PROJECTKaikouraroadandrailtunnels

Projectsheet-Kaikouratunnels.docx/Page1of2

Projectname: Kaikouraroadandrailtunnels

Client: NCTIR

Projectdate: 2017-2018

ProjectdescriptionThedamagecausedbythe7.8magnitudeNovember2016KaikouraearthquaketotheMainNorthLinerailway(andSH1alongtheeastcoastoftheSouthIsland)wasunprecedentedinNewZealand.Therewere60majordamagesitesalongtheMNL,includingtunnels,bridgesandembankments.Geotechhavehadtwotunnelcrewsandsupportstaffprovidingtunnelremediationservicesincluding:

• Slipanddebrisclearance• Portalrepairworks• Newportalestablishment• Improvementstotunnelentrygeometry• Ground and tunnel support through rock bolting, resin anchoring and

grouting• Rockmilling• Improvementstotunnelwidths• Applicationoffibrereinforcedshotcrete(FRS)• Repairsandreplacementofdamagedconcreteliner• Installationoftunnellighting

ResourcesappliedArangeofresourcesweremobilisedtoKaikouratosupporttheproject,including:

• Excavators• Roadtrucks• WA250wheelloader• Toro307loaderwithmancage• ErkatmillingmachinemountedonPC300• Tunnellightingandfans• Compressorsandgensets• AtlasCopcocombi-cutterCC1700• Hiabandworkplatforms• BohlerJumbodrillrig• Marinidrills• Clark1500groutpumps• Electricgroutpump• Craeliusinjectiongroutpump• AtlasCopcoUnigroutpump

PROJECTKaikouraroadandrailtunnels

Projectsheet-Kaikouratunnels.docx/Page2of2

GEOTECHGROUNDENGINEERING7370StateHighway6Charleston,BullerWestCoast,NewZealandwww.geotech.net.nz

ServicesGeotechhaveprovidedskilled,experiencedoperatorstoprovidearangeofservicesincludingexcavation,trucking/cartage,specialistunderground/tunnelworks,specialistelectricalworksandsupportlabour.Wehavetwocertifiedtunnelmanagersandarangeofspecialistunderground/tunnelequipmentthathasbeenmobilisedfortheproject.AllstaffworkinginthetunnelshavecompletedundergroundtunneltrainingtoUS7146orhigherandholdConstructSafelicences.Manystaffhaveawiderangeofundergroundandtunnelunitstandards,alongwithyearsoftunnelworksexperience.ProjectvalueInexcessof$1milliontodate(ongoingcontract)