![Page 1: Projects Design and Construction Management - SAWEA 3/Dave Barrie - Design and Construction... · Projects Design and Construction Management. 1. ... OTHER ASSESSMENTS AT PRELIMINARY](https://reader031.vdocuments.us/reader031/viewer/2022011723/5aa86d2a7f8b9a8b188b8e31/html5/thumbnails/1.jpg)
December 3, 2007
ProjectsDesign and Construction
Management
![Page 2: Projects Design and Construction Management - SAWEA 3/Dave Barrie - Design and Construction... · Projects Design and Construction Management. 1. ... OTHER ASSESSMENTS AT PRELIMINARY](https://reader031.vdocuments.us/reader031/viewer/2022011723/5aa86d2a7f8b9a8b188b8e31/html5/thumbnails/2.jpg)
1. PROJECT EXECUTION PLANNING
2. PRELIMINARY ENGINEERING
3. VALUE IMPROVEMENT PRACTICES
4. OTHER ASSESSMENTS AT PRELIMINARY
ENGINEERING
5. DETAILED DESIGN
6. MATERIAL PROCUREMENT
7. CONSTRUCTION CONTRACT
8. CONSTRUCTION ACTIVITIES
9. TESTING AND START-UP
10. PROJECT COMPLETION
OUTLINE
![Page 3: Projects Design and Construction Management - SAWEA 3/Dave Barrie - Design and Construction... · Projects Design and Construction Management. 1. ... OTHER ASSESSMENTS AT PRELIMINARY](https://reader031.vdocuments.us/reader031/viewer/2022011723/5aa86d2a7f8b9a8b188b8e31/html5/thumbnails/3.jpg)
PROJECT EXECUTION PLANNING
• Contracting Strategy
• Preliminary Design / Detailed Design (Scope)
• Material Procurement
• Construction
• Integrated Project Team - Roles &
Responsibilities
![Page 4: Projects Design and Construction Management - SAWEA 3/Dave Barrie - Design and Construction... · Projects Design and Construction Management. 1. ... OTHER ASSESSMENTS AT PRELIMINARY](https://reader031.vdocuments.us/reader031/viewer/2022011723/5aa86d2a7f8b9a8b188b8e31/html5/thumbnails/4.jpg)
PROJECT EXECUTION PLANNING (cont.)
• Project Controls –
Schedule / Cost
• Quality Planning
• Safety Planning for
Plant and Construction
• Permitting
![Page 5: Projects Design and Construction Management - SAWEA 3/Dave Barrie - Design and Construction... · Projects Design and Construction Management. 1. ... OTHER ASSESSMENTS AT PRELIMINARY](https://reader031.vdocuments.us/reader031/viewer/2022011723/5aa86d2a7f8b9a8b188b8e31/html5/thumbnails/5.jpg)
PRELIMINARY ENGINEERING
• Preliminary Engineering Deliverables:
- Scope of Work
- Specifications & Data Sheets
- Preliminary Design Drawings
• Environmental Impact Assessment
• Full Project Execution Plan
- Issued for approval by 30% preliminary
engineering completion
![Page 6: Projects Design and Construction Management - SAWEA 3/Dave Barrie - Design and Construction... · Projects Design and Construction Management. 1. ... OTHER ASSESSMENTS AT PRELIMINARY](https://reader031.vdocuments.us/reader031/viewer/2022011723/5aa86d2a7f8b9a8b188b8e31/html5/thumbnails/6.jpg)
• Project Proposal Review and Approval
- Review Packages (30%, 60%, 90%)
• Proponent Reviews
• Others Department Reviews
- Facilities Planning
- Environmental Protection
- Inspection
- Loss Prevention
- Consulting Services
- Power Distribution
PRELIMINARY ENGINEERING (cont.)
![Page 7: Projects Design and Construction Management - SAWEA 3/Dave Barrie - Design and Construction... · Projects Design and Construction Management. 1. ... OTHER ASSESSMENTS AT PRELIMINARY](https://reader031.vdocuments.us/reader031/viewer/2022011723/5aa86d2a7f8b9a8b188b8e31/html5/thumbnails/7.jpg)
VALUE IMPROVEMENT PRACTICES
• Value Engineering and a group of other value
management techniques called Best Practices
• Most of the Best Practices applied by Saudi
Aramco follow processes identified in
Construction Industry Institute (CII) publications
![Page 8: Projects Design and Construction Management - SAWEA 3/Dave Barrie - Design and Construction... · Projects Design and Construction Management. 1. ... OTHER ASSESSMENTS AT PRELIMINARY](https://reader031.vdocuments.us/reader031/viewer/2022011723/5aa86d2a7f8b9a8b188b8e31/html5/thumbnails/8.jpg)
• Project Execution Planning Workshop
- an alignment practice
• Project Definition Rating Index
- a measure of scope definition completeness
• Constructability
- use of construction knowledge during planning and
design
• Schedule Optimization
- combination of schedule reduction and compression
techniques
VALUE IMPROVEMENT PRACTICES (cont.)
