Project Novella Nigeria
SUPPLY CHAIN PROGRESS IN NIGERIAALLANBLACKIA MEETING
FORIG – Kumasi
11th to 13th November 2008
![Page 2: Project Novella Nigeria SUPPLY CHAIN PROGRESS IN NIGERIA ALLANBLACKIA MEETING FORIG – Kumasi 11 th to 13 th November 2008](https://reader035.vdocuments.us/reader035/viewer/2022070401/56649f1f5503460f94c37609/html5/thumbnails/2.jpg)
Summary
• The AB Supply Chain
• Key features of the Supply Chain
• More on the Supply Chain
• Supply Chain Strategy
• Targets /Analysis for Achievement
• Key Challenges
• Supply Chain into the future
![Page 3: Project Novella Nigeria SUPPLY CHAIN PROGRESS IN NIGERIA ALLANBLACKIA MEETING FORIG – Kumasi 11 th to 13 th November 2008](https://reader035.vdocuments.us/reader035/viewer/2022070401/56649f1f5503460f94c37609/html5/thumbnails/3.jpg)
Structure of the AB Supply Chain
COLLECTORS
FOCAL PERSON
BUYERS/TRANSPORTERS
OIL PROCESSORS
EXPORT
BUYER OF OIL
![Page 4: Project Novella Nigeria SUPPLY CHAIN PROGRESS IN NIGERIA ALLANBLACKIA MEETING FORIG – Kumasi 11 th to 13 th November 2008](https://reader035.vdocuments.us/reader035/viewer/2022070401/56649f1f5503460f94c37609/html5/thumbnails/4.jpg)
AB Supply Chain Management
COLLECTORS
FOCAL PERSON
FIELD OFFICERS
FIELD MANAGER
PROJECT MANAGER
![Page 5: Project Novella Nigeria SUPPLY CHAIN PROGRESS IN NIGERIA ALLANBLACKIA MEETING FORIG – Kumasi 11 th to 13 th November 2008](https://reader035.vdocuments.us/reader035/viewer/2022070401/56649f1f5503460f94c37609/html5/thumbnails/5.jpg)
Supply chain• Buying activities
– Supply Chain set up in 3 States – Edo, CRS & Rivers– 46 Focal people trained in Cross River State, buying
continues in 37. 18 in Rivers and 20 in Edo States– 2 Novella field officers per State visiting communities– 25 tons achieved so far – 20 (CRS), 2.5 (Edo), 1.0 (Riv)
• Logistics– Focal people equipped with scales, needles, ropes, Banners,
Bags, etc– 1 store in Edo. 1 in Ikom, CRS, Negotiating for other stores
• Processing– Still under negotiations
• Very lean structure for supply chain team
![Page 6: Project Novella Nigeria SUPPLY CHAIN PROGRESS IN NIGERIA ALLANBLACKIA MEETING FORIG – Kumasi 11 th to 13 th November 2008](https://reader035.vdocuments.us/reader035/viewer/2022070401/56649f1f5503460f94c37609/html5/thumbnails/6.jpg)
![Page 7: Project Novella Nigeria SUPPLY CHAIN PROGRESS IN NIGERIA ALLANBLACKIA MEETING FORIG – Kumasi 11 th to 13 th November 2008](https://reader035.vdocuments.us/reader035/viewer/2022070401/56649f1f5503460f94c37609/html5/thumbnails/7.jpg)
Key features of the supply chain
• Buyer as Key driver of initial SC Development
• Cost build up monitored and adjusted to ensure equity and Fairness to Stakeholders
• SC Should be profitable to all stakeholders
• SC designed to Promote Sustainability and be Socially Responsible
![Page 8: Project Novella Nigeria SUPPLY CHAIN PROGRESS IN NIGERIA ALLANBLACKIA MEETING FORIG – Kumasi 11 th to 13 th November 2008](https://reader035.vdocuments.us/reader035/viewer/2022070401/56649f1f5503460f94c37609/html5/thumbnails/8.jpg)
SC benefit to farmers• Potential of contributing to wealth creation• Farmers organised for tapping business
opportunity• Training given on entrepreneurship and
business development• Agricultural best-practice and knowledge
transferred to farmers• Conservation and protection of indigenous
trees (AB) both on and off- farms• Biodiversity conservation conscious• diversify sources of income• focus on the poorest in the community
![Page 9: Project Novella Nigeria SUPPLY CHAIN PROGRESS IN NIGERIA ALLANBLACKIA MEETING FORIG – Kumasi 11 th to 13 th November 2008](https://reader035.vdocuments.us/reader035/viewer/2022070401/56649f1f5503460f94c37609/html5/thumbnails/9.jpg)
SC Strategy
• Training and capacity building• Communication
– Development of key messages– Radio material– Sensitisation, Public education and awareness
creation
• Extension services• Community mobilisation• Sustaining interest of stakeholders
![Page 10: Project Novella Nigeria SUPPLY CHAIN PROGRESS IN NIGERIA ALLANBLACKIA MEETING FORIG – Kumasi 11 th to 13 th November 2008](https://reader035.vdocuments.us/reader035/viewer/2022070401/56649f1f5503460f94c37609/html5/thumbnails/10.jpg)
Performance against targets
2008 2009 2010 2011 2012 2013 2014 2015 2016
20 50 70 90 100 100 2,025 5,063 9,113
25***
![Page 11: Project Novella Nigeria SUPPLY CHAIN PROGRESS IN NIGERIA ALLANBLACKIA MEETING FORIG – Kumasi 11 th to 13 th November 2008](https://reader035.vdocuments.us/reader035/viewer/2022070401/56649f1f5503460f94c37609/html5/thumbnails/11.jpg)
Key Challenges• Price (other forest products constantly compared to Allanblackia)
– Income Study Results
• Gradual buy-in of participants – Community expectations
• Motivation for FPs and collectors – low volumes
• Covering more areas – (increasing overheads, project communities)
• Difficult terrain and expansive area for wild harvesting
![Page 12: Project Novella Nigeria SUPPLY CHAIN PROGRESS IN NIGERIA ALLANBLACKIA MEETING FORIG – Kumasi 11 th to 13 th November 2008](https://reader035.vdocuments.us/reader035/viewer/2022070401/56649f1f5503460f94c37609/html5/thumbnails/12.jpg)
SC into the future
• Improve income levels for farmers/collectors/price – N40
• Improve supply base of AB seed
• Scaling up AB market chains via domestication of trees
• Expand AB operational area within the 3 states
• Train and support few interested FPs to become entrepreneurs
• Intensify project information
• Improve quality assurance and control