UNDERGROUND UTILITIES & PUBLIC INFRASTRUCTURE
PUBLIC INFRASTRUCTURE UPDATE
CITY COMMISSION PRESENTATION
May 23, 2018
![Page 2: PUBLIC INFRASTRUCTURE UPDATE › fla › talgov › Board.nsf › files...Size - 64 square miles 103 square miles 60% Population - 125,000 190,000 50% Streets and Sidewalks to maintain](https://reader033.vdocuments.us/reader033/viewer/2022042410/5f279a0b811c85321f2c40c1/html5/thumbnails/2.jpg)
PUBLIC INFRASTRUCTURE UPDATE
Orange Avenue
Southwood
2-L
ane
Cap
ital
Cir
cle
SE
![Page 3: PUBLIC INFRASTRUCTURE UPDATE › fla › talgov › Board.nsf › files...Size - 64 square miles 103 square miles 60% Population - 125,000 190,000 50% Streets and Sidewalks to maintain](https://reader033.vdocuments.us/reader033/viewer/2022042410/5f279a0b811c85321f2c40c1/html5/thumbnails/3.jpg)
TIMES HAVE CHANGED…
![Page 4: PUBLIC INFRASTRUCTURE UPDATE › fla › talgov › Board.nsf › files...Size - 64 square miles 103 square miles 60% Population - 125,000 190,000 50% Streets and Sidewalks to maintain](https://reader033.vdocuments.us/reader033/viewer/2022042410/5f279a0b811c85321f2c40c1/html5/thumbnails/4.jpg)
Size - 64 square miles 103 square miles 60%
Population - 125,000 190,000 50%
Streets and Sidewalks to maintain
Demand for City Utilities and Services
1990 2018
TALLAHASSEE IS GROWING!
![Page 5: PUBLIC INFRASTRUCTURE UPDATE › fla › talgov › Board.nsf › files...Size - 64 square miles 103 square miles 60% Population - 125,000 190,000 50% Streets and Sidewalks to maintain](https://reader033.vdocuments.us/reader033/viewer/2022042410/5f279a0b811c85321f2c40c1/html5/thumbnails/5.jpg)
PUBLIC INFRASTRUCTURE – RESPONDING TO GROWTH
2016 DEPARTMENTAL REORGANIZATION
CREATED UNDERGROUND UTILITIES & PUBLIC INFRASTRUCTURE
• More efficient allocation of staff
• Better coordination between service area needs
• Major shift in approach to maintenance of STREETS AND SIDEWALKS
![Page 6: PUBLIC INFRASTRUCTURE UPDATE › fla › talgov › Board.nsf › files...Size - 64 square miles 103 square miles 60% Population - 125,000 190,000 50% Streets and Sidewalks to maintain](https://reader033.vdocuments.us/reader033/viewer/2022042410/5f279a0b811c85321f2c40c1/html5/thumbnails/6.jpg)
MAINTENANCE OF STREETS AND SIDEWALKS
Asset Management – Planning for the Future
• Successfully implemented in Underground Utilities
Approach Involves:
• Inspecting and assessing assets
• Developing efficient processes to address needs
• Seeking opportunities through innovation
• Committing adequate funding
• Planning the work / Working the plan
![Page 7: PUBLIC INFRASTRUCTURE UPDATE › fla › talgov › Board.nsf › files...Size - 64 square miles 103 square miles 60% Population - 125,000 190,000 50% Streets and Sidewalks to maintain](https://reader033.vdocuments.us/reader033/viewer/2022042410/5f279a0b811c85321f2c40c1/html5/thumbnails/7.jpg)
MAINTENANCE OF STREETS AND SIDEWALKS
Sidewalks
• Assessed network condition
• Condition issues were extensive
![Page 8: PUBLIC INFRASTRUCTURE UPDATE › fla › talgov › Board.nsf › files...Size - 64 square miles 103 square miles 60% Population - 125,000 190,000 50% Streets and Sidewalks to maintain](https://reader033.vdocuments.us/reader033/viewer/2022042410/5f279a0b811c85321f2c40c1/html5/thumbnails/8.jpg)
SIDEWALK MAINTENANCE
Over 18,000 Hazards Identified
Hazards Identified
![Page 9: PUBLIC INFRASTRUCTURE UPDATE › fla › talgov › Board.nsf › files...Size - 64 square miles 103 square miles 60% Population - 125,000 190,000 50% Streets and Sidewalks to maintain](https://reader033.vdocuments.us/reader033/viewer/2022042410/5f279a0b811c85321f2c40c1/html5/thumbnails/9.jpg)
SIDEWALK MAINTENANCE
Sidewalks
• Developed a plan
• Reallocated staff resources
• Developed efficient processes
• Opportunities through innovation
![Page 10: PUBLIC INFRASTRUCTURE UPDATE › fla › talgov › Board.nsf › files...Size - 64 square miles 103 square miles 60% Population - 125,000 190,000 50% Streets and Sidewalks to maintain](https://reader033.vdocuments.us/reader033/viewer/2022042410/5f279a0b811c85321f2c40c1/html5/thumbnails/10.jpg)
SIDEWALK MAINTENANCE
Committed Funding
FY 2015 FY 2016 FY 2017 FY 2018
1.0
$0.0 $0.0
$825,000
$1,000,000
SIDEWALK MAINTENANCE INVESTMENT
MIL
LIO
NS
OF
DO
LL
AR
S
0.5
0.25
0.75
![Page 11: PUBLIC INFRASTRUCTURE UPDATE › fla › talgov › Board.nsf › files...Size - 64 square miles 103 square miles 60% Population - 125,000 190,000 50% Streets and Sidewalks to maintain](https://reader033.vdocuments.us/reader033/viewer/2022042410/5f279a0b811c85321f2c40c1/html5/thumbnails/11.jpg)
SIDEWALK MAINTENANCE
Results
• Over 15,000 Trip Hazards
Removed to Date!
