kholsi WSS 9 49 New Y
180 SCI CDC Nuwak
ot Dangsing 4 Sisneghari Khola WSS 5 135 New Y
181 SCI CDC Nuwak
ot Dangsing 5 Bibing Khola
WSS 1 44 New Y
182 SCI CDC Nuwak
ot Dangsing 7 Karkalekhola
WSS 3 24 New N
183 SCI CDC Nuwak
ot Dangsing 8 Kharyangkhuru
ng WSS (1) 3 32 New N
184 SCI CDC Nuwak Dangsing 9 Pololung WSS 4 38 New N
SN
Consortiu
m Partner
Implementing
Partner District
Name of VDC
Priority Rank
Name of DWS Ward No
Total HHs
Type of work
(New/ rehab)
Selected by DFID
WASH (Y/N)
Remarks
ot
185 SCI CDC Nuwak
ot Dangsing 6 Tallohile WSS 6 48 New N
186 SCI CDC Nuwak
ot Taruka 2 Thatikhola
WSS 6,7,8
,9 375 Rehab N
187 SCI CDC Nuwak
ot Taruka 1 Tatopani WSS 2,3,4,5,6 299 Rehab N
188 SCI MSN Rasuwa Gatlang 1 Sanglang Gode 3,4,5
,6 258 Rehab Y
189 SCI MSN Rasuwa Gatlang 2 Syarnemba 1,2,3 74 New Y
190 SCI MSN Rasuwa Gatlang 3 Grey Gau 7,8 164 Rehab N
191 SCI MSN Rasuwa Goljung 1 Chhubar 7,9 37 New Y
192 SCI MSN Rasuwa Goljung 2 Chhumiku
3,4,5,6,8,
9 106 New Y
193 SCI MSN Rasuwa Syaphru 1 Gosaikunda 3 58 New Y
194 SCI MSN Rasuwa Syaphru 2 Thulo Syaphru 7,8 106 Rehab Y
195 SCI MSN Rasuwa Syaphru 3 Khambatar 9 26 New N
196 SCI MSN Rasuwa Syaphru 4 Sano-Thulo
Bharkhu 4,5 64 New N
197 SCI MSN Rasuwa Syaphru 5 Brabal 2 32 New N
198 SCI MSN Rasuwa Yarsa 1 Chhempidung 8 39 New Y
199 SCI MSN Rasuwa Yarsa 2 Yubra 2 63 New N
200 SCI MSN Rasuwa Yarsa 3 Ghangbor 3 52 New N
201 SCI MSN Rasuwa Yarsa 4 Puchhar tole 8 40 New N
SN
Consortiu
m Partner
Implementing
Partner District
Name of VDC
Priority Rank
Name of DWS Ward No
Total HHs
Type of work
(New/ rehab)
Selected by DFID
WASH (Y/N)
Remarks
202 SCI MSN Rasuwa Yarsa 5 Doglang 4 58 New N
203 SCI MSN Rasuwa Saramthali 1 Paarchang Farmchet 7,8 139 New Y
204 SCI MSN Rasuwa Saramthali 2 Pati Kharka 5,6 150 New N
205 SCI MSN Rasuwa Saramthali 3 Chilaune Gau 6 35 New N
206 SCI MSN Rasuwa Saramthali 4 Ghyang Tole 9 27 New N