![Page 9: Projects Design and Construction Management - SAWEA 3/Dave Barrie - Design and Construction... · Projects Design and Construction Management. 1. ... OTHER ASSESSMENTS AT PRELIMINARY](https://reader031.vdocuments.us/reader031/viewer/2022011723/5aa86d2a7f8b9a8b188b8e31/html5/thumbnails/9.jpg)
• Scope Control plus Change Management
- a formal system for managing scope changes
• Planning for Start-up
- tools and techniques to facilitate start-up planning
• Lessons Learned
- Implementing, collecting, managing and using what
has previously been learned
VALUE IMPROVEMENT PRACTICESVALUE IMPROVEMENT PRACTICES (cont.)
![Page 10: Projects Design and Construction Management - SAWEA 3/Dave Barrie - Design and Construction... · Projects Design and Construction Management. 1. ... OTHER ASSESSMENTS AT PRELIMINARY](https://reader031.vdocuments.us/reader031/viewer/2022011723/5aa86d2a7f8b9a8b188b8e31/html5/thumbnails/10.jpg)
VALUE IMPROVEMENT PRACTICES
• Value Engineering
- a function oriented multidisciplinary team
approach
- optimize project execution
- eliminate unnecessary costs
- without sacrificing total project performance,
quality, and reliability.
VALUE IMPROVEMENT PRACTICES (cont.)
![Page 11: Projects Design and Construction Management - SAWEA 3/Dave Barrie - Design and Construction... · Projects Design and Construction Management. 1. ... OTHER ASSESSMENTS AT PRELIMINARY](https://reader031.vdocuments.us/reader031/viewer/2022011723/5aa86d2a7f8b9a8b188b8e31/html5/thumbnails/11.jpg)
![Page 12: Projects Design and Construction Management - SAWEA 3/Dave Barrie - Design and Construction... · Projects Design and Construction Management. 1. ... OTHER ASSESSMENTS AT PRELIMINARY](https://reader031.vdocuments.us/reader031/viewer/2022011723/5aa86d2a7f8b9a8b188b8e31/html5/thumbnails/12.jpg)
![Page 13: Projects Design and Construction Management - SAWEA 3/Dave Barrie - Design and Construction... · Projects Design and Construction Management. 1. ... OTHER ASSESSMENTS AT PRELIMINARY](https://reader031.vdocuments.us/reader031/viewer/2022011723/5aa86d2a7f8b9a8b188b8e31/html5/thumbnails/13.jpg)
OTHER ASSESSMENTS
• Project Quality Plan
• Preliminary Hazard Identification Plan
• Facility Communications Requirement
• Operations Training Requirements
![Page 14: Projects Design and Construction Management - SAWEA 3/Dave Barrie - Design and Construction... · Projects Design and Construction Management. 1. ... OTHER ASSESSMENTS AT PRELIMINARY](https://reader031.vdocuments.us/reader031/viewer/2022011723/5aa86d2a7f8b9a8b188b8e31/html5/thumbnails/14.jpg)
DETAILED DESIGN
• Final Project Execution Plan
• Engineering Deliverables
- Scope of Work
- Specifications
& Data Sheets
- Detailed Drawings
• Final Hazard
Identification Plan
![Page 15: Projects Design and Construction Management - SAWEA 3/Dave Barrie - Design and Construction... · Projects Design and Construction Management. 1. ... OTHER ASSESSMENTS AT PRELIMINARY](https://reader031.vdocuments.us/reader031/viewer/2022011723/5aa86d2a7f8b9a8b188b8e31/html5/thumbnails/15.jpg)
DETAILED DESIGN (cont.)
• Special Design Considerations
- Tie-Ins & Shutdowns
- Protective Coatings
- Non-Metallic Materials grating, ladders, handrail
- Metallurgy
- Instrumentation and Controls
- Access-egress & equipment handling
(housed plant vs. outdoors plant design)
![Page 16: Projects Design and Construction Management - SAWEA 3/Dave Barrie - Design and Construction... · Projects Design and Construction Management. 1. ... OTHER ASSESSMENTS AT PRELIMINARY](https://reader031.vdocuments.us/reader031/viewer/2022011723/5aa86d2a7f8b9a8b188b8e31/html5/thumbnails/16.jpg)
DETAILED DESIGN (cont.)