![Page 12: PUBLIC INFRASTRUCTURE UPDATE › fla › talgov › Board.nsf › files...Size - 64 square miles 103 square miles 60% Population - 125,000 190,000 50% Streets and Sidewalks to maintain](https://reader033.vdocuments.us/reader033/viewer/2022042410/5f279a0b811c85321f2c40c1/html5/thumbnails/12.jpg)
STREET MAINTENANCE
• Over 650 miles of streets
• 2017 Discussed need for Pavement Management Program
Street Condition Assessment Completed
• Streets are in relatively good shape
• Historical maintenance strategies and
funding levels were inadequate
![Page 13: PUBLIC INFRASTRUCTURE UPDATE › fla › talgov › Board.nsf › files...Size - 64 square miles 103 square miles 60% Population - 125,000 190,000 50% Streets and Sidewalks to maintain](https://reader033.vdocuments.us/reader033/viewer/2022042410/5f279a0b811c85321f2c40c1/html5/thumbnails/13.jpg)
STREET MAINTENANCE
Developed a Plan
• Data driven Master plan
• Opportunities through innovation
Pavement Preservation
![Page 14: PUBLIC INFRASTRUCTURE UPDATE › fla › talgov › Board.nsf › files...Size - 64 square miles 103 square miles 60% Population - 125,000 190,000 50% Streets and Sidewalks to maintain](https://reader033.vdocuments.us/reader033/viewer/2022042410/5f279a0b811c85321f2c40c1/html5/thumbnails/14.jpg)
STREET MAINTENANCE
Committed Funding
FY 2014 FY 2015 FY 2016 FY 2017 FY 2018
1
2
3
4
5
6
7
8
$3.3 $3.3 $3.3
$4.1
$6.5
STREET MAINTENANCE INVESTMENT
MIL
LIO
NS
OF
DO
LL
AR
S
![Page 15: PUBLIC INFRASTRUCTURE UPDATE › fla › talgov › Board.nsf › files...Size - 64 square miles 103 square miles 60% Population - 125,000 190,000 50% Streets and Sidewalks to maintain](https://reader033.vdocuments.us/reader033/viewer/2022042410/5f279a0b811c85321f2c40c1/html5/thumbnails/15.jpg)
Results
• More efficient use of funding
• Increase in lane miles treated
STREET MAINTENANCE
FY 2014 FY 2015 FY 2016 FY 2017 FY 2018
10
20
30
40
50
60
70
80
LA
NE
MIL
ES
TR
EA
TE
D
STREET MAINTENANCE PRODUCTION
* Year End Forecast
1513
39
66*
40
Will Treat 5x More Lane Miles Than FY 2015
![Page 16: PUBLIC INFRASTRUCTURE UPDATE › fla › talgov › Board.nsf › files...Size - 64 square miles 103 square miles 60% Population - 125,000 190,000 50% Streets and Sidewalks to maintain](https://reader033.vdocuments.us/reader033/viewer/2022042410/5f279a0b811c85321f2c40c1/html5/thumbnails/16.jpg)
HOLISTIC APPROACH TO IMPLEMENTING PROJECTS
• Addressing other infrastructure in advance of street paving
• Minimizes inconvenience
• Minimizes future pavement impact
North Monroe Street
![Page 17: PUBLIC INFRASTRUCTURE UPDATE › fla › talgov › Board.nsf › files...Size - 64 square miles 103 square miles 60% Population - 125,000 190,000 50% Streets and Sidewalks to maintain](https://reader033.vdocuments.us/reader033/viewer/2022042410/5f279a0b811c85321f2c40c1/html5/thumbnails/17.jpg)
OPPORTUNITIES THROUGH INNOVATION
Utility Repairs
Standard Method of Repair – Open Trench
• Expensive
• Disruptive to traffic
• Affects pavement service life
![Page 18: PUBLIC INFRASTRUCTURE UPDATE › fla › talgov › Board.nsf › files...Size - 64 square miles 103 square miles 60% Population - 125,000 190,000 50% Streets and Sidewalks to maintain](https://reader033.vdocuments.us/reader033/viewer/2022042410/5f279a0b811c85321f2c40c1/html5/thumbnails/18.jpg)
OPPORTUNITIES THROUGH INNOVATION
New Technology Eliminates Need to Cut Pavement
Cured in Place Pipe Lining (CIPP)
Benefits:
• Faster
• Minimal impact to traffic
• No impact to pavement condition
• 1/5th the cost of standard process
South Meridian Street
![Page 19: PUBLIC INFRASTRUCTURE UPDATE › fla › talgov › Board.nsf › files...Size - 64 square miles 103 square miles 60% Population - 125,000 190,000 50% Streets and Sidewalks to maintain](https://reader033.vdocuments.us/reader033/viewer/2022042410/5f279a0b811c85321f2c40c1/html5/thumbnails/19.jpg)
OPPORTUNITIES THROUGH INNOVATION
Trenchless Technology
Other Trenchless Technologies
• Quick-Lock
• Perma-Patch
Quick-Lock
Perma-Patch
Before
Before
After
After
Savings since 2013…
$10,000,000!!
![Page 20: PUBLIC INFRASTRUCTURE UPDATE › fla › talgov › Board.nsf › files...Size - 64 square miles 103 square miles 60% Population - 125,000 190,000 50% Streets and Sidewalks to maintain](https://reader033.vdocuments.us/reader033/viewer/2022042410/5f279a0b811c85321f2c40c1/html5/thumbnails/20.jpg)
INVESTMENTS IN NEW INFRASTRUCTURE
Sidewalks 2017-2019
Shamrock Street Putnam Street
6th Avenue Oakland Avenue
7th Avenue Lafayette Paseo
Mitchell Avenue Alachua Avenue
Branch Street Iamonia Street
Palmetto Drive Rankin Avenue
Glenview Drive Flipper Street
Total Construction Cost $6.3 million
State Funding Awarded $3.8 million
![Page 21: PUBLIC INFRASTRUCTURE UPDATE › fla › talgov › Board.nsf › files...Size - 64 square miles 103 square miles 60% Population - 125,000 190,000 50% Streets and Sidewalks to maintain](https://reader033.vdocuments.us/reader033/viewer/2022042410/5f279a0b811c85321f2c40c1/html5/thumbnails/21.jpg)
2018 Capital Improvements Projects
GasStreet & Sidewalk
StormwaterWater & Sewer
Project Type
Nearly 200 Active Projects
Results in Local Jobs!
![Page 22: PUBLIC INFRASTRUCTURE UPDATE › fla › talgov › Board.nsf › files...Size - 64 square miles 103 square miles 60% Population - 125,000 190,000 50% Streets and Sidewalks to maintain](https://reader033.vdocuments.us/reader033/viewer/2022042410/5f279a0b811c85321f2c40c1/html5/thumbnails/22.jpg)
ECONOMIC IMPACT OF INFRASTRUCTURE INVESTMENTS
• $82 Million Approved FY 2018 CIP
• Translates to 1,100 jobs
• Catalyst for development and additional private sector jobs
Example: Gaines Street
![Page 23: PUBLIC INFRASTRUCTURE UPDATE › fla › talgov › Board.nsf › files...Size - 64 square miles 103 square miles 60% Population - 125,000 190,000 50% Streets and Sidewalks to maintain](https://reader033.vdocuments.us/reader033/viewer/2022042410/5f279a0b811c85321f2c40c1/html5/thumbnails/23.jpg)
![Page 24: PUBLIC INFRASTRUCTURE UPDATE › fla › talgov › Board.nsf › files...Size - 64 square miles 103 square miles 60% Population - 125,000 190,000 50% Streets and Sidewalks to maintain](https://reader033.vdocuments.us/reader033/viewer/2022042410/5f279a0b811c85321f2c40c1/html5/thumbnails/24.jpg)
PUBLIC INFRASTRUCTURE INVESTMENT
IMPROVING OUR QUALITY OF LIFE
FAMU WAY
• Provides Multi-Modal
Options
• Gateway to FAMU
• Infrastructure supporting
place making
• Adding value to our
community