OUTSIDE PLANT
HOUSED PLANT
![Page 17: Projects Design and Construction Management - SAWEA 3/Dave Barrie - Design and Construction... · Projects Design and Construction Management. 1. ... OTHER ASSESSMENTS AT PRELIMINARY](https://reader031.vdocuments.us/reader031/viewer/2022011723/5aa86d2a7f8b9a8b188b8e31/html5/thumbnails/17.jpg)
• Vendor Inspection
Requirements
• Use of Recommended
Vendor Lists
• Saudi Manufacturers
• Spare Parts Data Package
MATERIAL PROCUREMENT
![Page 18: Projects Design and Construction Management - SAWEA 3/Dave Barrie - Design and Construction... · Projects Design and Construction Management. 1. ... OTHER ASSESSMENTS AT PRELIMINARY](https://reader031.vdocuments.us/reader031/viewer/2022011723/5aa86d2a7f8b9a8b188b8e31/html5/thumbnails/18.jpg)
• Bid Package
- Pro Forma Contract
- Technical Scope
- Scheduled Milestone
- QA/QC Requirements
- Safety Requirements
CONSTRUCTION CONTRACT
![Page 19: Projects Design and Construction Management - SAWEA 3/Dave Barrie - Design and Construction... · Projects Design and Construction Management. 1. ... OTHER ASSESSMENTS AT PRELIMINARY](https://reader031.vdocuments.us/reader031/viewer/2022011723/5aa86d2a7f8b9a8b188b8e31/html5/thumbnails/19.jpg)
• Bid Slate Development
• Job Explanation Meeting
• Bid Period / Questions
• Bid Review Program
- Technical Review
- Commercial Review
CONSTRUCTION CONTRACT (cont.)
![Page 20: Projects Design and Construction Management - SAWEA 3/Dave Barrie - Design and Construction... · Projects Design and Construction Management. 1. ... OTHER ASSESSMENTS AT PRELIMINARY](https://reader031.vdocuments.us/reader031/viewer/2022011723/5aa86d2a7f8b9a8b188b8e31/html5/thumbnails/20.jpg)
• Mobilization
• Construction & Procurement Schedules
• Work Permits & Safety Procedures
• Contract Administration
• Progress Monitoring
• Inspection – Construction & Procurement
• Control of Special Processes
• Coordination with Proponent
• Construction Technical Support
CONSTRUCTION ACTIVITIES
![Page 21: Projects Design and Construction Management - SAWEA 3/Dave Barrie - Design and Construction... · Projects Design and Construction Management. 1. ... OTHER ASSESSMENTS AT PRELIMINARY](https://reader031.vdocuments.us/reader031/viewer/2022011723/5aa86d2a7f8b9a8b188b8e31/html5/thumbnails/21.jpg)
• Mechanical Completion
• Pre-Commissioning
• Hydrostatic Testing
• Instrument Loop Testing
• Electrical Testing
• Final Tie-Ins & Shutdowns
• Commissioning
• Functional Testing
TESTING AND START-UP
![Page 22: Projects Design and Construction Management - SAWEA 3/Dave Barrie - Design and Construction... · Projects Design and Construction Management. 1. ... OTHER ASSESSMENTS AT PRELIMINARY](https://reader031.vdocuments.us/reader031/viewer/2022011723/5aa86d2a7f8b9a8b188b8e31/html5/thumbnails/22.jpg)
• Operator Training
• Performance Acceptance
• Project Record Books
• As-Built Drawings
• Equipment Inspection Schedules
• Project Close Out Report
• Record Retention
PROJECT COMPLETION
![Page 23: Projects Design and Construction Management - SAWEA 3/Dave Barrie - Design and Construction... · Projects Design and Construction Management. 1. ... OTHER ASSESSMENTS AT PRELIMINARY](https://reader031.vdocuments.us/reader031/viewer/2022011723/5aa86d2a7f8b9a8b188b8e31/html5/thumbnails/23.jpg)
![Page 24: Projects Design and Construction Management - SAWEA 3/Dave Barrie - Design and Construction... · Projects Design and Construction Management. 1. ... OTHER ASSESSMENTS AT PRELIMINARY](https://reader031.vdocuments.us/reader031/viewer/2022011723/5aa86d2a7f8b9a8b188b8e31/html5/thumbnails/24.jpg)
“WATER PROJECT”, 1948
![Page 25: Projects Design and Construction Management - SAWEA 3/Dave Barrie - Design and Construction... · Projects Design and Construction Management. 1. ... OTHER ASSESSMENTS AT PRELIMINARY](https://reader031.vdocuments.us/reader031/viewer/2022011723/5aa86d2a7f8b9a8b188b8e31/html5/thumbnails/25.jpg)
THANK YOU