![Page 25: PUBLIC INFRASTRUCTURE UPDATE › fla › talgov › Board.nsf › files...Size - 64 square miles 103 square miles 60% Population - 125,000 190,000 50% Streets and Sidewalks to maintain](https://reader033.vdocuments.us/reader033/viewer/2022042410/5f279a0b811c85321f2c40c1/html5/thumbnails/25.jpg)
PUBLIC INFRASTRUCTURE INVESTMENT
IMPROVING OUR QUALITY OF LIFE
FAMU WAY
Phase 2
COMPLETED
July 2018
![Page 26: PUBLIC INFRASTRUCTURE UPDATE › fla › talgov › Board.nsf › files...Size - 64 square miles 103 square miles 60% Population - 125,000 190,000 50% Streets and Sidewalks to maintain](https://reader033.vdocuments.us/reader033/viewer/2022042410/5f279a0b811c85321f2c40c1/html5/thumbnails/26.jpg)
PUBLIC INFRASTRUCTURE INVESTMENT
IMPROVING OUR QUALITY OF LIFE
FAMU WAY
Phase 3
CONSTRUCTION
BEGINS 2019
![Page 27: PUBLIC INFRASTRUCTURE UPDATE › fla › talgov › Board.nsf › files...Size - 64 square miles 103 square miles 60% Population - 125,000 190,000 50% Streets and Sidewalks to maintain](https://reader033.vdocuments.us/reader033/viewer/2022042410/5f279a0b811c85321f2c40c1/html5/thumbnails/27.jpg)
WEEMS ROAD EXTENSION – WEEMS ROAD PASS
ELIZA RD
WEEMS RD
CA
PIT
AL
CIR
CL
E N
E
AUTOMOTIVE WAY
FA
LL
S C
HA
SE
PK
WYLAGNIAPPE WAY
EMMERSON LN
ADDISON LN
DARTMOUTH DR
BODMIN MOOR DR
BA
RN
ST
AP
LE
DR
PO
WE
LL
RD
WEEMS ROAD EXTENSION
Provides alternate route to
Congested intersection
Construction Begins:
Fall 2018
WEEMS ROAD PASS
Safety Project
Provides sidewalks and
Trails
Addresses flooding from
Weems Pond
Construction Start:
Fall, 2018
WE
EM
S R
OA
D P
AS
S
WEEMS ROAD EXTENSION
Over $10 Million
in Improvements!
![Page 28: PUBLIC INFRASTRUCTURE UPDATE › fla › talgov › Board.nsf › files...Size - 64 square miles 103 square miles 60% Population - 125,000 190,000 50% Streets and Sidewalks to maintain](https://reader033.vdocuments.us/reader033/viewer/2022042410/5f279a0b811c85321f2c40c1/html5/thumbnails/28.jpg)
Focus on Commission Priorities• Public Safety
• Infrastructure Planning
• Economic Development
• Quality of Life
Improved Processes for Street and Sidewalk Maintenance
• 15,000 Sidewalk Trip Hazards Removed
• 500% Increase in Street Maintenance Production
14 new sidewalks constructed or in design
New major infrastructure projects on the horizon
Over $10 million in savings from new technology and innovation
![Page 29: PUBLIC INFRASTRUCTURE UPDATE › fla › talgov › Board.nsf › files...Size - 64 square miles 103 square miles 60% Population - 125,000 190,000 50% Streets and Sidewalks to maintain](https://reader033.vdocuments.us/reader033/viewer/2022042410/5f279a0b811c85321f2c40c1/html5/thumbnails/29.jpg)
Why is This All So Important?
![Page 30: PUBLIC INFRASTRUCTURE UPDATE › fla › talgov › Board.nsf › files...Size - 64 square miles 103 square miles 60% Population - 125,000 190,000 50% Streets and Sidewalks to maintain](https://reader033.vdocuments.us/reader033/viewer/2022042410/5f279a0b811c85321f2c40c1/html5/thumbnails/30.jpg)
Because this next generation is counting on us!
![Page 31: PUBLIC INFRASTRUCTURE UPDATE › fla › talgov › Board.nsf › files...Size - 64 square miles 103 square miles 60% Population - 125,000 190,000 50% Streets and Sidewalks to maintain](https://reader033.vdocuments.us/reader033/viewer/2022042410/5f279a0b811c85321f2c40c1/html5/thumbnails/31.jpg)
THANK YOU